RU93029103A - METHOD OF SECONDARY OPENING OF PRODUCTIVE PLATE AND DEVICE FOR IMPLEMENTING IT - Google Patents

METHOD OF SECONDARY OPENING OF PRODUCTIVE PLATE AND DEVICE FOR IMPLEMENTING IT

Info

Publication number
RU93029103A
RU93029103A RU93029103/03A RU93029103A RU93029103A RU 93029103 A RU93029103 A RU 93029103A RU 93029103/03 A RU93029103/03 A RU 93029103/03A RU 93029103 A RU93029103 A RU 93029103A RU 93029103 A RU93029103 A RU 93029103A
Authority
RU
Russia
Prior art keywords
casing
opening
productive
secondary opening
reservoir
Prior art date
Application number
RU93029103/03A
Other languages
Russian (ru)
Other versions
RU2057909C1 (en
Inventor
Н.А. Петров
А.И. Есипенко
А.В. Кореняко
Ш.Х. Сагдеев
М.М. Мухаметшин
Г.А. Нуруллина
Original Assignee
Н.А. Петров
А.И. Есипенко
А.В. Кореняко
Ш.Х. Сагдеев
М.М. Мухаметшин
Г.А. Нуруллина
Filing date
Publication date
Application filed by Н.А. Петров, А.И. Есипенко, А.В. Кореняко, Ш.Х. Сагдеев, М.М. Мухаметшин, Г.А. Нуруллина filed Critical Н.А. Петров
Priority to RU93029103A priority Critical patent/RU2057909C1/en
Priority claimed from RU93029103A external-priority patent/RU2057909C1/en
Publication of RU93029103A publication Critical patent/RU93029103A/en
Application granted granted Critical
Publication of RU2057909C1 publication Critical patent/RU2057909C1/en

Links

Claims (1)

Способ относится к нефтедобывающей промышленности, в частности к технологии безперфораторного вскрытия нефтяных пластов с близким расположением водоносных горизонтов после цементирования обсадной колонной, оснащенной специальным устройством. Цель изобретения - уменьшение коррозионного разрушения обсадной колонны и цементного камня, а также повышение эффективности обработки призабойной зоны. Устройство для вторичного вскрытия продуктивного пласта состоит из фильтра в виде обсадной трубы с боковыми отверстиями. На наружной поверхности фильтровых труб закреплены плашки, выполненные в форме половины эллипса вращения, фрезерованного с боков, в радиальных отверстиях которого установлены с возможностью выдвижения заглушки, выполненные в виде стаканов с торцовыми буртиками, снабженных пружинными кольцами. Способ вторичного вскрытия продуктивного пласта осуществляют в такой последовательности. Спускают в скважину обсадную колонну с устройством напротив продуктивного пласта. Производят прямое цементирование обсадной колонны, а по окончании повышают давление в обсадной колонне и выдвигают заглушки до соприкосновения со стенками скважины с фиксацией в конечном положении. После ОЗЦ спускают НКТ, через которые в призабойную зону закачивают разбавленную водой жидкость ГКЖ-10/11/ в соотношении 1 - 2 : 1 - 2. После растворения алюминиевых заглушек часть разбавленной водой жидкости ГКЖ-10/11/ закачивают в продуктивный пласт. Способ и устройство для его осуществления позволяют повысить качество вторичного вскрытия продуктивных пластов с подошвенными водами: предупредить заколонные перетоки пластовых флюидов, а путем гидрофобизации обсадной колонны и призабойной зоны не допустить кольматации соединениями железа при вторичном вскрытии и снизить отрицательные последствия первичного вскрытия.The method relates to the oil industry, in particular to the technology of perforation-free opening of oil reservoirs with a close location of aquifers after cementing with a casing, equipped with a special device. The purpose of the invention is to reduce corrosion damage to the casing and cement stone, as well as improving the efficiency of the bottomhole treatment zone. Device for the secondary opening of the productive formation consists of a filter in the form of a casing with side holes. On the outer surface of the filter tubes are fixed plate, made in the form of a half ellipse of rotation, milled from the sides, in the radial holes of which are installed with the possibility of extending plugs, made in the form of glasses with end beads, equipped with spring rings. The method of secondary dissection of the reservoir is carried out in this sequence. Down the well casing with the device opposite the productive formation. The casing is directly cemented, and at the end, the pressure in the casing is increased and the plugs are advanced until they come into contact with the walls of the borehole with fixation in the final position. After RFQ, tubing is lowered through which GKZh-10/11 / diluted with water is pumped into the bottomhole zone in a ratio of 1 - 2: 1 - 2. After the aluminum caps dissolve, a part of the NGL-10/11 / diluted fluid is pumped into the reservoir. The method and device for its implementation can improve the quality of the secondary opening of productive layers with bottom waters: prevent backflow of reservoir fluids, and by hydrophobization of the casing and bottom-hole zone to prevent clogging with iron compounds during the secondary opening and reduce the negative consequences of the initial opening.
RU93029103A 1993-06-08 1993-06-08 Process of secondary opening of productive pool and gear for its implementation RU2057909C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU93029103A RU2057909C1 (en) 1993-06-08 1993-06-08 Process of secondary opening of productive pool and gear for its implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU93029103A RU2057909C1 (en) 1993-06-08 1993-06-08 Process of secondary opening of productive pool and gear for its implementation

Publications (2)

Publication Number Publication Date
RU93029103A true RU93029103A (en) 1996-02-10
RU2057909C1 RU2057909C1 (en) 1996-04-10

Family

ID=20142537

Family Applications (1)

Application Number Title Priority Date Filing Date
RU93029103A RU2057909C1 (en) 1993-06-08 1993-06-08 Process of secondary opening of productive pool and gear for its implementation

Country Status (1)

Country Link
RU (1) RU2057909C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2531688C1 (en) * 2013-05-13 2014-10-27 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Packer for open boreholes

Similar Documents

Publication Publication Date Title
RU93029103A (en) METHOD OF SECONDARY OPENING OF PRODUCTIVE PLATE AND DEVICE FOR IMPLEMENTING IT
RU2002130668A (en) METHOD FOR RESTORING PRODUCTIVITY AND ENTRY INTO OPERATION OF STILLING OIL AND GAS WELLS
RU2132455C1 (en) Method and pumping unit for injecting water into injection well
RU2001122000A (en) METHOD FOR DEVELOPING GAS-OIL DEPOSITS
RU2225938C1 (en) Methods for exploiting oil extracting wells
RU2001101858A (en) METHOD FOR PREPARING AND CARRYING OUT OF UNDERGROUND WELL REPAIR
RU96101730A (en) METHOD FOR THE DEVELOPMENT OF GAS DEPOSITS OF THE CONTINENTAL SHELF
RU94013696A (en) DEVICE FOR WELLING WELLS
RU2000125925A (en) METHOD FOR HYDRAULIC FRACTURING IN WELLS
CN208734569U (en) A kind of deep well water pump with Anti-bumping protection mechanism
RU2223391C2 (en) Process of protection of injection wells injected with fresh water
RU2071546C1 (en) Device for repair of productive string by cementation
CN2690583Y (en) Under balance well completion packer
RU2134773C1 (en) Method of gas recovery from water-bearing bed
RU2057909C1 (en) Process of secondary opening of productive pool and gear for its implementation
RU2211916C1 (en) Method of well operation
RU1831563C (en) Mining of oil pool
RU97103291A (en) METHOD OF OPERATING FOUNTAIN WELLS WITH USE OF GAS-LIFT EFFECT OF ASSOCIATED OIL GAS
RU2065026C1 (en) Method for producing flooded oil
RU2001135519A (en) The method of oil production using a submersible pump while cleaning the tubing string with a flying scraper and installation for its implementation
RU94022977A (en) METHOD OF DEVELOPING INHOMOGENEOUS OIL DISCHARGE
SU1687771A1 (en) Device recovery of flooded oil bed
RU17710U1 (en) DEVICE FOR DEPRESSIONAL CLEANING OF THE BOTTOM ZONE OF WELLS
SU1446272A1 (en) Method of cleaning bottom hole in well-drilling
RU1809005C (en) Gas lift