RU2627795C1 - Bitumnious oil field development method - Google Patents

Bitumnious oil field development method Download PDF

Info

Publication number
RU2627795C1
RU2627795C1 RU2016125029A RU2016125029A RU2627795C1 RU 2627795 C1 RU2627795 C1 RU 2627795C1 RU 2016125029 A RU2016125029 A RU 2016125029A RU 2016125029 A RU2016125029 A RU 2016125029A RU 2627795 C1 RU2627795 C1 RU 2627795C1
Authority
RU
Russia
Prior art keywords
wells
well
injection
pressure
gas
Prior art date
Application number
RU2016125029A
Other languages
Russian (ru)
Inventor
Азат Тимерьянович Зарипов
Руслан Ильдарович Хафизов
Дамир Камилевич Шайхутдинов
Original Assignee
Публичное акционерное общество "Татнефть" имени В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Публичное акционерное общество "Татнефть" имени В.Д. Шашина filed Critical Публичное акционерное общество "Татнефть" имени В.Д. Шашина
Priority to RU2016125029A priority Critical patent/RU2627795C1/en
Application granted granted Critical
Publication of RU2627795C1 publication Critical patent/RU2627795C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

FIELD: mining.
SUBSTANCE: bituminous oil filed development method includes construction of production and injection wells with horizontal sections located one above the other in productive reservoir stratum, injection of water vapor into both wells to create permeable zone between horizontal sections, injection of water vapor into the upper injection well and extraction of products from the lower production well. And before commencement of construction, the filed is studied to select areas with gas caps, horizontal sections of the wells are located below the gas cap, and pressure control devices are installed in the wells during construction. Steam injection into both wells and then into the injection well is performed at a pressure not exceeding the pressure in the gas cap.
EFFECT: increase in the oil recovery factor in fileds with gas caps, while reducing costs by eliminating the outbreak of heat carrier into gas caps.
1 dwg, 1 ex

Description

Изобретение относится к области горного дела и может быть использовано для разработки залежей углеводородных флюидов, в частности, при добыче высоковязкой нефти и природного битума.The invention relates to the field of mining and can be used to develop deposits of hydrocarbon fluids, in particular, in the production of highly viscous oil and natural bitumen.

Известен способ разработки залежи вязкой нефти и битума (патент RU №2322576, МПК Е21В 43/24, опубл. Бюл. №11 от 20.04.2008), включающий бурение добывающей двухустьевой скважины, крепление ее эксплуатационной колонной с перфорированным участком, расположенным в продуктивном пласте, размещение в полости скважины поршня с силовыми тягами, которые на устьях скважины соединены с приводным узлом, причем поршень выполнен с возможностью реверсивного движения в скважине, дополнительно бурят нагнетательную скважину с профилем, параллельным профилю добывающей скважины, крепят ее эксплуатационной колонной с перфорированным участком, расположенным в том же продуктивном пласте выше добывающей скважины, поршень устанавливают с возможностью взаимодействия непосредственно с эксплуатационной колонной добывающей скважины и реверсивного перемещения в ее пределах, скоростью перемещения поршня обеспечивают отбор вязкой нефти и битума со скоростью, превышающей скорость обратной фильтрации нефти из полости скважины перед движущимся поршнем, в пласт на силовых тягах с обеих сторон поршня устанавливают глубинные датчики для контроля температуры и давления в процессе отбора продукции из добывающей скважины.A known method of developing a deposit of viscous oil and bitumen (patent RU No. 2323276, IPC EV 43/24, publ. Bull. No. 11 of 04/20/2008), including drilling a producing double-well well, securing it with a production string with a perforated section located in the reservoir the placement of a piston with power rods in the well cavity, which are connected to the drive unit at the wellheads, the piston being capable of reversing movement in the well, an injection well is additionally drilled with a profile parallel to the production profile wells, fastened by its production casing with a perforated section located in the same reservoir above the production well, the piston is installed with the possibility of interaction directly with the production casing of the production well and reverse movement within it, the speed of the piston provides the selection of viscous oil and bitumen at a speed exceeding the rate of reverse oil filtration from the well cavity in front of the moving piston, in the reservoir using power rods on both sides of the piston Depth sensors are available to monitor temperature and pressure during the selection process from the production well.

Недостатками способа являются большая обводненность продукции из-за прорыва воды из нижележащего водоносного пласта в добывающую скважину, - снижение пластового давления, - затрудненный подъем жидкости (добываемой продукции пласта) на поверхность. Невозможность проводить исследования месторождений для выделения участков с наличием газовых шапок, так как прорыв в газовую шапку будет приводить к большой потере теплоносителя и значительным экономическим затратам.The disadvantages of the method are the large water cut of the product due to the breakthrough of water from the underlying aquifer into the producing well, a decrease in reservoir pressure, and difficulty in raising the fluid (produced reservoir products) to the surface. The inability to conduct field studies to identify areas with gas caps, since a break in the gas cap will lead to a large loss of coolant and significant economic costs.

Известен способ разработки залежи высоковязкой нефти и битума при тепловом воздействии (патент RU №2425969, МПК Е21В 43/24, опубл. Бюл. №22 от 10.08.2011), включающий строительство добывающей скважины с горизонтальным вскрытым участком в продуктивном пласте, строительство нагнетательной скважины с горизонтальным вскрытым участком, расположенным над аналогичным участком добывающей скважины в этом же пласте, закачку теплоносителя в нагнетательную скважину и отбор продукции пласта из добывающей скважины, в котором горизонтальные скважины бурят параллельно в противоположных направлениях с размещением забоя напротив входа горизонтальной близлежащей скважины в пласт.A known method of developing deposits of highly viscous oil and bitumen during thermal exposure (patent RU No. 2425969, IPC EV 43/24, publ. Bull. No. 22 of 08/10/2011), including the construction of a producing well with a horizontal exposed section in the reservoir, the construction of an injection well with a horizontal uncovered section located above a similar section of a producing well in the same formation, pumping coolant into an injection well and selecting production of a formation from a producing well in which horizontal wells drill paral in opposite directions with the placement of the face opposite the entrance of a horizontal nearby well into the formation.

Недостатками способа являются сложность контроля и регулирования самого процесса теплового воздействия, а также потери углеводородов при его реализации; невозможность проводить исследования месторождений для выделения участков с наличием газовых шапок, так как прорыв в газовую шапку будет приводить к большой потере теплоносителя и значительным экономическим затратам.The disadvantages of the method are the complexity of control and regulation of the process of heat exposure, as well as the loss of hydrocarbons during its implementation; the inability to conduct field research to identify areas with gas caps, since a break in the gas cap will lead to a large loss of coolant and significant economic costs.

Наиболее близким по технической сущности и достигаемому результату является способ разработки залежи высоковязкой нефти (патент RU №2287677, МПК Е21В 43/24, опубл. Бюл. №32 от 20.11.2006). Способ включает строительство добывающей двухустьевой горизонтальной скважины и параллельно ей построенную нагнетательную двухустьевую горизонтальную скважину, создание проницаемой зоны между скважинами за счет нагнетания водяного пара в обе скважины. После создания проницаемой зоны подают пар только в нагнетательную двухустьевую горизонтальную скважину, а по добывающей двухустьевой горизонтальной скважине отбирают продукцию, при этом степень сухости закачиваемого пара периодически чередуют, вначале закачивают пар высокой степени сухости до увеличения приемистости нагнетательной двухустьевой горизонтальной скважины и доли пара в отбираемой продукции, а затем закачивают пар в малой степени сухости, объем которого определяют по повышению давления нагнетания, которое поддерживают не превышающим давления раскрытия вертикальных трещин, а продукцию отбирают по добывающей двухустьевой горизонтальной скважине до полной выработки продуктивного пласта.The closest in technical essence and the achieved result is a method of developing a highly viscous oil deposit (patent RU No. 2287677, IPC E21B 43/24, publ. Bull. No. 32 from 11/20/2006). The method includes the construction of a producing double-well horizontal well and a parallel built double-well horizontal well, creating a permeable zone between the wells by injecting water vapor into both wells. After the creation of the permeable zone, steam is supplied only to the injection double-well horizontal well, and products are taken from the producing double-well horizontal well, while the degree of dryness of the injected steam is periodically alternated, at first high-dry steam is pumped to increase the injectivity of the double-well horizontal well and the proportion of steam in the selected product and then steam is injected in a small degree of dryness, the volume of which is determined by the increase in discharge pressure, which I maintain not exceeding the opening pressure of the vertical cracks and the product collected by extractive dvuhustevoy horizontal well to completely deplete the producing formation.

Недостатки этого способа - невозможность исследования месторождений для выделения участков с наличием газовых шапок, что приведет к неоптимальной закачке пара (теплоносителя) и, как следствие, к значительным энергетическим затратам и снижению прогрева и добычи высоковязкой нефти, так как при закачке пара в нагнетательную скважину будут происходить большие теплопотери за счет утечки пара в газовую шапку.The disadvantages of this method are the impossibility of exploring deposits to highlight areas with gas caps, which will lead to suboptimal injection of steam (coolant) and, as a result, to significant energy costs and reduce heating and production of highly viscous oil, since when injecting steam into the injection well, large heat loss due to steam leakage into the gas cap.

Техническими задачами способа разработки залежей битуминозной нефти являются расширение функциональных возможностей за счет применения на залежах с наличием газовых шапок и снижение затрат на прогрев продуктивного пласта за счет исключения прорыва теплоносителя в газовые шапки, что в совокупности приводит к экономии энергетических ресурсов и увеличению коэффициента извлечения нефти (КИН).The technical objectives of the method for developing tar oil deposits are to expand the functionality due to the use of gas caps on the deposits and reduce the cost of heating the reservoir by eliminating the breakthrough of the coolant in the gas caps, which together leads to energy savings and an increase in the oil recovery coefficient ( CIN).

Технические задачи решаются способом разработки залежи битуминозной нефти, включающим строительство добывающей и нагнетательной скважин с горизонтальными участками, располагаемыми друг над другом в продуктивном пласте залежи, нагнетание водяного пара в обе скважины до создания проницаемой зоны между горизонтальными участками, нагнетание водяного пара в верхнюю нагнетательную скважину и отбор продукции из нижней добывающей скважины.Technical problems are solved by the method of developing a tar oil deposit, including the construction of production and injection wells with horizontal sections located one above the other in the reservoir, injecting water vapor into both wells to create a permeable zone between horizontal sections, injecting water vapor into the upper injection well and selection of products from the lower producing well.

Новым является то, что до начала строительства производят исследования залежи для выделения участков с наличием газовых шапок, горизонтальные участки скважин располагают ниже газовой шапки, при строительстве в скважинах располагают устройства контроля давления, причем закачку пара в обе скважины, а потом в нагнетательную скважину производят при давлении, не превышающем давления в газовой шапке.What is new is that before the start of construction, deposits are studied to identify areas with gas caps, horizontal sections of wells are located below the gas caps, during construction, pressure monitoring devices are installed in the wells, and steam is injected into both wells and then into the injection well pressure not exceeding the pressure in the gas cap.

На чертеже изображена схема реализации способа разработки залежи битуминозной нефти.The drawing shows a diagram of an implementation of a method for developing a tar oil deposit.

Способ реализуется в следующей последовательности.The method is implemented in the following sequence.

Исследуют залежь 1 для выделения участков с наличием газовых шапок 2 при помощи промыслово-геофизических методов, например импульсного нейтрон-нейтронного каротажа. Производят строительство пар расположенных друг над другом добывающих 3 и нагнетательных 4 скважин с соответствующими горизонтальными участками 5 и 6. Горизонтальные участки 5 и 6 скважин 3 и 4 располагают ниже газовой шапки 2. При строительстве в скважинах располагают устройства 7 контроля давления и температуры. Производят закачку теплоносителя через колонну труб 8 верхних нагнетательных скважин 4 и нижних добывающих 3 скважин с прогревом продуктивного пласта залежи 1 и созданием паровой камеры 9. Производят закачку в нагнетательную 4 и добывающую 5 скважины при давлении в призабойной зоне скважин 4 и 5 меньше (например, на 10-15%), чем давление в газовой шапке 2, не допуская утечку закачиваемого пара через кровлю нефтеносного продуктивного пласта 1 залежи в газовую шапку 2. Создают гидродинамическую связь между горизонтальными участками 5 и 6 скважин 3 и 4. После создания гидродинамической связи между скважинами 3 и 4 производят отбор продукции за счет парогравитационного дренажа через добывающую скважину 3 и контроль за состоянием паровой камеры 9, при помощи наблюдательных скважин (не показаны) и аэрофотосъемки, а также снятия термограммы в горизонтальном участке 6 добывающей скважины 3 с определением зон наименьшего прогрева (не показаны). При превышении температуры в добывающей скважине, выше допустимой температуры для отбирающего глубинно-насосного оборудования (не показаны), которую определяют устройством контроля 7 давления и температуры, приводящей к прорыву пара к забою добывающей скважины 3, закачку теплоносителя в нагнетательную скважину 4 снижают. В качестве теплоносителя используется перегретый пар или пар с инертным газом. Закачку пара производят при давлении в нагнетательной скважине 4 меньшем, чем давление в газовой шапке 2. Пример конкретного выполнения.Investigate reservoir 1 to identify areas with the presence of gas caps 2 using field-geophysical methods, such as pulsed neutron-neutron logging. The pairs of production 3 and injection 4 wells located one above the other are constructed with the corresponding horizontal sections 5 and 6. The horizontal sections 5 and 6 of wells 3 and 4 are located below gas cap 2. During construction, pressure and temperature control devices 7 are located in the wells. The coolant is injected through the pipe string 8 of the upper injection wells 4 and the lower production 3 wells with heating the reservoir 1 and creating a steam chamber 9. They are injected into the injection 4 and production 5 wells at a pressure in the bottom-hole zone of wells 4 and 5 less (for example, 10-15%) than the pressure in the gas cap 2, preventing leakage of injected steam through the roof of the oil-bearing reservoir 1 of the reservoir into the gas cap 2. Create a hydrodynamic connection between the horizontal sections 5 and 6 of wells 3 and 4. After creating a hydrodynamic connection between wells 3 and 4, products are selected due to steam gravity drainage through the producing well 3 and the state of the steam chamber 9 is monitored using observation wells (not shown) and aerial photography, as well as taking a thermogram in the horizontal section 6 of the producing well 3 with determination of the zones of least warm-up (not shown). When the temperature in the production well is exceeded, above the permissible temperature for the selection of downhole pumping equipment (not shown), which is determined by the pressure and temperature control device 7, which leads to steam breakthrough to the bottom of the production well 3, the coolant pumping into the injection well 4 is reduced. Superheated steam or steam with an inert gas is used as a heat carrier. Steam is produced at a pressure in the injection well 4 less than the pressure in the gas cap 2. An example of a specific implementation.

Предложенный способ разработки залежи углеводородных флюидов был рассмотрен на Улановском поднятии Ново-Елховского месторождения, исследования которой определили участок со следующими геолого-физическими характеристиками:The proposed method for developing a hydrocarbon fluid reservoir was considered at the Ulanovsky uplift of the Novo-Elkhovsky field, the studies of which determined a site with the following geological and physical characteristics:

- глубина залегания - 150 м;- occurrence depth - 150 m;

- средняя общая толщина пласта - 31 м;- the average total thickness of the reservoir is 31 m;

- нефтенасыщенная толщина пласта - 18 м;- oil saturated layer thickness - 18 m;

- значение начального пластового давления - 0,9 МПа;- the value of the initial reservoir pressure is 0.9 MPa;

- начальная пластовая температура - 8°С;- initial reservoir temperature - 8 ° C;

- плотность нефти в пластовых условиях - 1,01 т/м3;- the density of oil in reservoir conditions - 1.01 t / m 3 ;

- коэффициент динамической вязкости нефти в пластовых условиях - 480140,5 мПа⋅с;- coefficient of dynamic viscosity of oil in reservoir conditions - 480140.5 mPa⋅s;

- коэффициент динамической вязкости воды в пластовых условиях - 1,3 мПа⋅с;- coefficient of dynamic viscosity of water in reservoir conditions - 1.3 mPa⋅s;

- значение средней проницаемости по керну в пласте - 296 мкм2;- the value of the average core permeability in the reservoir - 296 μm 2 ;

- значение средней пористости по керну в пласте - 0,16 д. ед.;- the value of the average core porosity in the reservoir is 0.16 units;

- средняя толщина газовой шапки на разрабатываемом участке - 7 м;- the average thickness of the gas cap in the developed section is 7 m;

- давление в газовой шапке - 0,9 МПа.- pressure in the gas cap is 0.9 MPa.

Исследуют залежь 1 для выделения участков с наличием газовых шапок 2. Газонасыщение в газовой шапке 2 составляло 70%. Расположили добывающую скважину в нефтяной залежи 1. Над добывающей скважиной 2 на расстоянии 5 м расположили нагнетательную скважину 3 с соответствующими горизонтальными участками 5 и 6. Добывающую скважину оборудовали устройством контроля температуры и давления 7. Горизонтальный участок 5 скважины 4 расположили ниже газовой шапки 2 на 4 м. После обустройства добывающей 2 и нагнетательной 3 скважин через колонну труб 8 нагнетательной скважины 3 производили закачку рабочего агента в объеме 5 тыс.т. В качестве теплоносителя использовался пар с температурой 191°С и сухостью 0,9 д. ед. Также производили закачку пара через добывающую скважину 3 для создания гидродинамической связи между скважинами 3 и 4. После прогрева призабойной зоны горизонтальной нагнетательной скважины 3 горизонтальная добывающая скважина 2 была введена в добычу, а горизонтальная нагнетательная скважина 3 - под постоянную закачку для создания паровой камеры 9.Investigate reservoir 1 to identify areas with gas caps 2. Gas saturation in gas cap 2 was 70%. The production well was located in the oil reservoir 1. Above the production well 2 at a distance of 5 m, the injection well 3 with the corresponding horizontal sections 5 and 6 was located. The producing well was equipped with a temperature and pressure control device 7. The horizontal section 5 of the well 4 was located below the gas cap 2 by 4 m. After equipping production 2 and injection 3 wells through a pipe string 8 of injection well 3, the working agent was pumped in the amount of 5 thousand tons. The heat carrier was steam with a temperature of 191 ° C and a dryness of 0.9 units. Steam was also injected through production well 3 to create a hydrodynamic connection between wells 3 and 4. After heating the bottom-hole zone of the horizontal injection well 3, the horizontal production well 2 was put into production, and the horizontal injection well 3 was injected continuously to create the steam chamber 9.

При повышении температуры до 120°С в добывающей скважине 2 объем закачиваемого пара снизили на 20,5% во избежание прорыва пара к добывающей скважине и для поддержания паровой камеры, контролируя с помощью устройства 7 контроля давления и температуры. Тепло от пара снизило вязкость тяжелой нефти, что способствовало ее продвижению к горизонтальному стволу 6 добывающей скважины 3. Производили закачку из горизонтальной части 5 нагнетательной скважины 4 при давлении в призабойной зоне нагнетательной скважине 3 меньшем на 12,7%, чем давление (0,9 МПа) в газовой шапке 2, не допуская утечку закачиваемого пара через кровлю нефтеносной залежи 1 в газовую шапку 2 залежи 1.When the temperature rises to 120 ° C in production well 2, the volume of injected steam was reduced by 20.5% in order to avoid breakthrough of steam to the production well and to maintain the steam chamber by monitoring pressure and temperature control devices 7. The heat from the steam reduced the viscosity of the heavy oil, which facilitated its advancement to the horizontal wellbore 6 of the producing well 3. The horizontal wellhead 5 of injection well 4 was injected at a pressure in the bottom-hole zone of injection well 3 lower by 12.7% than the pressure (0.9 MPa) in gas cap 2, preventing leakage of injected steam through the roof of oil reservoir 1 into gas cap 2 of reservoir 1.

При исследовании выявлены преимущества способа перед прототипом: снижение неэффективной закачки пара в 3,6 раза по отношению к прототипу, снижение процента обводненности добываемой продукции из пласта на 12%, уменьшение вероятности прорыва теплоносителя в добывающую скважину, накопленная добыча нефти выше, чем по прототипу, на 7,6%.The study revealed the advantages of the method over the prototype: a decrease in inefficient steam injection by 3.6 times in relation to the prototype, a decrease in the percentage of water cut in the produced products from the reservoir by 12%, a decrease in the likelihood of a coolant breaking into the producing well, cumulative oil production is higher than in the prototype, by 7.6%.

Предложенный способ позволяет решать поставленные технические задачи, такие как увеличение КИН на 0,12 дол. единиц, увеличение продолжительности эксплуатации месторождения, а также снижение затрат на прогрев пласта на 25%.The proposed method allows you to solve the technical problems, such as increasing the recovery factor by 0.12 dollars. units, increasing the duration of the field’s operation, as well as reducing the cost of heating the reservoir by 25%.

Пример осуществления предлагаемого изобретения показывает его эффективность для разработки разведанных, но неэксплуатируемых (из-за высокой стоимости извлечения вязкого флюида) месторождений углеводородного сырья, для повышения рентабельности разрабатываемых месторождений высоковязкой нефти и природных битумов.An example implementation of the present invention shows its effectiveness for the development of proven but non-exploitable (due to the high cost of extracting viscous fluid) hydrocarbon deposits, to increase the profitability of the developed fields of high viscosity oil and natural bitumen.

Предлагаемый способ разработки залежи битуминозной нефти позволяет расширить функциональные возможности за счет применения на залежах с наличием газовых шапок и снизить затраты на прогрев продуктивного пласта за счет исключения прорыва теплоносителя в газовые шапки, что в совокупности приводит к экономии энергетических ресурсов и увеличению КИН.The proposed method for the development of bituminous oil deposits allows you to expand the functionality due to the use of gas caps on the deposits and reduce the cost of heating the reservoir by eliminating the breakthrough of the coolant in the gas caps, which together leads to energy savings and an increase in oil recovery factor.

Claims (1)

Способ разработки залежи битуминозной нефти, включающий строительство добывающей и нагнетательной скважин с горизонтальными участками, располагаемыми друг над другом в продуктивном пласте залежи, нагнетание водяного пара в обе скважины до создания проницаемой зоны между горизонтальными участками, нагнетание водяного пара в верхнюю нагнетательную скважину и отбор продукции из нижней добывающей скважины, отличающийся тем, что до начала строительства производят исследования залежи для выделения участков с наличием газовых шапок, горизонтальные участки скважин располагают ниже газовой шапки, при строительстве в скважинах располагают устройства контроля давления, причем закачку пара в обе скважины, а потом в нагнетательную скважину производят при давлении, не превышающем давления в газовой шапке.A method of developing a tar oil deposit, including the construction of production and injection wells with horizontal sections located one above the other in the reservoir, injecting water vapor into both wells to create a permeable zone between the horizontal sections, injecting water vapor into the upper injection well and selecting products from lower producing well, characterized in that before the start of construction, studies of the deposit are made to identify areas with gas caps, burn the horizontal sections of the wells are located below the gas cap, during construction, pressure control devices are installed in the wells, and steam is injected into both wells and then into the injection well at a pressure not exceeding the pressure in the gas cap.
RU2016125029A 2016-06-22 2016-06-22 Bitumnious oil field development method RU2627795C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016125029A RU2627795C1 (en) 2016-06-22 2016-06-22 Bitumnious oil field development method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016125029A RU2627795C1 (en) 2016-06-22 2016-06-22 Bitumnious oil field development method

Publications (1)

Publication Number Publication Date
RU2627795C1 true RU2627795C1 (en) 2017-08-11

Family

ID=59641659

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016125029A RU2627795C1 (en) 2016-06-22 2016-06-22 Bitumnious oil field development method

Country Status (1)

Country Link
RU (1) RU2627795C1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2250648C (en) * 1998-10-19 2002-09-24 Eddy Isaacs Enhanced oil recovery by altering wettability
RU2287677C1 (en) * 2005-12-16 2006-11-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for extracting oil-bitumen deposit
RU2312983C1 (en) * 2006-04-10 2007-12-20 Федеральное агентство по образованию Российский Государственный Университет нефти и газа им. И.М. Губкина Method to develop oil deposit with gas cap (variants)
RU2342522C1 (en) * 2007-04-26 2008-12-27 Владислав Иванович Корпусов Cyclic method of hydrocarbon deposits development of wells with horizontal borehole
RU2386804C1 (en) * 2008-12-04 2010-04-20 Государственное Образовательное Учреждение Высшего Профессионального Образования "Российский Государственный Университет Нефти И Газа Им. И.М. Губкина" Method of oil pool development with gas cap and bottom water
RU2543009C1 (en) * 2014-04-23 2015-02-27 Общество с ограниченной ответственностью "Петролеум Технолоджис" Gas-oil deposit development method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2250648C (en) * 1998-10-19 2002-09-24 Eddy Isaacs Enhanced oil recovery by altering wettability
RU2287677C1 (en) * 2005-12-16 2006-11-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for extracting oil-bitumen deposit
RU2312983C1 (en) * 2006-04-10 2007-12-20 Федеральное агентство по образованию Российский Государственный Университет нефти и газа им. И.М. Губкина Method to develop oil deposit with gas cap (variants)
RU2342522C1 (en) * 2007-04-26 2008-12-27 Владислав Иванович Корпусов Cyclic method of hydrocarbon deposits development of wells with horizontal borehole
RU2386804C1 (en) * 2008-12-04 2010-04-20 Государственное Образовательное Учреждение Высшего Профессионального Образования "Российский Государственный Университет Нефти И Газа Им. И.М. Губкина" Method of oil pool development with gas cap and bottom water
RU2543009C1 (en) * 2014-04-23 2015-02-27 Общество с ограниченной ответственностью "Петролеум Технолоджис" Gas-oil deposit development method

Similar Documents

Publication Publication Date Title
RU2287677C1 (en) Method for extracting oil-bitumen deposit
RU2295030C1 (en) Method for extracting layer-zone-wise heterogeneous formation of highly viscous oil or bitumen
RU2522369C1 (en) Method for development of high-viscosity oil and/or bitumen deposits with oil-water zones
US3692111A (en) Stair-step thermal recovery of oil
RU2527051C1 (en) Method for development of high-viscous oil deposits or bitumens at thermal effect
RU2582251C1 (en) Development method of layer-by-zonal heterogeneous superviscous oil or bitumen
RU2582529C1 (en) Development method of layer-by-zonal heterogeneous superviscous oil or bitumen
RU2582256C1 (en) Method for development of high-viscosity oil or bitumen
RU2478164C1 (en) Development method of oil deposit located above gas deposit and separated from it with non-permeable interlayer
RU2567918C1 (en) Development method of multilayer non-homogeneous oil deposit
RU2343276C1 (en) Method of development of high viscous oil deposit
RU2506417C1 (en) Development method of high-viscosity oil deposit
RU2509880C1 (en) Development method of deposits of viscous oils and bitumens
RU2395676C1 (en) Method of bitumen deposit development
RU2627795C1 (en) Bitumnious oil field development method
RU2584467C1 (en) Method of developing high-viscosity oil field
RU2499134C2 (en) Method of development of oil pool located above gas pool and separated therefrom by impermeable parting
RU2672272C2 (en) Method for developing super-viscous oil deposits
RU2693055C1 (en) Method for development of high-viscosity oil deposit with water-saturated zones
RU2626500C1 (en) Method of development of bituminous oil reservoir from horizontal well
RU2289684C1 (en) Method for extracting reservoirs of highly viscous oil or bitumen
RU2630330C1 (en) Bitumnious oil field development method
RU2690586C1 (en) Method for development of high-viscosity oil deposit with water-saturated zones
RU2669968C1 (en) Method for mining deposits of bituminous oil from horizontal well
RU2506418C1 (en) Method for oil deposit development at late stage