RU2800852C2 - Scaffold system and method for manufacturing a scaffold system - Google Patents

Scaffold system and method for manufacturing a scaffold system Download PDF

Info

Publication number
RU2800852C2
RU2800852C2 RU2021115571A RU2021115571A RU2800852C2 RU 2800852 C2 RU2800852 C2 RU 2800852C2 RU 2021115571 A RU2021115571 A RU 2021115571A RU 2021115571 A RU2021115571 A RU 2021115571A RU 2800852 C2 RU2800852 C2 RU 2800852C2
Authority
RU
Russia
Prior art keywords
deck
profile
platform
fastening
maximum height
Prior art date
Application number
RU2021115571A
Other languages
Russian (ru)
Other versions
RU2021115571A (en
Inventor
Эрзад МИКИЧ
Тобиас СТЕК
Кристиан ЛЕДЕР
Юрген КУРТ
Original Assignee
Пери Се
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Пери Се filed Critical Пери Се
Publication of RU2021115571A publication Critical patent/RU2021115571A/en
Application granted granted Critical
Publication of RU2800852C2 publication Critical patent/RU2800852C2/en

Links

Images

Abstract

FIELD: scaffolding.
SUBSTANCE: present invention relates to a platform system with at least one platform deck. The platform decks preferably comprise identical fasteners which are connected to deck profiles of different heights in an identical manner. Particularly preferably, the scaffold system comprises at least two scaffold decks, each containing identical fasteners but deck profiles with different maximum heights, more preferably the length of the deck profile with a lower maximum height is less than that of the deck profile with a higher maximum height. In an even more preferred embodiment of the present invention, the scaffold system comprises at least three scaffold decks, each containing identical fixtures but deck profiles with different maximum heights, with the deck profiles still more preferably having different lengths and a larger maximum height with increased length.
EFFECT: improved characteristics.
17 cl, 7 dwg

Description

Предшествующий уровень техники настоящего изобретенияBackground of the Invention

Настоящее изобретение относится к системе подмостей согласно родовому понятию пункта 1 формулы изобретения. Настоящее изобретение также относится к способу изготовления такой системы подмостей.The present invention relates to a scaffold system according to the generic concept of paragraph 1 of the claims. The present invention also relates to a method for manufacturing such a scaffold system.

Известно предоставление систем подмостей, особенно систем подмостей для выполнения работ с фасадом, характеризующихся определенным классом нагрузки. Такие системы подмостей содержат, в частности, несколько настилов подмостей. Известные настилы подмостей определенного класса нагрузки характеризуются профилями настила одинаковой высоты. Высота профилей настила соответствует высоте креплений настилов подмостей, соединенных с профилями настила в каждом случае. Высота профилей настила обычно не зависит от длины настилов подмостей. Однако, поскольку грузоподъемность настилов подмостей зависит от длины соответствующих настилов подмостей, короткие настилы подмостей характеризуются увеличенным размером по сравнению с длинными настилами подмостей при той же высоте профилей настила.It is known to provide scaffold systems, especially scaffold systems for façade work characterized by a certain load class. Such scaffold systems comprise in particular a plurality of scaffold decks. Known scaffold decks of a certain load class are characterized by deck profiles of the same height. The height of the deck profiles corresponds to the height of the scaffold deck fasteners connected to the deck profiles in each case. The height of the deck profiles is usually independent of the length of the scaffold decks. However, since the load capacity of the platform decks depends on the length of the respective platform decks, the short platform decks have an increased dimension compared to the long platform decks for the same height of the deck profiles.

Цель изобретенияPurpose of the invention

Таким образом, целью настоящего изобретения является предоставление системы подмостей и способа изготовления этой системы подмостей, причем система подмостей может особенно эффективно выдерживать нагрузки в то же время может быть собрана простым образом.Thus, the aim of the present invention is to provide a scaffold system and a method for manufacturing this scaffold system, wherein the scaffold system can bear loads particularly effectively while at the same time being assembled in a simple manner.

Сущность настоящего изобретенияThe essence of the present invention

Эта цель достигается согласно настоящему изобретению посредством системы подмостей согласно пункту 1 формулы изобретения и способу изготовления этой системы подмостей согласно пункту 14 формулы изобретения. В зависимых пунктах приведены предпочтительные варианты осуществления.This object is achieved according to the present invention by means of a scaffold system according to claim 1 and a method for manufacturing this scaffold system according to claim 14. The dependent claims provide preferred embodiments.

Обозначения «высота», «длина», «ширина», «верх», «низ» и т.д. относятся к системе подмостей в собранном состоянии.Designations "height", "length", "width", "top", "bottom", etc. refer to the scaffold system in the assembled state.

Система подмостей может содержать только первый настил подмостей или дополнительные настилы подмостей.The scaffold system may comprise only the first scaffold deck or additional scaffold decks.

Таким образом, цель согласно настоящему изобретению достигается посредством системы подмостей с первым настилом подмостей, причем первый настил подмостей содержит профиль первого настила для поддержки первой плиты настила, пригодной для ходьбы, и первое крепление для соединения первого настила подмостей с первой горизонтальной балкой. Первое крепление содержит неразъемный корпус первого крепления, неподвижно соединенный с профилем первого настила. Максимальная высота профиля первого настила превышает максимальную высота корпуса первого крепления, в частности, на максимальный коэффициент Kh=1,5-2,5.Thus, the object of the present invention is achieved by a platform system with a first platform deck, the first platform deck comprising a first deck profile to support the first walkable deck slab and a first fastener to connect the first platform deck to the first horizontal beam. The first fastening contains a one-piece body of the first fastening, which is fixedly connected to the profile of the first flooring. The maximum height of the profile of the first flooring exceeds the maximum height of the body of the first fastening, in particular, by the maximum factor Kh=1.5-2.5.

Таким образом, согласно настоящему изобретению предусмотрено, что первый настил подмостей содержит крепление для соединения с возможностью отсоединения первого настила подмостей с первой горизонтальной балкой. Высота этого крепления (в вертикальном направлении) меньше высоты профиля первого настила, который предпочтительно соединен без возможности отсоединения с первым креплением. Таким образом, первый настил подмостей может выдерживать большие нагрузки и по-прежнему может содержать стандартизованное первое крепление.Thus, according to the present invention, it is provided that the first platform deck comprises a fastener for releasably connecting the first platform deck to the first horizontal beam. The height of this attachment (in the vertical direction) is less than the height of the profile of the first deck, which is preferably connected without the possibility of detachment with the first attachment. Thus, the first platform deck can withstand heavy loads and still have a standardized first anchor.

Предпочтительно корпус первого крепления выполнен из листовой стали. Это обеспечивает особенно простое и экономичное производство.Preferably, the body of the first attachment is made of sheet steel. This ensures particularly simple and economical production.

Корпус первого крепления может содержать две угловые области, каждая из которых содержит поверхности, согнутые под прямым углом, на которые частично опирается первый настил или профиль настила. Это обеспечивает особенно надежную передачу нагрузки от профиля настила к креплению.The body of the first attachment may include two corner regions, each of which contains surfaces bent at right angles, on which the first deck or deck profile partially rests. This ensures particularly reliable load transfer from the deck profile to the fastening.

Первый настил подмостей может содержать стопорное приспособление. Стопорное приспособление предпочтительно содержит скобу, которая может перемещаться относительно корпуса крепления для входа в зацепление под первой горизонтальной балкой.The first platform deck may include a locking device. The locking device preferably includes a bracket that is movable relative to the body of the fixture to engage under the first horizontal beam.

Согласно предпочтительному варианту осуществления первого настила подмостей профиль первого настила прикреплен к корпусу первого крепления с помощью по меньшей мере одного L-образного винта, заклепки, дюбельного и/или сварного соединения. Такое сварное соединение обеспечивает надежное и простое изготовление первого настила подмостей.According to a preferred embodiment of the first platform deck, the profile of the first deck is attached to the body of the first fastening with at least one L-shaped screw, rivet, dowel and/or weld. Such a welded joint ensures reliable and simple manufacture of the first platform deck.

Особенно предпочтительно нижняя сторона профиля первого настила закруглена вблизи первого крепления. За счет этого можно избежать напряжений в надрезе в области нижней стороны первого настила подмостей.Particularly preferably, the underside of the profile of the first deck is rounded in the vicinity of the first attachment. As a result, stresses in the notch in the area of the underside of the first platform deck can be avoided.

Преимущества настоящего изобретения особенно очевидны в ранее описанной системе подмостей со вторым настилом подмостей, причем второй настил подмостей содержит профиль второго настила для поддержки второго настила, пригодного для ходьбы, и второе крепление для соединения второго настила подмостей со второй горизонтальной балкой, причем второе крепление содержит неразъемный, т.е. цельный корпус второго крепления, прочно соединенный с профилем второго настила, второе крепление характеризуется той же конструкцией, что и первое крепление, и максимальная высота профиля второго настила меньше максимальной высоты профиля первого настила. Второе крепление содержит неразъемный корпус второго крепления, неподвижно соединенный с профилем второго настила, второе крепление характеризуется той же конструкцией, что и первое крепление, и максимальная высота профиля второго настила меньше максимальной высоты профиля первого настила. Предпочтительно средний коэффициент Kh равен 1,1-1,5. Таким образом, могут использоваться профили настила разной высоты с идентичными, в частности, идентично сконструированными креплениями, и они предпочтительно могут быть соединены идентичным образом (посредством болтов, заклепок, дюбелей и/или сварки).The advantages of the present invention are particularly evident in the previously described platform system with a second platform deck, the second platform deck comprising a profile of the second platform for supporting the second walkable deck and a second fastener for connecting the second platform deck to the second horizontal beam, the second fastener comprising a one-piece , i.e. a one-piece body of the second fastener firmly connected to the profile of the second floor, the second fastener is of the same design as the first fastener, and the maximum height of the profile of the second floor is less than the maximum height of the profile of the first floor. The second fastening contains a one-piece body of the second fastening, fixedly connected to the profile of the second flooring, the second fastening is characterized by the same design as the first fastening, and the maximum height of the second flooring profile is less than the maximum height of the first flooring profile. Preferably, the average Kh factor is 1.1-1.5. Thus, deck profiles of different heights can be used with identical, in particular identically designed attachments, and they can preferably be connected in an identical way (by means of bolts, rivets, dowels and/or welding).

Особенно предпочтительно профиль второго настила короче профиля первого настила. Второй, более короткий профиль настила характеризуется меньшей высотой профиля настила, чем профиль первого настила. Другими словами, второй, более короткий профиль настила, таким образом, не обладает чрезмерно большими размерами и может быть изготовлен более простым образом.Particularly preferably, the profile of the second floor is shorter than the profile of the first floor. The second, shorter deck profile is characterized by a lower deck profile height than the first deck profile. In other words, the second, shorter deck profile is thus not oversized and can be produced in a simpler manner.

Еще более предпочтительно система подмостей содержит третий настил подмостей, причем третий настил подмостей содержит профиль третьего настила для поддержки третьего настила, пригодного для ходьбы, и третье крепление для соединения третьего настила подмостей с третьей горизонтальной балкой, третье крепление содержит неразъемный корпус третьего крепления, неподвижно соединенный с профилем третьего настила;Even more preferably, the platform system comprises a third platform deck, wherein the third platform deck comprises a third deck profile to support the third walkable deck and a third fixture to connect the third platform deck to the third horizontal beam, the third fixture comprising a one-piece body of the third fixture fixedly connected with a profile of the third flooring;

причем третье крепление выполнено таким же, как второе крепление, и максимальная высота профиля третьего настила меньше максимальной высоты профиля второго настила.moreover, the third fastening is made the same as the second fastening, and the maximum profile height of the third flooring is less than the maximum profile height of the second flooring.

Максимальная высота профиля третьего настила может совпадать с максимальной высотой корпуса третьего крепления, в частности, она может соответствовать максимальной высоте корпуса третьего крепления.The maximum height of the profile of the third deck may coincide with the maximum height of the body of the third fixture, in particular it may correspond to the maximum height of the body of the third fixture.

Согласно еще одному предпочтительному варианту осуществления системы подмостей профиль третьего настила короче профиля второго настила. Высота профиля настила предпочтительно меньше у более короткого профиля настила. Таким образом, система подмостей может быть выполнена особенно легкой и с высокой грузоподъемностью.According to another preferred embodiment of the platform system, the profile of the third deck is shorter than the profile of the second deck. The height of the deck profile is preferably smaller for the shorter deck profile. In this way, the platform system can be designed particularly light and with a high load capacity.

Цель согласно настоящему изобретению также достигается посредством способа изготовления ранее описанной системы подмостей, предусматривающего следующую стадию:The object according to the present invention is also achieved by a method for manufacturing the previously described scaffold system, comprising the following step:

A) прикрепление, в частности таким же образом, предпочтительно сваркой, профиля первого настила к корпусу первого крепления.A) attaching, in particular in the same way, preferably by welding, the profile of the first deck to the body of the first attachment.

Предпочтительно способ предусматривает следующую дополнительную стадию:Preferably, the method comprises the following additional step:

B) прикрепление, в частности таким же образом, предпочтительно сваркой, профиля второго настила к корпусу второго крепления.B) attaching, in particular in the same way, preferably by welding, the profile of the second deck to the body of the second attachment.

Также предпочтительно способ предусматривает следующую дополнительную стадию:Also preferably, the method comprises the following additional step:

C) прикрепление, в частности таким же образом, предпочтительно сваркой, профиля третьего настила к корпусу третьего крепления.C) attaching, in particular in the same way, preferably by welding, the profile of the third deck to the body of the third attachment.

Стадии А), В) и С) могут осуществляться в любом порядке.Steps A), B) and C) may be carried out in any order.

Также предпочтительно способ предусматривает следующую стадию:Also preferably, the method comprises the following step:

D) размещение с возможностью отсоединения первого крепления на первой горизонтальной балке.D) placement with the possibility of detachment of the first fastening on the first horizontal beam.

Второе крепление (и/или третье крепление) может быть размещено с возможностью отсоединения на первой горизонтальной балке заранее, одновременно или позднее.The second fixture (and/or the third fixture) may be releasably placed on the first horizontal beam in advance, at the same time or later.

Дополнительные преимущества настоящего изобретения станут очевидны из описания и фигур. Аналогично, вышеупомянутые и дополнительно разработанные признаки могут использоваться согласно настоящему изобретению в каждом случае отдельно или вместе в любой желаемой комбинации. Показанные и описанные варианты осуществления не следует рассматривать как ограниченный перечень, а, скорее, как приведенные для иллюстрации описания настоящего изобретения.Additional advantages of the present invention will become apparent from the description and figures. Likewise, the above and further developed features can be used according to the present invention in each case separately or together in any desired combination. The embodiments shown and described should not be construed as a limited list, but rather as being given to illustrate the description of the present invention.

Подробное описание настоящего изобретения и фигурDetailed Description of the Present Invention and Figures

На фиг. 1а показан вид в изометрии первого крепления для соединения первого настила подмостей с первой горизонтальной балкой.In FIG. 1a shows an isometric view of the first attachment for connecting the first platform deck to the first horizontal beam.

На фиг. 1b показан вид спереди первого крепления, показанного на фиг. 1а.In FIG. 1b is a front view of the first attachment shown in FIG. 1a.

На фиг. 2 показан вид сбоку первого настила подмостей с первым креплением согласно фиг. 1а и 1b и профилем первого настила.In FIG. 2 shows a side view of the first platform deck with the first fastening according to FIG. 1a and 1b and the profile of the first deck.

На фиг. 3 показан вид сбоку второго настила подмостей с креплением согласно фиг. 1а и 1b и профилем второго настила.In FIG. 3 shows a side view of the second platform deck with the fastening according to FIG. 1a and 1b and the profile of the second deck.

На фиг. 4 показан вид сбоку третьего настила подмостей с креплением согласно фиг. 1а и 1b и профилем третьего настила. В данном случае показан способ соединения (три точки соединения, расположенные в форме буквы «L» для крепления посредством болтов, заклепок, дюбелей или сварки) между третьим креплением и профилем третьего настила, предпочтительно такой же, как показанный на фиг. 2 и 4.In FIG. 4 shows a side view of the third platform deck with fastening according to FIG. 1a and 1b and the third deck profile. In this case, the connection method (three connection points arranged in the shape of an "L" for fastening by bolts, rivets, dowels or welding) between the third fastening and the profile of the third deck is shown, preferably the same as shown in Fig. 2 and 4.

На фиг. 5а показан вид сбоку настила подмостей согласно фиг. 2, но с другим соединением профиля первого настила с креплением. В данном случае показан второй тип соединения посредством сварки.In FIG. 5a shows a side view of the platform deck according to FIG. 2, but with a different connection of the profile of the first deck to the anchor. In this case, the second type of connection by welding is shown.

На фиг. 5b показан вид сбоку настила подмостей согласно фиг. 5а без скрытых краев.In FIG. 5b shows a side view of the platform deck according to FIG. 5a without hidden edges.

На фиг. 6а показан вид сбоку настила подмостей согласно фиг. 3, но с другим соединением профиля второго настила с креплением, при этом данное соединение по существу идентично соединению, показанному на фиг. 5а.In FIG. 6a shows a side view of the platform deck according to FIG. 3, but with a different connection of the profile of the second deck to the anchorage, this connection being substantially identical to the connection shown in FIG. 5a.

На фиг. 6b показан вид сбоку настила подмостей согласно фиг. 6а без скрытых краев.In FIG. 6b shows a side view of the platform deck according to FIG. 6a without hidden edges.

На фиг. 7а показан вид сбоку настила подмостей согласно фиг. 4, но с другим соединением профиля третьего настила с креплением, при этом оно по существу идентично соединению, показанному на фиг. 5а и 6а.In FIG. 7a shows a side view of the platform deck according to FIG. 4, but with a different connection of the third deck profile to the fastening, which is essentially identical to the connection shown in FIG. 5a and 6a.

На фиг. 7b показан вид сбоку настила подмостей согласно фиг. 7а без скрытых краев.In FIG. 7b shows a side view of the platform deck according to FIG. 7a without hidden edges.

На фиг. 1а показано первое крепление 10 для соединения с первой горизонтальной балкой подмостей. Первое крепление 10 содержит корпус 12 крепления. Корпус 12 крепления может быть изготовлен из металла, в частности листового металла. Опорные крюки 14а, 14b предусмотрены для поддержки первого крепления 10 на первой горизонтальной балке. В собранном состоянии крепления 10 первая горизонтальная балка перекрывается по меньшей мере одним захватным крюком 16а, 16b, в частности двумя захватными крюками 16а, 16b. Скоба 18 расположенная с возможностью перемещения относительно корпуса 12 крепления, препятствует подъему первого крепления 10, например, в случае порыва ветра.In FIG. 1a shows a first attachment 10 for connection to a first horizontal scaffold beam. The first mount 10 contains the body 12 of the mount. The attachment body 12 can be made of metal, in particular sheet metal. Support hooks 14a, 14b are provided to support the first fastening 10 on the first horizontal beam. In the assembled state of the attachment 10, the first horizontal beam is covered by at least one gripping hook 16a, 16b, in particular two gripping hooks 16a, 16b. The shackle 18, which is movably positioned relative to the anchor body 12, prevents the first anchor 10 from lifting, for example, in the event of a gust of wind.

Первое крепление 10 содержит два угловых участка 20а, 20b, в которых может быть размещен профиль настила. Каждый из угловых участков 20а, 20b содержит поверхности 22а, 22b, 22с, 22d, выполненные под прямым углом друг к другу, обе из которых упрощают размещение профиля настила и обеспечивают эффективную передачу нагрузки от профиля настила на первое крепление 10. Угловые части 20а, 20b могут быть соединены с передней поверхностью 24, передняя поверхность 24 предпочтительно соединена с поверхностью 22b и/или 22d под прямым углом.The first fastening 10 comprises two corner sections 20a, 20b in which a deck profile can be placed. Each of the corner portions 20a, 20b includes surfaces 22a, 22b, 22c, 22d at right angles to each other, both of which facilitate positioning of the deck profile and ensure efficient load transfer from the deck profile to the first fastener 10. Corner portions 20a, 20b can be connected to the front surface 24, the front surface 24 is preferably connected to the surface 22b and/or 22d at right angles.

На фиг. 1В показан вид спереди первого крепления 10 согласно фиг. 1а. Как можно увидеть на фиг. 1b, передняя панель 24 содержит сужающиеся книзу боковые панели 26а, 26b для уменьшения массы. Захватные крюки 16а, 16b выполнены со смещением от горизонтального центра первого крепления 10, вследствие чего другое идентичное крепление может быть расположено на той же первой горизонтальной балке. Грузоподъемность захватных крюков 16а, 16b увеличивается посредством по меньшей мере одного ребра 28а, 28b, 28с, 28d жесткости, предпочтительно нескольких ребер 28а-28d жесткости.In FIG. 1B shows a front view of the first attachment 10 according to FIG. 1a. As can be seen in FIG. 1b, the front panel 24 includes downwardly tapering side panels 26a, 26b to reduce weight. The gripping hooks 16a, 16b are offset from the horizontal center of the first fastening 10, so that another identical fastening can be located on the same first horizontal beam. The lifting capacity of the hooks 16a, 16b is increased by at least one stiffener 28a, 28b, 28c, 28d, preferably several stiffeners 28a-28d.

На фиг. 2 показан первый настил 30 подмостей с первым креплением 10 согласно первому креплению 10, показанному на фиг. 1а и 1b, которое неподвижно соединено с профилем 32 первого настила, т.е. его невозможно отсоединить без использования инструментов. Вертикальная максимальная высота Н32 профиля 32 первого настила превышает вертикальную максимальную высоту Н12 корпуса 12 первого крепления, в частности, на максимальный коэффициент Kh=1,5-2,5.In FIG. 2 shows a first platform deck 30 with a first anchorage 10 according to the first anchorage 10 shown in FIG. 1a and 1b, which is fixedly connected to the profile 32 of the first deck, i.e. it cannot be detached without the use of tools. The vertical maximum height H32 of the first deck profile 32 exceeds the vertical maximum height H12 of the first fastening body 12, in particular by a maximum factor Kh=1.5-2.5.

На фиг. 3 показан второй настил 34 подмостей с вторым креплением 10' согласно первому креплению 10, показанному на фиг. 1а и 1b, которое неподвижно соединено с профилем 36 второго настила. Вертикальная максимальная высота Н36 профиля 36 второго настила превышает вертикальную максимальную высоту Н12 корпуса 12' второго крепления, в частности, на средний коэффициент Kh=1,1-1,5.In FIG. 3 shows a second platform deck 34 with a second anchorage 10' according to the first anchorage 10 shown in FIG. 1a and 1b, which is fixedly connected to the profile 36 of the second deck. The vertical maximum height H 36 of the second deck profile 36 exceeds the vertical maximum height H12 of the second fastening body 12', in particular by an average factor Kh=1.1-1.5.

На фиг. 4 показан третий настил 38 подмостей с третьим креплением 10'' согласно первому креплению 10, показанному на фиг. 1а и 1b, которое неподвижно соединено с профилем 40 третьего настила. Вертикальная максимальная высота Н40 профиля 40 третьего настила превышает вертикальную максимальную высоту Н12 корпуса 12'' третьего крепления, причем последняя предпочтительно соответствует максимальной высоте Н40 профиля 40 третьего настила.In FIG. 4 shows a third platform deck 38 with a third anchor 10'' according to the first anchor 10 shown in FIG. 1a and 1b, which is fixedly connected to the profile 40 of the third deck. The vertical maximum height H 40 of the third deck profile 40 exceeds the vertical maximum height H12 of the third attachment body 12'', the latter preferably corresponding to the maximum height H40 of the third deck profile 40.

Как для иллюстрации показано на фиг. 2 и 3, профиль 32, 36 настила может быть закругленным или содержать скругление R на нижней стороне в направлении крепления 10, 10', чтобы избежать влияния надреза, когда настил 30, 34 подмостей находится под нагрузкой.As shown in FIG. 2 and 3, the profile 32, 36 of the platform may be rounded or comprise a rounding R on the underside in the direction of fastening 10, 10' to avoid the effect of the notch when the platform 30, 34 is under load.

Каждый из настилов подмостей, показанных на фиг. 2-4, образует отдельно или вместе систему подмостей. В этой системе подмостей используются одинаковые крепления 10, 10', 10'', вследствие чего система подмостей может быть сооружена с минимумом затрат. Настилы 30, 34, 38 подмостей предпочтительно соединены с креплениями 10, 10', 10'', как показано на фиг. 4 со ссылочными позициями, посредством-соединений идентичного типа и способа (например, три точки соединения, расположенные в форме буквы «L» для крепления посредством болтов, заклепок, дюбелей или сварки на боковых поверхностях креплений 22а и 22с), в частности, посредством сварных соединений 42а, 42b, 42с. Чем меньше максимальная высота Н32, Н26, H40 настилов 30, 34, 38 подмостей, тем короче они предпочтительно изготавливаются (см. указанные значения длины L32, L36 и L40). Поскольку настилы 30, 34, 38 подмостей разной длины L32, L36, L40 предпочтительно все не характеризуются одинаковой большой максимальной высотой Н32, H36, H40, достигается существенное сокращение массы, используемой энергии и затрат во время транспортировки и сборки системы подмостей.Each of the platform decks shown in FIG. 2-4 form, individually or collectively, a scaffold system. This scaffold system uses the same fasteners 10, 10', 10'', whereby the scaffold system can be constructed with a minimum of effort. Platform decks 30, 34, 38 are preferably connected to fixtures 10, 10', 10'' as shown in FIG. 4 with reference numerals, by means of connections of the same type and method (for example, three connection points arranged in the shape of the letter "L" for fastening by bolts, rivets, dowels or welding on the side surfaces of the fasteners 22a and 22c), in particular by means of welded compounds 42a, 42b, 42c. The lower the maximum height H 32 , H 26 , H 40 of the platforms 30, 34, 38, the shorter they are preferably made (see the specified lengths L 32 , L 36 and L 40 ). Since the platforms 30, 34, 38 of different lengths L 32 , L 36 , L 40 preferably do not all have the same large maximum height H 32 , H 36 , H 40 , a significant reduction in mass, energy used and costs during transportation and assembly of the system is achieved. scaffolding.

На фиг. 5а и 5b показан первый настил 30' подмостей, который соответствует первому настилу 30 подмостей согласно фиг. 2, за исключением по-другому выполненных сварных соединений 42d, 42е (в частности, второй тип сварки).In FIG. 5a and 5b show a first platform deck 30' which corresponds to the first platform deck 30 of FIG. 2, except for the differently executed welds 42d, 42e (particularly the second type of weld).

На фиг. 6а и 6b показан второй настил 34' подмостей, который соответствует второму настилу 34 подмостей согласно фиг. 3, за исключением по-другому выполненных сварных соединений 42d, 42е (в частности, второй способ сварки согласно фиг. 5а и 5b).In FIG. 6a and 6b show a second platform deck 34' which corresponds to the second platform deck 34 of FIG. 3, except for the differently executed welds 42d, 42e (in particular the second welding method according to FIGS. 5a and 5b).

На фиг. 7а и 7b показан третий настил 38' подмостей, аналогичный третьему настилу 38 подмостей согласно фиг. 4, за исключением по-другому выполненных сварных соединений 42d, 42е (в частности, второй способ сварки согласно фиг. 5а и 5b, или фиг. 6а и 6b).In FIG. 7a and 7b show a third platform deck 38' similar to the third platform deck 38 of FIG. 4, except for the differently executed welds 42d, 42e (in particular, the second welding method according to Figs. 5a and 5b, or Figs. 6a and 6b).

Если рассматривать все фигуры вместе, настоящее изобретение в целом относится к системе подмостей с по меньшей мере одним настилом 30, 30', 34, 34', 38, 38' подмостей. Настилы 30, 30', 34, 34', 38, 38' подмостей предпочтительно содержат идентичные крепления 10, 10', 10'', которые соединены с профилями 32, 36, 40 настила разной высоты, в частности идентичным образом. Особенно предпочтительно система подмостей содержит по меньшей мере два настила 30, 30', 34, 34', 38, 38' подмостей, каждый из которых содержит идентичные крепления 10, 10', 10'', но профили 32, 36, 40 настила с разной максимальной высотой Н32, Н36, Н38, причем еще более предпочтительно длина L32, L36, L40 профиля 32, 36, 40 настила с меньшей максимальной высотой Н32, Н36, Н38 меньше, чем у профиля настила с большей максимальной высотой Н32, Н36, Н38. В еще более предпочтительном варианте осуществления настоящего изобретения система подмостей содержит по меньшей мере три настила 30, 30', 34, 34', 38, 38' подмостей, каждый из которых содержит идентичные крепления 10, 10', 10'', но профили 32, 36, 40 настила с разными максимальными высотами Н32, Н36, Н38, причем еще более предпочтительно профили 32, 36, 40 настила характеризуются разной длиной и большей максимальной высотой Н32, Н36, Н38 с увеличенной длиной L32, L36, L40.Considering all the figures together, the present invention relates generally to a platform system with at least one platform deck 30, 30', 34, 34', 38, 38'. The platform decks 30, 30', 34, 34', 38, 38' preferably comprise identical fasteners 10, 10', 10'', which are connected to deck profiles 32, 36, 40 of different heights, in particular in an identical manner. Particularly preferably, the scaffold system comprises at least two scaffold decks 30, 30', 34, 34', 38, 38', each containing identical anchorages 10, 10', 10'', but deck profiles 32, 36, 40 with different maximum heights H 32 , H 36 , H 38 , and even more preferably the length L 32 , L 36 , L 40 of the deck profile 32, 36, 40 with a lower maximum height H 32 , H 36 , H 38 is less than that of the deck profile with a higher maximum height H 32 , H 36 , H 38 . In an even more preferred embodiment of the present invention, the scaffold system comprises at least three scaffold decks 30, 30', 34, 34', 38, 38', each containing identical anchorages 10, 10', 10'', but profiles 32 , 36, 40 decking with different maximum heights H 32 , H 36 , H 38 , and even more preferably the deck profiles 32, 36, 40 are characterized by different lengths and a greater maximum height H 32 , H 36 , H 38 with increased length L 32 , L 36 , L 40 .

Условные обозначенияConventions

10 - первое крепление10 - first fastening

10' - второе крепление10' - second fastening

10'' - третье крепление10'' - third mount

12 - корпус первого крепления12 - housing of the first fastening

12' - корпус второго крепления12' - body of the second mount

12'' - корпус третьего крепления12'' - body of the third mount

14а, 14b - опорный крюк14a, 14b - support hook

16а, 16b - захватный крюк16a, 16b - gripping hook

18 - скоба18 - bracket

20а, 20b - угловые области20a, 20b - corner areas

22a-22d - поверхности22a-22d - surfaces

24 - передняя поверхность24 - front surface

26а, 26b - боковые поверхности26a, 26b - side surfaces

28a-28d - ребра жесткости28a-28d - stiffeners

30, 30' - первый настил подмостей30, 30' - first scaffolding

32 - профиль первого настила32 - profile of the first deck

34, 34' - второй настил подмостей34, 34' - second platform deck

36 - профиль второго настила36 - profile of the second deck

38, 38' - третий настил подмостей38, 38' - third platform deck

40 - профиль третьего настила40 - profile of the third flooring

42а-42е - соединения, предпочтительно сварные соединения (в частности, точки L-образного соединения для крепления болтами, заклепками, дюбелями и/или сваркой), где 42d-42e представляет второй способ сварного соединения42a-42e show connections, preferably welded connections (particularly L-shaped connection points for bolting, riveting, doweling and/or welding), where 42d-42e represents the second welding method

R - скруглениеR - rounding

Н12 - максимальная высота крепления 12H 12 - maximum mounting height 12

Н32 - максимальная высота профиля 32 первого настилаH 32 - the maximum height of the profile 32 of the first deck

Н36 - максимальная высота профиля 36 второго настилаH 36 - the maximum height of the profile 36 of the second flooring

H40 - максимальная высота профиля 40 третьего настилаH 40 - maximum profile height 40 of the third deck

L32 - длина профиля 32 первого настилаL 32 - profile length 32 of the first deck

L36 - длина профиля 36 второго настилаL 36 - profile length 36 of the second deck

L40 - длина профиля 40 третьего настилаL 40 - profile length 40 of the third deck

Kh - избыточный коэффициент (макс. Kh=Н32/Н12; средний Kh=H36/H12)Kh - excess coefficient (max. Kh=H32/H12; average Kh=H36/H12)

Claims (32)

1. Система подмостей, содержащая первый настил (30, 30') подмостей, причем первый настил (30, 30') подмостей содержит:1. A platform system comprising a first platform deck (30, 30'), the first platform deck (30, 30') comprising: (а) профиль (32) первого настила для поддержки первой плиты настила, пригодной для ходьбы;(a) a first deck profile (32) for supporting the first walkable deck slab; b) первое крепление (10) для соединения первого настила (30, 30') подмостей с первой горизонтальной балкой, причем первое крепление (10) имеет неразъемный корпус (12) первого крепления, неподвижно соединенный с профилем (32) первого настила;b) a first fixture (10) for connecting the first platform deck (30, 30') to the first horizontal beam, the first fixture (10) having a one-piece first fixture body (12) fixedly connected to the profile (32) of the first deck; отличающаяся тем, чтоcharacterized in that максимальная высота (Н32) профиля (32) первого настила превышает максимальную высоту (H12) корпуса (12) первого крепления,the maximum height (H32) of the profile (32) of the first decking exceeds the maximum height (H12) of the body (12) of the first fastening, причем максимальная высота (Н32) профиля (32) первого настила больше максимальной высоты (H12) корпуса (12) первого крепления на максимальный коэффициент Kh=1,5-2,5.moreover, the maximum height (H32) of the profile (32) of the first flooring is greater than the maximum height (H12) of the body (12) of the first fastening by the maximum coefficient Kh=1.5-2.5. 2. Система подмостей по п. 1, в которой корпус (12) первого крепления выполнен из листового металла.2. The scaffold system according to claim 1, in which the body (12) of the first fastening is made of sheet metal. 3. Система подмостей по п. 2, в которой корпус (12) первого крепления содержит два угловых участка (20а, 20b), каждый из которых содержит поверхности (22a-22d), согнутые под прямым углом, на которые частично опирается профиль (32) первого настила.3. The scaffold system according to claim 2, in which the body (12) of the first fastening contains two corner sections (20a, 20b), each of which contains surfaces (22a-22d) bent at a right angle, on which the profile (32) partially rests. ) of the first deck. 4. Система подмостей по любому из предыдущих пунктов, в которой первое крепление (10) содержит скобу (18), выполненную с возможностью перемещения относительно корпуса (12) крепления для входа в зацепление под первой горизонтальной балкой.4. A scaffold system according to any one of the preceding claims, wherein the first fixture (10) comprises a bracket (18) movable relative to the fixture body (12) to engage under the first horizontal beam. 5. Система подмостей по любому из предыдущих пунктов, в которой профиль (32) первого настила прикреплен к корпусу (12) первого крепления с помощью по меньшей мере одного сварного соединения (42а-42е).5. A scaffold system according to any one of the preceding claims, wherein the profile (32) of the first deck is attached to the body (12) of the first fastening by means of at least one welded joint (42a-42e). 6. Система подмостей по любому из предыдущих пунктов, в которой профиль (32) первого настила содержит скругление (R) на своей нижней стороне в направлении первого крепления (10).6. A scaffold system according to any one of the preceding claims, wherein the profile (32) of the first deck has a rounding (R) on its underside in the direction of the first attachment (10). 7. Система подмостей по любому из предыдущих пунктов, содержащая второй настил (34) подмостей, причем второй настил (34) подмостей содержит:7. A scaffold system according to any one of the preceding claims, comprising a second platform deck (34), the second platform deck (34) comprising: а) профиль (36) второго настила для поддержки второй плиты настила, пригодной для ходьбы;a) a second deck profile (36) for supporting a second walkable deck slab; b) второе крепление (10') для соединения второго настила подмостей с второй горизонтальной балкой, причем второе крепление (10') имеет неразъемный корпус (12') второго крепления, неподвижно соединенный с профилем (36) второго настила;b) a second fixture (10') for connecting the second platform deck to the second horizontal beam, the second fixture (10') having an integral body (12') of the second fixture fixedly connected to the profile (36) of the second deck; причем второе крепление (10') выполнено таким же, как первое крепление (10), и максимальная высота (Н36) профиля (36) второго настила меньше максимальной высоты (Н32) профиля (32) первого настила.moreover, the second fastening (10') is made the same as the first fastening (10), and the maximum height (H36) of the profile (36) of the second deck is less than the maximum height (H32) of the profile (32) of the first deck. 8. Система подмостей по п. 7, в которой максимальная высота (Н36) профиля (36) второго настила больше, чем максимальная высота (H12) корпуса (12') второго крепления на максимальный коэффициент Kh=1,1-1,5.8. Scaffolding system according to claim 7, in which the maximum height (H36) of the profile (36) of the second flooring is greater than the maximum height (H12) of the body (12') of the second fastening by the maximum factor Kh=1.1-1.5. 9. Система подмостей по любому из пп. 6-8, в которой профиль (36) второго настила короче, чем профиль (32) первого настила.9. System scaffolding according to any one of paragraphs. 6-8, in which the profile (36) of the second deck is shorter than the profile (32) of the first deck. 10. Система подмостей по любому из пп. 6-9, содержащая третий настил (38) подмостей, причем третий настил (38) подмостей содержит:10. System scaffolding according to any one of paragraphs. 6-9 comprising a third platform deck (38), the third platform deck (38) comprising: a) профиль (40) третьего настила для поддержки третьей плиты настила, пригодной для ходьбы;a) third deck profile (40) to support a third walkable deck slab; b) третье крепление (10'') для соединения третьего настила (38) подмостей с третьей горизонтальной балкой, причем третье крепление (10'') содержит неразъемный корпус (12'') третьего крепления, неподвижно соединенный с профилем (40) третьего настила;b) a third fixture (10'') for connecting the third platform deck (38) to the third horizontal beam, the third fixture (10'') comprising a one-piece body (12'') of the third fixture fixedly connected to the profile (40) of the third deck ; причем третье крепление (10'') выполнено таким же, как второе крепление (10''), и максимальная высота (Н40) профиля (40) третьего настила меньше максимальной высоты (Н36) профиля (36) второго настила.moreover, the third fastening (10'') is made the same as the second fastening (10''), and the maximum height (H40) of the profile (40) of the third deck is less than the maximum height (H36) of the profile (36) of the second deck. 11. Система подмостей по п. 10, в которой максимальная высота (Н40) профиля (40) третьего настила согласована с максимальной высотой (H12) корпуса (12'') третьего крепления, в частности соответствует ей.11. The scaffold system according to claim 10, wherein the maximum height (H40) of the profile (40) of the third deck is consistent with the maximum height (H12) of the body (12'') of the third fixture, in particular corresponds to it. 12. Система подмостей по любому из пп. 7-11, в которой профиль (40) третьего настила короче, чем профиль (36) второго настила.12. System scaffolding according to any one of paragraphs. 7-11, in which the profile (40) of the third deck is shorter than the profile (36) of the second deck. 13. Способ изготовления системы подмостей по любому из предыдущих пунктов, включающий следующую стадию:13. A method for manufacturing a scaffold system according to any one of the preceding claims, comprising the following step: A) прикрепление, в частности сваркой, профиля (32) первого настила к корпусу (12) первого крепления.A) attaching, in particular by welding, the profile (32) of the first deck to the body (12) of the first attachment. 14. Способ по п. 13, включающий следующую стадию:14. The method according to p. 13, including the following stage: B) прикрепление, в частности сваркой, профиля (36) второго настила к корпусу (12') второго крепления.B) attaching, in particular by welding, the profile (36) of the second deck to the body (12') of the second attachment. 15. Способ по п. 14, включающий следующую стадию:15. The method according to p. 14, including the following stage: C) прикрепление, в частности сваркой, профиля (40) третьего настила к корпусу (12'') третьего крепления.C) attaching, in particular by welding, the profile (40) of the third deck to the body (12'') of the third attachment. 16. Способ по любому из пп. 13-15, включающий следующую стадию:16. The method according to any one of paragraphs. 13-15, including the following step: D) размещение с возможностью отсоединения первого крепления (10) на первой горизонтальной балке.D) placement with the possibility of detachment of the first fastening (10) on the first horizontal beam. 17. Применение профиля (32) настила или крепления (10) в системе подмостей по любому из пп. 1-12.17. The use of profile (32) flooring or fastening (10) in the scaffold system according to any one of paragraphs. 1-12.
RU2021115571A 2018-11-06 2019-10-31 Scaffold system and method for manufacturing a scaffold system RU2800852C2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102018218849.1 2018-11-06

Publications (2)

Publication Number Publication Date
RU2021115571A RU2021115571A (en) 2022-12-07
RU2800852C2 true RU2800852C2 (en) 2023-07-31

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU604943A1 (en) * 1976-12-15 1978-04-30 Pocheptsov Sergej G Three-dimensional transformable scaffold
EP1010838A1 (en) * 1998-12-19 2000-06-21 Wilhelm Layher Vermögensverwaltungs-GmbH Metal scaffold board
EP1426523A1 (en) * 2002-11-20 2004-06-09 Wilhelm Layher Vermögensverwaltungs-GmbH Scaffold platform and scaffold, stand or tribune comprising said platform
DE102004023226A1 (en) * 2004-05-07 2005-12-01 Altrad Plettac Assco Gmbh I.G. Scaffolding head cover has a connecting member with a structured length, to fit to longitudinal carriers of different lengths in at least two different positions
EP2479360A1 (en) * 2008-03-19 2012-07-25 Wilhelm Layher Verwaltungs-GmbH Lining unit with lifting guard and method for preventing a lining unit from being lifted and method for unlocking a lining unit secured against lifting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU604943A1 (en) * 1976-12-15 1978-04-30 Pocheptsov Sergej G Three-dimensional transformable scaffold
EP1010838A1 (en) * 1998-12-19 2000-06-21 Wilhelm Layher Vermögensverwaltungs-GmbH Metal scaffold board
EP1426523A1 (en) * 2002-11-20 2004-06-09 Wilhelm Layher Vermögensverwaltungs-GmbH Scaffold platform and scaffold, stand or tribune comprising said platform
DE102004023226A1 (en) * 2004-05-07 2005-12-01 Altrad Plettac Assco Gmbh I.G. Scaffolding head cover has a connecting member with a structured length, to fit to longitudinal carriers of different lengths in at least two different positions
EP2479360A1 (en) * 2008-03-19 2012-07-25 Wilhelm Layher Verwaltungs-GmbH Lining unit with lifting guard and method for preventing a lining unit from being lifted and method for unlocking a lining unit secured against lifting

Similar Documents

Publication Publication Date Title
CN212453613U (en) Formwork support system and cross beam for installation in a formwork support system
US9932734B1 (en) Deck component with post sleeve and flanges
US6519902B1 (en) Heavy-duty floor panel for a raised access floor system
CA2749006C (en) Support framing system for use with bar joists and beams
CA2595842C (en) A pedestal head
US11970873B2 (en) Bearing plate of an integrated construction system
US10570630B2 (en) Suspended scaffolding structure and connector therefor
US10072416B2 (en) Tubular joist structures and assemblies and methods of using
US10662658B2 (en) Scaffold for supporting a working platform for bridges
CN111344465B (en) Scaffolding base having a cross member with spaced profile sections for fixing connecting elements
RU2800852C2 (en) Scaffold system and method for manufacturing a scaffold system
CN113227513A (en) Scaffolding system and method for manufacturing scaffolding system
US3720024A (en) Prefabricated stackable stair unit
KR101961067B1 (en) A stock type system deck with truss on slope surface
EP2900882B1 (en) Composite steel joist
US6769556B1 (en) Cantilever type shelf
CN109809278B (en) Frame type light composite sedan bottom
CA2085536A1 (en) Interconnecting edge beams for concrete forming panels
CA3085940A1 (en) Integrated construction system
CN217353460U (en) Assembled steel beam welding hanging basket
CN114233030B (en) Railing welding-free installation and reinforcement device and construction method
GB2591430A (en) Structural Beam for a balcony chassis
JPS62268764A (en) Chassis for car
JP5096254B2 (en) Cloth frame with floor and frame scaffold
CN110821188A (en) Auxiliary device for installing prefabricated part