RU2326229C1 - Method for water isolation in bottom-hole zone of exploitation well - Google Patents

Method for water isolation in bottom-hole zone of exploitation well Download PDF

Info

Publication number
RU2326229C1
RU2326229C1 RU2006142226/03A RU2006142226A RU2326229C1 RU 2326229 C1 RU2326229 C1 RU 2326229C1 RU 2006142226/03 A RU2006142226/03 A RU 2006142226/03A RU 2006142226 A RU2006142226 A RU 2006142226A RU 2326229 C1 RU2326229 C1 RU 2326229C1
Authority
RU
Russia
Prior art keywords
water
well
insulating material
radius
zone
Prior art date
Application number
RU2006142226/03A
Other languages
Russian (ru)
Inventor
Сергей Константинович Чепик (RU)
Сергей Константинович Чепик
Мунавир Хадеевич Мусабиров (RU)
Мунавир Хадеевич Мусабиров
Original Assignee
Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Татнефть" им. В.Д. Шашина filed Critical Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority to RU2006142226/03A priority Critical patent/RU2326229C1/en
Application granted granted Critical
Publication of RU2326229C1 publication Critical patent/RU2326229C1/en

Links

Landscapes

  • Sealing Material Composition (AREA)

Abstract

FIELD: oil and gas producing industry.
SUBSTANCE: invention is referred to oil and gas producing industry. According to the method in the beginning water-insulating material volume is defined. The water- insulating material is injected in a hole. It is pressed through in a formation. Thus, a water- insulating material is placed in annular space of a bottom-hole zone of the hole, bounded by isopotentials. Pressure on isopotentials makes 0÷1/3 to 1/2 from a total pressure drop between reservoir and bottom-hole magnitudes. Radiuses of isopotentials are counted under the formula.
EFFECT: it provides efficiency upgrading of water inflow isolation.
1 ex

Description

Предложение относится к нефтедобывающей промышленности, в частности к способам ограничения водопритока и изоляции пластовых и закачиваемых вод в добывающих скважинах.The proposal relates to the oil industry, in particular to methods of limiting water inflow and isolation of produced and injected water in production wells.

Наиболее близким по технической сущности к заявляемому способу является способ изоляции воды в призабойной зоне добывающей скважины, включающий закачку водоизоляционного материала в скважину с предварительным определением объема водоизоляционного материала и продавку его в пласт (Изоляционные работы при заканчивании и эксплуатации нефтяных скважин / И.И.Клещенко, А.В.Григорьев, А.П.Телков. - М.: Недра. - 1998, с.143-147).The closest in technical essence to the claimed method is a method of isolating water in the bottom-hole zone of a producing well, including pumping a waterproofing material into a well with a preliminary determination of the volume of waterproofing material and pushing it into the formation (Insulation work when completing and operating oil wells / I.I. Kleshenko , A.V. Grigoriev, A.P. Telkov. - M .: Nedra. - 1998, p.143-147).

Эффективность способа изоляции воды в призабойной зоне добывающей скважины зависит от точности создания интервала изоляционного экрана, который выбирается по результатам геофизических и гидродинамических исследований. Сложность выбора интервала создания экрана иногда обусловливается невозможностью однозначно выделить нефтенасыщенные и обводненные интервалы пласта, несмотря на значительный объем исследований. Радиус экрана определяется из условия, что частная производная депрессии по радиусу депрессионной воронки не должна превышать величины:The effectiveness of the method of isolating water in the bottomhole zone of a producing well depends on the accuracy of creating the interval of the insulating screen, which is selected according to the results of geophysical and hydrodynamic studies. The difficulty in choosing the interval for creating a screen is sometimes due to the inability to unambiguously distinguish oil-saturated and flooded intervals of the reservoir, despite a significant amount of research. The radius of the screen is determined from the condition that the partial derivative of depression along the radius of the depression funnel should not exceed the value:

Figure 00000001
Figure 00000001

где ρв - плотность пластовой воды.where ρ in - the density of formation water.

Частную производную, после предварительного расчета величины депрессии по радиусу депрессионной воронки по формуле Лейбензона и предварительного определения по формуле Дюпюи установившейся забойной депрессии на стенке скважины, определяют графическим дифференцированием кривой депрессионной воронки. Далее интерполяционным путем подбирают такую протяженность радиуса экрана, на внешней границе которого будет выполняться условие (1). Эффективность данного способа изоляции воды полностью зависит от точного предварительного определения целого ряда величин, погрешность расчета которых составляет большие величины. Таким образом, недостатки данного способа очевидны - большая погрешность в расчетах определения объема закачки водоизоляционного материала, сложность, громоздкость и субъективизм расчетов, необходимость проведения комплекса предварительных трудоемких скважинных исследований и расчетов. В результате: либо перерасход, либо недостаточный объем закачки изоляционного материала. В первом случае - повышаются экономические затраты, во втором - снижается эффективность водоизоляционных работ.The partial derivative, after preliminary calculation of the depression value according to the radius of the depression funnel according to the Leibenzon formula and preliminary determination by the Dupuis formula of the established bottomhole depression on the well wall, is determined by graphical differentiation of the depression funnel curve. Then, by interpolation, they select such a length of the screen radius, on the external boundary of which condition (1) will be fulfilled. The effectiveness of this method of water isolation completely depends on the exact preliminary determination of a number of quantities, the calculation error of which is large. Thus, the disadvantages of this method are obvious - a large error in the calculation of determining the volume of injection of waterproofing material, the complexity, cumbersome and subjective calculations, the need for a complex of preliminary laborious downhole research and calculations. As a result: either overspending or insufficient injection of insulating material. In the first case, economic costs increase, in the second, the effectiveness of waterproofing works decreases.

Технической задачей является повышение эффективности изоляции притока воды в добывающей скважине за счет увеличения надежности блокирующего эффекта путем повышения точности определения оптимального по размерам водоизоляционного экрана, а также расширения технологических возможностей способа изоляции воды в призабойной зоне добывающей скважины, упрощения операций и снижения экономических затрат.The technical task is to increase the efficiency of isolation of water inflow in the producing well by increasing the reliability of the blocking effect by increasing the accuracy of determining the optimum water-proof screen, as well as expanding the technological capabilities of the method of isolating water in the bottom-hole zone of the producing well, simplifying operations and reducing economic costs.

Поставленная задача решается описываемым способом, включающим закачку водоизоляционного материала в скважину с предварительным определением объема водоизоляционного материала и продавку его в пласт. Новым является то, что водоизоляционный материал размещают в кольцевом пространстве призабойной зоны скважины, ограниченном эквипотенциалями, давления на которых составляют от 0÷1/3 и до 1/2 от общего перепада давления между пластовыми и забойными величинами, а радиусы эквипотенциалей рассчитывают по формуле:The problem is solved by the described method, including the injection of waterproofing material into the well with a preliminary determination of the volume of waterproofing material and pushing it into the reservoir. New is that the waterproofing material is placed in the annular space of the bottomhole zone of the well, limited by equipotentials, the pressures of which are from 0 ÷ 1/3 and up to 1/2 of the total pressure drop between the reservoir and bottomhole values, and the radii of the equipotentials are calculated by the formula:

Figure 00000002
Figure 00000002

где Rа - радиусы эквипотенциалей, где происходит 1/2 и 0-1/3 потерь подводимого перепада давления на преодоление фильтрационных сопротивлений;where R a are the radii of the equipotentials, where 1/2 and 0-1 / 3 of the losses of the input pressure drop to overcome the filtration resistance occur;

Rκ - радиус условного контура питания;R κ is the radius of the conditional power circuit;

rc - радиус скважины по долоту;r c is the radius of the well by bit;

α - коэффициент, учитывающий распределение давления в призабойной зоне пласта, равный соответственно 0÷1/3 и 1/2.α - coefficient taking into account the pressure distribution in the bottomhole formation zone, equal to 0 ÷ 1/3 and 1/2, respectively.

Сопоставительный анализ с прототипом показывает, что заявляемый способ обладает отличительными признаками, отсутствующими у известного способа изоляции водопритока. Эти признаки обеспечивают соответствие нового технического решения критерию «новизна». При сравнении способа не только с прототипом, но и другими известными техническими решениями в области водоизоляционных работ в добывающих скважинах не обнаружены решения, обладающие совпадающими с отличительными признаками предлагаемого изобретения, выполняющие аналогичную техническую задачу. Это позволяет сделать вывод о соответствии нового технического решения критерию «изобретательский уровень».Comparative analysis with the prototype shows that the inventive method has distinctive features that are absent in the known method of isolation of water inflow. These features ensure that the new technical solution meets the criterion of "novelty." When comparing the method not only with the prototype, but also with other well-known technical solutions in the field of waterproofing works in producing wells, no solutions were found that have the same characteristics as the present invention, performing a similar technical task. This allows us to conclude that the new technical solution meets the criterion of "inventive step".

В заявляемом способе решается задача повышения эффективности изоляции воды в призабойной зоне добывающих скважин. Задача решается нестандартными взаимосвязанными операциями расчета размещения водоизодяционного материала в строго определенном кольцевом пространстве вокруг ствола скважины, представляющем собой по геометрии коаксильный цилиндр, высота которого равна толщине обводненного пласта, а наружный и внутренний радиусы цилиндра равны расстояниям в радиальном направлении от оси скважины, где происходит соответственно 0÷1/3 и 1/2 часть потерь подводимого перепада давления на преодоление фильтрационных сопротивлений, при этом расчет этих расстояний (радиусы эквипотенциален) ведут по предлагаемой формуле. Эквипотенциаль - условная изолиния вокруг скважины, на которой перепад давления между пластовыми и забойными значениями составляет одну величину. Внешний радиус коаксильного цилиндра соответствует эквипотенциали с величиной 1/2 доли полного перепада давления, а внутренний радиус цилиндра может изменяться (соответствовать эквипотенциалям) от 0 до 1/3 доли полного перепада давления.The claimed method solves the problem of increasing the efficiency of water isolation in the bottom-hole zone of production wells. The problem is solved by non-standard interconnected operations of calculating the placement of the displacement material in a strictly defined annular space around the wellbore, which is a coaxial cylinder in geometry, the height of which is equal to the thickness of the flooded formation, and the outer and inner radii of the cylinder are equal to the radial distances from the axis of the well, where respectively 0 ÷ 1/3 and 1/2 of the losses of the supplied differential pressure to overcome the filtration resistance, while the calculation of these calculations Thawings (radii are equipotential) are carried out according to the proposed formula. Equipotential is a conditional contour around a well, in which the pressure drop between reservoir and bottomhole values is one value. The outer radius of the coaxial cylinder corresponds to the equipotential with a value of 1/2 of the total differential pressure, and the inner radius of the cylinder can vary (correspond to equipotentials) from 0 to 1/3 of the total differential pressure.

Предлагаемый способ позволяет достичь нового технического эффекта за счет установки в призабойной зоне пласта оптимального по размеру водоизоляционного экрана, обеспечивающего изоляцию водопритока по определяющему эффективность критерию энергетики пласта - перепаду давления; при этом экран обеспечивает нейтрализацию от 1/6(1/2-1/3) до 1/2(1/2-0) доли полного перепада давления. Аналогичных решений (одновременно простых, универсальных и эффективных) в области оптимизации водоизоляционных работ в скважинах в мире пока нет.The proposed method allows to achieve a new technical effect due to the installation in the bottomhole formation zone of the optimal size of the waterproofing screen, which provides isolation of water inflow according to the criterion of formation energy efficiency - pressure drop; the screen provides neutralization from 1/6 (1 / 2-1 / 3) to 1/2 (1 / 2-0) of the fraction of the total pressure drop. There are no similar solutions (at the same time simple, universal and effective) in the field of optimization of water insulation works in wells in the world.

Способ на практике реализуется следующим образом.The method in practice is implemented as follows.

Объемы водоизоляционного состава и продавочной жидкости определяются исходя из текущих значений приемистости скважины и следующих параметров:The volume of the waterproofing composition and the displacement fluid are determined based on the current values of the well injectivity and the following parameters:

- условного радиуса контура питания - RK, м (определяют по сетке скважин и принимают как среднее расстояние между скважинами);- conditional radius of the power circuit - R K , m (determined by the grid of wells and taken as the average distance between the wells);

- радиуса скважины по долоту - rC, м;- well radius by bit - r C , m;

- толщины нефтенасыщенной части пласта - hHH, м;- thickness of the oil-saturated part of the reservoir - h HH , m;

- пористости - m, доли ед.;- porosity - m, fractions of a unit;

- вязкости нефти и воды в пластовых условиях - μн и μв, мПа·сек;- viscosity of oil and water in reservoir conditions - μ n and μ in , MPa · s;

- обводненности - В, доли ед.- water cut - In, the share of units.

В качестве водоизоляционного материала используют, например, гипан, жидкое стекло, их смеси, фенолформальдегидные смолы, нефтецементные смеси и другие известные материалы. Порядок расчета объема изоляционного материала основан на представлении о геометрической форме изоляционного экрана в виде коаксиального цилиндра, габаритные размеры которого определяют такие параметры, как высота цилиндра hИЗ, м; наружный радиус RН, м; внутренний радиус RÂ, м.As a waterproofing material, for example, gypsum, water glass, mixtures thereof, phenol-formaldehyde resins, oil-cement mixtures and other known materials are used. The procedure for calculating the volume of insulating material is based on the idea of the geometric shape of the insulating screen in the form of a coaxial cylinder, the overall dimensions of which determine such parameters as the height of the cylinder h IZ , m; outer radius R N , m; inner radius R Â , m

Объем изоляционного материала Vиз, м3, вычисляют по формуле:The volume of insulating material V of , m 3 is calculated by the formula:

Figure 00000003
Figure 00000003

где π=3,14; m - пористость, доли ед.where π = 3.14; m - porosity, fractions of units

Изоляционный материал размещают в кольцевой зоне с наружным радиусом RH=R1/2, и внутренним радиусом RB=R0...R1/3, где R1/2 и R1/3 - расстояния в радиальном направлении от оси скважины, где происходит половина и одна треть потерь подводимого перепада давления (разница между пластовым и забойным давлением) на преодоление фильтрационных сопротивлений. Внутренний радиус может быть от R0 (внутренний радиус коаксильного цилиндра равен в этом случае радиусу скважины по долоту) до R1/3. Объем водоизоляционного материала, обеспечивающего достижение наружного радиуса более R1/2 (эквипотенциали с более 1/2 доли полного перепада давления), энергетически и экономически нецелесообразен.The insulating material is placed in an annular zone with an outer radius R H = R 1/2 , and an inner radius R B = R 0 ... R 1/3 , where R 1/2 and R 1/3 are the distances in the radial direction from the axis wells, where half and one third of the losses of the input pressure drop occur (the difference between the reservoir and bottomhole pressure) to overcome the filtration resistance. The inner radius can be from R 0 (the inner radius of the coaxial cylinder is equal in this case to the radius of the well bit) to R 1/3 . The volume of waterproofing material, ensuring an outer radius of more than R 1/2 (equipotentials with more than 1/2 of the total pressure drop), is energetically and economically impractical.

Расчет радиуса Rα, определяющего размер зоны заданных потерь полного перепада давления, определяют по формуле:The calculation of the radius R α that determines the size of the zone of the given losses of the total pressure drop is determined by the formula:

Figure 00000004
Figure 00000004

Значение параметра hИЗ определяют по формуле:The value of the parameter h FR is determined by the formula:

Figure 00000005
Figure 00000005

где δ=-0,4...0,6 - поправочный коэффициент на продуктивную часть пласта толщиной hНН, доли ед.where δ = -0.4 ... 0.6 is the correction factor for the productive part of the formation with a thickness of h NN , fractions of units

Поправочный коэффициент δ определяет долю нефтенасыщенной части пласта по разрезу, эффективно проявляющей нефтью при вводе скважины в эксплуатацию;The correction factor δ determines the proportion of the oil-saturated part of the formation along the section, which effectively manifests oil when a well is put into operation;

ξmax - поправочный коэффициент, определяющий долю обводненной части продуктивного пласта, доли ед.ξ max - correction factor that determines the proportion of the flooded part of the reservoir, the share of units

Значение поправочного коэффициента ξ определяют по формуле:The value of the correction coefficient ξ is determined by the formula:

Figure 00000006
Figure 00000006

Объем продавочной жидкости рассчитывают по формуле:The volume of the squeezing liquid is calculated by the formula:

VПЖ=VMB+VНКТ V RV = V MB + V tubing

Figure 00000007
Figure 00000007

где VМВ - объем продавочной жидкости, м3;where V MV - the volume of the displacement fluid, m 3 ;

VНКТ - объем продавочной жидкости на основе жидкости глушения (внутренний объем колонны насосно-компрессорных труб), м3.V tubing - the volume of the squeezing fluid based on the killing fluid (internal volume of the tubing string), m 3 .

Пример конкретного исполнения (проектирования) способа.An example of a specific implementation (design) of the method.

Предлагаемый способ испытан на скважине №1544 Ромашкинского месторождения.The proposed method was tested at well No. 1544 of the Romashkinskoye field.

Исходные данные: плотность сетки скважин - 600×600 м, радиус скважины по долоту - 0,11 м, интервал перфорации 1700-1705 м, эффективная толщина пласта - 5 м, пористость - 20%, содержание воды в продукции скважины - 90%, вязкость нефти и воды в пластовых условиях - соответственно 4,0 и 1,0 мПа·сек, длина 2,5// колонны НКТ - 1706 м.Initial data: density of wells grid - 600 × 600 m, well radius by bit - 0.11 m, perforation interval 1700-1705 m, effective formation thickness - 5 m, porosity - 20%, water content in the well production - 90%, viscosity of oil and water in reservoir conditions - 4.0 and 1.0 MPa · s, respectively, length 2.5 // tubing string - 1706 m

Алгоритм расчетаCalculation algorithm

R1/3=3001/3·0,111-1/3=1,54 мR 1/3 = 300 1/3 · 0.11 1-1 / 3 = 1.54 m

R1/2=3001/2·0,111-1/2=5,74 мR 1/2 = 300 1/2 · 0.11 1-1 / 2 = 5.74 m

Figure 00000008
Figure 00000008

hИЗ=0,6×0,692×5=2,1h FR = 0.6 × 0.692 × 5 = 2.1

Объем изоляционного материала, м3:The volume of insulating material, m 3 :

Vиз=3,14×0,2×(5,7421,542)×2,1=40,3V out = 3.14 × 0.2 × (5.74 2 1.54 2 ) × 2.1 = 40.3

Объем продавочной жидкости, м3:Volume of squeezing liquid, m 3 :

VМВ=3,14×0,2×(1,542-0,112)×2,1+3,14×0,112×5=3,3V MV = 3.14 × 0.2 × (1.54 2 -0.11 2 ) × 2.1 + 3.14 × 0.11 2 × 5 = 3.3

VНКТ=3,14×0,0312×1706=5,5V tubing = 3.14 × 0.031 2 × 1706 = 5.5

VПЖ=3,3+5,5=8,8.V pancreas = 3.3 + 5.5 = 8.8.

По спущенной до интервала нижних перфорационных отверстий колонне насосно-компрессорных труб (НКТ) закачали водоизолирующий материал гипан-жидкое стекло при открытой задвижке на межтрубье. Закачку в скважину водоизоляционного материала вели до приподъема уровня жидкости (водоизоляционного материала) в межтрубье до интервала кровли пласта. Закрыли задвижку на межтрубье. Продавили водоизоляционный материал в расчетном объеме - 40,3 м3 в интервал водопритока. Расчетный объем продавочной жидкости 8,8 м3 обеспечил отодвигание оторочки водоизоляционного материала на заданное расстояние от стенки скважины, в данном случае на 1,54 м. Далее скважину оставили под давлением на время структурирования и схватывания водоизоляционного материала. Необходимо отметить, что весь расчет необходимых объемов технологических жидкостей занял всего 15 мин. Водоизоляционный экран сформировался в кольцевом пространстве призабойной зоны скважины, ограниченного эквипотенциалями, давления на которых составили 1/3 и 1/2 от общего перепада давления между пластовыми и забойными величинами.Through the lowering of the lower perforation holes, the tubing string (tubing) was pumped with a water-insulating material, gypsum-liquid glass with an open valve on the annulus. Water-insulating material was injected into the well until the liquid level (water-insulating material) was raised in the annulus to the interval of the formation roof. They closed the valve on the annulus. They sold waterproofing material in the estimated volume of 40.3 m 3 in the interval of water inflow. The estimated volume of the squeezing fluid of 8.8 m 3 provided the rim of the waterproofing material to be offset by a predetermined distance from the well wall, in this case by 1.54 m. Next, the well was left under pressure for the time of structuring and setting the waterproofing material. It should be noted that the entire calculation of the required volumes of process fluids took only 15 minutes. A waterproofing screen was formed in the annular space of the bottomhole zone of the well, limited by equipotentials, the pressures of which amounted to 1/3 and 1/2 of the total pressure drop between the reservoir and bottomhole values.

После выхода скважины №1544 на режим получены следующие результаты: обводненность снизилась в 3 раза, с 95-97% до 33-35%; дебит скважины по нефти увеличился в 5 раз, с 0,9-1,2 т/сут до 4,5-5,5 т/сут. Эффект стабильно продолжается в течение 9 мес.After well No. 1544 entered the regime, the following results were obtained: water cut decreased 3 times, from 95-97% to 33-35%; oil production rate increased by 5 times, from 0.9-1.2 tons / day to 4.5-5.5 tons / day. The effect stably lasts for 9 months.

На соседней скважине №1542 (аналогичной со скважиной №1544 конструкции) был испытан известный способ по прототипу. Расчет потребного объема водоизоляционного материала был выполнен в течение 7 суток (по результатам гидродинамических исследований были уточнены следующие исходные данные: проницаемости, гидропроводность, дебиты по жидкости и нефти, упрогоемкость жидкости нагнетания, пьезопроводность, определялась приемистость скважины, упругоемкость породы-коллектора и др). Протяженность радиуса экрана (при плотности пластовой воды 1170 кг/м3) оказалась равной 120 см при частной производной равной 0,02. Потребный объем изоляционного материала при этом составил 20 м3.In the neighboring well No. 1542 (similar to well No. 1544 of the design), a known prototype method was tested. The calculation of the required volume of waterproofing material was performed within 7 days (according to the results of hydrodynamic studies, the following initial data were clarified: permeability, hydraulic conductivity, flow rates for liquid and oil, elasticity of injection fluid, piezoelectric conductivity, well injectivity was determined, reservoir elasticity, and others). The length of the screen radius (with a density of produced water of 1170 kg / m 3 ) turned out to be 120 cm with a partial derivative of 0.02. The required volume of insulating material was 20 m 3 .

В скважину закачали 20 м3 изоляционного материала гипан + жидкое стекло, продавили в пласт 5 м3 продавочной жидкости. Оставили на реагирование (схватывание) растворов. После изоляционных работ скважина была пущена в эксплуатацию.20 m 3 of insulating material Hypan + liquid glass was pumped into the well, 5 m 3 of squeezing liquid was pushed into the formation. Left to react (setting) solutions. After insulation work, the well was put into operation.

После выхода скважины на постоянный режим эксплуатации получены следующие результаты: произошло снижение обводненности продукции с 93% до 78%, увеличение дебита нефти составило с 1,1 т/сут до 2,0-2,3 т/сут. Эффект продолжался в течение 3 мес. Затем потребовалось проведение повторных операций по изоляции воды.After the well entered continuous operation, the following results were obtained: there was a decrease in water cut from 93% to 78%, an increase in oil production from 1.1 tons / day to 2.0-2.3 tons / day. The effect lasted for 3 months. Then, repeated water isolation operations were required.

Сравнительный анализ результативности предлагаемого способа изоляции воды показал, что новый способ в 2,5-3 раза эффективнее известного способа изоляции воды в призабойной зоне добывающей скважины.A comparative analysis of the effectiveness of the proposed method for isolating water showed that the new method is 2.5-3 times more effective than the known method for isolating water in the bottomhole zone of a producing well.

Таким образом, промысловые испытания предлагаемого нового способа изоляции воды в призабойной зоне добывающей скважины показали его высокую технологическую и экономическую эффективность. Планируется широкое промышленное внедрение данного способа изоляции воды на промыслах ОАО «Татнефть», которое обеспечит снижение обводненности продукции, увеличение дебита скважин по нефти за счет повышения надежности блокирующего эффекта путем повышения точности определения оптимального по размерам водоизоляционного экрана, а также расширения технологических возможностей способа изоляции воды в призабойной зоне добывающей скважины, упрощения операций и снижения экономических затрат.Thus, field tests of the proposed new method for isolating water in the bottomhole zone of a producing well have shown its high technological and economic efficiency. A wide industrial introduction of this method of water isolation in the fields of OAO TATNEFT is planned, which will reduce water cut, increase oil production by increasing the reliability of the blocking effect by increasing the accuracy of determining the optimum size of the water barrier, as well as expanding the technological capabilities of the method of water isolation in the bottom-hole zone of the producing well, simplifying operations and reducing economic costs.

Claims (1)

Способ изоляции воды в призабойной зоне добывающей скважины, включающий закачку водоизоляционного материала в скважину с предварительным определением объема водоизоляционного материала и продавку его в пласт, отличающийся тем, что водоизоляционный материал размещают в кольцевом пространстве призабойной зоны скважины, ограниченного эквипотенциалями, давления на которых составляют от 0÷1/3 и до 1/2 от общего перепада давления между пластовыми и забойными величинами, а радиусы эквипотенциалей рассчитывают по формулеA method of isolating water in the bottom-hole zone of a producing well, which includes injecting water-insulating material into the well with preliminary determination of the volume of water-insulating material and pushing it into the formation, characterized in that the water-insulating material is placed in the annular space of the bottom-hole zone of the well, limited by equipotentials, the pressures of which are from 0 ÷ 1/3 and up to 1/2 of the total pressure differential between the reservoir and downhole quantities and equipotentials radii calculated by the formula
Figure 00000009
Figure 00000009
где Rα - радиусы эквипотенциалей, где происходит 1/2 и 0÷1/3 потерь подводимого перепада давления на преодоление фильтрационных сопротивлений;where R α are the radii of the equipotentials, where 1/2 and 0 ÷ 1/3 of the losses of the input pressure drop to overcome the filtration resistance occur; Rκ - радиус условного контура питания;R κ is the radius of the conditional power circuit; rс - радиус скважины по долоту;r s - well radius by bit; α - коэффициент, учитывающий распределение давления в призабойной зоне пласта, равный соответственно 0÷1/3 и 1/2.α - coefficient taking into account the pressure distribution in the bottomhole formation zone, equal to 0 ÷ 1/3 and 1/2, respectively.
RU2006142226/03A 2006-11-29 2006-11-29 Method for water isolation in bottom-hole zone of exploitation well RU2326229C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2006142226/03A RU2326229C1 (en) 2006-11-29 2006-11-29 Method for water isolation in bottom-hole zone of exploitation well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2006142226/03A RU2326229C1 (en) 2006-11-29 2006-11-29 Method for water isolation in bottom-hole zone of exploitation well

Publications (1)

Publication Number Publication Date
RU2326229C1 true RU2326229C1 (en) 2008-06-10

Family

ID=39581382

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2006142226/03A RU2326229C1 (en) 2006-11-29 2006-11-29 Method for water isolation in bottom-hole zone of exploitation well

Country Status (1)

Country Link
RU (1) RU2326229C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2492317C1 (en) * 2012-03-22 2013-09-10 Сергей Семенович Демичев Method to increase well productivity
WO2023277727A1 (en) * 2021-06-28 2023-01-05 Юрий Анатольевич ДЕРГУНОВ Method for shutting off water in the near-wellbore region of a producing well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
КЛЕЩЕНКО И.И. и др. Изоляционные работы при заканчивании и эксплуатации нефтяных скважин. - М.: Недра, 1998, с.142-147. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2492317C1 (en) * 2012-03-22 2013-09-10 Сергей Семенович Демичев Method to increase well productivity
WO2023277727A1 (en) * 2021-06-28 2023-01-05 Юрий Анатольевич ДЕРГУНОВ Method for shutting off water in the near-wellbore region of a producing well

Similar Documents

Publication Publication Date Title
CA2376701C (en) Gas recovery apparatus, method and cycle having a three chamber evacuation phase for improved natural gas production and down-hole liquid management
CN106194145B (en) Multistage temporary plugging deep network acid fracturing method
US20030141073A1 (en) Advanced gas injection method and apparatus liquid hydrocarbon recovery complex
RU2518684C2 (en) Method of extraction of oil and other formation fluids from reservoir (versions)
US11898414B2 (en) Method for filling oil-gas well of fractured oil-gas reservoir with isolation particles to reduce water and increase oil production
CN112302612A (en) Functional slickwater temporary blocking and steering volume fracturing method for synchronously implanting oil displacement agent
RU2463445C2 (en) Method of developing oil pool in fractured-porous carbonate basins
CN111764875A (en) Oil recovery method and CO for assisting huff-puff oil increase2Injection amount determination method and device
CN113389525A (en) Shale gas well foam exhausting-gas lifting composite process design method and process flow thereof
RU2326229C1 (en) Method for water isolation in bottom-hole zone of exploitation well
RU2439298C1 (en) Method of development of massive oil field with laminar irregularities
CN110439528B (en) Carbon dioxide acid fracturing method for low-permeability heterogeneous carbonate rock gas reservoir
US3208522A (en) Method of treating subterranean formations
CN204646203U (en) A kind of single pump injected system of applicable two-fluid process system
CN113323636A (en) Nitrogen injection amount determining method and oil extraction method for composite water control and oil increase
RU2731243C2 (en) Method of developing low-permeable oil deposit using separate injection of water and gas
CN108798623B (en) Natural gas dilution gas lift process parameter optimization method
CN111622727A (en) Method for identifying effectiveness of temporary plugging diversion fracturing
RU2160362C2 (en) Process of working of multipool oil field
CN114109327B (en) Oil-water well linkage profile control method
RU2812976C1 (en) Method for developing oil deposits
RU2078201C1 (en) Method of increasing formation oil recovery
CN107060707A (en) Oil well inflating method
Adiraju Artificial Lift Applications to Unconventional Reservoirs
RU2681758C1 (en) Method of developing super-viscous oil field

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees