RU2817834C1 - Method of increasing oil recovery in areas of non-stationary water flooding - Google Patents

Method of increasing oil recovery in areas of non-stationary water flooding Download PDF

Info

Publication number
RU2817834C1
RU2817834C1 RU2023119937A RU2023119937A RU2817834C1 RU 2817834 C1 RU2817834 C1 RU 2817834C1 RU 2023119937 A RU2023119937 A RU 2023119937A RU 2023119937 A RU2023119937 A RU 2023119937A RU 2817834 C1 RU2817834 C1 RU 2817834C1
Authority
RU
Russia
Prior art keywords
days
injection
depression
water
water injection
Prior art date
Application number
RU2023119937A
Other languages
Russian (ru)
Inventor
Рустем Ирекович Галимов
Николай Александрович Сурков
Original Assignee
Публичное акционерное общество "Татнефть" имени В.Д. Шашина
Filing date
Publication date
Application filed by Публичное акционерное общество "Татнефть" имени В.Д. Шашина filed Critical Публичное акционерное общество "Татнефть" имени В.Д. Шашина
Application granted granted Critical
Publication of RU2817834C1 publication Critical patent/RU2817834C1/en

Links

Abstract

FIELD: oil and gas industry.
SUBSTANCE: in the method of increasing oil recovery in sections of non-stationary water flooding, sections are selected for non-stationary water flooding with an compartmentalization factor of 1.5 and more, permeability of not less than 0.001 mcm2, oil viscosity up to 300 mPa⋅with, as well as the average value of water cut for all production wells in the area of not more than 98% and exceeding the depletion index of the recoverable reserves in the area, with the section development system — intra-contour waterflooding, type of injected water — fresh, waste and mineralized water with density of up to 1.18 g/cm3, containing weighted average solid-weighted particles up to 50 mg/dm3, oil products up to 60 mg/dm3, wherein all wells of the area — injection and production — represent a single hydrodynamic system. Results of geophysical investigations are used to determine duration of decreasing injectivity of the least permeable formation by 40%. Then, duration of half-cycles of cyclic mode of water injection and shutdown of injection wells after each half-cycle for depression-repression action on formations is determined as follows: with reduction of formation injectivity by 40% for 1–5 days, performing a semi-cycle of cyclic water injection for 5 days with depression-repression effects between semi-cycles of cyclic water injection in amount of 6 pieces, with reduction of formation injectivity by 40% for 6–15 days — for 12 days with depression-repression effects between semi-cycles of cyclic water injection mode in amount of 5 pcs, with reduction of formation injectivity by 40% for 16–30 days — for 22 days with depression-repression effects between semi-cycles of cyclic water injection mode in amount of 3 pcs, at reduction of formation injectivity by 40% for 31 and more days — during 30 days with depression-repression effects between semi-cycles of cyclic mode of water injection in amount of 3 pcs. Depression-repression action on formations is carried out after a half-cycle of water injection into the well immediately after its shutdown.
EFFECT: increasing oil recovery of the developed section due to prevention of colmatation of low-permeability interlayers, maintaining the profile of injectivity and oil displacement.
1 cl, 1 tbl, 2 ex

Description

Изобретение относится к нефтегазодобывающей промышленности и может быть использовано при разработке нефтяных залежей на поздней стадии, характеризующихся неоднородными коллекторами различной природы, в частности зонально неоднородными коллекторами, коллекторами, имеющими пласты различной проницаемости как метод увеличения нефтеотдачи.The invention relates to the oil and gas industry and can be used in the development of oil deposits at a late stage, characterized by heterogeneous reservoirs of various natures, in particular zonally heterogeneous reservoirs, reservoirs having layers of different permeability as a method of increasing oil recovery.

Известен способ разработки нефтяной залежи на основе системно-адресного воздействия (патент RU №2418155, МПК Е21 В 43/16, опубл. 10.05.2011), включающий циклическое изменение режимов закачки вытесняющего агента, анализ геолого-промысловых данных по работе скважин, адресное регулирование системы разработки в выделенных зонах. Первому циклу в ряды нагнетательных скважин закачивают вытесняющий агент, а из среднего ряда добывающих скважин производят форсированный отбор с объемом на 10-15% выше объема, чем при отборе в других рядах. По результатам анализа геолого-промысловых данных из добывающих скважин, количеству, темпу и обводнению и/или газированию нефти принимают решение о переходе ко второму циклу с изменением зон разработки, перпендикулярным и аналогичным первоначальным зонам, при этом режимы закачки вытесняющего агента в нагнетательные скважины и отбор нефти из добывающих скважин выбирают аналогично первому циклу, по результатам анализа принимают решения о переходе к первому циклу, после чего циклы чередуют.There is a known method for developing an oil deposit based on system-targeted action (patent RU No. 2418155, MPK E21 B 43/16, published on May 10, 2011), including cyclic changes in the injection modes of the displacing agent, analysis of geological and field data on well operation, targeted regulation development systems in designated areas. In the first cycle, a displacing agent is pumped into the rows of injection wells, and forced selection is made from the middle row of production wells with a volume 10-15% higher than during selection in other rows. Based on the results of the analysis of geological and field data from production wells, the quantity, rate and water cut and/or gasification of oil, a decision is made to move to the second cycle with a change in development zones, perpendicular and similar to the initial zones, while the modes of injection of the displacing agent into injection wells and selection oil from production wells is selected similarly to the first cycle; based on the results of the analysis, decisions are made to move to the first cycle, after which the cycles are alternated.

Недостатком известного способа является отсутствие мероприятий по адресному изменению фильтрационных потоков и выравниванию профиля приемистости, подбору оптимальных технологий воздействия применительно к конкретным геолого-физическим условиям пласта и текущему состоянию разработки.The disadvantage of this known method is the lack of measures for targeted changes in filtration flows and leveling of the injectivity profile, selection of optimal impact technologies in relation to the specific geological and physical conditions of the formation and the current state of development.

Также известен способ системной циклической разработки нефтяной залежи на поздней стадии (патент RU №2209947, МПК Е21 В 43/16, опубл.10.08.2003), включающий закачку вытесняющего агента через одну или несколько нагнетательных скважин, извлечение нефти через одну или несколько добывающих скважин, анализ геолого-промысловых данных по работе каждой из скважин с учетом всей истории разработки данной залежи, выделение из истории разработки спонтанных - незапланированных изменений гидродинамического режима работы всех скважин и отклика залежи на эти спонтанные изменения гидродинамического режима изменениями показателей работы добывающих скважин, выделение по отклику залежи зон остаточных запасов нефти, определение величины остаточных запасов нефти по параметрам полученного отклика и адресное регулирование системы разработки в выделенных зонах отклика с учетом полученных результатов отклика. В выделенных зонах осуществляют бурение дополнительных нагнетательных и/или добывающих скважин, причем в выделенных зонах выявляют преимущественные первичные направления фильтрационных потоков вытесняющего агента в залежи, после чего фильтрационным потокам задают новые направленияThere is also a known method for systemic cyclic development of an oil deposit at a late stage (patent RU No. 2209947, IPC E21 B 43/16, publ. 08/10/2003), including injection of a displacing agent through one or more injection wells, oil extraction through one or more production wells , analysis of geological and field data on the operation of each well, taking into account the entire development history of a given deposit, identification from the development history of spontaneous - unplanned changes in the hydrodynamic operating regime of all wells and the response of the deposit to these spontaneous changes in the hydrodynamic regime by changes in the performance indicators of producing wells, identification by response deposits of zones of residual oil reserves, determination of the value of residual oil reserves based on the parameters of the received response and targeted regulation of the development system in the selected response zones, taking into account the received response results. In the selected zones, additional injection and/or production wells are drilled, and in the selected zones the preferential primary directions of the filtration flows of the displacing agent in the deposits are identified, after which the filtration flows are given new directions

Недостатками данного способа являются высокая стоимость его осуществления, обусловленная тем, что в выделенных зонах производят бурение дополнительных нагнетательных и/или добывающих скважин, низкая эффективность способа за счет сложности его осуществления, отсутствие адресного выравнивания профилей приемистости.The disadvantages of this method are the high cost of its implementation, due to the fact that additional injection and/or production wells are drilled in the selected zones, the low efficiency of the method due to the complexity of its implementation, and the lack of targeted alignment of injectivity profiles.

Также известен способ нестационарной разработки низкопроницаемых коллекторов (патент RU №2716759, МПК Е21 В 43/20, опубл. 16.03.2020), при котором осуществляют бурение горизонтальных скважин, при этом горизонтальные стволы скважин располагают со смещением по азимуту более 10 град. относительно направления максимального горизонтального напряжения в пласте. Проводят многостадийный гидравлический разрыв пласта в скважинах. Добычу осуществляют по крайней мере в двух скважинах, используют по крайней мере одну из вышеупомянутых скважин в качестве нагнетательной путем осуществления закачки рабочей жидкости. Осуществляют закачку рабочей жидкости по крайней мере в одну нагнетательную скважину с превышением давления над давлением гидравлического разрыва пласта. При прорыве жидкости из нагнетательной скважины по трещинам авто-ГРП по крайней мере в одну скважину, находящуюся в режиме добычи, осуществляют остановку добывающей скважины. Закачивают рабочую жидкость в нагнетательную скважину до обеспечения превышения объема рабочей жидкости, закаченной в нагнетательную скважину, к суммарному объему жидкости, извлеченной из добывающей скважины на предыдущих стадиях, останавливают нагнетательную скважину, осуществляют добычу. Технический результат заключается в повышении эффективности разработки низкопроницаемых коллекторов и упрощении процесса производстваThere is also a known method for the non-stationary development of low-permeability reservoirs (patent RU No. 2716759, MPK E21 B 43/20, published on March 16, 2020), in which horizontal wells are drilled, with horizontal well bores located with an azimuth offset of more than 10 degrees. relative to the direction of the maximum horizontal stress in the formation. Multi-stage hydraulic fracturing is carried out in wells. Production is carried out in at least two wells; at least one of the above-mentioned wells is used as an injection well by injecting working fluid. The working fluid is injected into at least one injection well with the pressure exceeding the hydraulic fracturing pressure. When fluid breaks through from an injection well through auto-frac fractures into at least one well that is in production mode, the production well is shut down. The working fluid is pumped into the injection well until the volume of the working fluid pumped into the injection well exceeds the total volume of liquid extracted from the production well at the previous stages, the injection well is stopped, and production is carried out. The technical result is to increase the efficiency of developing low-permeability reservoirs and simplify the production process

Недостатком данного способа является дороговизна бурения горизонтальных скважин, возможные технологические ограничения по возможности повышения давления нагнетания.The disadvantage of this method is the high cost of drilling horizontal wells and possible technological limitations on the possibility of increasing the injection pressure.

Наиболее близким является способ разработки нефтяной залежи (патент RU №2121060, МПК Е21 В 43/22, опубл. 27.10.1998), включающий закачку вытесняющего агента - воды через нагнетательные скважины, отбор нефти через добывающие скважины, определение параметров пластов продуктивного горизонта и выбор продолжительности полуциклов циклического режима закачки воды через нагнетательные скважины, в начале первого полуцикла в нагнетательные скважины в высокопроницаемые интервалы разреза продуктивного горизонта закачивают реагенты, повышающие гидродинамическое сопротивление пластов и сохраняющие эти свойства в течение времени первого полуцикла, а затем закачивают воду в течение всего первого полуцикла, в течение второго полуцикла закачивают воду в нагнетательные скважины через весь интервал разреза продуктивного горизонта.The closest is the method of developing an oil deposit (patent RU No. 2121060, MPK E21 V 43/22, published on October 27, 1998), including injection of a displacing agent - water through injection wells, oil extraction through production wells, determination of the parameters of the productive horizon layers and selection the duration of half-cycles of the cyclic mode of water injection through injection wells, at the beginning of the first half-cycle, reagents are pumped into the injection wells into highly permeable intervals of the productive horizon section, increasing the hydrodynamic resistance of the formations and maintaining these properties during the first half-cycle, and then water is pumped throughout the entire first half-cycle, During the second half-cycle, water is pumped into injection wells through the entire interval of the productive horizon section.

Недостатками являются высокая стоимость проведения закачки реагентов при циклировании большого количества скважин, что на последней стадии разработки может не окупить полученным эффектом, существующий риск несоответствия характеристик пластов для проведения закачки реагента, что также сокращает область применения предлагаемого способа, а также недостаточная вовлеченность ранее не охваченных разработкой зон.The disadvantages are the high cost of reagent injection when cycling a large number of wells, which at the last stage of development may not be repaid by the resulting effect, the existing risk of inconsistency of formation characteristics for reagent injection, which also reduces the scope of application of the proposed method, as well as insufficient involvement of those not previously covered by development zones

Техническими задачами являются увеличение нефтизвлечения разрабатываемого участка за счет предотвращения кольматации низкопроницаемых пропластков после проведения очистки призабойной зоны пласта между циклами закачки, сохранение профиля приемистости и вытеснения нефти.The technical objectives are to increase the oil recovery of the developed area by preventing clogging of low-permeability interlayers after cleaning the bottomhole formation zone between injection cycles, maintaining the injectivity profile and oil displacement.

Технические задачи решаются способом увеличения нефтеизвлечения на участках нестационарного заводнения, включающим определение параметров пластов продуктивного горизонта и продолжительности полуциклов циклического режима закачки воды и остановки нагнетательных скважин, последующую циклическую закачку воды и остановку нагнетательных скважин, отбор нефти через добывающие скважины.Technical problems are solved by a method of increasing oil recovery in non-stationary flooding areas, including determining the parameters of the reservoirs of the productive horizon and the duration of half-cycles of the cyclic mode of water injection and shutdown of injection wells, subsequent cyclic injection of water and shutdown of injection wells, and oil extraction through production wells.

Новым является то, что определяют следующие параметры пластов продуктивного горизонта: коэффициент расчлененности, проницаемость, вязкость нефти, среднее значение обводненности по всем добывающим скважинам на участке и выработанность извлекаемых запасов по участку, выбирают участки для нестационарного заводнения с коэффициентом расчлененности от 1,5 и выше, проницаемостью не менее 0,001 мкм², вязкостью нефти до 300 мПа*с, а также средним значением обводненности по всем добывающим скважинам на участке не более 98% и превышающим показатель выработанности извлекаемых запасов по участку, с системой разработки участка - внутриконтурным заводнением, типом закачиваемой воды - пресная, сточная и минерализованная вода плотностью до 1,18 г/см³, содержащая средневзвешенные твердо-взвешенные частицы до 50 мг/дм3, нефтепродукты до 60 мг/дм3, все скважины участка - нагнетательные и добывающие - представляют единую гидродинамическую систему, по результатам геофизических исследований определяют продолжительность уменьшения приемистости наименее проницаемого пласта на 40%, затем определяют продолжительность полуциклов циклического режима закачки воды и остановки нагнетательных скважин после каждого полуцикла для депрессионно-репрессионного воздействия на пласты следующим образом: при уменьшении приемистости пласта на 40% за 1-5 сут.осуществляют полуцикл циклического режима закачки воды в течение 5 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 6 шт., при уменьшении приемистости пласта на 40% за 6-15 сут.- в течение 12 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 5 шт., при уменьшении приемистости пласта на 40% за 16-30 сут.- в течение 22 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 3 шт., при уменьшении приемистости пласта на 40% за 31 и более сут.- в течение 30 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 3 шт., депрессионно-репрессионное воздействие на пласты производят после проведения полуцикла закачки воды в скважину, сразу после еq остановки, следующим образом: насосный цементировочный агрегат с диаметром поршней не менее 125 мм подключают к скважине, производят репрессионное воздействие - закачку воды с ростом устьевого давления, не превышающего максимально допустимое давление на пласты, на максимальной производительности цементировочного агрегата с контролем устьевого давления, далее производят сброс давления в скважины до начального устьевого давления остановленной скважины, при этом время изменения давления между максимальным значением до начального устьевого не должно превышать 10 с.What is new is that the following parameters of the reservoirs of the productive horizon are determined: the coefficient of compartmentalization, permeability, oil viscosity, the average value of water cut for all production wells in the area and the depletion of recoverable reserves in the area; areas are selected for non-stationary flooding with a compartmentation coefficient of 1.5 and above , permeability of at least 0.001 µm², oil viscosity up to 300 mPa*s, as well as the average water cut for all production wells on the site is no more than 98% and exceeds the depletion rate of recoverable reserves for the site, with the site development system - intra-circuit flooding, type of injected water - fresh, waste and mineralized water with a density of up to 1.18 g/cm³, containing average suspended solids up to 50 mg/dm 3 , oil products up to 60 mg/dm 3 , all wells of the site - injection and production - represent a single hydrodynamic system, Based on the results of geophysical studies, the duration of the reduction in the injectivity of the least permeable formation is determined by 40%, then the duration of half-cycles of the cyclic mode of water injection and shutdown of injection wells after each half-cycle is determined for the depression-repression effect on the formations as follows: when the injectivity of the formation is reduced by 40% in 1- 5 days carry out a half-cycle of the cyclic mode of water injection for 5 days with depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 6 pcs., with a decrease in reservoir injectivity by 40% for 6-15 days - for 12 days. depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 5 pcs., with a decrease in reservoir injectivity by 40% in 16-30 days - for 22 days with depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 3 pcs., when the reservoir injectivity decreases by 40% for 31 or more days - for 30 days with depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 3 pcs., depression-repression effects on the formations are carried out after a half-cycle of water injection into the well, immediately after eq stop, as follows: a pumping cementing unit with a piston diameter of at least 125 mm is connected to the well, a repressive effect is performed - water is pumped with an increase in wellhead pressure, not exceeding the maximum permissible pressure on the formations, at the maximum productivity of the cementing unit with wellhead pressure control , then the pressure in the wells is released to the initial wellhead pressure of the shut-in well, while the time of pressure change between the maximum value and the initial wellhead value should not exceed 10 s.

Способ увеличения нефтеизвлечения на участках нестационарного заводнения осуществляют следующим образом.A method for increasing oil recovery in non-stationary flooding areas is carried out as follows.

На поздней стадии разработки большую роль играет эффективное заводнение с целью вытеснения остаточных запасов нефти. В результате прокачки большого объема воды образуются промытые зоны в более проницаемых пропластках, менее проницаемые зоны, которые содержат больший объем нефти остаются не охвачены. При разработке послойно-неоднородных по проницаемости пластов широкое применение нашла технология нестационарного заводнения пластов, эффект от которой выражается в перераспределении пластового давления между пропластками и увеличенной выработке нефтяных запасов из низкопроницаемых слоев. Более того, чем сильнее выражена неоднородность пласта, тем значительнее эффект от технологии нестационарного заводнения. В связи с тем, что подготавливаемая для закачки вода все же имеет какое-то количество твердо-взвешенных частиц, менее проницаемые коллектора кольматируются и перестают принимать закачиваемую воду. Это приводит к уменьшению охвата вытеснения нефти и снижения эффективности нестационарного заводнения.At the late stage of development, effective waterflooding plays an important role in order to displace residual oil reserves. As a result of pumping a large volume of water, flushed zones are formed in more permeable layers, while less permeable zones that contain a larger volume of oil remain uncovered. When developing layer-by-layer formations with heterogeneous permeability, the technology of non-stationary reservoir flooding has found widespread use, the effect of which is expressed in the redistribution of reservoir pressure between layers and increased production of oil reserves from low-permeability layers. Moreover, the more pronounced the heterogeneity of the formation, the greater the effect of the non-stationary waterflooding technology. Due to the fact that the water prepared for injection still has a certain amount of solid suspended particles, less permeable reservoirs become clogged and stop accepting injected water. This leads to a decrease in oil displacement coverage and a decrease in the efficiency of non-stationary waterflooding.

Сущность предлагаемого способа заключается в подборе участка нестационарного заводнения для циклической закачки и остановки закачки в нагнетательные скважины с наличием перфорированных пластов с различными коллекторскими свойствами и проведением после каждого полуцикла закачки, сразу после закрытия нагнетательной скважины, депрессионно-репрессионного воздействия на призабойную зону пласта. Объектом разработки являются обводненные терригенные и карбонатные коллектора порового или трещиновато-порового типа, имеющие проницаемостную неоднородность в разрезе продуктивного горизонта.The essence of the proposed method is to select a non-stationary flooding site for cyclic injection and stop injection into injection wells with the presence of perforated formations with different reservoir properties and to carry out a depression-repression effect on the bottom-hole zone of the formation after each half-cycle of injection, immediately after closing the injection well. The development object is watered terrigenous and carbonate reservoirs of the pore or fractured-pore type, which have permeability heterogeneity in the section of the productive horizon.

Определяют следующие параметры пластов продуктивного горизонта: коэффициент расчлененности, проницаемость, вязкость нефти, среднее значение обводненности по всем добывающим скважинам на участке и выработанность извлекаемых запасов по участку. Выбирают участки для нестационарного заводнения с коэффициентом расчлененности от 1,5 и выше, проницаемостью не менее 0,001 мкм², вязкостью нефти до 300 мПа*с, а также средним значением обводненности по всем добывающим скважинам, превышающим показатель выработанности извлекаемых запасов по участку, но не более 98% (т.е. среднее значение обводненности должно превышать выработанность извлекаемых запасов по участку). Выделяют наименее проницаемый пласт. При среднем значении обводненности 98% и более развивается опережающее обводнение, проведение нестационарного заводнения при таких условиях нецелесообразно. При выборе участков для нестационарного заводнения также учитываются следующие показатели:The following parameters of the reservoirs of the productive horizon are determined: coefficient of compartmentalization, permeability, oil viscosity, average water cut for all production wells in the area and depletion of recoverable reserves in the area. Select areas for non-stationary flooding with a compartmentalization coefficient of 1.5 and higher, a permeability of at least 0.001 µm², an oil viscosity of up to 300 mPa*s, as well as an average water cut for all production wells that exceeds the depletion rate of recoverable reserves for the area, but not more 98% (i.e. the average water cut must exceed the depletion of recoverable reserves in the area). The least permeable layer is identified. With an average water cut of 98% or more, advanced water flooding develops; non-stationary waterflooding under such conditions is impractical. When selecting areas for non-stationary flooding, the following indicators are also taken into account:

- система разработки - внутриконтурное заводнение;- development system - in-circuit flooding;

- тип закачиваемой воды - пресная, сточная и минерализованная вода плотностью до 1,18 г/см³;- type of injected water - fresh, waste and mineralized water with a density of up to 1.18 g/cm³;

- приемистость нагнетательных скважин - без ограничений;- injectivity of injection wells - without restrictions;

- все скважины участка (нагнетательные и реагирующие добывающие) должны представлять собой единую гидродинамическую систему;- all wells of the site (injection and reactive production) must represent a single hydrodynamic system;

- соотношение нагнетательных и добывающих скважин на участке воздействия - без ограничений;- the ratio of injection and production wells in the impact area - without restrictions;

- обеспечение качества подготавливаемой воды - средневзвешенные твердо-взвешенные частицы - до 50 мг/дм3, нефтепродукты - до 60 мг/дм3.- ensuring the quality of treated water - weighted average solid suspended particles - up to 50 mg/dm 3 , oil products - up to 60 mg/dm 3 .

По результатам геофизических исследований определяют продолжительностьBased on the results of geophysical research, the duration is determined

уменьшения приемистости наименее проницаемого пласта на 40%, затем определяют продолжительность (выражаемую в количестве сут.) полуциклов циклического режима закачки воды и остановки нагнетательных скважин после каждого полуцикла для депрессионно-репрессионного воздействия на пласты.reducing the injectivity of the least permeable formation by 40%, then determine the duration (expressed in the number of days) of half-cycles of the cyclic mode of water injection and stopping injection wells after each half-cycle for depression-repression effects on the formations.

Выбор данного граничного значения обусловлен значительным снижением фронта вытеснения по целевому пласту при достижении вышеуказанного показателя уменьшения приемистости. При этом после каждого полуцикла закачки воды сразу после остановки скважины осуществляют депрессионно-репрессионное воздействие на пласты.The choice of this limit value is due to a significant reduction in the displacement front in the target formation when the above indicator of injectivity reduction is achieved. In this case, after each half-cycle of water injection, immediately after stopping the well, a depression-repression effect is carried out on the formations.

При уменьшении приемистости пласта на 40% за 1-5 сут.осуществляют полуцикл циклического режима закачки воды в течение 5 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 6 шт., при уменьшении приемистости пласта на 40% за 6-15 сут.осуществляют полуцикл циклического режима закачки воды в течение 12 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 5 шт., при уменьшении приемистости пласта на 40% за 16-30 сут.осуществляют полуцикл циклического режима закачки воды в течение 22 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 3 шт., при уменьшении приемистости пласта на 40% за 31 и более сут.осуществляют полуцикл циклического режима закачки воды в течение 30 сут.с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 3 шт. (см. таблицу).When the reservoir injectivity decreases by 40% in 1-5 days, a half-cycle of the cyclic mode of water injection is carried out for 5 days with depression-repression effects between the half-cycles of the cyclic mode of water injection in the amount of 6 pcs., with a decrease in the reservoir injectivity by 40% in 6- 15 days carry out a half-cycle of the cyclic mode of water injection for 12 days with depression-repression effects between the half-cycles of the cyclic mode of water injection in the amount of 5 pcs., with a decrease in reservoir injectivity by 40% for 16-30 days, carry out a half-cycle of the cyclic mode of water injection in for 22 days with depression-repression effects between half-cycles of the cyclic mode of water injection in an amount of 3 pcs., with a decrease in reservoir injectivity by 40% for 31 or more days, a half-cycle of the cyclic mode of water injection is carried out for 30 days with depression-repression influences between half-cycles of cyclic water injection in an amount of 3 pcs. (see table).

Таблица. Продолжительность периода полуцикла закачки и остановки, количества депрессионно-репрессионных воздействийTable. Duration of the half-cycle of injection and shutdown, the number of depression-repressive effects

Продолжительность времени (сут), за которое происходит уменьшение приемистости пласта на 40%Duration of time (days) during which the reservoir injectivity decreases by 40% Период полуцикла закачки и остановки, сутHalf-cycle period of injection and shutdown, days Количество депрессионно-репрессионных воздействий между полуциклами закачки, штNumber of depression-repression effects between half-cycles of injection, pcs. 1-51-5 55 66 6 -156 -15 1212 55 16-3016-30 2222 33 от 31 и болееfrom 31 or more 30thirty 33

Таким образом период полуцикла циклического режима закачки воды (непрерывного периода работы нагнетательной скважины) и остановки нагнетательной скважины может варьироваться от 5 до 30 сут и выбирается в зависимости от продолжительности (в сут) уменьшения приемистости наименее проницаемого пласта на 40%.Thus, the period of the half-cycle of the cyclic mode of water injection (the continuous period of operation of the injection well) and the shutdown of the injection well can vary from 5 to 30 days and is selected depending on the duration (in days) of reducing the injectivity of the least permeable formation by 40%.

После проведения полуцикла закачки воды в скважину, сразу после ее остановки, производят депрессионно-репрессионное воздействие, за счет которого будет производиться вынос кольматанта с призабойной зоны пласта и его извлечение в автоцистерну или осаждение в зумпф. Для этого используют насосный цементировочный агрегат (ЦА) с диаметром поршней не менее 125 мм, который подключают к скважине. Производят закачку воды (репрессионное воздействие) с ростом устьевого давления, не превышающего максимально допустимое давление на пласты. При этом репрессионное воздействие производят на максимальной производительности ЦА с контролем устьевого давления. Устьевое давление для девонских объектов может достигать 21,0 МПа, для нижнего и среднего карбона - 14,0 МПа.After a half-cycle of pumping water into the well, immediately after stopping it, a depression-repression effect is performed, due to which the bridging agent will be removed from the bottom-hole zone of the formation and its extraction into a tanker or sedimentation into a sump. To do this, use a pump cementing unit (CA) with a piston diameter of at least 125 mm, which is connected to the well. Water is injected (repressive action) with an increase in wellhead pressure that does not exceed the maximum permissible pressure on the formations. In this case, the repressive effect is carried out at the maximum productivity of the central pump with control of wellhead pressure. The wellhead pressure for Devonian objects can reach 21.0 MPa, for the Lower and Middle Carboniferous - 14.0 MPa.

Далее производят сброс давления в скважины до устьевого давления остановленной скважины, при этом время изменения давления между максимальным значением до начального устьевого не должно превышать 10 сек, таким образом происходит импульсное воздействие на пласты. За счет депрессионно-репрессионного воздействия происходит «встряхивание» пласта (вынос кольматанта) из призабойной зоны пласта. Это позволяет сохранить приемистость скважины, где менее проницаемые участки продолжают участвовать в разработке, повышается коэффициент извлечения нефти с участка. Применение данного способа также позволяет увеличить межремонтный период в 1,5 раза.Next, the pressure in the wells is released to the wellhead pressure of the shut-in well, while the time of pressure change between the maximum value and the initial wellhead value should not exceed 10 seconds, thus a pulse effect on the formations occurs. Due to the depression-repression effect, the formation is “shaken” (removal of the bridging agent) from the bottomhole zone of the formation. This allows you to maintain the injectivity of the well, where less permeable areas continue to participate in development, and the oil recovery factor from the area increases. The use of this method also allows you to increase the overhaul period by 1.5 times.

Данное депрессионно-репрессионного воздействие предлагается повторять в зависимости от продолжительности снижения приемистости наименее проницаемого пласта согласно табл.This depression-repression effect is proposed to be repeated depending on the duration of the reduction in the injectivity of the least permeable formation according to Table.

Примеры практического применения.Examples of practical application.

Пример 1Example 1

Участок нагнетательной скважины №666 (приемистость 150 м3/сут при давлении 120 атм) имеет выработанность извлекаемых запасов 86% при средней обводненности реагирующих добывающих скважин 92%, коэффициент расчлененности - 1,5, проницаемость - 0,02 мкм², вязкость нефти до 300 мПа*с.При этом на нагнетательной скважине согласно профилю приемистости после освоения под закачку вода распределялась следующим образом: пласт "а" (песчаник)-80%, пласт 6 (алевролит) - 20%. Опытным путем определено, что уменьшение приемистости наименее проницаемого пласта «б» на 40% составляло 35 сут.The section of injection well No. 666 (injectivity 150 m 3 /day at a pressure of 120 atm) has a depletion of recoverable reserves of 86% with an average water cut of reacting production wells of 92%, a compartmentation coefficient of 1.5, permeability of 0.02 µm², oil viscosity of up to 300 mPa*s. At the same time, at the injection well, according to the injectivity profile, after development for injection, water was distributed as follows: formation “a” (sandstone) - 80%, formation 6 (siltstone) - 20%. It was experimentally determined that the reduction in injectivity of the least permeable formation “b” by 40% was 35 days.

После первого полуцикла работы произвели нагнетание давления с помощью ЦА до 160 атм (максимально допустимое на пласты) и затем открытие задвижки и стравливание избыточного давления из скважины в приемную емкость (депрессионно-репрессионное воздействие). При этом объем стравливания составил 4,7 м³. Повторили процесс создания импульса еще два раза. Суммарный объем стравливания воды составил 12,4 м³. Далее скважина была оставлена на период остановки 30 сут.После запуска скважины в работу повторно провели исследование профиля приемистости, в результате которого уход жидкости в пласт "а" составил 80%, в пласт "б"- 20%. В результате предлагаемого способа удалось вернуть первоначальный профиль приемистости, обеспечить нефтеизвлечение из менее проницаемого пласта "б" и получить дополнительную добычу по участку 1,3 т/сут.After the first half-cycle of work, pressure was pumped using a central pressure pump up to 160 atm (the maximum permissible for the formations) and then the valve was opened and excess pressure was released from the well into the receiving tank (depression-repression effect). In this case, the volume of bleed was 4.7 m³. We repeated the process of creating an impulse two more times. The total volume of water released was 12.4 m³. Then the well was left for a shutdown period of 30 days. After putting the well into production, the injectivity profile was re-tested, as a result of which the fluid loss into formation “a” was 80%, into formation “b” - 20%. As a result of the proposed method, it was possible to return the original injectivity profile, ensure oil recovery from the less permeable formation "b" and obtain additional production in the area of 1.3 tons/day.

Пример 2Example 2

Участок нагнетательной скважины №777 (приемистость 100 м3/сут при давлении 130 атм) имеет выработанность извлекаемых запасов 85% при средней обводненности реагирующих добывающих скважин 90%, коэффициент расчлененности - 2,1, проницаемость - 0,015 мкм², вязкость нефти до 300 мПа*с.При этом на нагнетательной скважине согласно профилю приемистости, после освоения под закачку вода распределялась следующим образом: пласт «а» (песчаник) - 40%, пласт «б» (алевролит) - 20%, пласт «в» (песчаник) - 45%. Опытным путем определено, что уменьшение приемистости наименее проницаемого пласта «б» на 40% составляло 5 сут.The section of injection well No. 777 (injectivity 100 m 3 /day at a pressure of 130 atm) has a depletion of recoverable reserves of 85% with an average water cut of reacting production wells of 90%, a compartmentation coefficient of 2.1, permeability of 0.015 µm², oil viscosity of up to 300 mPa* c. At the same time, at the injection well, according to the injectivity profile, after development for injection, water was distributed as follows: formation “a” (sandstone) - 40%, formation “b” (siltstone) - 20%, formation “c” (sandstone) - 45%. It was experimentally determined that the reduction in injectivity of the least permeable formation “b” by 40% was 5 days.

После первого полуцикла работы произвели остановку скважины и нагнетание давления с помощью ЦА до 175 атм (максимально допустимое на пласты) и затем открытие задвижки и стравливание избыточного давления из скважины в приемную емкость (депрессионно-репрессионное воздействие). При этом объем стравливания составил 5,1 м³. Повторили процесс создания импульса 5 раз. Суммарный объем стравливания воды составил 29,1 м³. Далее скважина была оставлена на период остановки 5 сут.After the first half-cycle of work, the well was shut down and pressure was pumped up with the help of a central pressure pump to 175 atm (the maximum permissible for the formations) and then the valve was opened and excess pressure was released from the well into the receiving tank (depression-repression effect). In this case, the volume of bleed was 5.1 m³. We repeated the process of creating an impulse 5 times. The total volume of water released was 29.1 m³. Then the well was left for a shutdown period of 5 days.

После запуска скважины в работу повторно провели исследование профиля приемистости, в результате которого уход жидкости в пласт пласт «а» (песчаник) - 40%, пласт «б» (алевролит) - 20%, пласт «в» (песчаник) - 45%. В результате предлагаемого способа удалось сохранить первоначальный профиль приемистости, обеспечить нефтеизвлечение из менее проницаемого пласта "б" и получить дополнительную добычу 1,9 т/сут.After the well was put into operation, the injectivity profile was re-investigated, as a result of which the fluid loss into the formation, formation “a” (sandstone) - 40%, formation “b” (siltstone) - 20%, formation “c” (sandstone) - 45% . As a result of the proposed method, it was possible to maintain the original injectivity profile, ensure oil recovery from the less permeable formation “b” and obtain additional production of 1.9 tons/day.

Предлагаемый способ позволяет сохранить фронт вытеснения, повысить эффективность нестационарного заводнения и увеличить межремонтный период скважин в 1,5 раза (проведение ремонта на восстановление приемистости).The proposed method allows you to maintain the displacement front, increase the efficiency of non-stationary waterflooding and increase the overhaul period of wells by 1.5 times (carrying out repairs to restore injectivity).

Claims (1)

Способ увеличения нефтеизвлечения на участках нестационарного заводнения, включающий определение параметров пластов продуктивного горизонта и продолжительности полуциклов циклического режима закачки воды и остановки нагнетательных скважин, последующую циклическую закачку воды и остановку нагнетательных скважин, отбор нефти через добывающие скважины, отличающийся тем, что определяют следующие параметры пластов продуктивного горизонта: коэффициент расчлененности, проницаемость, вязкость нефти, среднее значение обводненности по всем добывающим скважинам на участке и выработанность извлекаемых запасов по участку, выбирают участки для нестационарного заводнения с коэффициентом расчлененности от 1,5 и выше, проницаемостью не менее 0,001 мкм2, вязкостью нефти до 300 мПа⋅с, а также средним значением обводненности по всем добывающим скважинам на участке не более 98% и превышающим показатель выработанности извлекаемых запасов по участку, с системой разработки участка - внутриконтурным заводнением, типом закачиваемой воды - пресная, сточная и минерализованная вода плотностью до 1,18 г/см3, содержащая средневзвешенные твердовзвешенные частицы до 50 мг/дм3, нефтепродукты до 60 мг/дм3, все скважины участка - нагнетательные и добывающие - представляют единую гидродинамическую систему, по результатам геофизических исследований определяют продолжительность уменьшения приемистости наименее проницаемого пласта на 40%, затем определяют продолжительность полуциклов циклического режима закачки воды и остановки нагнетательных скважин после каждого полуцикла для депрессионно-репрессионного воздействия на пласты следующим образом: при уменьшении приемистости пласта на 40% за 1-5 сут осуществляют полуцикл циклического режима закачки воды в течение 5 сут с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 6 шт., при уменьшении приемистости пласта на 40% за 6-15 сут - в течение 12 сут с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 5 шт., при уменьшении приемистости пласта на 40% за 16-30 сут - в течение 22 сут с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 3 шт., при уменьшении приемистости пласта на 40% за 31 и более сут - в течение 30 сут с депрессионно-репрессионными воздействиями между полуциклами циклического режима закачки воды количеством 3 шт., депрессионно-репрессионное воздействие на пласты производят после проведения полуцикла закачки воды в скважину сразу после еe остановки следующим образом: насосный цементировочный агрегат с диаметром поршней не менее 125 мм подключают к скважине, производят репрессионное воздействие - закачку воды с ростом устьевого давления, не превышающего максимально допустимое давление на пласты, на максимальной производительности цементировочного агрегата с контролем устьевого давления, далее производят сброс давления в скважины до начального устьевого давления остановленной скважины, при этом время изменения давления между максимальным значением до начального устьевого не должно превышать 10 с.A method for increasing oil recovery in areas of non-stationary flooding, including determining the parameters of the reservoirs of the productive horizon and the duration of half-cycles of the cyclic mode of water injection and shutdown of injection wells, subsequent cyclic injection of water and shutdown of injection wells, oil extraction through production wells, characterized in that the following parameters of productive reservoirs are determined horizon: compartmentation coefficient, permeability, oil viscosity, average water cut for all production wells in the area and depletion of recoverable reserves in the area, select areas for non-stationary flooding with a compartmentation coefficient of 1.5 and higher, permeability of at least 0.001 µm 2 , oil viscosity up to 300 mPa⋅s, as well as the average water cut for all production wells on the site is no more than 98% and exceeds the depletion rate of recoverable reserves on the site, with the site development system - intra-circuit flooding, type of injected water - fresh, waste and mineralized water with a density of up to 1.18 g/cm 3 , containing average suspended solid particles up to 50 mg/dm 3 , petroleum products up to 60 mg/dm 3 , all wells of the site - injection and production - represent a single hydrodynamic system; based on the results of geophysical studies, the duration of the reduction in injectivity of the least permeable reservoir by 40%, then determine the duration of half-cycles of the cyclic mode of water injection and stopping injection wells after each half-cycle for depression-repression effects on the formations as follows: when the reservoir injectivity decreases by 40% in 1-5 days, a half-cycle of the cyclic mode of water injection is carried out for 5 days with depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 6 pcs., with a decrease in reservoir injectivity by 40% in 6-15 days - for 12 days with depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 5 pcs. , when the reservoir injectivity decreases by 40% in 16-30 days - for 22 days with depression-repression effects between half-cycles of the cyclic mode of water injection in the amount of 3 pcs., when the reservoir injectivity decreases by 40% in 31 or more days - for 30 days with depression-repression effects between half-cycles of the cyclic mode of water injection in an amount of 3 pcs., depression-repression effects on the formations are carried out after a half-cycle of water injection into the well immediately after it is stopped as follows: a pump cementing unit with a piston diameter of at least 125 mm is connected to well, perform a repressive effect - water injection with an increase in wellhead pressure, not exceeding the maximum permissible pressure on the formations, at the maximum productivity of the cementing unit with control of the wellhead pressure, then the pressure is released into the wells to the initial wellhead pressure of the shut-in well, while the time of pressure change between the maximum value to the initial wellhead should not exceed 10 s.
RU2023119937A 2023-07-28 Method of increasing oil recovery in areas of non-stationary water flooding RU2817834C1 (en)

Publications (1)

Publication Number Publication Date
RU2817834C1 true RU2817834C1 (en) 2024-04-22

Family

ID=

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2121060C1 (en) * 1996-04-08 1998-10-27 Поддубный Юрий Анатольевич Method for development of oil pool
RU2170341C1 (en) * 2000-12-07 2001-07-10 Боксерман Аркадий Анатольевич Process of exploitation of multipool oil deposit
RU2191890C1 (en) * 2002-03-05 2002-10-27 Павлов Михаил Викторович Method of hydrocarbon pool development
RU2471971C1 (en) * 2011-09-01 2013-01-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of non-homogeneous oil deposit
RU2513787C1 (en) * 2012-10-17 2014-04-20 Открытое акционерное общество "Всероссийский нефтегазовый научно-исследовательский институт имени академика А.П. Крылова" (ОАО "ВНИИнефть") Method for oil deposit development based on system address action
CN102022107B (en) * 2010-06-30 2014-08-27 中国石油大学(北京) Method for establishing physical model capable of predicting waterflooding of fractured anisotropic oil reservoirs

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2121060C1 (en) * 1996-04-08 1998-10-27 Поддубный Юрий Анатольевич Method for development of oil pool
RU2170341C1 (en) * 2000-12-07 2001-07-10 Боксерман Аркадий Анатольевич Process of exploitation of multipool oil deposit
RU2191890C1 (en) * 2002-03-05 2002-10-27 Павлов Михаил Викторович Method of hydrocarbon pool development
CN102022107B (en) * 2010-06-30 2014-08-27 中国石油大学(北京) Method for establishing physical model capable of predicting waterflooding of fractured anisotropic oil reservoirs
RU2471971C1 (en) * 2011-09-01 2013-01-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of non-homogeneous oil deposit
RU2513787C1 (en) * 2012-10-17 2014-04-20 Открытое акционерное общество "Всероссийский нефтегазовый научно-исследовательский институт имени академика А.П. Крылова" (ОАО "ВНИИнефть") Method for oil deposit development based on system address action

Similar Documents

Publication Publication Date Title
Zhdanov et al. Application of foam for gas and water shut-off: review of field experience
RU2578134C1 (en) Method of developing oil deposits in fractured reservoirs with water oil zones
RU2817834C1 (en) Method of increasing oil recovery in areas of non-stationary water flooding
RU2584190C1 (en) Method of development of multilayer oil deposits
RU2072031C1 (en) Method for exploration of multi-seam oil deposit with reservoirs of different structure type
RU2273728C1 (en) Method for further oil field development (variants)
RU2708924C1 (en) Method of increasing oil recovery of carbonate oil formation with recovery of formation pressure
RU2731243C2 (en) Method of developing low-permeable oil deposit using separate injection of water and gas
RU2459936C1 (en) Oil deposit development method
RU2185502C1 (en) Method of oil pool development with its decolmatation
RU2189438C1 (en) Method of oil field development
RU2812976C1 (en) Method for developing oil deposits
RU2087686C1 (en) Method for development of oil deposit
RU2217582C1 (en) Process of development of zonally-inhomogeneous oil field
RU2179237C1 (en) Method of oil pool development
RU2779501C1 (en) Method for developing a geologically heterogeneous oil reservoir by waterflooding
RU2816602C1 (en) Oil deposit development method
RU2191255C1 (en) Method of oil pool development
RU2206727C1 (en) Method of development of nonuniform zone oil deposit
RU2819856C1 (en) Oil field development method
Kuleshova et al. Efficiency of maintaining reservoir pressure in oil wells during the development of carbonate reservoirs
RU2108451C1 (en) Method for development of oil deposit
RU2813867C1 (en) Oil deposit development method
SU1756545A1 (en) Method for developing oil field composed of non-uniform layered beds
RU2231632C1 (en) Method of development of an oil pool