RU2314412C1 - Method and device for oil well treatment - Google Patents

Method and device for oil well treatment Download PDF

Info

Publication number
RU2314412C1
RU2314412C1 RU2006122507/03A RU2006122507A RU2314412C1 RU 2314412 C1 RU2314412 C1 RU 2314412C1 RU 2006122507/03 A RU2006122507/03 A RU 2006122507/03A RU 2006122507 A RU2006122507 A RU 2006122507A RU 2314412 C1 RU2314412 C1 RU 2314412C1
Authority
RU
Russia
Prior art keywords
inhibitor
well
plunger pump
annulus
wells
Prior art date
Application number
RU2006122507/03A
Other languages
Russian (ru)
Inventor
Геннадий Григорьевич Громыхалин (RU)
Геннадий Григорьевич Громыхалин
Original Assignee
Общество с ограниченной ответственностью "Клариант (РУС)"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Клариант (РУС)" filed Critical Общество с ограниченной ответственностью "Клариант (РУС)"
Priority to RU2006122507/03A priority Critical patent/RU2314412C1/en
Application granted granted Critical
Publication of RU2314412C1 publication Critical patent/RU2314412C1/en

Links

Images

Abstract

FIELD: equipment for liquid inhibitor injection into annulus of oil well cluster with the use of pumping plant to prevent salt or paraffin deposit development or corrosion damage.
SUBSTANCE: method involves linking injection line of well treatment device to annulus of well; supplying inhibitor under pressure with the use of plunger pump from vessel into annulus via injection pipeline connected with plunger pump outlet; controlling inhibitor flow rate. Device is mounted on cross-country vehicle, which moves between wells of one or several oil field well cluster for serial treatment thereof. During each well treatment pressure in annulus is previously reduced and threshold pressure level is set in signaling manometer installed in injection line. Two or more inhibitor types are serially supplied along with provision of predetermined amount of each inhibitor delivery in reaction zone through produced liquid under gravity. Injection line pressure is controlled. After termination of each inhibitor type supply injection line is cleaned with flushing liquid. Oil well treatment device comprises plunger pump, which may perform metered inhibitor supply in well annulus from vessel communicated with plunger pump inlet through sucking line, injection line connected to plunger pump outlet and provided with check valve, as well as inhibitor flow rate control means. Device also has at least one additional vessel connected with plunger pump inlet through suction line, vessel with flushing liquid and signaling manometer.
EFFECT: increased number of wells to be treated in unit time, possibility of necessary amount of inhibitor to be injected, prevention of inhibitor forcing in reservoir, possibility to supply several inhibitor types in single operation and decreased inhibitor consumption.
4 cl, 2 dwg

Description

Способ и устройство согласно предлагаемой группе изобретений относятся к технике, предназначенной для подачи жидких ингибиторов при помощи насосного агрегата в затрубное пространство куста нефтяных скважин для предотвращения солеотложения, парафиноотложения и коррозии.The method and device according to the proposed group of inventions relate to a technique intended for supplying liquid inhibitors by means of a pump unit to the annular space of an oil well cluster to prevent scaling, paraffin deposition and corrosion.

Под кустом нефтяных скважин понимается специальная площадка искусственного происхождения, участка территории месторождения с расположенными на ней устьями скважин, удаленных друг от друга на расстоянии не менее пяти метров, или одиночные скважины, удаленные друг от друга на расстояние не менее 50 м. Количество скважин в кусте определяется проектом разработки месторождения.An oil well cluster is understood to mean a special site of artificial origin, a section of the field’s territory with wellheads located on it remote from each other at a distance of at least five meters, or single wells remote from each other at a distance of at least 50 m. The number of wells in the cluster determined by the field development project.

Способ и устройство согласно предлагаемой группе изобретений могут использоваться при добыче нефти с использованием установок электроцентробежных насосов, штанговых глубинных насосов, иных методов с наличием циркуляции между насосно-компрессорной трубой и затрубным пространством нефтяной скважины, причем нефтяная скважина не должна фонтанировать по затрубному пространству.The method and device according to the proposed group of inventions can be used in oil production using electric centrifugal pump installations, sucker rod pumps, other methods with the presence of circulation between the tubing and the annulus of an oil well, and the oil well should not gush through the annulus.

Известны следующие способы и устройства для подачи реагентов в скважину посредством дозировочных установок.The following methods and devices are known for supplying reagents to a well by means of metering units.

Из патента РФ №2167272 (МПК Е21В 37/06, опубликован 27.01.2001) известен способ подачи ингибитора в скважину. Способ включает подключение линии нагнетания устройства для обработки скважин к затрубному пространству скважины, подачу под давлением при помощи насоса заданного количества ингибитора в затрубное пространство скважины. Известный способ позволяет осуществлять обработку труб ингибитором коррозии.From the patent of the Russian Federation No. 2167272 (IPC ЕВВ 37/06, published January 27, 2001), a method for feeding an inhibitor into a well is known. The method includes connecting the injection line of the device for treating wells to the annulus of the well, supplying under pressure with a pump a predetermined amount of inhibitor into the annulus of the well. The known method allows the processing of pipes with a corrosion inhibitor.

Однако данный способ не предусматривает возможность обработки скважин несколькими ингибиторами различного вида и назначения, в частности ингибиторами коррозии, ингибиторами солеотложения, ингибиторами парафинообразований и противогидратными ингибиторами, а также данный способ не позволяет производить подачу ингибиторов различного назначения в участки трубопроводов и другое нефтяное оборудование.However, this method does not provide the ability to treat wells with several inhibitors of various types and purposes, in particular corrosion inhibitors, scale inhibitors, paraffin inhibitors and antihydrate inhibitors, and this method does not allow the supply of various inhibitors to pipeline sections and other oil equipment.

Известен способ подготовки и подачи водорастворимого реагента-ингибитора коррозии (патент РФ №2172389, МПК Е21В 37/06, опубликован 20.08.2001).A known method for the preparation and supply of a water-soluble corrosion inhibitor reagent (RF patent No. 2172389, IPC ЕВВ 37/06, published on 08/20/2001).

Способ включает загрузку реагента в контейнер и дозированную подачу его в затрубное пространство скважины.The method includes loading the reagent into the container and dosing it into the annulus of the well.

Данный способ также не позволяет производить последовательную обработку скважины ингибиторами различного назначения за одну операцию подключения к затрубному пространству.This method also does not allow sequential treatment of the well by inhibitors for various purposes in one operation of connecting to the annulus.

Известен устьевой блок подачи химического реагента по патенту РФ №42059, МПК Е21В 43/00, Е21В 37/06, который опубликован 20.11.2004. Устройство содержит насос-дозатор, соединенный с емкостью, а также манометр и средство контроля расхода ингибитора, выполненное в виде датчика уровня.Known wellhead block supply of a chemical reagent according to the patent of the Russian Federation No. 42059, IPC ЕВВ 43/00, ЕВВ 37/06, which was published on November 20, 2004. The device includes a metering pump connected to the tank, as well as a pressure gauge and means for controlling the flow of the inhibitor, made in the form of a level sensor.

Данное устройство не позволяет производить подачу в скважину нескольких ингибиторов за одну операцию. Кроме этого в нем не предусмотрена система промывки трубопроводов. Данное устройство является стационарным.This device does not allow the supply of several inhibitors to the well in a single operation. In addition, it does not provide for a piping flushing system. This device is stationary.

Известна дозировочная установка по патенту РФ №2238393, МПК Е21В 37/06, который опубликован 20.01.2004.Known dosage installation according to the patent of Russian Federation No. 2238393, IPC ЕВВ 37/06, which was published on January 20, 2004.

Дозировочная установка содержит емкость для ингибитора, насос-дозатор, соединенный с ней посредством трубопровода, дополнительную емкость для ингибитора, средство контроля расхода ингибитора, выполненное в виде датчика уровня. На трубопроводе, соединяющем емкость для ингибитора и насос-дозатор, установлены электроконтактный манометр и обратный клапан.The dosing unit contains a container for the inhibitor, a metering pump connected to it via a pipeline, an additional container for the inhibitor, means for controlling the flow of the inhibitor, made in the form of a level sensor. An electric contact pressure gauge and a non-return valve are installed on the pipeline connecting the inhibitor tank and the metering pump.

Известная установка не позволяет отслеживать уровень давления подачи ингибитора. При ее использовании ингибитор перемещается в затрубном пространстве под высоким давлением. В результате ингибитор может задавливаться в пласт, что приводит к забиванию зоны перфорации и к самопроизвольному глушению нефтяной скважины, то есть прекращению ее фонтанирования.The known installation does not allow you to track the pressure level of the inhibitor. When used, the inhibitor moves in the annulus under high pressure. As a result, the inhibitor can be crushed into the reservoir, which leads to clogging of the perforation zone and to spontaneous killing of the oil well, that is, the cessation of its flowing.

Наиболее близким аналогом заявленного способа является способ обработки нефтяных скважин, раскрытый в патенте США US №4375833 (опубликован 08.03.1983, МПК Е21В 43/12). Способ включает подключение линии нагнетания устройства для обработки скважин к затрубному пространству скважины, подачу под давлением при помощи плунжерного насоса ингибитора из емкости через линию нагнетания, соединенную с выходом плунжерного насоса, в затрубное пространство скважины, осуществление контроля расхода ингибитора.The closest analogue of the claimed method is a method of processing oil wells, disclosed in US patent US No. 4375833 (published on 03/08/1983, IPC ЕВВ 43/12). The method includes connecting the injection line of the device for processing the wells to the annulus of the well, supplying the inhibitor from the reservoir under pressure using the plunger pump through the injection line connected to the outlet of the plunger pump into the annulus of the well, controlling the flow of the inhibitor.

Способ предусматривает возможность автоматического закрытия линии нагнетания и открытия разгрузочного клапана с рециркуляцией ингибитора с помощью насоса обратно по линиям рециркуляции в емкость ингибитора.The method provides the ability to automatically close the discharge line and open the discharge valve with recirculation of the inhibitor using the pump back along the recirculation lines to the capacity of the inhibitor.

Недостатком указанного аналога является невозможность последовательной обработки скважины ингибиторами различных видов за одну технологическую операцию, а также невозможность обслуживания всего куста нефтяных скважин с помощью одного устройства.The disadvantage of this analogue is the impossibility of sequential treatment of the well by inhibitors of various types in one technological operation, as well as the inability to service the entire cluster of oil wells using one device.

Наиболее близким аналогом заявленного устройства является устройство для обработки скважин, описанное в указанном выше патенте US №4375833. Устройство для обработки нефтяных скважин содержит плунжерный насос, выполненный с возможностью дозированной подачи ингибитора в затрубное пространство скважины из емкости, которая соединена со входом плунжерного насоса по линии всасывания ингибитора, линию нагнетания, соединенную с выходом плунжерного насоса и снабженную обратным клапаном, и средство контроля расхода ингибитора.The closest analogue of the claimed device is a device for processing wells, described in the aforementioned US patent No. 4375833. A device for treating oil wells contains a plunger pump configured to dose the inhibitor into the annulus of the well from a reservoir that is connected to the inlet of the plunger pump through the suction line of the inhibitor, a discharge line connected to the outlet of the plunger pump and equipped with a check valve, and flow control means inhibitor.

Известное устройство также не позволяет осуществлять обработку скважины несколькими ингибиторами за одну технологическую операцию.The known device also does not allow the processing of the well by several inhibitors in one technological operation.

Кроме этого известное устройство не содержит средств для его перемещения с целью обработки нескольких скважин, а также не содержит средств для предотвращения задавливания ингибитора в пласт при его подаче в затрубное пространство.In addition, the known device does not contain means for moving it to process several wells, and also does not contain means to prevent crushing of the inhibitor into the formation when it is fed into the annulus.

Техническим результатом заявленной группы изобретений является:The technical result of the claimed group of inventions is:

1) Обеспечение возможности обслуживания многих кустов обрабатываемых скважин с помощью одного устройства и, как следствие, увеличение числа обрабатываемых скважин в единицу времени;1) Ensuring the possibility of servicing many clusters of treated wells using one device and, as a result, an increase in the number of processed wells per unit time;

2) обеспечение возможности подачи заданного количества ингибиторов;2) providing the ability to supply a given number of inhibitors;

3) предотвращение задавливания ингибитора в пласт;3) prevention of crushing of the inhibitor into the reservoir;

4) обеспечение возможности подачи при одной операции подключения к затрубному пространству скважины нескольких типов ингибиторов, что дает возможность за одну технологическую операцию обработать не только поверхность насосно-компрессорной трубы скважины, но и насосное оборудование при одновременном сокращении временных затрат на подключение к затрубному пространству. Это дает возможность повысить ресурс нефтепромыслового оборудования и в конечном итоге снизить себестоимость добываемой нефти;4) providing the possibility of supplying, during one operation, connecting several types of inhibitors to the annulus of the well, which makes it possible to process not only the surface of the tubing of the well, but also pumping equipment in one technological operation while reducing the time required to connect to the annulus. This makes it possible to increase the resource of oilfield equipment and ultimately reduce the cost of produced oil;

5) сокращение расходов ингибитора за счет точного дотирования ингибитора в соответствии с дебитом нефти каждой конкретной скважины и ее рабочих параметров, взятых в отдельности.5) reduction of inhibitor costs due to accurate subsidizing of the inhibitor in accordance with the oil production rate of each particular well and its operating parameters taken separately.

Указанный технический результат обеспечивается при реализации способа обработки нефтяных скважин, включающего подключение линии нагнетания устройства для обработки скважин к затрубному пространству скважины, подачу под давлением при помощи плунжерного насоса ингибитора из емкости через линию нагнетания, соединенную с выходом плунжерного насоса, в затрубное пространство скважины, осуществление контроля расхода ингибитора.The specified technical result is achieved by implementing a method for treating oil wells, which includes connecting the injection line of the device for processing wells to the annulus of the well, pressurizing the inhibitor from the tank through the injection line, connected to the outlet of the plunger pump, to the annulus of the well using a plunger pump inhibitor flow control.

Согласно настоящему изобретению устройство для обработки скважин, смонтированное на транспортном средстве высокой проходимости, перемещают между скважинами кустов одного или нескольких месторождений для их последовательной обработки, причем при обработке каждой скважины предварительно снижают давление в затрубном пространстве и устанавливают предельный уровень давления на сигнализирующем манометре, установленном на линии нагнетания, осуществляют последовательную подачу двух и более видов ингибиторов с обеспечением возможности доставки заданного количества каждого ингибитора в зону реагирования через добываемую жидкость под действием собственного веса, при этом осуществляют контроль за величиной давления на линии нагнетания, после окончания подачи каждого вида ингибитора промывают линию нагнетания промывочной жидкостью.According to the present invention, a device for processing wells mounted on a cross-country vehicle is moved between the wells of the bushes of one or more fields for their sequential processing, moreover, when processing each well, the pressure in the annulus is previously reduced and the pressure level is set on the signaling pressure gauge mounted on discharge lines, sequentially supply two or more types of inhibitors with the possibility of delivering a predetermined amount of each inhibitor to the reaction zone through the produced fluid under its own weight, while monitoring the pressure on the discharge line, after the supply of each type of inhibitor is completed, the discharge line is washed with washing liquid.

Для повышения эффективности использования патентуемого устройства, именуемого в технической документации МБРХ (мобильный блок реагентного хозяйства), при последовательной подаче двух и более видов ингибиторов в скважину при одной операции первым подают ингибитор с большей плотностью.To increase the efficiency of using a patented device, referred to in the technical documentation of MBRH (mobile reagent unit), with the sequential supply of two or more types of inhibitors into the well during one operation, the inhibitor with a higher density is fed first.

Дозировку ингибитора рассчитывают исходя из рабочей концентрации применяемого ингибитора, дебита воды в добываемой жидкости и периода между обработками по формуле:The dosage of the inhibitor is calculated based on the working concentration of the inhibitor used, the flow rate of water in the produced fluid and the period between treatments according to the formula:

Figure 00000002
Figure 00000002

где D - дозировка ингибитора, л/сут;where D is the dosage of the inhibitor, l / day;

Q - дебит воды в добываемой жидкости;Q - flow rate of water in the produced fluid;

С - рабочая концентрация ингибитора, г/т;C is the working concentration of the inhibitor, g / t;

Т - период между обработками, сут;T is the period between treatments, days;

ρ - плотность ингибитора, кг/л.ρ is the density of the inhibitor, kg / l.

Указанный технический результат достигается также при использовании устройства для обработки нефтяных скважин, содержащего плунжерный насос, выполненный с возможностью дозированной подачи ингибитора в затрубное пространство скважины из емкости, которая соединена со входом плунжерного насоса по линии всасывания, линию нагнетания, соединенную с выходом плунжерного насоса и снабженную обратным клапаном, средство контроля расхода ингибитора.The specified technical result is also achieved when using a device for processing oil wells, containing a plunger pump, configured to dose the inhibitor into the annulus of the well from the reservoir, which is connected to the inlet of the plunger pump through the suction line, a discharge line connected to the outlet of the plunger pump and equipped check valve, a means of controlling the flow of inhibitor.

Согласно настоящему изобретению устройство установлено на транспортном средстве высокой проходимости, выполненном с возможностью перемещения между скважинами кустов одного или нескольких месторождений и их последовательной обработки, при этом устройство снабжено по меньшей мере одной дополнительной емкостью, соединенной по линии всасывания со входом плунжерного насоса, емкостью с промывочной жидкостью, а также сигнализирующим манометром, установленным на линии нагнетания, и выполнено с возможностью последовательной подачи двух и более видов ингибиторов в затрубное пространство с обеспечением возможности доставки заданного количества каждого ингибитора в зону реагирования через добываемую жидкость под действием собственного веса.According to the present invention, the device is mounted on a cross-country vehicle configured to move bushes between one or more fields between wells and their sequential processing, while the device is equipped with at least one additional tank connected along the suction line to the inlet of the plunger pump, a tank with a flushing liquid, as well as a signaling pressure gauge mounted on the discharge line, and is configured to sequentially supply two and more types of inhibitors in the annulus, with the possibility of delivering a given amount of each inhibitor to the reaction zone through the produced fluid under its own weight.

Далее изобретение поясняется конкретным примером реализации и прилагаемыми чертежами, на которых изображено следующее.The invention is further illustrated by a specific implementation example and the accompanying drawings, which depict the following.

На фиг.1 изображен общий вид устройства для обработки нефтяных скважин.Figure 1 shows a General view of a device for processing oil wells.

На фиг.2 изображена гидравлическая схема устройства для обработки нефтяных скважин.Figure 2 shows the hydraulic circuit of a device for processing oil wells.

На фиг.1 изображен вариант выполнения устройства для обработки нефтяных скважин, в котором все блоки устройства установлены в фургоне транспортного средства, выполненного с возможностью перевозки упомянутых блоков от одной скважины куста нефтяных скважин к другой.Figure 1 shows an embodiment of a device for processing oil wells, in which all the blocks of the device are installed in the van of the vehicle, made with the possibility of transporting the said blocks from one well of a cluster of oil wells to another.

В рассматриваемом варианте выполнения устройство состоит из транспортного средства (1), плунжерного насоса (2), установленного в фургоне транспортного средства на раме (7), электростанции (3), которая является источником электроэнергии для электродвигателя плунжерного насоса (2). Электростанция (3) установлена в фургоне транспортного средства (1) на раме (8). Шкаф управления (9) установлен в фургоне транспортного средства (1) и предназначен для управления плунжерным насосом (2). Сигнализирующий манометр (12) установлен в линии нагнетания (6) и служит для отключения плунжерного насоса (2) при избыточном давлении ингибитора либо при минимальном давлении, а также в случае падения давления при разрыве линии нагнетания. На полу фургона транспортного средства (1) закреплены две емкости (4), в которых содержатся ингибиторы различного назначения, например ингибитор коррозии и ингибитор солеотложения. В фургоне транспортного средства (1) также установлена и закреплена емкость с промывочной жидкостью (5).In this embodiment, the device consists of a vehicle (1), a plunger pump (2) installed in a vehicle van on a frame (7), a power station (3), which is a source of electricity for the plunger pump motor (2). The power station (3) is installed in the vehicle van (1) on the frame (8). The control cabinet (9) is installed in the vehicle van (1) and is designed to control the plunger pump (2). A signaling pressure gauge (12) is installed in the discharge line (6) and serves to turn off the plunger pump (2) at an overpressure of the inhibitor or at a minimum pressure, as well as in the event of a pressure drop when the discharge line ruptures. Two containers (4) are fixed on the floor of the vehicle van (1), which contain inhibitors of various purposes, for example, a corrosion inhibitor and a scale inhibitor. In the van of the vehicle (1), a tank with washing liquid (5) is also installed and fixed.

На фиг.2 изображена принципиальная гидравлическая схема устройства для обработки нефтяных скважин.Figure 2 shows a schematic hydraulic diagram of a device for processing oil wells.

Две емкости для ингибитора (4) и емкость для промывочной жидкости (5) соединены через шаровые краны по линии всасывания (16) с входом плунжерного насоса (2). Выход плунжерного насоса (2) соединен по линии нагнетания (15) через шаровой кран и обратный клапан (10) с рукавом высокого давления (11) для подключения к затрубному пространству нефтяной скважины (на чертеже не показана). Между плунжерным насосом (2) и обратным клапаном (10) на линии нагнетания (15) установлен сигнализирующий манометр (12). Также выход плунжерного насоса (2) через шаровые краны по линиям рециркуляции (17) соединен с емкостями для ингибиторов (4) и емкостью для промывочной жидкости (5).Two tanks for the inhibitor (4) and a tank for flushing fluid (5) are connected through ball valves along the suction line (16) to the inlet of the plunger pump (2). The output of the plunger pump (2) is connected via the discharge line (15) through a ball valve and a check valve (10) with a high pressure sleeve (11) for connection to the annular space of an oil well (not shown in the drawing). Between the plunger pump (2) and the check valve (10) on the discharge line (15), a signaling pressure gauge (12) is installed. Also, the outlet of the plunger pump (2) through ball valves through recirculation lines (17) is connected to tanks for inhibitors (4) and a tank for flushing fluid (5).

Средства контроля расходов ингибиторов выполнены в виде расходомеров (18) на емкостях (4) и уровнемеров (19).The means for controlling the expenditure of inhibitors are made in the form of flow meters (18) on tanks (4) and level meters (19).

Работа устройства для обработки нефтяных скважин и реализация патентуемого способа обработки нефтяных скважин осуществляется следующим образом.The operation of the device for processing oil wells and the implementation of the patented method of processing oil wells is as follows.

Перед началом работы необходимо установить транспортное средство (1) с устройством для обработки нефтяных скважин на горизонтальную поверхность и обеспечить охлаждение электростанции (3). Во время работы устройства давление в затрубном пространстве скважины не должно превышать 40 атм. Для проверки герметичности необходимо произвести опрессовку нагнетательной линии (при закрытой затрубной задвижке) путем заполнения ее промывочной жидкостью под давлением, величина которого в полтора раза превышает величину давления подачи ингибитора.Before starting work, it is necessary to install a vehicle (1) with a device for processing oil wells on a horizontal surface and provide cooling for the power plant (3). During operation of the device, the pressure in the annulus of the well should not exceed 40 atm. To check the tightness, it is necessary to pressure test the discharge line (with the annular valve closed) by filling it with flushing liquid under pressure, the value of which is one and a half times the value of the supply pressure of the inhibitor.

После проверки герметичности необходимо выставить предельный уровень давления на сигнализирующем манометре (12), установленном на линии нагнетания (15), и подключить установку для обработки нефтяных скважин к затрубному пространству с помощью рукава высокого давления (11). Далее определяют наличие циркуляции между трубным и затрубным пространствами. После этого при закрытой затрубной задвижке открывают шаровой кран К1 и подают в затрубное пространство расчетное количество ингибитора, имеющего большую плотность. В рассматриваемом варианте реализации изобретения таким ингибитором является ингибитор солеотложения.After checking the tightness, it is necessary to set the maximum pressure level on the signaling pressure gauge (12) installed on the discharge line (15), and connect the installation for processing oil wells to the annulus using a high-pressure hose (11). Next, determine the presence of circulation between the tube and annulus. After that, when the annular valve is closed, the ball valve K1 is opened and the calculated amount of the inhibitor having a high density is fed into the annulus. In the present embodiment, the inhibitor is a scale inhibitor.

Подача ингибитора солеотложения из соответствующей емкости (4) к дозировочному плунжерному насосу (2) производится через канал линии всасывания (15), соединяющий данную емкость (4) со входом плунжерного насоса (2) путем всасывания ингибитора за счет перемещения плунжера насоса (2).Scale inhibitor is supplied from the corresponding tank (4) to the metering plunger pump (2) through the suction line channel (15) connecting this tank (4) to the inlet of the plunger pump (2) by suction of the inhibitor by moving the pump plunger (2).

Плунжерный насос (2) подает ингибитор по линии нагнетания (15), которая заканчивается обратным клапаном (10), соединенным с рукавом высокого давления (11). Обратный клапан (10) предотвращает обратное движение ингибитора при отсутствии в трубопроводе давления, создаваемого дозировочным плунжерным насосом (2).The plunger pump (2) delivers the inhibitor through the discharge line (15), which ends with a check valve (10) connected to the high pressure sleeve (11). The non-return valve (10) prevents the reverse movement of the inhibitor in the absence of pressure in the pipeline created by the metering plunger pump (2).

Из линии нагнетания (15) ингибитор через рукав высокого давления (11) подается в затрубное пространство скважины. При этом шаровые краны К4, К5, К6 линий рециркуляции (17) должны быть закрыты.From the injection line (15), the inhibitor through the high pressure sleeve (11) is fed into the annulus of the well. In this case, the ball valves K4, K5, K6 of the recirculation lines (17) must be closed.

Эксперименты показали, что давление на линии нагнетания должно быть в пределах от 15 до 20 атм, предпочтительно 16 атм. С помощью сигнализирующего манометра (12) осуществляется контроль за давлением подачи ингибитора. При превышении давления ингибитора, о чем свидетельствует сигнал манометра (12), отключают линию нагнетания (15), соединяющую выход плунжерного насоса (2) и затрубное пространство обрабатываемой нефтяной скважины, путем остановки плунжерного насоса (2). При снижении давления ингибитора (например, при обрыве линии нагнетания) также производят отключение линии нагнетания (15) путем остановки плунжерного насоса (2). Контролируют расход закачиваемого ингибитора солеотложения с помощью уровнемера (19) и расходомера (18).The experiments showed that the pressure on the discharge line should be in the range of 15 to 20 atm, preferably 16 atm. Using a signaling pressure gauge (12), the inhibitor supply pressure is monitored. If the pressure of the inhibitor is exceeded, as evidenced by the pressure gauge signal (12), the discharge line (15) connecting the outlet of the plunger pump (2) and the annulus of the treated oil well is turned off by stopping the plunger pump (2). When the inhibitor pressure decreases (for example, when the discharge line is cut off), the discharge line (15) is also turned off by stopping the plunger pump (2). The flow rate of the injected scale inhibitor is controlled using a level gauge (19) and a flow meter (18).

После закачивания необходимого (расчетного) количества ингибитора солеотложения в обрабатываемую нефтяную скважину осуществляют выключение плунжерного насоса (2).After pumping the required (estimated) amount of scaling inhibitor into the treated oil well, the plunger pump is turned off (2).

Затем переключают плунжерный насос (2) на емкость (5) с промывочной жидкостью. Включают дозировочный плунжерный насос (2) и осуществляют промывку всей линии подачи ингибитора промывочной жидкостью в объеме, в два раза превышающем объем линий нагнетания. Далее выключают дозировочный плунжерный насос и открывают линии рециркуляции (шаровые краны К4, К5, К6), соединяющие выход плунжерного насоса (2) и емкости с ингибиторами (4) и промывочной жидкостью (5).Then switch the plunger pump (2) to the tank (5) with flushing fluid. The metering plunger pump (2) is turned on and the entire inhibitor supply line is flushed with washing liquid in a volume twice as large as the volume of the discharge lines. Next, turn off the metering plunger pump and open the recirculation line (ball valves K4, K5, K6) connecting the outlet of the plunger pump (2) and containers with inhibitors (4) and flushing fluid (5).

После промывки линии нагнетания осуществляют подачу другого вида ингибитора - ингибитора коррозии, и т.д., путем повторения всех вышеперечисленных операций.After washing the discharge line, another type of inhibitor is supplied — a corrosion inhibitor, etc., by repeating all of the above operations.

В других вариантах реализации способа и устройства на транспортном средстве могут быть установлены дополнительные емкости для подачи других видов реагентов.In other embodiments of the method and device, additional containers may be installed on the vehicle to supply other types of reagents.

После осуществления последовательной подачи ингибиторов снижают давление в линии нагнетания (15) до давления в емкостях (4). Контролируют снижение давления с помощью манометра (12). После того как давление снизилось, отключают нагнетательную линию (15) от затрубного пространства скважины.After the sequential supply of inhibitors, the pressure in the discharge line (15) is reduced to the pressure in the vessels (4). The pressure drop is monitored using a pressure gauge (12). After the pressure has decreased, the injection line (15) is disconnected from the annulus of the well.

Затем транспортное средство своим ходом передвигается с закрепленным на нем устройством для обработки скважин к следующей нефтяной скважине куста. И осуществляют обработку следующей нефтяной скважины куста путем повторения всех вышеперечисленных операций.Then the vehicle moves under its own power with a device for processing wells fixed to it to the next oil well of the bush. And carry out the processing of the next oil well bush by repeating all of the above operations.

Длительность обработки одной скважины составляет около 10-15 минут в зависимости от количества закачиваемого ингибитора и производительности дозировочного плунжерного насоса (2).The processing time for one well is about 10-15 minutes, depending on the amount of inhibitor injected and the performance of the metering plunger pump (2).

Мобильность патентуемого устройства позволяет производить большое количество операций за одну рабочую смену. Устройство может перемещаться между скважинами кустов по месторождению, причем в зависимости от удаленности месторождений обеспечивается возможность проведения работ на нескольких месторождениях. Высокая проходимость транспортного средства позволяет проводить работы на месторождениях с нетвердым дорожным покрытием.The mobility of the patented device allows for a large number of operations per shift. The device can be moved between the wells of the bushes in the field, and depending on the remoteness of the fields, it is possible to work at several fields. High maneuverability of the vehicle allows you to work on fields with non-solid road surface.

Патентуемая установка за счет своей мобильности имеет возможность в течение одной рабочей смены произвести обработку до 25 точек значительно удаленных друг от друга. Например, на месторождении нефти, где проводится работа, скважины удалены друг от друга на расстояние от 2 до 40 км. Обработка осуществляется путем ударной дозировки.Due to its mobility, the patented installation has the ability to process up to 25 points significantly remote from each other during one work shift. For example, in the oil field where the work is carried out, the wells are separated from each other by a distance of 2 to 40 km. Processing is carried out by impact dosage.

При использовании стационарных установок на одну скважину путем постоянного дозирования ингибитора в течение месяца подается 100 кг ингибитора одного вида. Патентуемое устройство путем ударного дозирования 4 раза в месяц, то есть один раз в неделю, позволяет производить закачку 25 кг ингибитора каждого вида за один раз. Таким образом, осуществляется возможность обработки большого количества скважин с помощью одного мобильного устройства.When using stationary installations on one well by constant dosing of the inhibitor for a month, 100 kg of one type of inhibitor is supplied. A patented device by shock dosing 4 times a month, that is, once a week, allows the injection of 25 kg of each type of inhibitor at a time. Thus, it is possible to process a large number of wells using one mobile device.

Предотвращение задавливания ингибитора в пласт происходит за счет обеспечения возможности доставки заданного количества каждого ингибитора в зону реагирования через добываемую жидкость под действием собственного веса, что выражается в перемещении порций ингибиторов в добываемой жидкости исключительно под действием силы тяжести без сообщения им дополнительного ускорения. Такой режим перемещения обеспечивается за счет использования плунжерного насоса, при помощи которого осуществляется подача заданного количества ингибитора в затрубное пространство. При этом порции ингибиторов из линии нагнетания, давление в которой поддерживается в пределах заданного диапазона значений и контролируется при помощи сигнализирующего манометра, поступая в затрубное пространство, свободно стекают в направлении зоны перфорации. При такой системе подачи ингибитор впрыскивается в затрубное пространство, а далее самотеком поступает через столб жидкости в зону приема насоса, что позволяет избежать задавливания ингибиторов в пласт.The inhibitor is prevented from being crushed into the reservoir by providing the ability to deliver a given amount of each inhibitor to the reaction zone through the produced fluid under its own weight, which is expressed in the movement of portions of inhibitors in the produced fluid solely under the influence of gravity without additional acceleration. This mode of movement is ensured through the use of a plunger pump, with the help of which a predetermined amount of inhibitor is fed into the annulus. In this case, portions of inhibitors from the injection line, the pressure of which is maintained within a given range of values and is controlled by a signaling pressure gauge, entering the annulus, flow freely in the direction of the perforation zone. With such a supply system, the inhibitor is injected into the annulus, and then by gravity flows through a column of liquid into the pump intake area, which avoids crushing the inhibitors into the reservoir.

Предотвращение задавливания ингибитора в зону перфорации происходит также за счет того, что ингибитор подается не в насосно-компрессорную трубу, а в затрубное пространство скважины, в то время как скважина продолжает работать. При этом ингибитор стекает по затрубному пространству и поступает на прием ЭЦН (электрического центробежного насоса) за счет наличия циркуляции между насосно-компрессорной трубой и затрубным пространством нефтяной скважины.The prevention of crushing of the inhibitor in the perforation zone is also due to the fact that the inhibitor is not supplied to the tubing, but into the annulus of the well, while the well continues to work. In this case, the inhibitor flows down the annulus and enters an ESP (electric centrifugal pump) due to the circulation between the tubing and the annulus of the oil well.

При смешении ингибитора коррозии с водной фазой добываемой жидкости происходит смешивание поверхностно-активных веществ ингибитора, которые в дальнейшем создают защитную пленку на поверхности насосно-компрессорной трубы.When a corrosion inhibitor is mixed with the aqueous phase of the produced fluid, the surfactants of the inhibitor are mixed, which subsequently create a protective film on the surface of the tubing.

После поступления на прием электроцентробежного насоса ингибитора солеотложений ингибитор, попадая в водную фазу, растворяется и предотвращает образование ионов солей, что в конечном счете предотвращает образование солей на рабочих элементах ЭЦН и обеспечивает долговременную безаварийную работу насосов.After the scaling inhibitor arrives at the electric centrifugal pump, the inhibitor, getting into the aqueous phase, dissolves and prevents the formation of salt ions, which ultimately prevents the formation of salts on the working elements of the ESP and ensures long-term trouble-free operation of the pumps.

Таким образом, обеспечивается возможность подачи при одной операции подключения к затрубному пространству скважины нескольких видов ингибиторов, что дает возможность за одну технологическую операцию обработать не только поверхность труб скважины и защищать ее от коррозии, но и защитить насосное оборудование при одновременном сокращении временных затрат на подключение к затрубному пространству. Это дает возможность повысить ресурс нефтепромыслового оборудования и в конечном итоге снизить себестоимость добытой нефти.Thus, it is possible to supply several types of inhibitors during one operation of connecting to the annulus of the well, which makes it possible to process not only the surface of the well pipes and protect it from corrosion in one technological operation, but also to protect pumping equipment while reducing the time required to connect to annulus. This makes it possible to increase the resource of oilfield equipment and ultimately reduce the cost of oil produced.

Возможность после окончания подачи каждого вида ингибитора осуществлять промывку линии нагнетания позволяет применять разные типы ингибиторов.The ability to flush the injection line after the supply of each type of inhibitor is completed allows the use of different types of inhibitors.

Дозирование ингибитора (в литрах) рассчитывается исходя из рабочей концентрации применяемого ингибитора, дебита нефти, жидкости или воды и периода между обработками. Таким образом, подача ингибитора осуществляется с учетом реального дебита каждой скважины так, чтобы обеспечить необходимый уровень дозировки ингибитора для любых типов скважин.The dosage of the inhibitor (in liters) is calculated based on the working concentration of the inhibitor used, the flow rate of oil, liquid or water and the period between treatments. Thus, the supply of the inhibitor is carried out taking into account the actual flow rate of each well so as to ensure the required dosage level of the inhibitor for any type of well.

Возможность осуществлять последовательную подачу двух и более видов ингибиторов с обеспечением возможности подачи заданного количества каждого ингибитора в затрубное пространство одной скважины, позволяет защитить скважинное оборудование от коррозии, от образования солей, защищать фонд скважин от парафино-смолообразований.The ability to sequentially supply two or more types of inhibitors with the possibility of supplying a predetermined amount of each inhibitor to the annulus of one well allows you to protect downhole equipment from corrosion, from salt formation, to protect the well stock from paraffin-gum formation.

Низкая стоимость эксплуатационных расходов патентуемого устройства для обработки скважин, в технологической документации именуемого также МБРХ (мобильный блок реагентного хозяйства) или УДРМ (устройство дозирования реагентов мобильное), делает его незаменимым и востребованным инструментом в нефтегазодобывающей промышленности.The low cost of operating the patented device for treating wells, also referred to as MBRH (mobile reagent unit) or UDRM (mobile reagent dosing unit) in technological documentation, makes it an indispensable and popular tool in the oil and gas industry.

Claims (4)

1. Способ обработки нефтяных скважин, включающий подключение линии нагнетания устройства для обработки скважин к затрубному пространству скважины, подачу под давлением при помощи плунжерного насоса ингибитора из емкости через линию нагнетания, соединенную с выходом плунжерного насоса, в затрубное пространство скважины, осуществление контроля расхода ингибитора, отличающийся тем, что устройство для обработки скважин, смонтированное на транспортном средстве высокой проходимости, перемещают между скважинами кустов одного или нескольких месторождений для их последовательной обработки, причем при обработке каждой скважины предварительно снижают давление в затрубном пространстве и устанавливают предельный уровень давления на сигнализирующем манометре, установленном на линии нагнетания, осуществляют последовательную подачу двух и более видов ингибиторов с обеспечением возможности доставки заданного количества каждого ингибитора в зону реагирования через добываемую жидкость под действием собственного веса, при этом осуществляют контроль за величиной давления на линии нагнетания, после окончания подачи каждого вида ингибитора промывают линию нагнетания промывочной жидкостью.1. A method of treating oil wells, including connecting the injection line of the device for processing wells to the annulus of the well, supplying pressure of the inhibitor using the plunger pump from the reservoir through the injection line connected to the outlet of the plunger pump, into the annulus of the well, controlling the flow of the inhibitor, characterized in that the device for processing wells mounted on a high-cross-country vehicle is moved between wells of bushes of one or more x deposits for their sequential treatment, and during the treatment of each well, the pressure in the annulus is preliminarily reduced and the pressure level is set on a signaling pressure gauge installed on the injection line, two or more types of inhibitors are sequentially supplied to ensure that a given amount of each inhibitor can be delivered to the zone reaction through the produced fluid under the action of its own weight, while monitoring the pressure on discharge lines, after the supply of each type of inhibitor is completed, the discharge line is washed with washing liquid. 2. Способ по п.1, отличающийся тем, что при последовательной подаче двух и более видов ингибиторов в скважину при одной операции первым подают ингибитор с большей плотностью.2. The method according to claim 1, characterized in that when sequentially feeding two or more types of inhibitors into the well during one operation, the inhibitor with a higher density is first fed. 3. Способ по п.1, отличающийся тем, что дозировку ингибитора рассчитывают исходя из рабочей концентрации применяемого ингибитора, дебита воды в добываемой жидкости и периода между обработками по формуле3. The method according to claim 1, characterized in that the dosage of the inhibitor is calculated based on the working concentration of the inhibitor used, the flow rate of water in the produced fluid and the period between treatments according to the formula
Figure 00000003
Figure 00000003
где D - дозировка ингибитора, л/сут;where D is the dosage of the inhibitor, l / day; Q - дебит воды в добываемой жидкости;Q - flow rate of water in the produced fluid; С - рабочая концентрация ингибитора, г/тонна;C is the working concentration of the inhibitor, g / ton; Т - период между обработками, сут;T is the period between treatments, days; ρ - плотность ингибитора, кг/л.ρ is the density of the inhibitor, kg / l.
4. Устройство для обработки нефтяных скважин, содержащее плунжерный насос, выполненный с возможностью дозированной подачи ингибитора в затрубное пространство скважины из емкости, которая соединена со входом плунжерного насоса по линии всасывания, линию нагнетания, соединенную с выходом плунжерного насоса и снабженную обратным клапаном, средство контроля расхода ингибитора, отличающееся тем, что установлено на транспортном средстве высокой проходимости, выполненном с возможностью перемещения между скважинами кустов одного или нескольких месторождений и их последовательной обработки, при этом устройство снабжено по меньшей мере одной дополнительной емкостью, соединенной по линии всасывания со входом плунжерного насоса, емкостью с промывочной жидкостью, а также сигнализирующим манометром, установленным на линии нагнетания, и выполнено с возможностью последовательной подачи двух и более видов ингибиторов в затрубное пространство с обеспечением возможности доставки заданного количества каждого ингибитора в зону реагирования через добываемую жидкость под действием собственного веса.4. A device for treating oil wells, comprising a plunger pump configured to dose the inhibitor into the annulus of the well from a reservoir that is connected to the inlet of the plunger pump through an intake line, an injection line connected to the outlet of the plunger pump and equipped with a check valve inhibitor consumption, characterized in that it is installed on a high-cross-country vehicle, made with the possibility of moving between the wells of bushes of one or several fields and their sequential processing, while the device is equipped with at least one additional tank connected along the suction line to the inlet of the plunger pump, a tank with flushing fluid, as well as a signaling pressure gauge installed on the discharge line, and is configured to supply two and more types of inhibitors in the annulus with the possibility of delivering a given amount of each inhibitor to the reaction zone through the produced fluid under the action of m of its own weight.
RU2006122507/03A 2006-06-26 2006-06-26 Method and device for oil well treatment RU2314412C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2006122507/03A RU2314412C1 (en) 2006-06-26 2006-06-26 Method and device for oil well treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2006122507/03A RU2314412C1 (en) 2006-06-26 2006-06-26 Method and device for oil well treatment

Publications (1)

Publication Number Publication Date
RU2314412C1 true RU2314412C1 (en) 2008-01-10

Family

ID=39020205

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2006122507/03A RU2314412C1 (en) 2006-06-26 2006-06-26 Method and device for oil well treatment

Country Status (1)

Country Link
RU (1) RU2314412C1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2456435C2 (en) * 2010-09-15 2012-07-20 Общество с ограниченной ответственностью "ЮграХимСервис" Mobile chemical plant for supply of chemicals for treatment of oil-gas production wells and pipelines
US9896917B2 (en) 2013-08-02 2018-02-20 Olga Nikolaevna Sizonenko Oil production intensification device and method
CN110131586A (en) * 2019-05-27 2019-08-16 西安利都仪表测控设备有限公司 A kind of well group drops back to pressure metering device
US10577767B2 (en) 2018-02-20 2020-03-03 Petram Technologies, Inc. In-situ piling and anchor shaping using plasma blasting
US10767479B2 (en) 2018-04-03 2020-09-08 Petram Technologies, Inc. Method and apparatus for removing pavement structures using plasma blasting
US10844702B2 (en) 2018-03-20 2020-11-24 Petram Technologies, Inc. Precision utility mapping and excavating using plasma blasting
USD904305S1 (en) 2019-02-25 2020-12-08 Petram Technologies, Inc. Electrode cage for a plasma blasting probe
US10866076B2 (en) 2018-02-20 2020-12-15 Petram Technologies, Inc. Apparatus for plasma blasting
US11203400B1 (en) 2021-06-17 2021-12-21 General Technologies Corp. Support system having shaped pile-anchor foundations and a method of forming same
US11268796B2 (en) 2018-02-20 2022-03-08 Petram Technologies, Inc Apparatus for plasma blasting
US11293735B2 (en) 2018-12-17 2022-04-05 Petram Technologies, Inc Multi-firing swivel head probe for electro-hydraulic fracturing in down hole fracking applications
RU2783949C1 (en) * 2022-06-17 2022-11-22 Общество с ограниченной ответственностью "Уфанефтегазмаш" Mobile pumping unit for metered supply of chemicals

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2456435C2 (en) * 2010-09-15 2012-07-20 Общество с ограниченной ответственностью "ЮграХимСервис" Mobile chemical plant for supply of chemicals for treatment of oil-gas production wells and pipelines
US9896917B2 (en) 2013-08-02 2018-02-20 Olga Nikolaevna Sizonenko Oil production intensification device and method
US11268796B2 (en) 2018-02-20 2022-03-08 Petram Technologies, Inc Apparatus for plasma blasting
US10577767B2 (en) 2018-02-20 2020-03-03 Petram Technologies, Inc. In-situ piling and anchor shaping using plasma blasting
US10760239B2 (en) 2018-02-20 2020-09-01 Petram Technologies, Inc. In-situ piling and anchor shaping using plasma blasting
US10866076B2 (en) 2018-02-20 2020-12-15 Petram Technologies, Inc. Apparatus for plasma blasting
US10844702B2 (en) 2018-03-20 2020-11-24 Petram Technologies, Inc. Precision utility mapping and excavating using plasma blasting
US10767479B2 (en) 2018-04-03 2020-09-08 Petram Technologies, Inc. Method and apparatus for removing pavement structures using plasma blasting
US11293735B2 (en) 2018-12-17 2022-04-05 Petram Technologies, Inc Multi-firing swivel head probe for electro-hydraulic fracturing in down hole fracking applications
USD904305S1 (en) 2019-02-25 2020-12-08 Petram Technologies, Inc. Electrode cage for a plasma blasting probe
CN110131586A (en) * 2019-05-27 2019-08-16 西安利都仪表测控设备有限公司 A kind of well group drops back to pressure metering device
US11203400B1 (en) 2021-06-17 2021-12-21 General Technologies Corp. Support system having shaped pile-anchor foundations and a method of forming same
US11427288B1 (en) 2021-06-17 2022-08-30 General Technologies Corp. Support system having shaped pile-anchor foundations and a method of forming same
RU2783949C1 (en) * 2022-06-17 2022-11-22 Общество с ограниченной ответственностью "Уфанефтегазмаш" Mobile pumping unit for metered supply of chemicals

Similar Documents

Publication Publication Date Title
RU2314412C1 (en) Method and device for oil well treatment
US7556100B2 (en) Apparatus and method for delivering chemicals into an underground well
US9291038B2 (en) Apparatus and method for high pressure abrasive fluid injection
US5343941A (en) Apparatus for treating oil and gas wells
US7731843B2 (en) Method and apparatus for treatment of water for an injection well
US20160186543A1 (en) System for chemical treatment of a subsurface wellbore
CN200975233Y (en) Down-hole slow corroding antisludging equipment for oil gas field
US10190718B2 (en) Accumulator assembly, pump system having accumulator assembly, and method
US11261705B2 (en) Systems and methods for treating fluids in oilfield facilities
CN205217598U (en) Normal position injection system
RU2418156C1 (en) Development method of non-homogeneous oil formation
US11059003B2 (en) Method for providing brine
MX2008008933A (en) Nano-otologic protective equipment for impact noise toxicity and/or blast overpressure exposure.
RU170136U1 (en) PIPE ADDITION DEVICE FOR PIPELINE
US20170226824A1 (en) Method and system for operating a well treatment chemical pump
CN201835785U (en) Oil-water well device capable of automatically controlling pressure relief and liquid discharge as well as pumping discharged liquid to production pipeline
RU2422620C1 (en) Procedure for protection of centrifugal pump from deposit of salts
RU2752569C1 (en) Downhole metering pumping unit to prevent deposits
JP6566157B2 (en) How to wash wells
US9234414B1 (en) Pressurized injection apparatus for downhole treatment pellets
RU2264530C2 (en) Method for periodical chemical reagent injection into object to be treated
RU61340U1 (en) PIPING OF THE MEASURING AND DISTRIBUTION NODE OF THE BUST PUMPING STATION
RU2706980C1 (en) Method of operation of gas or gas condensate well with self-contained pump for supply of surfactants for removal of liquid from bottom
RU2608096C1 (en) Installation for pumping fluid into the formation
RU94623U1 (en) MOISTURE DOUBLE-MOUNTED FITTINGS

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20080627

NF4A Reinstatement of patent

Effective date: 20110110

PC41 Official registration of the transfer of exclusive right

Effective date: 20120914

MM4A The patent is invalid due to non-payment of fees

Effective date: 20150627

NF4A Reinstatement of patent

Effective date: 20160610

MM4A The patent is invalid due to non-payment of fees

Effective date: 20190627