RU2726096C1 - Method for completion of construction of production well with horizontal end of wellbore - Google Patents

Method for completion of construction of production well with horizontal end of wellbore Download PDF

Info

Publication number
RU2726096C1
RU2726096C1 RU2019140634A RU2019140634A RU2726096C1 RU 2726096 C1 RU2726096 C1 RU 2726096C1 RU 2019140634 A RU2019140634 A RU 2019140634A RU 2019140634 A RU2019140634 A RU 2019140634A RU 2726096 C1 RU2726096 C1 RU 2726096C1
Authority
RU
Russia
Prior art keywords
hydraulic fracturing
wellbore
hff
packer
interval
Prior art date
Application number
RU2019140634A
Other languages
Russian (ru)
Inventor
Юрий Александрович Санников
Анатолий Петрович Клевцур
Александр Геннадьевич Горбунов
Людмила Анатольевна Обласова
Михаил Евгеньевич Зеваков
Татьяна Нуриахметовна Тукмакова
Original Assignee
Публичное акционерное общество "Газпром"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Публичное акционерное общество "Газпром" filed Critical Публичное акционерное общество "Газпром"
Priority to RU2019140634A priority Critical patent/RU2726096C1/en
Application granted granted Critical
Publication of RU2726096C1 publication Critical patent/RU2726096C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

FIELD: oil and gas industry.SUBSTANCE: invention relates to oil and gas industry, namely, to development of oil, gas and gas condensate fields. Proposed method comprises lowering and fitting of cementless shank-filter into horizontal end of wellbore with disconnecting packers, multi-stage hydraulic fracturing ports and flow regulators. Then, tubing string is lowered with complex of underground equipment to design depth, input of tubing string is made with sealing device into polished receiving socket of packer of shank tail, and coil-tubing unit is installed. Test HFF is performed in the interval from the shoe of the column to the first disconnected packer. Test HFF results in the basic HFF in the given interval. In subsequent intervals HFF is carried out similarly. Number of cycles is equal to the number of the formation fracturing ports. After closing the last port, flow regulators are opened.EFFECT: higher efficiency of hydrocarbon production due to selective production of HFF, increased area of hydrocarbon influx due to devices of flow regulators and prevention of proppant transport.1 cl, 1 dwg

Description

Область техники, к которой относится изобретениеFIELD OF THE INVENTION

Изобретение относится к нефтяной и газовой промышленности, а именно к разработке нефтяных, газовых и газоконденсатных месторождений и может быть использовано для вскрытия продуктивных пластов проведением поинтервального гидравлического разрыва пласта и оборудование в этих интервалах фильтрами при заканчивании строительства скважин.The invention relates to the oil and gas industry, in particular to the development of oil, gas and gas condensate fields and can be used for opening productive formations by conducting interval hydraulic fracturing and equipment at these intervals with filters when completing well construction.

Уровень техникиState of the art

Известен способ освоению скважин с хвостовиком, включающий сплошные обсадные трубы, разделенные на участки заколонными пакерами и установленные на каждом из участков циркуляционные порты (каталог продукции АО «ОКБ Зенит» «Скважинное оборудование → Оборудование для ГРП с пакером гидромеханическим». Электронный ресурс www.zenith.ru).A known method of developing wells with a liner, including continuous casing, divided into sections by annular packers and circulation ports installed on each of the sections (product catalog of JSC OKB Zenit "Well equipment → Equipment for hydraulic fracturing with a hydro-mechanical packer." Electronic resource www.zenith .ru).

К недостаткам освоения скважин с применением известных конструкций можно отнести следующее:The disadvantages of well development using well-known designs include the following:

- отсутствие фильтрующего элемента, предотвращающего разрушение призабойной зоны продуктивного пласта и попадания в скважину песка и других механических примесей, в т.ч. не обеспечиваются необходимые требования по предотвращению выноса проппанта, в результате чего трещины пород постепенно смыкаются, тем самым ухудшается эффективность добычи углеводородов после проведенных работ по интенсификации притока;- the absence of a filter element that prevents the destruction of the bottom-hole zone of the reservoir and the ingress of sand and other mechanical impurities into the well, including the necessary requirements to prevent proppant removal are not provided, as a result of which the rock cracks gradually close, thereby deteriorating the efficiency of hydrocarbon production after work to intensify the influx;

- площадь притока пластового продукта ограничено отверстиями циркуляционных портов.- the area of inflow of the reservoir product is limited by the openings of the circulation ports.

Известна конструкция скважины для проведения многоэтапного гидроразрыва пласта (ПМ №175464), включающая нецементируемый хвостовик для проведения многоэтапного гидравлического разрыва пласта (ГРП), характеризующийся тем, что он выполнен с возможностью размещения в продуктивном пласте, закрепления в эксплуатационной колонне и разделения заколонными пакерами на участки, содержащие секцию фильтровых труб, секцию сплошных труб и управляемые циркуляционные муфты с возможностью открытия и закрытия, при этом ширина щели в фильтровой трубе определена соотношением t≤(0,65÷0,80)D10,A well-known design of the well for conducting multi-stage hydraulic fracturing (PM No. 175464), including a cementless liner for conducting multi-stage hydraulic fracturing (hydraulic fracturing), characterized in that it is made with the possibility of placement in the reservoir, fixing in the production casing and separation of annular packers into sections containing a section of filter pipes, a section of solid pipes and controlled circulation couplings with the possibility of opening and closing, while the width of the slit in the filter pipe is determined by the ratio t≤ (0,65 ÷ 0,80) D10,

где t - ширина щели в фильтровой трубе, мм;where t is the width of the slit in the filter pipe, mm;

D10 - диаметр частиц расклинивающего материала для гидроразрыва пласта, соответствующий размеру ячей сита, через которые проходит 10% от общей массы пробы расклинивающего материала, мм.D 10 - the particle diameter of the proppant for hydraulic fracturing, corresponding to the size of the mesh through which 10% of the total mass of the proppant material passes, mm.

Данная конструкция, включающая фильтровую трубу с шириной фильтрующей щели определенной по заявленному соотношению направлена на предотвращение выноса расклинивающего материала (проппанта) из трещин гидроразрыва в скважину.This design, including a filter pipe with a filter slit width determined by the stated ratio, is aimed at preventing proppant from being taken out of hydraulic fractures into the well.

Недостатком данной конструкции является то, что для проведения ГРП требуется колонна насосно-компрессорных труб, оборудованная сдвоенным пакером, что подразумевает появление дополнительных сопротивлений потоку, это повлечет за собой уменьшение концентрации проппанта и соответственно трещина ГРП будет недостаточно эффективна. Также отсутствует возможность контроля фиксации верхнего пакера, а нижний пакер невозможно опрессовать должным образом, т.е. высока вероятность получения негерметичности пакера при ГРП, что приведет к высыпанию проппанта в колонну.The disadvantage of this design is that for hydraulic fracturing, a tubing string equipped with a dual packer is required, which implies the appearance of additional flow resistance, this will entail a decrease in proppant concentration and, accordingly, a hydraulic fracture will not be effective enough. Also, it is not possible to control the fixation of the upper packer, and the lower packer cannot be crimped properly, i.e. there is a high probability of a packer leak during hydraulic fracturing, which will lead to proppant precipitation into the column.

Наиболее близким по технической сущности и достигаемому результату является способ заканчивания строительства добывающей горизонтальной скважины проведением поинтервального гидравлического разрыва пласта (патент RU №2564316), включающий бурение ствола добывающей горизонтальной скважины с определением фильтрационно-емкостных характеристик пласта и их изменения по стволу горизонтальной скважины, разделение ствола скважины на зоны, отличающиеся фильтрационно-емкостными характеристиками пласта в 1,5-1,6 раза, подбор пропускной способности отверстий фильтра отдельно для каждой зоны и количества отверстий в зависимости от фильтрационно-емкостных характеристик, спуск в ствол пробуренной горизонтальной скважины эксплуатационной колонны с фильтром и заколонными нефтенабухающими пакерами, размещение пакеров на границах зон с различающимися фильтрационно-емкостными характеристиками, крепление эксплуатационной колонны, спуск в горизонтальную скважину колонны труб с насосом и запуск горизонтальной скважины в эксплуатацию. Согласно изобретению на наружной поверхности каждого фильтра установлен водонабухающий пакер, выполненный в виде эластичного рукава с отверстиями и натянутый на фильтр, причем отверстия в фильтрах соосны с отверстиями, выполненными в эластичных рукавах, а диаметры отверстий в эластичном рукаве выполнены в два раза больше диаметров отверстий в фильтрах и при контакте с водой отверстия в эластичном рукаве стягиваются и герметично перекрывают снаружи отверстия в фильтрах, производят разъединение технологической колонны труб от заглушенного снизу извлекаемого хвостовика путем срабатывания скважинного разъединителя, после чего извлекают технологическую колонну труб на поверхность.The closest in technical essence and the achieved result is a method of completing the construction of a producing horizontal well by conducting an interval hydraulic fracturing (patent RU No. 2564316), including drilling a trunk of a producing horizontal well with determining the reservoir properties of the formation and their changes along the horizontal wellbore, splitting the trunk wells for zones differing in reservoir properties by a factor of 1.5-1.6, selection of the throughput of the filter holes for each zone and the number of holes depending on the filtration and reservoir characteristics, descent of a production drill string with a filter into the trunk of a drilled horizontal well and annular oil-swellable packers, placement of packers at the borders of zones with different filtration-capacitive characteristics, fixing the production string, lowering the pipe string with the pump into the horizontal well and launching the horizontal wells in operation. According to the invention, a water swellable packer is installed on the outer surface of each filter, made in the form of an elastic sleeve with holes and stretched onto the filter, the holes in the filters being aligned with the holes made in the elastic sleeves, and the diameters of the holes in the elastic sleeve are twice as large as the diameters of the holes in the filters and when in contact with water, the holes in the elastic sleeve are pulled together and hermetically block the holes in the filters from the outside, the pipe string is disconnected from the retractable liner plugged from below by triggering the downhole disconnector, and then the pipe string is removed to the surface.

Недостатками данного способа являются:The disadvantages of this method are:

- набухающие пакера и рукава требуют определенного времени выстойки для их активации или деактивации (в случае с рукавами), надежность которых в пластовых условиях вызывает сомнения и практически невозможно проконтролировать результат;- swelling packers and hoses require a certain dwell time for their activation or deactivation (in the case of hoses), the reliability of which in reservoir conditions is doubtful and it is almost impossible to control the result;

- протяженность зон, разделенных заколонными пакерами для селективного производства ГРП очень ограничена, так как, например, при 100 м зоне невозможно будет изолировать одни рукава (закрыть отверстия) и оставить другие, кроме того, рукава должны будут выдерживать давление, создаваемое при ГРП;- the length of the zones separated by annular packers for the selective production of hydraulic fracturing is very limited, since, for example, at a 100 m zone it will be impossible to isolate one sleeve (close the holes) and leave the others, in addition, the sleeve will have to withstand the pressure created during hydraulic fracturing;

- низкая эффективность, обусловленная тем, что в данном способе не реализованы меры для предотвращения выноса проппанта при эксплуатации скважины.- low efficiency, due to the fact that this method has not implemented measures to prevent proppant removal during well operation.

Предлагаемый способ заканчивания строительства эксплуатационной скважины с горизонтальным окончанием ствола нацелен на устранение недостатков известных способов.The proposed method for completing the construction of a production well with a horizontal end of the barrel is aimed at eliminating the disadvantages of the known methods.

Раскрытие сущности изобретенияDisclosure of the invention

Техническим результатом, на выполнение которого направлено заявляемое техническое решение является повышение эффективности разработки месторождений и более полное извлечение углеводородов из продуктивных пластов за счет селективного производства ГРП, в т.ч. повторного при необходимости, а также увеличение зоны притока углеводородов за счет применения устройств регуляторов потока и эффективное предотвращение выноса проппанта.The technical result, the implementation of which the claimed technical solution is directed, is to increase the efficiency of field development and a more complete extraction of hydrocarbons from productive formations due to the selective production of hydraulic fracturing, including repeated if necessary, as well as an increase in the zone of influx of hydrocarbons through the use of flow control devices and the effective prevention of proppant removal.

Поставленная задача решается способом заканчивания строительства эксплуатационной скважины с горизонтальным окончанием ствола, включающий бурение ствола горизонтальной скважины с определением фильтрационно-емкостных свойств пласта по результатам геофизических исследований, спуск и крепление эксплуатационной колонны до начала горизонтального участка ствола, спуск и установку в горизонтальное окончание ствола нецементируемого хвостовика-фильтра, проведение поинтервального гидравлического разрыва пласта.The problem is solved by the method of completing the construction of a production well with a horizontal end of the well, including drilling a horizontal well with determining the reservoir properties of the reservoir according to the results of geophysical studies, lowering and securing the production string to the beginning of the horizontal section of the well, lowering and installing an uncemented liner in the horizontal end of the well filter, conducting interval hydraulic fracturing.

Технический результат достигается за счет того, что производят спуск и установку нецементируемого хвостовика-фильтра (фиг.) с портами многостадийного гидравлического разрыва пласта 1, 2, 3, 4, 5, фильтрами с регуляторами потока 6, разобщающими пакерами 7, затем производят спуск колонны насосно-компрессорных труб с комплексом подземного оборудования до проектной глубины, производят ввод колонны насосно-компрессорных труб с герметизирующим устройством на нижней трубе в полированное приемное гнездо пакера подвески хвостовика, проводят работы по монтажу колтюбинговой установки и подготовительные работы перед производством гидравлического разрыва пласта (ГРП), затем производят тестовый ГРП в интервале от башмака колонны до первого разобщающего пакера, причем по результатам тестового ГРП производят основной ГРП в данном интервале, далее производят закрытие порта многостадийного гидравлического разрыва пласта 1, открывают порт 2 и приступают к производству работ по ГРП в следующем интервале, аналогичные работы проводятся с последующими портами 3, 4, 5: закрытие предыдущего порта, открытие последующего и производство ГРП в следующем интервале, причем количество циклов работ по ГРП равно количеству портов многостадийного гидравлического разрыва пласта, затем после закрытия последнего порта многостадийного гидравлического разрыва пласта осуществляют открытие регуляторов потока 6, позволяющих увеличить зону притока пластового флюида, демонтируют оборудование ГРП и приступают к освоению скважины.The technical result is achieved due to the fact that they carry out the launch and installation of a cementless shank-filter (Fig.) With ports of multi-stage hydraulic fracturing 1, 2, 3, 4, 5, filters with flow controllers 6, disconnecting packers 7, then run the columns tubing with a complex of underground equipment to the design depth, a column of tubing with a sealing device on the lower pipe is inserted into the polished receiving socket of the liner suspension packer, installation of a coiled tubing installation and preparatory work is carried out before the production of hydraulic fracturing (hydraulic fracturing) then test hydraulic fracturing is performed in the interval from the shoe of the column to the first uncoupling packer, and according to the test hydraulic fracturing, the main hydraulic fracturing is performed in this interval, then the port of multi-stage hydraulic fracturing is closed, port 2 is opened, and hydraulic fracturing is started in the next interval , similar work is carried out with subsequent ports 3, 4, 5: closing the previous port, opening the next one and producing hydraulic fracturing in the next interval, the number of hydraulic fracturing cycles being equal to the number of ports of multistage hydraulic fracturing, then after closing the last port of multistage hydraulic fracturing flow controllers 6, allowing to increase the zone of formation fluid inflow, dismantle the hydraulic fracturing equipment and begin to develop the well.

Таким образом, технический результат, достигаемый с использованием заявленного изобретения, обеспечивает:Thus, the technical result achieved using the claimed invention provides:

- возможность селективной обработки выбранных интервалов;- the ability to selectively process selected intervals;

- увеличение зоны притока пластового флюида за счет устройств регуляторов потока;- increase in the zone of formation fluid inflow due to the devices of flow regulators;

- смену комплекса подземного оборудования без больших объемов глушения скважин;- change of the complex of underground equipment without large volumes of killing wells;

- надежную изоляцию фильтров при проведении операций ГРП;- reliable isolation of filters during hydraulic fracturing operations;

- возможность проведения повторных ГРП при падении продуктивности;- the possibility of repeated hydraulic fracturing in case of a drop in productivity;

- в связи с отсутствием операции по разбуриванию/фрезировке исключение риска скопления на забое металлических остатков;- due to the absence of a drilling / milling operation, eliminating the risk of accumulation of metal residues at the bottom;

- предотвращение разрушения призабойной зоны продуктивного пласта и попадание в скважину песка и других механических примесей через фильтрующий элемент.- preventing the destruction of the bottom-hole zone of the reservoir and the ingress of sand and other mechanical impurities into the well through the filter element.

Краткое описание чертежейBrief Description of the Drawings

На чертеже изображен нецементируемый хвостовик-фильтр с компоновкой для многостадийного гидроразрыва пласта с управляемыми портами и устройствами регулятора потока, гдеThe drawing shows a cementless shank filter with a layout for multi-stage hydraulic fracturing with controlled ports and flow control devices, where

1 - порт многостадийного гидравлического разрыва номер 1,1 - port multi-stage hydraulic fracturing number 1,

2 - порт многостадийного гидравлического разрыва номер 2,2 - port multi-stage hydraulic fracturing number 2,

3 - порт многостадийного гидравлического разрыва номер 3,3 - port multi-stage hydraulic fracturing number 3,

4 - порт многостадийного гидравлического разрыва номер 4,4 - port multi-stage hydraulic fracturing number 4,

5 - порт многостадийного гидравлического разрыва номер 5,5 - port multi-stage hydraulic fracturing number 5,

6 - фильтр с устройством регулятора потока,6 - filter with a device for flow control,

7 - разобщающий пакер. Осуществление изобретения7 - uncoupling packer. The implementation of the invention

Спуск и крепление эксплуатационной колонны производится до начала горизонтального участка ствола. В процессе бурения ствола горизонтальной скважины определяют фильтрационно-емкостные свойства пласта по результатам геофизических исследований. Производят спуск и установку в горизонтальное окончание ствола нецементируемого хвостовика-фильтра, включающего следующие основные элементы, приведенные на фигуре.Launching and fixing the production casing is carried out before the start of the horizontal section of the barrel. In the process of drilling a horizontal wellbore, the reservoir properties of the formation are determined by the results of geophysical studies. Make a descent and installation in the horizontal end of the barrel of the cementless filter shank, which includes the following main elements shown in the figure.

- управляемые порты многостадийного гидравлического разрыва 1, 2, 3, 4, 5;- managed ports of multi-stage hydraulic fracturing 1, 2, 3, 4, 5;

- фильтры с устройством регулятора потока 6;- filters with flow regulator 6;

- разобщающие пакеры 7 гидравлические или набухающие;- uncoupling packers 7 hydraulic or swelling;

- полированное приемное гнездо пакера подвески хвостовика (не показано) для стингерного соединения с комплексом подземного оборудования.- a polished receiving socket for the liner suspension packer (not shown) for the stinger connection with the complex of underground equipment.

Колонну насосно-компрессорных труб с комплексом подземного оборудования спускают до проектной глубины. Производят ввод колонны насосно-компрессорных труб с герметизирующим устройством на нижней трубе (стингером) в приемное гнездо пакера подвески хвостовика и осуществляют посадку разгрузкой. Проводят работы по монтажу колтюбинговой установки и обвязке устья. Проводят подготовительные работы перед производством ГРП. Спускают на безмуфтовой длинномерной трубе переключающий инструмент, активируемый гидромониторным давлением в безмуфтовой длинномерной трубе, который перемещает скользящую втулку порта многостадийного гидравлического разрыва номер 1 в открытое положение. Открытие порта проверяют наличием приемистости скважины через него. Производят подъем переключающего инструмента из скважины.A column of tubing with a complex of underground equipment is lowered to the design depth. A column of tubing is inserted with a sealing device on the lower pipe (stinger) into the receiving socket of the liner suspension packer and landing by unloading. They carry out work on the installation of a coiled tubing installation and piping of the mouth. Conduct preparatory work before the production of hydraulic fracturing. A switching tool is activated on the sleeveless long pipe, activated by the hydraulic pressure in the sleeveless long pipe, which moves the sliding sleeve of port number 1 of the multi-stage hydraulic fracture to the open position. The opening of the port is checked by the presence of the injectivity of the well through it. Make the rise of the switching tool from the well.

Производят закачку порции проппанта и жидкостей ГРП в объеме до одной тонны (тестовый ГРП) в нижнюю, изолированную пакерами 7, зону, проводят запись давления и расхода проппанта и жидкости, обрабатывают результаты и корректируют по полученным данным дизайн основного ГРП (объем проппанта, оптимальный расход при закачке и т.д.). В соответствии с откорректированным планом производится основной ГРП. По окончанию записи параметров ГРП и разрядки скважины после ГРП на первом интервале, производится спуск безмуфтовой длинномерной трубы с промывочной насадкой и инструментом переключения. Вымывается оставшийся в полости хвостовика проппант. Закрывается порт многостадийного гидравлического разрыва 1 при помощи инструмента переключения.A portion of proppant and hydraulic fracturing fluids is injected in a volume of up to one ton (test hydraulic fracturing) into the lower zone isolated by packers 7, the pressure and flow rate of proppant and fluid are recorded, the results are processed and the design of the main hydraulic fracturing is corrected (proppant volume, optimal flow rate) when downloading, etc.). In accordance with the adjusted plan, the main hydraulic fracturing is carried out. At the end of the recording of hydraulic fracturing parameters and the discharge of the well after hydraulic fracturing in the first interval, a sleeveless long pipe with a flushing nozzle and a switching tool is lowered. The proppant remaining in the shank cavity is washed out. The multi-stage hydraulic fracture port 1 closes with the switching tool.

Далее перемещают переключающий инструмент на глубину установки следующего порта многостадийного гидравлического разрыва номер 2, открывают порт и выполняют работы по производству ГРП, далее одним спуском переключающего инструмента осуществляют закрытие порта многостадийного гидравлического разрыва 2. Для последующих интервалов проводят работы по ГРП аналогично, причем количество циклов работ по ГРП равно количеству портов многостадийного гидравлического разрыва (порты многостадийного гидравлического разрыва номер 3, 4, 5), после закрытия последнего порта многостадийного гидравлического разрыва переключающим инструментом на безмуфтовой длинномерной трубе осуществляют открытие регуляторов потока 6, производят подъем безмуфтовой длинномерной трубы, демонтируют оборудование ГРП и приступают к освоению скважины.Next, the switch tool is moved to the installation depth of the next multi-stage hydraulic fracture port number 2, the port is opened and hydraulic fracturing production is performed, then, with the lowering of the switching tool, the multi-stage hydraulic fracture port is closed 2. For the next intervals, hydraulic fracturing is carried out similarly, with the number of work cycles in hydraulic fracturing is equal to the number of multistage hydraulic fracture ports (multistage hydraulic fracture ports 3, 4, 5), after closing the last multistage hydraulic fracture port with switching tool on a sleeveless long pipe, flow regulators 6 are opened, the sleeveless long pipe is raised, hydraulic fracturing equipment is removed and begin to develop the well.

Claims (1)

Способ заканчивания строительства эксплуатационной скважины с горизонтальным окончанием ствола, включающий бурение ствола горизонтальной скважины с определением фильтрационно-емкостных свойств пласта по результатам геофизических исследований, спуск и крепление эксплуатационной колонны до начала горизонтального участка ствола, спуск и установку в горизонтальное окончание ствола нецементируемого хвостовика-фильтра, проведение поинтервального гидравлического разрыва пласта, отличающийся тем, что производят спуск и установку нецементируемого хвостовика-фильтра с разобщающими пакерами, портами многостадийного гидравлического разрыва пласта, регуляторами потока, затем производят спуск колонны насосно-компрессорных труб с комплексом подземного оборудования до проектной глубины, производят ввод колонны насосно-компрессорных труб с герметизирующим устройством на нижней трубе в полированное приемное гнездо пакера подвески хвостовика, проводят монтаж колтюбинговой установки и подготовительные работы перед производством гидравлического разрыва пласта (ГРП), затем производят тестовый ГРП в интервале от башмака колонны до первого разобщающего пакера, причем по результатам тестового ГРП производят основной ГРП в данном интервале, затем в последующих интервалах проводят работы по ГРП аналогично, причем количество циклов работ по ГРП равно количеству портов многостадийного гидравлического разрыва пласта, затем после закрытия последнего порта многостадийного гидравлического разрыва пласта осуществляют открытие регуляторов потока.A method of completing the construction of a production well with a horizontal end of the wellbore, including drilling a horizontal wellbore with determining the reservoir properties of the reservoir according to the results of geophysical studies, lowering and securing the production string to the beginning of the horizontal section of the wellbore, lowering and installing an uncemented filter liner in the horizontal end of the wellbore, conducting interval hydraulic fracturing, characterized in that the cement-free filter liner is run and installed with uncoupling packers, multi-stage hydraulic fracturing ports, flow controllers, then the tubing string with the complex of underground equipment is lowered to the design depth, the string is introduced tubing with a sealing device on the lower pipe into the polished receiving socket of the liner suspension packer, the coiled tubing installation and preparatory work are carried out bots before the production of hydraulic fracturing (Fracturing), then they produce test hydraulic fracturing in the interval from the shoe of the column to the first uncoupling packer, and according to the results of the test hydraulic fracturing, the main hydraulic fracturing is performed in this interval, then in subsequent intervals hydraulic fracturing is carried out similarly, with the number of work cycles according to hydraulic fracturing is equal to the number of ports of multistage hydraulic fracturing, then after closing the last port of multistage hydraulic fracturing, flow controllers are opened.
RU2019140634A 2019-12-10 2019-12-10 Method for completion of construction of production well with horizontal end of wellbore RU2726096C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2019140634A RU2726096C1 (en) 2019-12-10 2019-12-10 Method for completion of construction of production well with horizontal end of wellbore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2019140634A RU2726096C1 (en) 2019-12-10 2019-12-10 Method for completion of construction of production well with horizontal end of wellbore

Publications (1)

Publication Number Publication Date
RU2726096C1 true RU2726096C1 (en) 2020-07-09

Family

ID=71510599

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2019140634A RU2726096C1 (en) 2019-12-10 2019-12-10 Method for completion of construction of production well with horizontal end of wellbore

Country Status (1)

Country Link
RU (1) RU2726096C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2757238C1 (en) * 2020-12-08 2021-10-12 федеральное государственное бюджетное образовательное учреждение высшего образования «Белгородский государственный технологический университет им. В.Г. Шухова» Composition for the arrangement of functional layers of the roadbed
RU2777032C1 (en) * 2022-02-27 2022-08-01 Общество с ограниченной ответственностью "НАБЕРЕЖНОЧЕЛНИНСКИЙ ТРУБНЫЙ ЗАВОД" Set of equipment for multi-stage hydraulic fracturing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7267172B2 (en) * 2005-03-15 2007-09-11 Peak Completion Technologies, Inc. Cemented open hole selective fracing system
EA012821B1 (en) * 2006-03-30 2009-12-30 Шлюмбергер Текнолоджи Б.В. Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly
RU2453695C1 (en) * 2011-09-06 2012-06-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Productive formation hydraulic fracturing method
RU2597231C1 (en) * 2012-12-21 2016-09-10 Ресорс Комплишн Системз Инк. Multistep isolation of well and hydraulic fracturing
RU2606479C2 (en) * 2010-12-17 2017-01-10 Веллтек А/С Completion of well
RU175464U1 (en) * 2017-01-17 2017-12-06 Общество с ограниченной ответственностью "Газпром добыча Уренгой" TAIL FOR CONDUCTING A MULTI-STAGE HYDRAULIC FRACTURE OF A PRODUCTIVE LAYER IN A WELL
RU185859U1 (en) * 2018-07-13 2018-12-20 Игорь Александрович Гостев DEVICE FOR CARRYING OUT A MULTI-STAGE HYDRAULIC GROUND RIG (MHF) FOR ONE LIFT-LIFTING OPERATION
RU2702037C1 (en) * 2019-01-18 2019-10-03 Общество с ограниченной ответственностью "ВОРМХОЛС Внедрение" Method for increasing efficiency of oil and gas production at implementation of multi-stage hydraulic fracturing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7267172B2 (en) * 2005-03-15 2007-09-11 Peak Completion Technologies, Inc. Cemented open hole selective fracing system
EA012821B1 (en) * 2006-03-30 2009-12-30 Шлюмбергер Текнолоджи Б.В. Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly
RU2606479C2 (en) * 2010-12-17 2017-01-10 Веллтек А/С Completion of well
RU2453695C1 (en) * 2011-09-06 2012-06-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Productive formation hydraulic fracturing method
RU2597231C1 (en) * 2012-12-21 2016-09-10 Ресорс Комплишн Системз Инк. Multistep isolation of well and hydraulic fracturing
RU175464U1 (en) * 2017-01-17 2017-12-06 Общество с ограниченной ответственностью "Газпром добыча Уренгой" TAIL FOR CONDUCTING A MULTI-STAGE HYDRAULIC FRACTURE OF A PRODUCTIVE LAYER IN A WELL
RU185859U1 (en) * 2018-07-13 2018-12-20 Игорь Александрович Гостев DEVICE FOR CARRYING OUT A MULTI-STAGE HYDRAULIC GROUND RIG (MHF) FOR ONE LIFT-LIFTING OPERATION
RU2702037C1 (en) * 2019-01-18 2019-10-03 Общество с ограниченной ответственностью "ВОРМХОЛС Внедрение" Method for increasing efficiency of oil and gas production at implementation of multi-stage hydraulic fracturing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2757238C1 (en) * 2020-12-08 2021-10-12 федеральное государственное бюджетное образовательное учреждение высшего образования «Белгородский государственный технологический университет им. В.Г. Шухова» Composition for the arrangement of functional layers of the roadbed
RU2777032C1 (en) * 2022-02-27 2022-08-01 Общество с ограниченной ответственностью "НАБЕРЕЖНОЧЕЛНИНСКИЙ ТРУБНЫЙ ЗАВОД" Set of equipment for multi-stage hydraulic fracturing

Similar Documents

Publication Publication Date Title
US2785754A (en) Permanent well completion
US5722490A (en) Method of completing and hydraulic fracturing of a well
US7096945B2 (en) Sand control screen assembly and treatment method using the same
US6675891B2 (en) Apparatus and method for gravel packing a horizontal open hole production interval
US5865252A (en) One-trip well perforation/proppant fracturing apparatus and methods
US6814144B2 (en) Well treating process and system
US8267173B2 (en) Open hole completion apparatus and method for use of same
US6186236B1 (en) Multi-zone screenless well fracturing method and apparatus
US9249652B2 (en) Controlled fracture initiation stress packer
US6533037B2 (en) Flow-operated valve
RU2485290C1 (en) Development method by horizontal well of formation with zones of various permeability
US6173783B1 (en) Method of completing and producing hydrocarbons in a well
US10648285B2 (en) Fracturing system and method
US2798558A (en) Well completion apparatus
US9926772B2 (en) Apparatus and methods for selectively treating production zones
RU2726096C1 (en) Method for completion of construction of production well with horizontal end of wellbore
US10370916B2 (en) Apparatus and methods for locating a particular location in a wellbore for performing a wellbore operation
WO2019040798A1 (en) Toe valve
RU2732891C1 (en) Method for multi-stage hydraulic fracturing in well with horizontal termination
NO20101750A1 (en) Parallel fracturing system for wellbores
US10415361B1 (en) Separating gas and liquid in a wellbore
US20090101343A1 (en) High rate gravel packing
US20140345869A1 (en) Moving liner fracturing method
RU2689936C2 (en) Method of hydraulic intensification and corresponding device of hydraulic intensification
RU2564316C1 (en) Method of completion of horizontal production well construction with deposit interval hydraulic fracturing