RU2418942C1 - Procedure for well development - Google Patents

Procedure for well development Download PDF

Info

Publication number
RU2418942C1
RU2418942C1 RU2010129798/03A RU2010129798A RU2418942C1 RU 2418942 C1 RU2418942 C1 RU 2418942C1 RU 2010129798/03 A RU2010129798/03 A RU 2010129798/03A RU 2010129798 A RU2010129798 A RU 2010129798A RU 2418942 C1 RU2418942 C1 RU 2418942C1
Authority
RU
Russia
Prior art keywords
well
pump
space
pressure
fluid
Prior art date
Application number
RU2010129798/03A
Other languages
Russian (ru)
Inventor
Раис Салихович Хисамов (RU)
Раис Салихович Хисамов
Наиль Габдулбариевич Ибрагимов (RU)
Наиль Габдулбариевич Ибрагимов
Александр Михайлович Евдокимов (RU)
Александр Михайлович Евдокимов
Станислав Александрович Евдокимов (RU)
Станислав Александрович Евдокимов
Ринат Анварович Габдрахманов (RU)
Ринат Анварович Габдрахманов
Ильяс Ахматгалиевич Нуриев (RU)
Ильяс Ахматгалиевич Нуриев
Original Assignee
Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Татнефть" им. В.Д. Шашина filed Critical Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority to RU2010129798/03A priority Critical patent/RU2418942C1/en
Application granted granted Critical
Publication of RU2418942C1 publication Critical patent/RU2418942C1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

FIELD: oil and gas production.
SUBSTANCE: at development of well pressure is periodically sunk without shutdown of immersed pump station and filtration equilibrium mode is periodically restored. Well space between interval of perforation and pump equipment is preliminary and temporarily disconnected into an upper and lower one to create periodical pressure sink without shutdown of the immersed pump station. Thus flow of liquid into the well stops and pressure is equalised in borehole environment. By withdrawing liquid with pump from upper space of the well above the place of disconnection there is created pressure sink in well. At restoration of the equilibrium mode of filtration upper and lower space of the well are connected creating rapid pressure sink in borehole environment and rapid restoration of liquid flow into the well. Fluid is continued to be withdrawn with the pump.
EFFECT: increased efficiency of procedure due to reduced production watering.
1 ex

Description

Изобретение относится к нефтяной промышленности и может найти применение при эксплуатации добывающей скважины.The invention relates to the oil industry and may find application in the operation of a producing well.

Известен способ эксплуатации скважины, согласно которому ведут раздельную откачку из верхнего продуктивного пласта нефти на дневную поверхность верхним насосом, установленным на максимальной рабочей высоте режима эксплуатации, и воды в водонасыщенную подошвенную область пласта или нижележащий водопоглощающий пласт нижним электроцентробежным насосом, обращенным вниз и имеющим снизу хвостовик с пакером, установленным над кровлей водопоглощающего пласта или в подошвенной области пласта. Соотношение производительностей нижнего и верхнего насосов подбирают в зависимости от соотношения количества поступающей в скважину воды и нефти. Общую производительность насосов подбирают из условия гравитационного разделения пластовой жидкости в скважине на нефть и воду и откачки нижним насосом воды, не содержащей нефти. Между верхним и нижним насосами на рабочей глубине режима депрессии размещают средний электроцентробежный насос с производительностью, большей производительности верхнего насоса. Периодически меняют режим эксплуатации скважины на режим депрессии, для чего отключают верхний насос и включают средний и нижний насосы. Предварительно перфорируют водонасыщенную подошвенную область пласта или водопоглощающий пласт ниже водонефтяного контакта на расстоянии не менее 5 м. В колонне насосно-компрессорных труб между насосами выполняют две группы отверстий. Нижнюю группу отверстий размещают выше перфорации продуктивного пласта на расстоянии в пределах от 50 до 100 м. Верхнюю группу отверстий размещают на расстоянии от нижней группы отверстий в пределах от 50 до 300 м (патент РФ №2382181, опубл. 20.02.2010).There is a method of operating a well, according to which separate pumping of oil from the upper productive formation to the day surface by an upper pump installed at the maximum working height of the operating mode and water into the water-saturated plantar area or the underlying water-absorbing formation by the lower electric centrifugal pump, facing down and having a liner bottom with a packer installed above the roof of the water-absorbing formation or in the plantar area of the formation. The ratio of the productivity of the lower and upper pumps is selected depending on the ratio of the amount of water and oil entering the well. The total performance of the pumps is selected from the conditions of gravity separation of the formation fluid in the well into oil and water and pumping water containing no oil with the lower pump. Between the upper and lower pumps at the working depth of the depression mode, an average electric centrifugal pump is installed with a capacity greater than that of the upper pump. Periodically change the operating mode of the well to the depression mode, for which the upper pump is turned off and the middle and lower pumps are turned on. The water-saturated bottom region of the formation or the water-absorbing formation is pre-punched below the oil-water contact at a distance of at least 5 m. Two groups of holes are made in the string of tubing between the pumps. The lower group of holes is placed above the perforation of the reservoir at a distance ranging from 50 to 100 m. The upper group of holes is placed at a distance from the lower group of holes in the range from 50 to 300 m (RF patent No. 2382181, publ. 02.20.2010).

Способ сложен в аппаратурном исполнении и в управлении оборудованием для поддержания режимов эксплуатации скважины. Способ позволяет разделить потоки жидкости на нефть и воду, но он не решает задачу снижения обводненности добываемой продукции.The method is complicated in hardware design and in the management of equipment to maintain well operation modes. The method allows to separate the fluid flows into oil and water, but it does not solve the problem of reducing the water content of the produced products.

Наиболее близким к предложенному изобретению по технической сущности является способ разработки нефтяной залежи, включающий отбор жидкости через добывающие скважины, закачку рабочего агента через нагнетательные скважины, периодическую депрессию в добывающих скважинах без остановки погружного скважинного насосного оборудования и периодическое восстановление равновесного режима фильтрации. Добывающие скважины оборудуют двумя глубинными насосами разной производительности. Насос меньшей производительности размещают сверху на рабочей глубине равновесного режима фильтрации. Насос большей производительности размещают снизу на рабочей глубине режима депрессии. Равновесный режим фильтрации обеспечивают работой насоса меньшей производительности при выключенном насосе большей производительности. Режим депрессии обеспечивают работой насоса большей производительности при выключенном насосе меньшей производительности и со снижением уровня жидкости в скважине ниже рабочей глубины равновесного режима фильтрации. При этом при переходе от режима депрессии к равновесному режиму фильтрации верхний насос запускают в работу сразу по достижении уровня жидкости в скважине глубины насоса меньшей производительности с сохранением потока жидкости в скважине (патент РФ №2320860, опубл. 2008.03.27 - прототип).Closest to the proposed invention in technical essence is a method of developing an oil reservoir, which includes taking fluid through production wells, pumping a working agent through injection wells, periodic depression in production wells without stopping submersible downhole pumping equipment, and periodically restoring the equilibrium filtration mode. Production wells are equipped with two deep pumps of different capacities. A pump of lower capacity is placed on top of the working depth of the equilibrium filtration mode. A pump with a higher capacity is placed at the bottom at the working depth of the depression mode. The equilibrium filtration mode provides a pump with a lower capacity when the pump is turned off with a higher capacity. The depression mode provides the pump with higher performance when the pump is turned off with lower productivity and with a decrease in the liquid level in the well below the working depth of the equilibrium filtration mode. In this case, when switching from the depression mode to the equilibrium filtration mode, the upper pump is put into operation immediately after reaching the liquid level in the well, the pump depth of the lower productivity, while maintaining the fluid flow in the well (RF patent No. 2320860, publ. 2008.03.27 - prototype).

Способ оказывается малоэффективным вследствие того, что при создании депрессии практически не меняется градиент давления, не происходит выравнивания давления в околоскважинном пространстве из-за отсутствия остановки потока жидкости. Происходит лишь ускорение движения потока жидкости, которое способствует ускорению прохождения жидкости по промытым каналам и практически не затрагивает запасы в низкопроницаемых зонах и блоках между трещинами. Обводненность добываемой продукции меняется незначительно.The method is ineffective due to the fact that when creating a depression, the pressure gradient practically does not change, there is no pressure equalization in the near-wellbore space due to the lack of stopping the fluid flow. Only the acceleration of the fluid flow occurs, which helps to accelerate the passage of fluid through the washed channels and practically does not affect the reserves in low-permeability zones and blocks between cracks. The water content of the extracted products varies slightly.

В предложенном изобретении решается задача снижения обводненности добываемой продукции за счет остановки потока жидкости и выравнивания давления в околоскважинной зоне и резкого снижения давления с одновременным отбором жидкости.The proposed invention solves the problem of reducing the water content of the produced products by stopping the fluid flow and equalizing the pressure in the near-wellbore zone and drastically reducing the pressure with simultaneous fluid withdrawal.

Задача решается тем, что в способе эксплуатации скважины, включающем периодическую депрессию в скважине без остановки погружного скважинного насосного оборудования и периодическое восстановление равновесного режима фильтрации, согласно изобретению, для создания периодической депрессии в скважине без остановки погружного скважинного насосного оборудования предварительно между интервалом перфорации и насосным оборудованием скважинное пространство временно разобщают на верхнее и нижнее, чем организуют остановку потока жидкости в скважину и выравнивание давления в околоскважинном пространстве, а депрессию в скважине создают отбором жидкости насосом из верхнего пространства скважины над местом разобщения, при восстановлении равновесного режима фильтрации сообщают верхнее и нижнее пространство скважины, чем организуют создание резкой депрессии на околоскважинную зону и резкое восстановление потока жидкости в скважину, и продолжают отбор жидкости насосом.The problem is solved in that in the method of operating the well, comprising periodic depression in the well without stopping the submersible downhole pumping equipment and periodically restoring the equilibrium filtration mode, according to the invention, to create periodic depression in the well without stopping the submersible downhole pumping equipment previously between the perforation interval and the pumping equipment the borehole space is temporarily divided into upper and lower, which organize the stop of the fluid flow in borehole and pressure equalization in the near-wellbore space, and depression in the well is created by pumping fluid from the upper space of the well above the place of separation, when the equilibrium filtration mode is restored, the upper and lower space of the well is reported, which organizes the creation of a sharp depression on the near-wellbore zone and a sharp restoration of fluid flow in well, and continue pumping fluid.

Сущность изобретенияSUMMARY OF THE INVENTION

При классической эксплуатации добывающей скважины, когда имеет место установившийся градиент давления в околоскважинной зоне, течение жидкости происходит по одним и тем же высокопроницаемым каналам и трещинам. При этом нефть из низкопроницаемых зон и блоков между высокопроницаемыми каналами и трещинами остается невыработанной. В результате промывается водой высокопроницаемая часть и наступает высокая обводненность добываемой продукции. Существующие способы эксплуатации скважин и разработки нефтяных залежей позволяют форсировать отбор жидкости из скважины, однако при этом изменения давления, достаточного для выхода нефти из низкопроницаемых зон и блоков в высокопроницаемые и трещинные зоны, не происходит. Заставить нефть из блоков и низкопроницаемых зон поступать в низкопроницаемые зоны и трещины и далее в скважину можно только остановкой потока, выравниванием давления и последующим резким снижением давления в околоскважинном пространстве. Резкое снижение давления способствует выходу нефти из низкопроницаемых зон и блоков и снижению обводненности добываемой продукции. В предложенном изобретении решается задача снижения обводненности добываемой продукции за счет остановки потока жидкости и выравнивания давления в околоскважинной зоне и резкого снижения давления с одновременным отбором жидкости. Задача решается следующим образом.In the classic operation of a producing well, when there is a steady pressure gradient in the near-wellbore zone, the fluid flows through the same highly permeable channels and fractures. At the same time, oil from low-permeability zones and blocks between highly permeable channels and cracks remains undeveloped. As a result, a highly permeable part is washed with water and a high water cut of the produced products occurs. Existing methods of operating wells and developing oil deposits make it possible to force the selection of liquid from the well, however, there is no change in pressure sufficient for oil to escape from low-permeability zones and blocks to high-permeability and fracture zones. It is possible to force oil from blocks and low-permeability zones to enter low-permeability zones and fractures and then to the well only by stopping the flow, equalizing the pressure and then drastically reducing the pressure in the near-wellbore space. A sharp decrease in pressure contributes to the release of oil from low-permeability zones and blocks and to a decrease in the water content of produced products. The proposed invention solves the problem of reducing the water content of the produced products by stopping the fluid flow and equalizing the pressure in the near-wellbore zone and drastically reducing the pressure with simultaneous fluid withdrawal. The problem is solved as follows.

В добывающую скважину спускают насосное оборудование ниже стандартного расположения и ближе к интервалу перфорации. Между интервалом перфорации и насосным оборудованием скважинное пространство временно разобщают на верхнее и нижнее, например, постановкой в эксплуатационной колонне пакера, снабженного управлением с устья скважины, постановкой в эксплуатационной колонне перемычки с клапаном, открываемым нажатием при опускании колонны труб или штанг, и т.п. Этим организуют остановку потока жидкости в скважину. В околоскважинной зоне при остановленном потоке жидкости происходит выравнивание давления. При этом выравнивается давление и между высокопроницаемыми и низкопроницаемыми зонами, между трещинной частью и блоками. При установленном разобщении продолжают отбирать жидкость из скважины насосом из верхнего пространства скважины над местом разобщения. В скважине над местом разобщения создается депрессия. При снижении уровня жидкости до заданного значения (пределом может быть давление насыщения нефти газом или другие особенности пласта коллектора), предпочтительно до уровня насоса, сообщают верхнее и нижнее пространство скважины, чем организуют создание резкой депрессии на околоскважинную зону и резкое восстановление потока жидкости в скважину. При этом продолжают отбор жидкости насосом. Создание резкой депрессии способствует созданию перепада давления между высокопроницаемыми и низкопроницаемыми зонами, между трещинной частью и блоками и поступлению нефти из низкопроницаемых зон и блоков в высокопроницаемые зоны и трещины и далее в скважину. Обводненность добываемой продукции снижается. Далее эксплуатируют скважину в обычном режиме до увеличения обводненности, при которой мероприятия по снижению обводненности повторяют.Pumping equipment is lowered into the production well below a standard location and closer to the perforation interval. Between the perforation interval and the pumping equipment, the borehole space is temporarily divided into upper and lower, for example, by setting a packer in the production string equipped with control from the wellhead, setting a jumper in the production string with a valve that can be opened by pressing when lowering the pipe string or rods, etc. . This organizes the stopping of fluid flow into the well. In the near-wellbore zone, when the fluid flow is stopped, pressure equalization occurs. In this case, the pressure is evened out between the high-permeability and low-permeability zones, between the fractured part and the blocks. When the disconnection is established, they continue to draw fluid from the well with a pump from the upper space of the well above the place of separation. In the well above the place of separation, depression is created. When the liquid level is reduced to a predetermined value (the limit may be the pressure of oil saturation with gas or other features of the reservoir), preferably to the pump level, the upper and lower space of the well is reported, thereby organizing the creation of a sharp depression on the near-wellbore zone and a sharp restoration of the fluid flow into the well. At the same time, the pump continues to take fluid. The creation of a sharp depression contributes to the creation of a pressure differential between the high-permeability and low-permeability zones, between the fractured part and the blocks, and the flow of oil from the low-permeability zones and blocks to the high-permeability zones and fractures and further to the well. The water content of the extracted products is reduced. Then the well is operated in the normal mode until the water cut increases, at which the water cut reduction measures are repeated.

Пример конкретного выполненияConcrete example

После обводнения добываемой продукции до 90% в добывающую скважину с интервалом перфорации на глубине 820-830 м, обсаженную эксплуатационной колонной диаметром 168 мм, спускают компоновку, состоящую из устройства для поинтервальной опрессовки эксплуатационных колонн (пакера), соединенного жестко через хвостовик из насосно-компрессорных труб с штанговым глубинным насосом типа 25-175-RHAM-12-4-2-2, расположенным выше и способным обеспечивать подачу жидкости из скважины с расходом 8-12 м3/сут., и колонны насосно-компрессорных труб. Кабель пакера закрепляют на наружной поверхности колонны насосно-компрессорных труб. Пакер размещают на глубине выше интервала перфорации на 25 м. Насос размещают на глубине на 65 м выше интервала перфорации. Скважину оборудуют контроллером и двумя глубинными манометрами с возможностью передачи данных на устье. Запускают в работу насос и отбирают по колонне насосно-компрессорных труб скважинную жидкость. По кабелю подают напряжение и включают электродвигатель пакера, который пакерует и разобщает скважинное пространство на верхнее и нижнее. Продолжают откачивать скважинную жидкость насосом из верхнего пространства скважины до снижения уровня жидкости в скважине до глубины 700 м. Подают по кабелю команду на электродвигатель пакера, распакеровывают пакер и сообщают верхнее и нижнее пространство скважины. При этом насос продолжает откачивать скважинную жидкость. Продолжают работу насоса в обычном режиме.After watering the produced products up to 90% into the production well with a perforation interval at a depth of 820-830 m, cased with a production string with a diameter of 168 mm, the assembly consisting of a device for interval testing of production casing (packer), rigidly connected through the shank of the tubing pipes with a sucker rod pump type 25-175-RHAM-12-4-2-2, located above and capable of supplying fluid from the well with a flow rate of 8-12 m 3 / day., and tubing string. The packer cable is fixed to the outer surface of the tubing string. The packer is placed at a depth above the perforation interval of 25 m. The pump is placed at a depth of 65 m above the perforation interval. The well is equipped with a controller and two depth gauges with the ability to transfer data to the mouth. The pump is started up and the well fluid is selected through the tubing string. The cable is energized and the packer motor is turned on, which packs and divides the borehole space into upper and lower. Continue to pump out the borehole fluid with a pump from the upper space of the borehole until the liquid level in the borehole drops to a depth of 700 m. A command is sent via cable to the packer electric motor, the packer is unpacked and the upper and lower borehole space is reported. In this case, the pump continues to pump out the well fluid. Continue to operate the pump as normal.

В результате обводненность добываемой продукции снизилась с 90 до 65%.As a result, the water cut of the extracted products decreased from 90 to 65%.

Применение предложенного способа позволит решить задачу снижения обводненности добываемой продукции.The application of the proposed method will solve the problem of reducing the water content of the extracted products.

Claims (1)

Способ эксплуатации скважины, включающий периодическую депрессию в скважине без остановки погружного скважинного насосного оборудования и периодическое восстановление равновесного режима фильтрации, отличающийся тем, что для создания периодической депрессии в скважине без остановки погружного скважинного насосного оборудования предварительно между интервалом перфорации и насосным оборудованием скважинное пространство временно разобщают на верхнее и нижнее, чем организуют остановку потока жидкости в скважину и выравнивание давления в околоскважинном пространстве, а депрессию в скважине создают отбором жидкости насосом из верхнего пространства скважины над местом разобщения, при восстановлении равновесного режима фильтрации сообщают верхнее и нижнее пространства скважины, чем организуют создание резкой депрессии на околоскважинную зону и резкое восстановление потока жидкости в скважину, и продолжают отбор жидкости насосом. A method of operating a well, including periodic depression in the well without stopping the submersible downhole pumping equipment and periodically restoring the equilibrium filtration mode, characterized in that in order to create a periodic depression in the well without stopping the submersible downhole pumping equipment, the borehole space is temporarily divided between the perforation and pumping equipment upper and lower than organizing a stop of fluid flow into the well and alignment phenomena in the near-wellbore space, and depression in the well is created by pumping fluid from the upper space of the well above the place of separation, when the equilibrium filtration mode is restored, the upper and lower spaces of the well are reported, thereby organizing the creation of a sharp depression on the near-wellbore zone and a sharp restoration of fluid flow into the well, and continue pumping fluid.
RU2010129798/03A 2010-07-20 2010-07-20 Procedure for well development RU2418942C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010129798/03A RU2418942C1 (en) 2010-07-20 2010-07-20 Procedure for well development

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010129798/03A RU2418942C1 (en) 2010-07-20 2010-07-20 Procedure for well development

Publications (1)

Publication Number Publication Date
RU2418942C1 true RU2418942C1 (en) 2011-05-20

Family

ID=44733711

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010129798/03A RU2418942C1 (en) 2010-07-20 2010-07-20 Procedure for well development

Country Status (1)

Country Link
RU (1) RU2418942C1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459936C1 (en) * 2011-10-31 2012-08-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2459937C1 (en) * 2011-10-31 2012-08-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2645196C1 (en) * 2016-12-02 2018-02-16 Ильдар Зафирович Денисламов Oil well deep pump equipment operation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459936C1 (en) * 2011-10-31 2012-08-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2459937C1 (en) * 2011-10-31 2012-08-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2645196C1 (en) * 2016-12-02 2018-02-16 Ильдар Зафирович Денисламов Oil well deep pump equipment operation method

Similar Documents

Publication Publication Date Title
RU2417306C1 (en) Procedure for development of oil deposit
RU2297521C1 (en) Device for simultaneous separate extraction of well product and for forcing water into formation
RU2394153C1 (en) Procedure for operation of high water flooded oil well
RU2433250C1 (en) Method of oil development by using periodic operation of producer wells with operation portions varying with oil well fluid density variation
US10597993B2 (en) Artificial lift system
RU2456441C1 (en) Production method of high-viscous oil by means of simultaneous pumping of steam and extraction of liquid from single horizontal well
RU2418942C1 (en) Procedure for well development
RU2737043C1 (en) Method for development of oil reservoir of multi-layer oil and gas condensate deposit
AU2010300497B2 (en) Producing gas and liquid from below a permanent packer in a hydrocarbon well
RU2451165C1 (en) Method for restriction of brine water inflow to production well
RU109792U1 (en) EQUIPMENT FOR SIMULTANEOUS-SEPARATE OIL PRODUCTION FROM TWO LAYERS
RU2539486C1 (en) Method for oil development with horizontal wells
US9587470B2 (en) Acoustic artificial lift system for gas production well deliquification
RU2616052C1 (en) Method development of shaly carbonate oil pays
RU2431737C1 (en) Procedure for development of oil-water deposit
RU2695906C1 (en) Method for development of weakly permeable oil deposit with application of horizontal wells and water and gas impact
RU2504646C1 (en) Method of oil deposit development using flooding
RU2401937C1 (en) Procedure for development of watered oil deposit
RU2510456C2 (en) Formation method of vertically directed fracture at hydraulic fracturing of productive formation
RU2320860C1 (en) Oil field development
RU2491418C1 (en) Method to develop multizone oil reservoir
EA029770B1 (en) Oil production method
RU2463443C1 (en) Method of development of oil deposit
RU2242594C1 (en) Method for extraction of sedimentologically screened oil-saturated lens by one well
RU2724715C1 (en) Operating method of water-flooded oil formation

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20170721