RU2359113C1 - Treatment method of layer bottomhole - Google Patents
Treatment method of layer bottomhole Download PDFInfo
- Publication number
- RU2359113C1 RU2359113C1 RU2007143427/03A RU2007143427A RU2359113C1 RU 2359113 C1 RU2359113 C1 RU 2359113C1 RU 2007143427/03 A RU2007143427/03 A RU 2007143427/03A RU 2007143427 A RU2007143427 A RU 2007143427A RU 2359113 C1 RU2359113 C1 RU 2359113C1
- Authority
- RU
- Russia
- Prior art keywords
- zone
- well
- depression
- oil
- formation
- Prior art date
Links
Landscapes
- Filtering Materials (AREA)
Abstract
Description
Изобретение относится к области добычи нефтепродуктов, в частности к методам воздействия на зону продуктивного пласта с целью восстановления нефтеотдачи скважин.The invention relates to the field of oil production, in particular to methods of influencing the zone of a productive formation in order to restore oil recovery wells.
Одной из причин снижения продуктивности скважин является активное отложение асфальтосмолопарафинового вещества (АСПО) в фильтре обсадной колонны и непосредственно в поровом пространстве пласта по поверхности, вскрытой скважиной в так называемой призабойной зоне пласта (ПЗП).One of the reasons for the decrease in well productivity is the active deposition of asphalt-resin-paraffin substance (AFS) in the casing filter and directly in the pore space of the formation along the surface exposed by the well in the so-called bottom-hole formation zone (BHP).
Осаждение АСПО происходит вследствие снижения температуры добываемого пластового флюида ниже точки кристаллизации растворенных в нем асфальтенов и парафинов. Особенно интенсивно процесс снижения температуры происходит при движении пластового флюида через наружную поверхность фильтрации пласта и через отверстия фильтра обсадной колонны (эффект Джоуля-Томсона), где и происходит активное выпадение АСПО из коллоидного раствора, представляющего собой в основном эмульсию нефти в воде.The deposition of paraffin deposits occurs due to a decrease in the temperature of the produced formation fluid below the crystallization point of the asphaltenes and paraffins dissolved in it. The temperature reduction process is especially intense when the formation fluid moves through the outer surface of the formation filtration and through the openings of the casing filter (Joule-Thomson effect), where the active deposition of paraffin deposits from the colloidal solution occurs, which is mainly an oil emulsion in water.
Указанный процесс существенно повышает гидравлическое сопротивление ПЗП и фильтра колонны, приводящее к снижению продуктивности скважин.The specified process significantly increases the hydraulic resistance of the bottom hole and the column filter, leading to a decrease in well productivity.
Существуют различные методы и средства для очистки фильтра и ПЗП от АСПО.There are various methods and tools for cleaning the filter and PZP from AFS.
Известны способы химического воздействия на ПЗП с закачкой в интервал фильтра определенного объема растворителя углеводородов и выдерживания его на забое некоторое время (сутки и более), пока не завершится процесс очистки ПЗП от АСПО. (Ибрагимов Г.З., Сорокин В.А., Хисамутдинов Н.И. Химические реагенты для добычи нефти: Справочник рабочего. - Недра, 1986 г., с.240).Known methods of chemical exposure to the BFP with the injection into the filter interval of a certain volume of hydrocarbon solvent and keeping it at the bottom for some time (a day or more) until the process of cleaning the BCP from ASPO is completed. (Ibragimov G.Z., Sorokin V.A., Khisamutdinov N.I. Chemical reagents for oil production: Worker's Handbook. - Nedra, 1986, p. 240).
Для ускорения процесса очистки в некоторых случаях закачивают растворитель, подогретый до определенной температуры (Разницын В.В. «Методы борьбы с парафином на месторождении Узень». - Нефтепромысловое дело, - М., ВНИИОЭНГ, 1979 г., Вып.10, с.26-27).To speed up the cleaning process, in some cases, a solvent is heated up to a certain temperature (V. Raznitsyn, “Methods of Paraffin Control at the Uzen Field.” - Oilfield Business, - M., VNIIOENG, 1979, Issue 10, p. 26-27).
Применяют также комбинированный вариант очистки от АСПО, в котором для ускорения очистки на объем растворителя, закаченный в зону ПЗП, воздействуют источником вибрационных колебаний (Мусабиров М.Х. Технологии обработки призабойной зоны нефтяного пласта в процессе ПРС, М., ВНИИОЭНГ, 2002 г., с.224).They also use the combined version of ASPA cleaning, in which, to accelerate cleaning, the volume of solvent pumped into the zone of the bottom-hole zone is affected by a source of vibrational vibrations (Musabirov M.Kh. Technologies for processing the bottom-hole zone of an oil reservoir in the PRS process, M., VNIIOENG, 2002 , p. 224).
Недостаток химических методов заключается в сложности используемого оборудования по закачке химреагентов в скважину, требует больших энерго- и трудозатрат, а также в несоответствии требованиям по экологии.The disadvantage of chemical methods is the complexity of the equipment used for pumping chemicals into the well, it requires large energy and labor costs, and also does not comply with environmental requirements.
Известен способ очистки ПЗП, основанный на применении разогрева ПЗП с помощью электроиндукционных преобразователей с одновременной обработкой зоны разогрева ультразвуковыми колебаниями от специальных источников (Кудинов В.И. Совершенствование тепловых методов разработки месторождений высоковязкой нефти. - М., Нефть и газ, 1996 г., с.28).There is a method of cleaning PZP, based on the application of heating PZP using electro-induction converters with simultaneous processing of the heating zone by ultrasonic vibrations from special sources (V. Kudinov. Improving thermal methods of developing high-viscosity oil fields. - M., Oil and gas, 1996, p. 28).
Недостаток способа заключается в том, что он требует трудоемких спускоподъемных операций по доставке источников в ПЗП и больших энергозатрат по ее разогреву.The disadvantage of this method is that it requires laborious tripping operations for the delivery of sources to the PZP and high energy consumption for its heating.
В последние годы были разработаны более эффективные технологии очистки ПЗП от АСПО, частично лишенные указанных недостатков.In recent years, more effective technologies have been developed for the cleaning of PPP from ASPO, partially devoid of these shortcomings.
Известна технология термогазобарического воздействия на ПЗП, основанная на создании в ПЗП высокой температуры и давления с помощью сжигания в ней порохового заряда (ПЗ), спущенного в зону обработки на каротажном кабеле (Пат. РФ №2072423, «Способ обработки призабойной зоны скважины и устройство для его осуществления», приоритет 12.04.1996 г., опубликовано 27.01.1997 г., бюл. №3). Температура, давление и длительность воздействия регулируются в этом случае с помощью подбора соответствующего типа ПЗ и соотношения его размеров с габаритами обрабатываемого участка ПЗП.There is a known technology of thermogasobaric impact on the bottomhole formation zone, based on the creation in the bottomhole zone of high temperature and pressure by burning a powder charge in it, lowered into the processing zone on a wireline cable (Pat. RF No. 2072423, "Method for processing bottom-hole zone of a well and device for its implementation ”, priority 04/12/1996, published 01/27/1997, bull. No. 3). The temperature, pressure and duration of exposure are regulated in this case by selecting the appropriate type of PP and the ratio of its dimensions to the dimensions of the processed section of the PPP.
В процессе сгорания ПЗ в ПЗП образуется высокотемпературный парогазовый пузырь, пульсации которого оказывают активное репрессионно-депрессионные воздействие на ПЗП и фильтр колонны, приводящее не только к их активной очистке от АСПО, но также к аномальному газодинамическому воздействию через отверстия фильтра на поверхность горной породы с образованием в ней дополнительных фильтрационных каналов (микротрещин).In the process of the combustion of PP in the PZP, a high-temperature vapor-gas bubble is formed, the pulsations of which have an active repressive and depressive effect on the PZP and the filter of the column, leading not only to their active purification from ASPO, but also to an abnormal gas-dynamic effect through the filter openings on the rock surface with the formation in it additional filtration channels (microcracks).
В качестве прототипа к заявляемому способу взят способ по патенту №2072423, «Способ обработки призабойной зоны скважины и устройство для его осуществления».As a prototype of the claimed method, the method according to patent No. 2072423, “Method for processing the bottom-hole zone of a well and a device for its implementation,” was taken.
Известный способ включает доставку в интервал продуктивного пласта депрессионной камеры и сжигание в нем пиротехнического заряда с выделением газов и создание депрессии, в котором предварительно скважину заполняют жидкостью с повышенной плотностью и создают давление столба жидкости, соответствующее пластовому давлению, при этом для осуществления способа используют медленно горящий пиротехнический заряд, обеспечивающий выделение газов с повышенной температурой, сжигание медленно горящего пиротехнического заряда производят перед созданием депрессии, начиная со стороны нижней части интервала продуктивного пласта в течение времени, соответствующего времени прогрева призабойной зоны до температуры плавления кольматирующих элементов, во время сжигания медленно горящего пиротехнического заряда организуют циркуляцию скважинной жидкости для охлаждения корпуса узла впускного клапана депрессионной камеры, затем производят технологическую выдержку для замещения в интервале продуктивного пласта газообразных продуктов горения медленно горящего пиротехнического заряда скважинной жидкостью, а после проведения депрессии удаляют из интервала продуктивного пласта часть скважинной жидкости с поступившими в нее при депрессии из призабойной зоны кольматирующими элементами.The known method includes delivering a depression chamber to the interval of a productive formation and burning a pyrotechnic charge therein with gas evolution and creating a depression in which the well is pre-filled with a liquid with increased density and a liquid column pressure corresponding to the formation pressure is created, while the method uses a slowly burning pyrotechnic charge, providing the release of gases with elevated temperature, the burning of a slowly burning pyrotechnic charge is carried out before creating depression, starting from the bottom of the interval of the reservoir for a time corresponding to the time of heating the bottom-hole zone to the melting temperature of the clogging elements, while burning a slowly burning pyrotechnic charge, circulate well fluid to cool the body of the inlet valve assembly of the depression chamber, then produce technological exposure for substitution in the interval of the reservoir of gaseous products of combustion of a slowly burning pyrotechnic number of wells with liquid and after the depression is removed from the reservoir interval portion of the wellbore fluid with the received therein depression bottom zone of the bridging elements.
Преимуществом описанного способа является его высокая технико-экономическая эффективность, обусловленная оперативностью проведения работ по очистке ПЗП, длительность которых составляет не более 6-8 часов и значительным промысловым эффектом, заключающимся в существенном приросте продуктивности скважин (до 4-5 раз) наряду со значительным (до 15-20 месяцев) сохранением полученного положительного эффекта.The advantage of the described method is its high technical and economic efficiency, due to the efficiency of the work on the cleaning of the bottomhole zone, the duration of which is no more than 6-8 hours and a significant field effect, consisting in a significant increase in well productivity (up to 4-5 times) along with a significant ( up to 15-20 months) by maintaining the resulting positive effect.
Основным недостатком известного способа является ограничение в области его применения по геолого-физическим и геолого-техническим условиям. В частности указанный способ может применяться при обработке терригенных коллекторов с обводненностью не более 40%, при мощности перемычки до водоносного пласта не менее 5 метров.The main disadvantage of this method is the limitation in the field of its application according to the geological and physical and geological and technical conditions. In particular, this method can be used in the treatment of terrigenous reservoirs with a water cut of not more than 40%, with a bridge power of at least 5 meters to the aquifer.
Другим существенным недостатком данного способа является разрушение цементного камня в зоне активного воздействия (ПЗП), особенно в скважинах старого фонда, приводящее к последующему выносу его обломков с потоком пластового флюида при вводе скважины в эксплуатацию и, как следствие, к поломке насосного оборудования с соответствующими дополнительными затратами на его подъем и ремонт.Another significant drawback of this method is the destruction of cement stone in the zone of active impact (PZP), especially in the wells of the old stock, leading to the subsequent removal of its fragments with the flow of formation fluid during commissioning of the well and, as a result, to the breakdown of pumping equipment with corresponding additional the costs of its lifting and repair.
Подобные ограничения существенно сужают область применения известного способа, особенно на старых месторождениях в поздней стадии эксплуатации, когда обводненность у большей части (90%) эксплутационного фонда скважин превышает 70-80%, а средняя величина перемычек, особенно в условиях широко распространенных сложнопостроенных коллекторов, составляет не более 3-4 м.Such restrictions significantly narrow the scope of the known method, especially in old fields in the late stage of operation, when the water cut in most (90%) of the production well stock exceeds 70-80%, and the average size of jumpers, especially in conditions of widespread complex reservoirs, is no more than 3-4 m.
Задачей заявляемого способа обработки призабойной зоны пласта является расширение области применения и повышение его эффективности.The objective of the proposed method for processing bottom-hole formation zone is to expand the scope and increase its effectiveness.
Указанная задача решается тем, что в заявляемом способе обработки призабойной зоны пласта (ПЗП), включающем доставку в интервал продуктивного пласта и сжигание там пиротехнического заряда, создание депрессии и последующее удаление из интервала продуктивного пласта скважинной жидкости с поступившими в нее из ПЗП кольматирующими элементами, предварительно в скважине в зоне фильтра проводят дополнительную щадящую перфорацию с плотностью не более 3 отверстия на метр, далее закачивают в ПЗП гидрофобный раствор в количестве, обеспечивающем образование водонепроницаемого гидрофобного экрана, отсекающего водонасыщенные пропластки в ближней зоне продуктивного пласта, а создание депрессии и последующее удаление пластовой жидкости с поступившими в нее кольматирующими элементами осуществляют с помощью свабирования скважины до установившегося постоянным притока нефтепродукта с одновременным контролем поступления кольматирующих элементов на поверхность.This problem is solved by the fact that in the inventive method for processing the bottom-hole formation zone (PZP), which includes delivering a pyrotechnic charge to the interval of the reservoir and burning a pyrotechnic charge therein, creating a depression and subsequent removal of the borehole fluid from the interval of the reservoir, with the colming elements received from it, in the well in the filter zone, additional gentle perforation is carried out with a density of not more than 3 holes per meter, then a hydrophobic solution is pumped into the PZP in an amount that ensures the formation of a waterproof hydrophobic screen that cuts off water-saturated interlayers in the near zone of the reservoir, and the creation of depression and subsequent removal of the reservoir fluid with the fluid elements entering it is carried out by swabbing the well until a steady inflow of oil is obtained with simultaneous control of the arrival of the reservoir elements to the surface.
Для раскрытия сути заявляемого способа приводится следующее пояснение.To disclose the essence of the proposed method provides the following explanation.
Из практики выполнения водоизоляционных работ (ВИР) в скважинах, проводимых с целью блокирования обводнившихся пропластков, известно, что наибольший эффект достигается при применении различных гидрофобных растворов или эмульсий, которые обладают свойствами селективного проникновения в промывные зоны пласта, образуя в них водонепроницаемый экран (оторочку) вокруг ПЗП (Клещенко И.И., Григорьев A.B., Телков А.П. Изоляционные работы при заканчивании и эксплуатации нефтяных скважин. М.: Недра, 1998 г., с.267).From the practice of performing waterproofing works (VIR) in wells conducted to block waterlogged layers, it is known that the greatest effect is achieved when various hydrophobic solutions or emulsions are used that have the properties of selective penetration into the wash zone of the formation, forming a waterproof screen (rim) in them around the PPP (Kleshenko II, Grigoryev AB, Telkov AP Insulation work in the completion and operation of oil wells. M: Nedra, 1998, p.267).
Заявляемый способ осуществляют следующим образом.The inventive method is as follows.
При выборе объекта воздействия главное внимание уделяется величине перемычки до водоносного пласта, которая должна быть не менее 3-4 м, и состоянию сцепления цемента с обсадной колонной вблизи ПЗП (в интервале ±10 метров), которое должно обеспечивать коэффициент качества цементирования в этом интервале не ниже 0,3. Обводненность добываемой продукции может быть не более 80-90%. После выбора скважины для обработки в интервале продуктивного пласта (в зоне фильтра) производят щадящую перфорацию с плотностью не более 3-х отверстий на метр. Такая плотность перфорации выбрана расчетным путем и обеспечивает в дальнейшем надежную гидродинамическую связь с пластом. Перфорацию осуществляют стандартным кумулятивным методом.When choosing an object of influence, the main attention is paid to the size of the bridge to the aquifer, which should be at least 3-4 m, and the state of adhesion of cement to the casing near the PZP (in the range of ± 10 meters), which should provide a cementation quality coefficient in this interval not below 0.3. The water content of the extracted products can be no more than 80-90%. After selecting a well for processing in the interval of the reservoir (in the filter zone), gentle perforation is performed with a density of not more than 3 holes per meter. Such a perforation density was chosen by calculation and subsequently provides reliable hydrodynamic connection with the formation. Perforation is carried out by the standard cumulative method.
Затем осуществляют закачку в скважину гидрофобных растворов или эмульсий для отсечения обводнившихся пропластков и образования вокруг ПЗП водонепроницаемого экрана. Осуществление водоизоляционных работ осуществляют, например, согласно РД-153-39.0-329-04 «Инструкция по технологии предотвращения выноса песка, крепления призабойной зоны и снижения притока пластовых вод в добывающих скважинах (Кристалл)», «ТатНИПИнефть», г.Бугульма, 2002 г. Согласно инструкции «…в выбранный интервал скважины закачивают высоковязкую оторочку структурированной гидрофобной эмульсии. Объем оторочки должен оттеснить воду от ствола скважины на 20-25 м. Гидрофобный состав не растворяется водой, а наоборот, упрочняется при контакте с ней, т.е. практически не размывается в пластовых условиях под напором вод. Экранирующий эффект усиливается за счет набора структурно-механических свойств эмульсии во времени (эффект тиксотропного упрочнения структуры)…».Then, hydrophobic solutions or emulsions are injected into the well to cut off the waterlogged layers and form a waterproof screen around the bottom-hole zone. Implementation of waterproofing works is carried out, for example, according to RD-153-39.0-329-04 “Instructions on the technology for preventing sand removal, fixing the bottomhole zone and reducing the influx of formation water in production wells (Crystal)”, “TatNIPIneft”, Bugulma, 2002 d. According to the instructions “... a highly viscous rim of a structured hydrophobic emulsion is pumped into the selected interval of the well. The rim volume should displace water from the wellbore by 20-25 m. The hydrophobic composition does not dissolve with water, but on the contrary, hardens upon contact with it, i.e. practically does not erode in reservoir conditions under the pressure of water. The screening effect is enhanced by a set of structural and mechanical properties of the emulsion over time (the effect of thixotropic hardening of the structure) ... ”.
Таким образом, при дальнейшем вызове притока после осуществления водоизоляционных работ, активно работают только нефтенасыщенные пропластки, в то время как промытые, высокообводненные прослойки остаются блокированными в течение длительного времени.Thus, in the case of a further inflow call after the implementation of waterproofing works, only oil-saturated interlayers are actively working, while the washed-out, highly flooded interlayers remain blocked for a long time.
Далее проводят технологию термогазобарического воздействия на ПЗП с помощью медленно горящего пиротехнического заряда, которую осуществляют по РД-153-39.0-335-04 «Инструкция по применению устройства термоимплозионного УТИ-1 с термогазогенератором СТГГ-80 для воздействия на призабойную зону пласта», ОАО «Татнефть» и ООО НТП «ВУГЭЦ», 2004 г. Указанная технология защищена патентом №2072423, выбранном в качестве прототипа к заявляемому способу.Next, they carry out the technology of thermogasobaric impact on the bottomhole formation zone using a slowly burning pyrotechnic charge, which is carried out according to RD-153-39.0-335-04 “Instructions for the use of the UTI-1 thermoimplosion device with a STGG-80 thermogas generator for impacting the bottom-hole formation zone”, OJSC “ Tatneft ”and LLC NTP“ VUHEC ”, 2004. This technology is protected by patent No. 2072423, selected as a prototype of the claimed method.
После завершения этой операции осуществляют процесс свабирования, контролируя при этом динамику изменения дебита по нефти и воде, а также процесс выноса кольматирующих элементов и осколков цементного камня на поверхность до получения постоянного притока нефтепродукта. Процесс свабирования производят согласно РД-39-0147585-140-96 «Технология вызова притока свабированием при освоении скважин», «ТатНИПИнефть», г.Бугульма, 1996 г. Свабирование по колонне насосно-компрессорных труб (НКТ) скважинным поршнем (свабом) применяется для создания депрессии путем снижения уровня жидкости при подъеме ее из скважины для вызова притока из пласта и удаления продуктов реакции после обработки призабойной зоны.After this operation is completed, the swabbing process is carried out, while controlling the dynamics of changes in the oil and water flow rate, as well as the process of removing the clogging elements and fragments of cement stone to the surface until a constant influx of oil product is obtained. The swabbing process is carried out in accordance with RD-39-0147585-140-96 “Technology for invoking swabling inflows during well development”, TatNIPIneft, Bugulma, 1996. Swabling of a tubing string using a bore piston (swab) is used to create depression by lowering the fluid level when lifting it from the well to cause inflow from the reservoir and removing reaction products after treatment of the bottom-hole zone.
После завершения процесса свабирования и получения подтверждения положительных промысловых результатов от обработки ПЗП, спускают на забой штатное насосное оборудование и приступают к промышленной эксплуатации пласта.After completion of the swabbing process and obtaining confirmation of positive production results from the processing of the bottomhole formation zone, standard pumping equipment is lowered to the bottom and the reservoir is commercially operational.
Осуществление щадящей пефорации с плотностью не более 3 отверстия на метр позволяет без масштабного нарушения крепления цементного кольца обеспечить надежную связь с продуктивным пластом.The implementation of gentle perforation with a density of not more than 3 holes per meter allows without large-scale violation of the cement ring fastening to ensure reliable communication with the reservoir.
Применение гидрофобных составов для изоляции водонасыщенных интервалов позволит значительно увеличить (в несколько раз) количество скважин, в которых можно осуществить высокоэффективную технологию термогазобарического воздействия на ПЗП даже при уровне средней обводненности коллектора от 40% до 80-90% и удаленности от водоносного пласта до 3-4 метров, тем самым резко расширить область применения данной технологии.The use of hydrophobic compositions to isolate water-saturated intervals will significantly increase (several times) the number of wells in which it is possible to implement highly effective technology of thermogas-bar pressure treatment on the bottom hole even with average water cut of the reservoir from 40% to 80-90% and distance from the aquifer to 3- 4 meters, thereby dramatically expanding the scope of this technology.
Осуществление свабирования до спуска насоса на забой предотвращает попадание кольматантов и обломков цементного камня, образовавшихся в результате неизбежного разрушения цементного кольца, особенно в скважинах старого фонда под воздействием перфорации, высоких температур и давления при осуществлении термогазобарического воздействия с помощью пиротехнического заряда, в насосное оборудование и последующий выход его из строя.Carrying out swabbing before the pump runs down to the bottom prevents the penetration of cement and fragments of cement stone resulting from the inevitable destruction of the cement ring, especially in the old foundation wells under the influence of perforation, high temperatures and pressure during the implementation of thermogas pressure with the help of a pyrotechnic charge, into pumping equipment and subsequent its failure.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2007143427/03A RU2359113C1 (en) | 2007-11-23 | 2007-11-23 | Treatment method of layer bottomhole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2007143427/03A RU2359113C1 (en) | 2007-11-23 | 2007-11-23 | Treatment method of layer bottomhole |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2359113C1 true RU2359113C1 (en) | 2009-06-20 |
Family
ID=41025944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2007143427/03A RU2359113C1 (en) | 2007-11-23 | 2007-11-23 | Treatment method of layer bottomhole |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2359113C1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2513965C1 (en) * | 2013-04-16 | 2014-04-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Multilayer oil deposit development method |
RU2558837C1 (en) * | 2014-06-06 | 2015-08-10 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Method of water-producing well recovery |
RU2781721C1 (en) * | 2022-04-28 | 2022-10-17 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for treatment of the bottomhole formation zone (options) |
-
2007
- 2007-11-23 RU RU2007143427/03A patent/RU2359113C1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2513965C1 (en) * | 2013-04-16 | 2014-04-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Multilayer oil deposit development method |
RU2558837C1 (en) * | 2014-06-06 | 2015-08-10 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Method of water-producing well recovery |
RU2781721C1 (en) * | 2022-04-28 | 2022-10-17 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for treatment of the bottomhole formation zone (options) |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2459934C1 (en) | Development method of multilayer non-homogeneous oil deposit | |
RU2483209C1 (en) | Method of hydraulic fracturing of well formation | |
RU2495996C1 (en) | Development method of water-flooded oil deposit | |
RU2448240C1 (en) | Development method of oil deposits in carbonate reservoirs with water-oil zones | |
RU2359113C1 (en) | Treatment method of layer bottomhole | |
RU2231630C1 (en) | Method for restoring productiveness and starting operation of standing oil and gas wells | |
RU2320854C1 (en) | Well operation method | |
RU2524800C1 (en) | Development of inhomogeneous deposit by inclined and horizontal wells | |
RU2225942C1 (en) | Method for extraction of bituminous deposit | |
RU2580532C2 (en) | Isolation method of brine water influx in well | |
RU2205950C1 (en) | Method of treatment of producing carbonate formation | |
RU2651829C1 (en) | Method for preventing coning of bottom water in small-scale horizontal well | |
RU2684262C1 (en) | Method for development of high deposits of high viscosity oil with water consistent zones | |
RU2781721C1 (en) | Method for treatment of the bottomhole formation zone (options) | |
RU2191886C2 (en) | Method of isolation of beds with water flows | |
RU2459936C1 (en) | Oil deposit development method | |
RU2774251C1 (en) | Method for eliminating flows behind the casing in petroleum production boreholes | |
RU2144135C1 (en) | Method increasing productivity of oil well | |
CN112709561A (en) | Low-pressure compact marlite reservoir transformation method | |
RU2320856C1 (en) | Injection well operation method | |
RU2775120C1 (en) | Method for isolating water inflow in a formation with bottom water | |
RU2195545C1 (en) | Method of isolating flushed zones in producing and injection wells | |
RU2680089C1 (en) | Superhigh viscosity oil with aquifers deposit development method | |
RU2663521C1 (en) | Method for development of high deposits of high viscosity oil with water consistent zones | |
RU2717163C1 (en) | Treatment method of borehole zone of productive formation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20131124 |