RU2525043C1 - Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation - Google Patents

Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation Download PDF

Info

Publication number
RU2525043C1
RU2525043C1 RU2013122524/06A RU2013122524A RU2525043C1 RU 2525043 C1 RU2525043 C1 RU 2525043C1 RU 2013122524/06 A RU2013122524/06 A RU 2013122524/06A RU 2013122524 A RU2013122524 A RU 2013122524A RU 2525043 C1 RU2525043 C1 RU 2525043C1
Authority
RU
Russia
Prior art keywords
control
controller
integrity
voltage
crane
Prior art date
Application number
RU2013122524/06A
Other languages
Russian (ru)
Inventor
Вадим Александрович Дрошнев
Владимир Васильевич Зиновьев
Сергей Владимирович Рогожин
Original Assignee
Вадим Александрович Дрошнев
Владимир Васильевич Зиновьев
Сергей Владимирович Рогожин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Вадим Александрович Дрошнев, Владимир Васильевич Зиновьев, Сергей Владимирович Рогожин filed Critical Вадим Александрович Дрошнев
Priority to RU2013122524/06A priority Critical patent/RU2525043C1/en
Application granted granted Critical
Publication of RU2525043C1 publication Critical patent/RU2525043C1/en

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

FIELD: machine building.
SUBSTANCE: method for permanent monitoring of pipeline valve control circuit integrity involves monitoring mode, control mode, selection of a control circuit, generation of a signal on circuit integrity and electric control command and carrying out of valve control. Monitoring is performed by measuring the voltage at the ends of the normally open contact of a control relay for a solenoid valve by means of the telemetering module of a teleautomatic controller. Circuit integrity signal is generated by the comparison of the above voltage with the voltage value for the controller pickup threshold stored in the controller memory. Description is also given to a permanent monitoring scheme for the pipeline valve control circuit integrity.
EFFECT: carrying out of permanent monitoring of valve control circuit integrity and simultaneous control of the valve along with improved reliability of the control scheme.
2 cl, 3 dwg

Description

Предложенные способ и схема относятся к области автоматизации управления пневмогидроприводами охранных или запорных кранов (далее по тексту краны), устанавливаемых на трубопроводах. Схема применима к кранам, управление которыми осуществляется системой линейной телемеханики (ЛТМ) или автоматизированной системой управления технологическими процессами (АСУ ТП) магистральных, промысловых: газопроводов и продуктопроводов (далее по тексту трубопроводов), обеспечивает постоянный, автоматический контроль целостности электрических цепей управления кранами, позволяет производить одновременно контроль целостности цепей управления и управлять краном.The proposed method and scheme relate to the field of automation of control of pneumohydraulic actuators of safety or shutoff valves (hereinafter referred to as taps) installed on pipelines. The scheme is applicable to cranes controlled by a linear telemechanics system (LTM) or an automated process control system (ACS TP) of main and field pipelines: gas pipelines and product pipelines (hereinafter referred to as pipelines), provides constant, automatic control of the integrity of the crane electric circuits, allows simultaneously control the integrity of control circuits and control the crane.

Краны устанавливаются на трубопроводах с целью отсечения аварийного участка, для остановки транспорта продукта и локализации аварийного участка.Cranes are installed on pipelines in order to cut off the emergency section, to stop the transport of the product and to localize the emergency section.

Краны, в основном, оснащены двумя видами управления:Cranes are mainly equipped with two types of control:

- автономное управление - управление краном осуществляется в автоматическом режиме, посредством автомата аварийного закрытия крана (ААЗК) и блоком управления электропневматическим (БУЭП) по пневматическим или гидравлическим сигналам контроля технологических параметров транспортировки продукта [1] Д.Ф.Гуревич, О.Н.Заринский, Ю.К.Кузьмин. Справочник по арматуре для газо- и нефтепроводов. Ленинград: "Недра", Ленинградское отделение, 1988 г. Глава 9, стр.388-412; [2] Техническая документация. Система обнаружения автомата аварийного с разделением сред закрытия с цифровой регулировкой для жидкостей и газопроводов высокого давления, работающий при низких температурах. Via Gandini 4, 27058 Voghera (Pavia) Italy Tel. +39-0383.343311 Telefax +39-0383.62289-366105. 2012 г.];- autonomous control - the crane is controlled automatically, by means of an emergency shut-off machine (AAZK) and an electro-pneumatic control unit (BUEP) by pneumatic or hydraulic signals for monitoring the technological parameters of product transportation [1] D.F. Gurevich, O.N. Zarinsky , Yu.K. Kuzmin. Handbook of fittings for gas and oil pipelines. Leningrad: "Nedra", Leningrad Branch, 1988. Chapter 9, pp. 388-412; [2] Technical documentation. A detection system for an emergency machine with separation of closure media with digital adjustment for liquids and high pressure gas pipelines, operating at low temperatures. Via Gandini 4, 27058 Voghera (Pavia) Italy Tel. + 39-0383.343311 Telefax + 39-0383.62289-366105. 2012];

- дистанционное управление - управление краном осуществляется системой линейной телемеханики. В этом режиме, управление краном осуществляют электрическим сигналом, который формирует контроллер линейной телемеханики. Электрический сигнал подается на электромагнитный клапан, расположенный в БУЭП. В свою очередь, электромагнитный клапан формирует пневматический сигнал управления краном.- remote control - the crane is controlled by a linear telemechanics system. In this mode, the crane is controlled by an electrical signal that forms a linear telemechanics controller. An electrical signal is supplied to the solenoid valve located in the BUEP. In turn, the solenoid valve generates a pneumatic valve control signal.

Известная система телемеханики «Магистраль-1» [3]. Техническое описание и инструкция по эксплуатации ЗИО.239.006 ТО Блоки БК. Телемеханика «Магистраль-1». ВНПО «Союзгазавтоматика», СКБ «Газприборавтоматика» 1988 г.] укомплектована блоками управления кранами БК-22÷БК-25, которые предназначены для формирования электрических команд управления кранами и осуществления автоматического контроля целостности цепей управления. В ней устройством контроля является высокоомная обмотка реле К1 блока БК-22, представлена на фиг 1. Высокоомная обмотка I реле А2:К1 включена последовательно с обмоткой электромагнитного клапана ЭО. В исходном состоянии при исправности цепей управления, реле А2:К1 находится в сработанном состоянии и его контакты А2:К1 формируют сигнал о целостности цепей управления. Электромагнитный клапан ЭО не срабатывает, так как величина его тока срабатывания значительно выше тока срабатывания реле А2:К1, имеющего высокоомную обмотку. При возникновении обрыва в цепи управления или обрыва катушки электромагнитного клапана ЭО, реле А2:К1 обесточивается, его контакты А2:К1 размыкаются и этим формируется сигнал о неисправности.The well-known telemechanics system "Highway-1" [3]. Technical description and operating instructions ZIO.239.006 TO Blocks BK. Telemechanics "Highway-1". VNPO "Soyuzgazavtomatika", SKB "Gazpriboravtomatika" 1988] is equipped with crane control units BK-22 ÷ BK-25, which are designed to form electrical control commands for cranes and to automatically control the integrity of control circuits. In it, the control device is a high-resistance winding of relay K1 of the BK-22 unit, shown in Fig 1. High-resistance winding I of relay A2: K1 is connected in series with the winding of the electromagnetic valve EO. In the initial state, when the control circuits are in good condition, the relay A2: K1 is in the activated state and its contacts A2: K1 form a signal about the integrity of the control circuits. The solenoid valve EO does not work, since the value of its response current is much higher than the response current of relay A2: K1, which has a high-resistance winding. In the event of an open circuit in the control circuit or open coil of the EO solenoid valve, relay A2: K1 is de-energized, its contacts A2: K1 open and this generates a fault signal.

При управлении краном ток включения электромагнитного клапана ЭО проходит через токовую обмотку II реле А2:К1. Электромагнитный клапана ЭО срабатывает, а реле А2:К1 остается в сработанном состоянии за счет тока в токовой обмотке II реле А2:К1. Токи срабатывания электромагнитного клапана ЭО и токовой обмотки II реле А2:К1 равны. В этом режиме контакты А2:К1 также формируют сигнал о целостности цепей управления так как реле А2:К1 находится в сработанном состоянии за счет протекания тока по токовой обмотки II реле А2:К1. При наладке выравнивание токов срабатывания электромагнитного клапана ЭО и токовой обмотки II реле А2:К1 производят перепайкой перемычек ХВ1.When controlling a crane, the switching current of the EO electromagnetic valve passes through the current winding II of relay A2: K1. The electromagnetic valve EO is activated, and the relay A2: K1 remains in the activated state due to the current in the current winding II of relay A2: K1. The operation currents of the electromagnetic valve EO and current winding II of relay A2: K1 are equal. In this mode, the contacts A2: K1 also form a signal about the integrity of the control circuits since the relay A2: K1 is in the triggered state due to the current flowing through the current winding II of relay A2: K1. When adjusting, the alignment of the response currents of the electromagnetic valve EO and the current winding II of relay A2: K1 is done by soldering the jumpers ХВ1.

В блоках БК-23÷БК-25 применяется аналогичный принцип контроля целостности электрических цепей дистанционного управления краном, как и в описанном выше блоке БК-22.In blocks BK-23 ÷ BK-25, a similar principle of integrity control of electric circuits of remote control of a crane is used, as in the above-described block BK-22.

Наиболее близким к заявляемому техническому решению (прототипом) является автоматизированная система управления газоконденсатонефтепроводов Павловского коридора [4] Пояснительная записка рабочей документации АСУ ТП «Ремонт средств телемеханики, энергоснабжения связи, приводов и ААЗК газоконденсатонефтепроводов Павловского коридора» 57295386. 000.11. 10.046. П2, 2010 г.Оренбург, (лист 56, приложение 25), в которой реализуется способ проверки цепей телеуправления, включающий режим контроля или режим управления, выбор цепей управления, формируется сигнал о целостности цепи и осуществляется управление краном. Проверка цепей телеуправления краном производится контроллером телемеханики СТН-3000, путем переключения цепей управления краном от модуля телеуправления к модулю телесостояния. Формирование сигнала о целостности цепи осуществляется при контроле протекания тестового тока по цепи телеуправления краном (см. фиг.2). Средством контроля является дискретный вход модуля телесостояния (ТС) контроллера СТН-3000. Если цепи управления исправны, то протекающий по ним тестовый ток формирует в модуле телесостояния «единичное» значение, а при неисправных цепях телеуправления тестовый ток отсутствует и формируется «нулевое» значение. Соответственно на программном уровне контроллера фиксируется исправность или неисправность данного канала управления.The closest to the claimed technical solution (prototype) is the automated control system for gas condensate and oil pipelines of the Pavlovsky corridor [4] Explanatory note of the working documentation of ACS TP "Repair of telemechanics, power supply for communications, drives and AACS of gas condensate and oil pipelines of the Pavlovsky corridor 57295386. 000.11. 10.046. P2, 2010 Orenburg, (sheet 56, appendix 25), which implements a method for checking telecontrol circuits, including a control mode or control mode, selection of control circuits, a signal about the integrity of the circuit is generated and the crane is controlled. Checking the remote control circuits of the crane is carried out by the telemetry controller STN-3000, by switching the crane control circuits from the remote control module to the telestate module. The formation of a signal about the integrity of the circuit is carried out when monitoring the flow of test current through the remote control circuit of the crane (see figure 2). The means of control is the discrete input of the telestate module (TS) of the STN-3000 controller. If the control circuits are operational, then the test current flowing through them forms a “single” value in the telestate module, and with faulty telecontrol circuits there is no test current and a “zero” value is generated. Accordingly, at the software level of the controller, the serviceability or malfunction of this control channel is recorded.

Работу схемы Фиг.2 проверки цепей телеуправления крана рассмотрим на примере канала управления «Открыть»:The operation of the circuit of Figure 2 for checking the crane telecontrol circuits will be considered using the Open control channel as an example:

- в исходном состоянии напряжение источника питания 110 В подается на нормально замкнутый контакт Кдоп и далее на контакты реле управления краном К1 и К2. При разомкнутых контактах К1 и К2 цепи управления обесточены, а кран находится в режиме ожидания;- in the initial state, the voltage of the power source 110 V is supplied to the normally closed contact Kdop and then to the contacts of the control relay of the crane K1 and K2. When contacts K1 and K2 are open, the control circuits are de-energized, and the tap is in standby mode;

- в режиме контроля целостности цепей управления «Открыть» контроллер формирует сигнал на тестирование, реле модуля телеуправления ТУ3 срабатывает и переключает контакт Кдоп. Напряжение 110 В отключается, а напряжение 24 В от источника 24 В через переключившийся контакт Кдоп подается на контакты реле управления краном К1 и К2. Схема подготовлена для тестирования цепей управления;- in the “Open” control circuit integrity control mode, the controller generates a signal for testing, the TU3 telecontrol module relay activates and switches the Kdop contact. The voltage of 110 V is turned off, and the voltage of 24 V from the source of 24 V is supplied through the switched contact Kdop to the contacts of the relay control valve K1 and K2. The circuit is prepared for testing control circuits;

- контроллер формирует сигнал на открытие крана и реле модуля телеуправления ТУ1 срабатывает, замыкая контакт К1. По цепи от источника напряжение 24 В через внутреннее сопротивление модуля телесостояния ТС1, замкнутого контакта Кдоп и К1, обмотку электромагнитного клапана «Открыть» протекает тестовый ток контроля порядка 5 мА. Тестовый ток контролируется модулем телесостояния ТС1, если его величина находится на уровне 5 мА, то в модуле телесостояния ТС1 формируется «единичное» значение. Контроллер, в свою очередь, формирует сигнал о целостности цепи телеуправления. Если тестовый ток отсутствует, то в модуле телесостояния ТС1 формируется «нулевое» значение, и контроллер формирует сигнал о неисправности цепи телеуправления;- the controller generates a signal to open the crane and the relay of the telecontrol module TU1 is activated, closing contact K1. Through the circuit from the source, the voltage is 24 V through the internal resistance of the telestate module TC1, the closed contact Kdop and K1, the winding of the solenoid valve "Open" flows test control current of about 5 mA. The test current is controlled by the TC1 telestate module, if its value is at the level of 5 mA, then a “single” value is generated in the TC1 telestate module. The controller, in turn, generates a signal about the integrity of the telecontrol circuit. If there is no test current, then in the telestate module TC1 a “zero” value is generated, and the controller generates a signal about a malfunction of the telecontrol circuit;

- по окончании периода контроля цепей управления контроллер снимает сигнал на тестирование, реле модуля телеуправления ТУ3 отпускает контакт Кдоп и схема возвращается в исходное состояние.- at the end of the monitoring period of the control circuits, the controller removes the signal for testing, the relay of the TU3 telecontrol module releases the Kdop contact and the circuit returns to its original state.

На программном уровне в контроллере должна быть реализована четкая блокировка одномоментного переключения контактов Кдоп и К1. В противном случае при переходе из режима тестирования (переключение Кдоп) и замкнутом контакте К1 произойдет самопроизвольное срабатывание электромагнитного клапана и крана в целом.At the software level in the controller, a clear blocking of simultaneous switching of the contacts Kdop and K1 should be implemented. Otherwise, when switching from the test mode (switching Kdop) and the closed contact K1, the electromagnetic valve and the crane as a whole will spontaneously operate.

При контроле целостности цепей управления «Закрыть» контроллер формирует сигнал на тестирование, аналогичный для цепи управления «Открыть». Разница в том, что вместо реле модуля телеуправления ТУ1 включается модуль телеуправления ТУ2, который замыкает контакт К2, и по цепи электромагнитного клапана «Закрыть» протекает тестовый ток.When controlling the integrity of the control circuits “Close”, the controller generates a signal for testing, similar to the control circuit “Open”. The difference is that instead of the TU1 telecontrol module relay, the TU2 telecontrol module is turned on, which closes contact K2, and a test current flows through the “Close” electromagnetic valve circuit.

Во время тестирования электромагнитный клапан не включается, так как по цепи телеуправления протекает тестовый ток контроля не более 5 мА, который значительно ниже рабочего тока электромагнитного клапана «150 мА для электромагнитного клапана 110 В и 730 мА для электромагнитного клапана 24 В» [4]. Величина тестового тока ограничивается большим внутренним сопротивлением модуля ТС1 и низким напряжением питания 24 В, используемым для тестирования.During testing, the solenoid valve does not turn on, since the test current of control flows no more than 5 mA, which is significantly lower than the operating current of the solenoid valve “150 mA for the solenoid valve 110 V and 730 mA for the solenoid valve 24 V” [4]. The magnitude of the test current is limited by the large internal resistance of the TC1 module and the low 24 V supply voltage used for testing.

В связи с тем, что в период тестирования производится переключение цепей управления краном от модуля телеуправления ТУ1 к модулю телесостояния ТС1, управление краном невозможно, так как источник 110 В для питания электромагнитного клапана отключается контактом Кдоп. Соответственно в процессе управления краном невозможно тестирование цепей управления, так как модуль телесостояния ТС1 отключен от цепей управления контактом Кдоп.Due to the fact that during the testing period the crane control circuits are switched from the TU1 telecontrol module to the TC1 telestate module, crane control is not possible, since the 110 V source for powering the electromagnetic valve is switched off by the Kdop contact. Accordingly, it is not possible to test the control circuits in the process of controlling the crane, since the TC1 telestate module is disconnected from the control circuits of the Kdop contact.

«Проверка цепей управления электромагнитного клапана производится периодически в автоматическом режиме, один раз в сутки или по команде оператора. Время и периодичность проверки в автоматическом режиме можно изменить программным путем» [4] (лист 56, приложения 25).“Checking the control circuits of the solenoid valve is carried out periodically in automatic mode, once a day or at the command of the operator. The time and frequency of testing in automatic mode can be changed programmatically ”[4] (sheet 56, appendix 25).

В обоих известных описанных технических решениях реализован единый принцип контроля целостности цепей управления краном, который основан на контроле прохождения тестового тока (тока не достаточного для срабатывания электромагнитного клапана) по цепям управления. Элементом контроля в телемеханике «Магистраль-1», является высокоомная обмотка I реле А2:К1, а в контроллере СТН-3000 - модуль телесостояния ТС1.In both well-known technical solutions described, a single principle is implemented to control the integrity of the crane control circuits, which is based on monitoring the passage of test current (current not sufficient for the electromagnetic valve to operate) through the control circuits. The control element in the telemechanics “Magistral-1” is the high-resistance winding I of relay A2: K1, and in the STN-3000 controller - the telestate module TC1.

Прототип имеет следующие недостатки:The prototype has the following disadvantages:

- проверка цепей управления электромагнитного клапана производится периодически;- check the control circuits of the solenoid valve periodically;

- невозможно одновременно осуществлять контроль целостности цепей управления и управлять краном. Схема прототипа позволяет либо контролировать цепи, либо управлять краном;- it is impossible to simultaneously monitor the integrity of the control circuits and control the crane. The prototype circuit allows you to either control the circuit or control the crane;

- присутствуют элементы, которые уменьшают надежность схемы управления, к ним относятся реле модуля ТУ3, с подвижным механическим контактом Кдоп;- there are elements that reduce the reliability of the control circuit, these include the relay of the TU3 module, with a movable mechanical contact Kdop;

- эпизодически происходит ложное срабатывание электромагнитного клапана при тестировании схемы управления, что в ряде случаев приводило к самопроизвольному закрытию/открытию крана.- occasionally there is a false response of the electromagnetic valve when testing the control circuit, which in some cases led to spontaneous closing / opening of the valve.

Существует практическая задача, решение которой позволит осуществить постоянный контроль целостности цепей управления краном и одновременно управлять краном, при повышении надежности схемы управления.There is a practical problem, the solution of which will allow for continuous monitoring of the integrity of the crane control circuits and at the same time control the crane, while increasing the reliability of the control circuit.

Поставленная задача решается способом постоянного контроля целостности цепей управления кранами трубопроводов, включающим режим контроля, режим управления, выбор цепи управления, формирование сигнала о целостности цепи и электрической команды управления и осуществление управления краном, в котором согласно изобретению, контроль осуществляют измерением напряжения на концах нормально разомкнутого контакта реле управления электромагнитным клапаном посредством модуля телеизмерения контроллера телемеханики, а сигнал о целостности цепи формируют при сравнении этого напряжения, со значением напряжения порога срабатывания контроллера, хранящимся в памяти контроллера. Заявляемый способ осуществляется посредством схемы постоянного контроля целостности цепей управления кранами трубопроводов, включающей контроллер линейной телемеханики с элементами контроля и модулями телеуправления, источник питания, а также кран с электромагнитными клапанами, связанные цепями управления, в котором согласно изобретению контроллер линейной телемеханики в качестве элементов контроля содержит модули телеизмерения и преобразователи, а в памяти контроллера записано значение напряжения порога его срабатывания.The problem is solved by the method of continuous monitoring of the integrity of the control circuits of pipeline valves, including the control mode, control mode, selecting a control circuit, generating a signal about the integrity of the circuit and an electrical control command and controlling the valve, in which according to the invention, the control is carried out by measuring the voltage at the ends of a normally open the contact of the solenoid valve control relay through the telemetry module of the telemechanics controller, and the integrity signal is pi is formed by comparing this voltage with a controller voltage threshold value stored in the controller memory. The inventive method is carried out by means of a continuous integrity control circuit for the control valves of pipelines, including a linear telemechanics controller with control elements and telecontrol modules, a power source, and a crane with solenoid valves connected by control circuits, in which according to the invention the linear telemechanics controller contains telemetry modules and converters, and the voltage of the threshold of its operation is recorded in the controller's memory.

На фиг.1 представлена схема управления краном с блоком БК-22, ЛТМ «Магистраль 1» [3], на фиг.2 - схема проверки цепей телеуправления кранами по прототипу [4], на фиг.3 - предлагаемая схема постоянного контроля целостности цепей управления кранами трубопроводов. На фиг.3 обозначены следующие позиции: (1) - контрольный пункт телемеханики; (2) - контроллер линейной телемеханики; (3), (4) - модули телеизмерения; (5), (6) - модули телеуправления; (7) - кран управления трубопроводом; (8) - контакт реле модуля телеуправления, управляет электромагнитным клапаном «открыть»; (10) - контакт реле модуля телеуправления, управляет электромагнитным клапаном «закрыть»; (9) - электромагнитный клапан «открыть»; (11) электромагнитный клапан «закрыть»; (12), (13) - преобразователи; (14) - источник питания 110 В.Figure 1 presents the control circuit of the crane with the block BK-22, LTM "Highway 1" [3], figure 2 - scheme for checking the remote control circuits of the cranes of the prototype [4], figure 3 - the proposed scheme for continuous monitoring of circuit integrity control valves of pipelines. In Fig. 3, the following positions are indicated: (1) —control point of telemechanics; (2) - controller of linear telemechanics; (3), (4) - telemetry modules; (5), (6) - telecontrol modules; (7) - pipeline control valve; (8) - relay contact of the telecontrol module, controls the “open” solenoid valve; (10) - relay contact of the telecontrol module, controls the “close” electromagnetic valve; (9) - “open” solenoid valve; (11) “close” solenoid valve; (12), (13) - converters; (14) - power supply 110 V.

Представленный в данном изобретении способ предлагается реализовать при автоматизации управления пневмогидроприводами охранных или запорных кранов, устанавливаемых на трубопроводах. Для его внедрения необходимо выполнить предлагаемую схему и на программном уровне контроллера реализовать обработку операций способа по соответствующим алгоритмам. Операции способа измеряют напряжение на концах нормально разомкнутого контакта реле управления электромагнитным клапаном посредством модуля телеизмерения контроллера телемеханики, сравнивают его со значением напряжения порога срабатывания контроллера, хранящимся в памяти контроллера, формируют сигнал о целостности цепи. В зависимости от режима - контроля, управления или совмещенного (контроль и управление) этапы операции формируют различные сигналы о целостности цепи по соответствующим алгоритмам, обрабатывающим три типа неисправностей и исправного состояния. Алгоритмы работы схемы подробно представлены ниже.The method presented in this invention is proposed to be implemented in the automation of control of pneumatic and hydraulic actuators of safety or shut-off valves installed on pipelines. For its implementation, it is necessary to carry out the proposed scheme and, at the software level of the controller, implement processing of the method operations according to the corresponding algorithms. The operation of the method measures the voltage at the ends of a normally open contact of the solenoid valve control relay by means of the telemechanics module of the telemechanics controller, compares it with the voltage of the controller threshold, stored in the controller memory, and forms a signal about the integrity of the circuit. Depending on the mode - control, control or combined (control and management) the stages of the operation generate various signals about the integrity of the circuit according to the corresponding algorithms that process three types of faults and a good condition. The algorithms of the circuit are presented in detail below.

Сущность предложения заключается в том, что в нормальном состоянии контакт (8) реле модуля телеуправления (6) электромагнитным клапаном (9) находится в разомкнутом состоянии, и на контактах (8) реле модуля телеуправления (6) присутствует напряжение, равное рабочему напряжению питания электромагнитного клапана (9). Напряжение на контактах (8) модуля телеуправления (6) имеет номинальное значение в том случае, если исправен блок питания электромагнитного клапана (14), цепи управления и обмотка электромагнитного клапана (9) не имеют обрыва, контакт (8) не залип. В случае неисправности блока питания (14), обрыва цепей управления или обмотки электромагнитного клапана (9), залипания контакта (8) напряжение станет равно нулю. Наличие или отсутствие напряжения на контактах (8) реле модуля телеуправления (6) является соответственно признаком исправности или не исправности цепей управления.The essence of the proposal lies in the fact that in the normal state, the contact (8) of the telecontrol module relay (6) with the solenoid valve (9) is in the open state, and there is a voltage equal to the operating voltage of the electromagnetic solenoid on the contacts (8) of the telecontrol module relay (6) valve (9). The voltage at the contacts (8) of the telecontrol module (6) has a nominal value if the power supply unit of the electromagnetic valve (14) is good, the control circuits and the coil of the electromagnetic valve (9) do not have an open circuit, contact (8) is not stuck. In the event of a malfunction of the power supply unit (14), an open circuit of the control circuit or the winding of the electromagnetic valve (9), sticking of the contact (8), the voltage becomes zero. The presence or absence of voltage at the contacts (8) of the telecontrol module relay (6) is, accordingly, a sign of serviceability or serviceability of the control circuits.

Контроль напряжения предлагается осуществлять модулем телеизмерения (3), который находится в составе контроллера телемеханики (2). Согласование величины измеряемого напряжения с величиной и типом входного сигнала модуля телеизмерения (3) осуществляется преобразователем (13).It is proposed to control the voltage with the telemetry module (3), which is part of the telemechanics controller (2). Matching the magnitude of the measured voltage with the magnitude and type of input signal of the telemetry module (3) is carried out by the converter (13).

Сущность функционирования способа рассмотрим на предлагаемой схеме проверки цепей управления краном (Фиг.3) и схемы проверки цепей управления краном прототипа (Фиг.2) на примере канала управления «Открыть».The essence of the functioning of the method is considered on the proposed circuit for checking the control circuits of the crane (Figure 3) and the circuit for testing the control circuits of the crane of the prototype (Figure 2) using the Open control channel as an example.

Предложенная схема (Фиг.3) работает по следующим алгоритмам:The proposed scheme (Figure 3) works according to the following algorithms:

1. Период режима контроля. Кран (7) закрыт, цепи управления в работоспособном состоянии. В этом случае на концах контакта (8) реле модуля телеуправления (6) присутствует напряжение 110 В, так как контакт (8) находится в разомкнутом положении. Напряжение 110 В формируется источником питания (14) для питания электромагнитных клапанов (9) и (11);1. The period of the control regime. The crane (7) is closed, the control circuit is operational. In this case, a voltage of 110 V is present at the ends of the contact (8) of the telecontrol module relay (6), since the contact (8) is in the open position. Voltage 110 V is generated by a power source (14) to power the solenoid valves (9) and (11);

2. Напряжение 110 В с контакта (8) реле модуля телеуправления (6) подается на вход преобразователя (13). Напряжение 110 В преобразуется преобразователем (13) в сигнал - «унифицированный сигнал 0-10 В» и подается на вход модуля телеизмерения (3);2. Voltage 110 V from the contact (8) of the telecontrol module relay (6) is supplied to the input of the converter (13). Voltage 110 V is converted by the converter (13) into a signal - “unified signal 0-10 V” and fed to the input of the telemetry module (3);

3. При наличии сигнала «унифицированный сигнал 0-10 В» в пределах 7-10 В на входе модуля телеизмерения (3), контроллер (2) формирует сигнал об исправности цепей управления;3. If there is a signal “unified signal 0-10 V” within 7-10 V at the input of the telemetry module (3), the controller (2) generates a signal about the serviceability of the control circuits;

4. Цепи управления исправны, схема в ожидании команды управления краном (7) - «Открыть»;4. The control circuits are OK, the circuit is waiting for the crane control command (7) - “Open”;

5. В период режима управления краном (7) «Открыть» контроллер (2) формирует сигнал на открытие крана (7). Модуль телеуправления (6) замкнет контакт (8) и электромагнитный клапан «Открыть» (9) сработает, кран (7) начинает открываться;5. During the period of the crane control mode (7) “Open”, the controller (2) generates a signal to open the crane (7). The telecontrol module (6) will close the contact (8) and the “Open” solenoid valve (9) will work, the valve (7) starts to open;

6. Замкнувшийся контакт (8) уменьшит напряжение 110 В до нулевого значения на своих концах и на входе преобразователя (13);6. A closed contact (8) will reduce the voltage of 110 V to zero at its ends and at the input of the converter (13);

7. На выходе преобразователя (13) и входе модуля телеизмерения (3) сигнал - «унифицированный сигнал 0-10 В» уменьшится до нуля. Модуль телеизмерения (3) в этот период передает контроллеру (2) нулевое значение сигнала. В период режима управления краном в отличие от режима контроля, контроллер (2) не формирует сигнал о неисправности цепей управления, так как замыкание контакта (8) является необходимым условием в период режима управления краном (7);7. At the output of the converter (13) and the input of the telemetry module (3), the signal - “unified signal 0-10 V” will decrease to zero. The telemetry module (3) during this period transmits to the controller (2) a zero signal value. In the period of the crane control mode, unlike the control mode, the controller (2) does not generate a signal about the malfunction of the control circuits, since the contact closure (8) is a necessary condition during the period of the crane control mode (7);

8. Уменьшение напряжения 110 В в период режима управления краном (7) сигнализирует о нормальной работе модуля телеуправления (6) и его контакта (8). Данный контроль в прототипе отсутствовал;8. A decrease in voltage of 110 V during the period of crane control mode (7) signals the normal operation of the telecontrol module (6) and its contact (8). This control was absent in the prototype;

9. После того как кран (7) откроется контроллер (2) снимает сигнал на открытие крана (7) и модуль телеуправления (6) размыкает контакт (8), на концах которого вновь появляется напряжение 110 В;9. After the valve (7) opens, the controller (2) removes the signal to open the valve (7) and the telecontrol module (6) opens the contact (8), at the ends of which voltage 110 V appears again;

10. По вновь появившемуся напряжению 110 В на концах контакта (8) контроллер (2) вновь сформирует сигнал об исправности цепей управления в соответствии с пп 1-4 настоящего алгоритма;10. According to the newly appeared voltage of 110 V at the ends of the contact (8), the controller (2) will again generate a signal about the serviceability of the control circuits in accordance with paragraphs 1-4 of this algorithm;

11. Обнаружение неисправности типа I. В случае если кран (7) открылся, контроллер (2) снял сигнал на открытие крана (7), а размыкание контакта (8) не произошло (контакт (8) подгорел или залип), то на его концах не появится напряжение 110 В. На входе преобразователя (13) напряжение также будет равно нулю;11. Type I malfunction detection. If the valve (7) opens, the controller (2) receives a signal to open the valve (7), but the contact (8) does not open (contact (8) burned or stuck), then the ends do not have a voltage of 110 V. At the input of the converter (13), the voltage will also be zero;

12. На выходе преобразователя (13) и входе модуля телеизмерения (3) сигнал «унифицированный сигнал 0-10 В» будет равен нулю. Модуль телеизмерения (3) в этом случае передает контроллеру (2) нулевое значение сигнала и контроллер (2) формирует сигнал о неисправности цепи управления краном;12. At the output of the converter (13) and the input of the telemetry module (3), the signal “unified signal 0-10 V” will be zero. The telemetry module (3) in this case transmits to the controller (2) the zero signal value and the controller (2) generates a signal about the failure of the crane control circuit;

13. Обнаружение неисправности типа II. При возникновении неисправности в блоке питания 110 В (14), обрыва цепей управления или катушки электромагнитного клапана (9), напряжение на контакте (8) станет равно нулю. Формируется сигнал о неисправности цепи управления краном в соответствии с п. 12 настоящего алгоритма. Контроль блока питания 110 В (14) в прототипе отсутствовал;13. Type II fault detection. If a malfunction occurs in the 110 V power supply unit (14), the control circuits or the solenoid valve coil (9) breaks, the voltage at terminal (8) will become zero. A signal is generated about a malfunction of the crane control circuit in accordance with paragraph 12 of this algorithm. The control of the 110 V power supply unit (14) was absent in the prototype;

14. Обнаружение неисправности типа III. В период подачи контроллером (2) команды управления краном (7) «Открыть», изменение напряжение на концах контакта (8) не произошло, из-за неисправности модуля телеуправления (6) или контакта (8), то контроллер (2) формирует сигнал о неисправности цепей управления краном. Данный контроль в прототипе отсутствовал.14. Fault detection type III. During the period when the controller (2) sends the crane control command (7) “Open”, the voltage at the ends of the contact (8) did not change, due to a malfunction of the telecontrol module (6) or contact (8), the controller (2) generates a signal about malfunction of the crane control circuits. This control was absent in the prototype.

Контроль цепей управления краном по каналу «Закрыть» производится аналогично описанному выше. В этом режиме будут задействованы следующие элементы схемы: контакты (10) реле модуля телеуправления (5), преобразователь (12), модуль телеизмерения (4), электромагнитный клапан (11). Контроллер (2), источник питания 110 В (14) и кран (7) остаются прежними.Control of the crane control circuits via the “Close” channel is carried out similarly to that described above. In this mode, the following circuit elements will be involved: contacts (10) of the telecontrol module relay (5), a converter (12), a telemetry module (4), an electromagnetic valve (11). The controller (2), 110 V power supply (14) and tap (7) remain the same.

В предложенной схеме тип преобразователей (12); (13) не является принципиальным и полностью зависит от практических схем управления краном. В частном случае при применении в качестве описанного модуля телеизмерения (3), (4) - модуля с унифицированным входным сигналом 0-10 В, можно использовать простой резистивный делитель.In the proposed scheme, the type of converters (12); (13) is not fundamental and completely depends on the practical crane control schemes. In the particular case, when a telemetry module (3), (4) is used as the described module, a module with a unified input signal of 0-10 V, a simple resistive divider can be used.

Величина порога срабатывания, при котором контроллер (2) определяет исправность или не исправность цепей, подбирается при наладке системы телемеханики на программном уровне. Порог срабатывания хранится в памяти контроллера в виде определенной константы (уставки). Если напряжение на входе модуля телеизмерения (3) выше константы, то контроллер (2) формирует сигнал об исправности цепей управления. Если напряжение на входе модуля телеизмерения (3) ниже константы, то контроллер (2) формирует сигнал о неисправности цепей управления. Подбор величины порога срабатывания определяется необходимой чувствительностью элементов контроля цепей управления краном и минимальным напряжением срабатывания электромагнитного клапана.The threshold value at which the controller (2) determines whether the circuits are working or not working is selected during the adjustment of the telemechanics system at the program level. The response threshold is stored in the controller's memory in the form of a certain constant (setpoint). If the voltage at the input of the telemetry module (3) is higher than a constant, then the controller (2) generates a signal about the serviceability of the control circuits. If the voltage at the input of the telemetry module (3) is lower than a constant, then the controller (2) generates a signal about the malfunction of the control circuits. The selection of the threshold value is determined by the necessary sensitivity of the control elements of the crane control circuits and the minimum response voltage of the electromagnetic valve.

Предложенная схема в сравнении с прототипом имеет ряд преимуществ, которые обеспечивают:The proposed scheme in comparison with the prototype has several advantages that provide:

- постоянный автоматический контроль целостности электрических цепей управления краном за счет: того что элементы контроля и управления крана постоянно подключены к контроллеру, источнику питания и функционируют независимо;- continuous automatic control of the integrity of the electrical circuits for controlling the crane due to the fact that the elements of control and control of the crane are constantly connected to the controller, power source and operate independently;

- возможность производить одновременно контроль целостности цепей управления и управлять краном, благодаря отсутствию коммутации элементов схемы при переходе из режима контроля цепей управления в режим управления краном, посредством модуля телеуправления ТУ3 с контактом Кдоп (Фиг.2);- the ability to simultaneously monitor the integrity of the control circuits and control the crane, due to the absence of switching circuit elements when switching from the control circuit control mode to the crane control mode, through the telecontrol module TU3 with contact Kdop (Figure 2);

- сокращение количества элементов с механически подвижными контактами, за счет исключения модуля телеуправления ТУ3 с подвижным механическим контактом Кдоп (Фиг.2);- reducing the number of elements with mechanically movable contacts, by eliminating the telecontrol module TU3 with a movable mechanical contact Kdop (Figure 2);

- устранение самопроизвольного закрытия или открытия крана, за счет исключения модуля телеуправления ТУ3 с контактом Кдоп, и исключения необходимости в применении блокировки одномоментного переключения контактов Кдоп и К1 или Кдоп и К2 (Фиг.2). Кроме того, исключение механически подвижных контактов Кдоп повышает надежность цепи управления краном (7).- elimination of spontaneous closing or opening of the crane, by eliminating the telecontrol module TU3 with the contact Kdop, and eliminating the need to use the blocking of simultaneous switching of contacts Kdop and K1 or Kdop and K2 (Figure 2). In addition, the exclusion of mechanically movable contacts Kdop increases the reliability of the crane control circuit (7).

Технико-экономический эффект при применении предлагаемого способа и схемы заключается в повышении надежности управления краном, а соответственно повышается надежность эксплуатации трубопроводов. Повышение надежности обеспечивается за счет постоянного, автоматического контроля целостности электрических цепей управления кранами, за счет возможности производить одновременно контроль целостности цепей управления и управлять краном. Режим управления краном не зависит от режима тестирования цепей управления, режимы выполняются параллельно. Появляется дополнительная опция контроля целостности цепей управления и работоспособности оборудования непосредственно в период управления краном. При наладке есть возможность регулировать чувствительность элементов контроля цепей управления краном. Устраняются ложные срабатывания крана, что исключает несанкционированную остановку транспорта продукта по трубопроводу.The technical and economic effect when applying the proposed method and scheme is to increase the reliability of crane control, and accordingly the reliability of operation of pipelines is increased. Improving reliability is ensured by constant, automatic control of the integrity of the electrical circuits of crane control, due to the ability to simultaneously control the integrity of control circuits and control the crane. The control mode of the crane does not depend on the test mode of the control circuits, the modes are executed in parallel. An additional option appears to control the integrity of the control circuits and the operability of the equipment directly during the crane control period. During commissioning, it is possible to adjust the sensitivity of the control elements of the crane control circuits. False responses of the crane are eliminated, which eliminates the unauthorized stoppage of transport of the product through the pipeline.

Список источников информации:List of sources of information:

[1] Д.Ф.Гуревич, О.Н.Заринский, Ю.К.Кузьмин. Справочник по арматуре для газо- и нефтепроводов. Ленинград: "Недра", Ленинградское отделение, 1988 г. Глава 9, стр.388-412[1] D.F. Gurevich, O.N. Zarinsky, Yu.K. Kuzmin. Handbook of fittings for gas and oil pipelines. Leningrad: "Nedra", Leningrad Branch, 1988. Chapter 9, pp. 388-412

[2] ТЕХНИЧЕСКАЯ ДОКУМЕНТАЦИЯ. СИСТЕМА ОБНАРУЖЕНИЯ АВТОМАТА АВАРИЙНОГО С РАЗДЕЛЕНИЕМ СРЕД ЗАКРЫТИЯ С ЦИФРОВОЙ РЕГУЛИРОВКОЙ ДЛЯ ЖИДКОСТЕЙ И ГАЗОПРОВОДОВ ВЫСОКОГО ДАВЛЕНИЯ, РАБОТАЮЩИХ ПРИ НИЗКИХ ТЕМПЕРАТУРАХ. Via Gandini 4, 27058 Voghera (Pavia) Italy Tel. +39-0383.343311 Telefax +39-0383.62289-366105. 2012 г.[2] TECHNICAL DOCUMENTATION. EMERGENCY AUTOMATIC DETECTION SYSTEM WITH SEPARATION OF A CLOSING ENVIRONMENT WITH DIGITAL ADJUSTMENT FOR LIQUIDS AND HIGH PRESSURE GAS PIPES OPERATING AT LOW TEMPERATURES. Via Gandini 4, 27058 Voghera (Pavia) Italy Tel. + 39-0383.343311 Telefax + 39-0383.62289-366105. 2012 year

[3] Техническое описание и инструкция по эксплуатации 3ИО.239.006 ТО Блоки БК. Телемеханика «Магистраль-1». ВНПО «Союзгазавтоматика», СКБ «Газприборав-томатика» 1988 г.[3] Technical description and instruction manual 3IO.239.006 TO Blocks BK. Telemechanics "Highway-1". VNPO "Soyuzgazavtomatika", SKB "Gazpriborav-tomatika" 1988

[4] Пояснительная записка рабочей документации АСУ ТП «Ремонт средств телемеханики, энергоснабжения связи, приводов и ААЗК газоконденсатонефтепроводов Павловского коридора» 57295386.000.11. 10.046. П2, 2010 г.Оренбург, (лист 56, приложение 25).[4] Explanatory note of the ACS TP working documentation “Repair of telemechanics, communication power supply, drives and AACC of gas condensate and oil pipelines of the Pavlovsky corridor” 57295386.000.11. 10.046. P2, 2010 Orenburg, (sheet 56, appendix 25).

Claims (2)

1. Способ постоянного контроля целостности цепей управления кранами трубопроводов, включающий режим контроля, режим управления, выбор цепи управления, формирование сигнала о целостности цепи и электрической команды управления и осуществление управления краном, отличающийся тем, что контроль осуществляют измерением напряжения на концах нормально разомкнутого контакта реле управления электромагнитным клапаном посредством модуля телеизмерения контроллера телемеханики, а сигнал о целостности цепи формируют при сравнении этого напряжения со значением напряжения порога срабатывания контроллера, хранящимся в памяти контроллера.1. A method for continuously monitoring the integrity of the control circuits of pipeline valves, including the monitoring mode, control mode, selecting a control circuit, generating a signal about the integrity of the circuit and the electrical control command and controlling the valve, characterized in that the control is carried out by measuring the voltage at the ends of the normally open relay contact control the electromagnetic valve through the telemetry module of the telemechanics controller, and a signal about the integrity of the circuit is formed when comparing this voltage Nia controller with the threshold voltage value stored in the controller memory. 2. Схема постоянного контроля целостности цепей управления кранами трубопроводов, включающая контроллер линейной телемеханики с элементами контроля и модулями телеуправления, источник питания, а также кран с электромагнитными клапанами, связанные цепями управления, отличающаяся тем, что контроллер линейной телемеханики в качестве элементов контроля содержит модули телеизмерения с преобразователями, а в памяти контроллера записано значение напряжения порога его срабатывания. 2. The scheme of continuous monitoring of the integrity of the control circuits of the valves of pipelines, including a linear telemechanics controller with control elements and telecontrol modules, a power source, as well as a crane with solenoid valves connected by control circuits, characterized in that the linear telemechanics controller contains telemetry modules as control elements with converters, and the voltage of the threshold of its operation is recorded in the controller's memory.
RU2013122524/06A 2013-05-15 2013-05-15 Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation RU2525043C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013122524/06A RU2525043C1 (en) 2013-05-15 2013-05-15 Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013122524/06A RU2525043C1 (en) 2013-05-15 2013-05-15 Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation

Publications (1)

Publication Number Publication Date
RU2525043C1 true RU2525043C1 (en) 2014-08-10

Family

ID=51355191

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013122524/06A RU2525043C1 (en) 2013-05-15 2013-05-15 Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation

Country Status (1)

Country Link
RU (1) RU2525043C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2681553C1 (en) * 2018-03-28 2019-03-11 Закрытое акционерное общество "Научно-производственное предприятие "Электронные информационные системы" Method for remote control of pneumatic actuator of main pipeline
RU220885U1 (en) * 2023-05-03 2023-10-09 Общество с ограниченной ответственностью "ГАЗПРОМ ТРАНСГАЗ НИЖНИЙ НОВГОРОД" Linear telemechanics system test bench

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU78380U1 (en) * 2008-06-16 2008-11-20 Закрытое Акционерное Общество "Корпоративный институт электротехнического приборостроения "Энергомера" TELEMECHANICAL SIGNAL CONVERTER
JP2010080765A (en) * 2008-09-26 2010-04-08 Fujitsu Ten Ltd Method of controlling current in circuit of driving solenoid
RU110160U1 (en) * 2011-02-28 2011-11-10 Открытое акционерное общество "АБС ЗЭиМ Автоматизация" (ОАО "АБС Автоматизация") CONTROL DEVICE FOR PIPELINE CONTROL BODY
RU2453723C2 (en) * 2007-01-11 2012-06-20 Ланди Ренцо С.П.А. Pressure regulator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2453723C2 (en) * 2007-01-11 2012-06-20 Ланди Ренцо С.П.А. Pressure regulator
RU78380U1 (en) * 2008-06-16 2008-11-20 Закрытое Акционерное Общество "Корпоративный институт электротехнического приборостроения "Энергомера" TELEMECHANICAL SIGNAL CONVERTER
JP2010080765A (en) * 2008-09-26 2010-04-08 Fujitsu Ten Ltd Method of controlling current in circuit of driving solenoid
RU110160U1 (en) * 2011-02-28 2011-11-10 Открытое акционерное общество "АБС ЗЭиМ Автоматизация" (ОАО "АБС Автоматизация") CONTROL DEVICE FOR PIPELINE CONTROL BODY

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2681553C1 (en) * 2018-03-28 2019-03-11 Закрытое акционерное общество "Научно-производственное предприятие "Электронные информационные системы" Method for remote control of pneumatic actuator of main pipeline
RU2809484C2 (en) * 2021-12-27 2023-12-12 Общество с ограниченной ответственностью "Газпром трансгаз Самара" Stand for checking operation of power, measuring, regulating and discrete elements of linear telemechanics system
RU220885U1 (en) * 2023-05-03 2023-10-09 Общество с ограниченной ответственностью "ГАЗПРОМ ТРАНСГАЗ НИЖНИЙ НОВГОРОД" Linear telemechanics system test bench

Similar Documents

Publication Publication Date Title
US7556238B2 (en) Emergency shutdown system
JP5134681B2 (en) System and process for field start type fluid conditioning inspection
MXPA01008885A (en) Emergency shutdown test system.
KR101992299B1 (en) Nuclear power plant digital protection system
CN112524320B (en) Hydraulic butterfly valve control system
CN208569395U (en) Field device and industrial process control system for industrial process
KR20150066250A (en) Digital Full automatic valve cross-over and controlling system for apparatus of supplying the high pressure gas for industry
CN111816505A (en) Control circuit of quick-closing electromagnetic valve of nuclear power plant and main steam system
RU2525043C1 (en) Method for permanent monitoring of pipeline valve control circuit integrity and scheme for its implementation
CN115437314A (en) Method for changing PLC control of oil station actuating mechanism into DCS control
EP3510450B1 (en) Emergency shutdown system for dynamic and high integrity operations
CA3035597C (en) Method and system for fail-safe control of electric actuators
KR101284419B1 (en) Device to prevent malfunction of regulator motor operated valve
JP2021518613A (en) Field device latch relay reset
CN108061195B (en) Method for accurately detecting switching speed of high-frequency quick-switching valve in VPSA process
JP2015209935A (en) Valve remote control device
US20110278484A1 (en) Valve isolation system and method
RU2561509C1 (en) Method of control of group of electromagnetic mechanisms, mainly shutdown valves and device for its implementation
CN210423202U (en) Valve fault position-keeping device
CN107178654B (en) A kind of regulating valve realizes the device and method of double loop automatic switchover adjusting
RU176944U1 (en) Electro-hydraulic column of a turbine speed controller
CN104220812A (en) Method and device for verifying the integrity of gas valve operators in gas appliance
RU2681553C1 (en) Method for remote control of pneumatic actuator of main pipeline
RU2718101C1 (en) Automated control system for valve on gas and condensate pipe line
WO2023031945A1 (en) Nifps system for transformer protection with two set of plc

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20150516