RU2279556C1 - Method of operation of thermal power station - Google Patents

Method of operation of thermal power station Download PDF

Info

Publication number
RU2279556C1
RU2279556C1 RU2005112680/06A RU2005112680A RU2279556C1 RU 2279556 C1 RU2279556 C1 RU 2279556C1 RU 2005112680/06 A RU2005112680/06 A RU 2005112680/06A RU 2005112680 A RU2005112680 A RU 2005112680A RU 2279556 C1 RU2279556 C1 RU 2279556C1
Authority
RU
Russia
Prior art keywords
water
stage
condenser
evaporator
heated
Prior art date
Application number
RU2005112680/06A
Other languages
Russian (ru)
Inventor
Владимир Иванович Шарапов (RU)
Владимир Иванович Шарапов
Михаил Евгеньевич Орлов (RU)
Михаил Евгеньевич Орлов
Игорь Николаевич Шепелев (RU)
Игорь Николаевич Шепелев
Original Assignee
Государственное образовательное учреждение высшего профессионального образования "Ульяновский государственный технический университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное образовательное учреждение высшего профессионального образования "Ульяновский государственный технический университет" filed Critical Государственное образовательное учреждение высшего профессионального образования "Ульяновский государственный технический университет"
Priority to RU2005112680/06A priority Critical patent/RU2279556C1/en
Application granted granted Critical
Publication of RU2279556C1 publication Critical patent/RU2279556C1/en

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

FIELD: heat power engineering.
SUBSTANCE: invention is designed for heating system water and producing electric energy. According to proposed method, waste steam from turbine is condensed in condenser, heated circulating water after condenser and system water getting from consumers are directed to evaporator of heat-pump plant for evaporating cooling agent. Leaks of system water are compensated by make-up water which is heated in condenser of heat-pump plant and are processed in water preparation plant. Heated circulating water is cooled in first stage of evaporator of heat-pump plant, and system water getting from consumers is cooled in second stage evaporator of heat-pump plant. Make-up water is heated in first stage of condenser of heat-pump plant coupled with first stage of evaporator, and system water is heated successively in lower system heater, in second stage of condenser of heat-pump plant coupled with second stage of evaporator and in upper system heater of turbine.
EFFECT: provision of economic operation of thermal power station.
1 dwg

Description

Изобретение относится к области теплоэнергетики и может быть использовано на тепловых электрических станциях.The invention relates to the field of power engineering and can be used at thermal power plants.

Известен способ работы тепловой электрической станции - аналог, по которому отработавший в турбине пар конденсируют в конденсаторе, для чего в последний подают холодную циркуляционную воду, нагретую циркуляционную воду после конденсатора и сетевую воду, поступающую от потребителей, направляют в испаритель теплонасосной установки для испарения хладагента, перед подачей потребителям сетевую воду нагревают в нижнем и верхнем сетевых подогревателях турбины, утечки сетевой воды компенсируют подпиточной водой, которую подогревают в конденсаторе теплонасосной установки и обрабатывают в водоподготовительной установке (см. а.с. SU 1590569 A1, F 01 К 17/02, 07.09.1990). Этот аналог принят в качестве прототипа изобретения.A known method of operation of a thermal power plant is an analogue by which the steam that is exhausted in a turbine is condensed in a condenser, for which cold circulating water is supplied to the latter, the heated circulating water after the condenser and the network water from consumers are sent to the evaporator of the heat pump installation for evaporating the refrigerant, before being supplied to consumers, the network water is heated in the lower and upper network heaters of the turbine, the leakage of network water is compensated by make-up water, which is heated in the cond Satoru heat pump unit and treated in the water treatment plant (see. AS SU 1590569 A1, F 01 K 17/02, 07.09.1990). This analogue is adopted as a prototype of the invention.

Недостатком аналогов и прототипа является пониженная экономичность тепловой электрической станции, которая обусловлена повышенной температурой обратной сетевой воды, что приводит к снижению теплофикационной выработки электроэнергии.The disadvantage of analogues and prototype is the reduced efficiency of the thermal power plant, which is due to the increased temperature of the return network water, which leads to a decrease in cogeneration of electricity.

Техническим результатом, достигаемым настоящим изобретением, является повышение экономичности работы тепловой электрической станции за счет максимально возможного отвода теплоты от циркуляционной воды и обратной сетевой воды и увеличения выработки электроэнергии.The technical result achieved by the present invention is to increase the efficiency of the thermal power plant due to the maximum possible removal of heat from the circulation water and the return network water and to increase the generation of electricity.

Для достижения этого результата предложен способ работы тепловой электрической станции, по которому отработавший в турбине пар конденсируют в конденсаторе, для чего в последний подают холодную циркуляционную воду, нагретую циркуляционную воду после конденсатора и сетевую воду, поступающую от потребителей, направляют в испаритель теплонасосной установки для испарения хладагента, перед подачей потребителям сетевую воду нагревают в нижнем и верхнем сетевых подогревателях турбины, утечки сетевой воды компенсируют подпиточной водой, которую подогревают в конденсаторе теплонасосной установки и обрабатывают в водоподготовительной установке.To achieve this result, a method of operating a thermal power plant is proposed, in which the steam exhausted in the turbine is condensed in a condenser, for which the latter is supplied with cold circulating water, heated circulating water after the condenser and network water from consumers is sent to the evaporator of the heat pump unit for evaporation refrigerant, before supplying consumers with network water is heated in the lower and upper network heaters of the turbine, the leakage of network water is compensated by make-up water, which oruyu heated in the condenser heat pump unit and treated in the water treatment plant.

Отличием заявленного способа работы тепловой электрической станции является то, что нагретую циркуляционную воду охлаждают в первой ступени испарителя теплонасосной установки, а сетевую воду, поступающую от потребителей, охлаждают во второй ступени испарителя теплонасосной установки, нагрев подпиточной воды производят в первой ступени конденсатора теплонасосной установки, связанной с первой ступенью испарителя, а нагрев сетевой воды осуществляют последовательно в нижнем сетевом подогревателе, во второй ступени конденсатора теплонасосной установки, связанной со второй ступенью испарителя, и в верхнем сетевом подогревателе турбины.The difference between the claimed method of operation of a thermal power plant is that the heated circulating water is cooled in the first stage of the evaporator of the heat pump installation, and the network water coming from consumers is cooled in the second stage of the evaporator of the heat pump installation, the make-up water is heated in the first stage of the condenser of the heat pump installation, connected with the first stage of the evaporator, and the heating of the mains water is carried out sequentially in the lower network heater, in the second stage of the condenser the heat pumping unit associated with the second stage of the evaporator, and in the upper network heater of the turbine.

Новый отличительный признак, характеризующий способ работы тепловой электрической станции, позволяет повысить ее экономичность.A new distinctive feature that characterizes the way a thermal power plant works allows to increase its efficiency.

Далее рассмотрим сведения, подтверждающие возможность осуществления изобретения с получением искомого технического результата.Next, we consider the information confirming the possibility of carrying out the invention with obtaining the desired technical result.

На чертеже изображена принципиальная схема тепловой электрической станции, поясняющая предложенный способ.The drawing shows a schematic diagram of a thermal power plant, explaining the proposed method.

Тепловая электрическая станция содержит паровую турбину 1 с отопительными отборами пара 2 и конденсатором 3, подающий 4 и обратный 5 сетевые трубопроводы, сетевой насос 6, нижний 7 и верхний 8 сетевые подогреватели, включенные по нагреваемой среде между подающим 4 и обратным 5 сетевыми трубопроводами и подключенные по греющей среде к отопительным отборам 2, теплонасосную установку 9 с двухступенчатыми испарителем и конденсатором. К конденсатору 3 турбины 1 подключены напорный 10 и сливной 11 трубопроводы циркуляционной воды. Первая ступень испарителя 12 подключена к сливному трубопроводу циркуляционной воды 11, а вторая ступень испарителя 13 подключена к обратному сетевому трубопроводу 5 перед нижним сетевым подогревателем 7. К обратному сетевому трубопроводу 5 подключен трубопровод исходной подпиточной воды 14, в который последовательно включены первая ступень конденсатора 15 теплонасосной установки 9, связанная с первой ступенью испарителя 12, и водоподготовительная установка 16. Вторая ступень конденсатора 17 теплонасосной установки 9, связанная со второй ступенью испарителя 13, включена в подающий трубопровод сетевой воды 4 между нижним 7 и верхним 8 сетевыми подогревателями.The thermal power plant contains a steam turbine 1 with heating steam extraction 2 and a condenser 3, supplying 4 and return 5 network pipelines, a network pump 6, lower 7 and upper 8 network heaters, connected via a heated medium between the supply 4 and return 5 network pipelines and connected heating medium to heating taps 2, heat pump unit 9 with a two-stage evaporator and condenser. To the condenser 3 of the turbine 1 are connected pressure 10 and drain 11 circulating water pipelines. The first stage of the evaporator 12 is connected to the drain pipe of the circulating water 11, and the second stage of the evaporator 13 is connected to the return network pipe 5 in front of the lower network heater 7. The pipe of the feed water 14 is connected to the return network pipe 5, in which the first stage of the heat pump condenser 15 is connected in series. installation 9, associated with the first stage of the evaporator 12, and a water treatment plant 16. The second stage of the condenser 17 of the heat pump installation 9, associated with the second stage New evaporator 13 is included in the network water feed conduit 4 between the bottom 7 and the upper network 8 heaters.

Способ работы тепловой электрической станции состоит из следующих операций.The method of operation of a thermal power plant consists of the following operations.

Отработавший в паровой турбине 1 пар конденсируют в конденсаторе турбины 3, для чего в конденсатор турбины 3 по напорному циркуляционному трубопроводу 10 подают охлаждающую воду. Нагретую в конденсаторе турбины 3 воду направляют в первую ступень испарителя 12 теплонасосной установки 9, где ее охлаждают с помощью хладагента, циркулирующего в контуре теплонасосной установки 9, а затем воду отводят по сливному трубопроводу циркуляционной воды 11. Возвращаемую от потребителей по обратному сетевому трубопроводу 5 сетевую воду подают сетевым насосом 6 во вторую ступень испарителя 13 теплонасосной установки 9, где ее охлаждают с помощью хладагента. Утечки сетевой воды компенсируют подпиточной водой, которую по трубопроводу исходной подпиточной воды 14 подают для подогрева в первую ступень конденсатора 15 теплонасосной установки 9, затем обрабатывают в водоподготовительной установке 16 и направляют в обратный сетевой трубопровод 5. Перед подачей потребителям сетевую воду последовательно нагревают в нижнем сетевом подогревателе 7, во второй ступени конденсатора 17 теплонасосной установки 9 и в верхнем сетевом подогревателе 8. Благодаря использованию двухступенчатого испарения и двухступенчатой конденсации хладагента теплонасосной установки достигается максимально возможный отвод теплоты от циркуляционной воды и обратной сетевой воды, что способствует увеличению теплофикационной выработки электроэнергии и позволяет повысить экономичность тепловой электрической станции.The steam spent in the steam turbine 1 is condensed in the condenser of the turbine 3, for which purpose cooling water is supplied to the turbine condenser 3 through the pressure circulation pipe 10. The water heated in the condenser of the turbine 3 is sent to the first stage of the evaporator 12 of the heat pump unit 9, where it is cooled with the help of a refrigerant circulating in the circuit of the heat pump unit 9, and then the water is discharged through the drain pipe of the circulation water 11. The network returned from the consumers through the return network pipe 5 water is supplied by a network pump 6 to the second stage of the evaporator 13 of the heat pump unit 9, where it is cooled using a refrigerant. Leakage of network water is compensated by make-up water, which is supplied through the feed water pipe 14 for heating to the first stage of the condenser 15 of the heat pump unit 9, then it is processed in the water treatment plant 16 and sent to the return network pipe 5. Before being supplied to consumers, the network water is sequentially heated in the lower network heater 7, in the second stage of the condenser 17 of the heat pump installation 9 and in the upper network heater 8. Through the use of two-stage evaporation and two In case of stepwise condensation of the coolant of the heat pump installation, the maximum possible heat removal from the circulation water and the return network water is achieved, which helps to increase the heat generation of electricity and allows to increase the efficiency of the thermal power station.

Claims (1)

Способ работы тепловой электрической станции, по которому отработавший в турбине пар конденсируют в конденсаторе, для чего в последний подают холодную циркуляционную воду, нагретую циркуляционную воду после конденсатора и сетевую воду, поступающую от потребителей, направляют в испаритель теплонасосной установки для испарения хладагента, перед подачей потребителям сетевую воду нагревают в нижнем и верхнем сетевых подогревателях турбины, утечки сетевой воды компенсируют подпиточной водой, которую подогревают в конденсаторе теплонасосной установки и обрабатывают в водоподготовительной установке, отличающийся тем, что нагретую циркуляционную воду охлаждают в первой ступени испарителя теплонасосной установки, а сетевую воду, поступающую от потребителей, охлаждают во второй ступени испарителя теплонасосной установки, нагрев подпиточной воды производят в первой ступени конденсатора теплонасосной установки, связанной с первой ступенью испарителя, а нагрев сетевой воды осуществляют последовательно в нижнем сетевом подогревателе, во второй ступени конденсатора теплонасосной установки, связанной со второй ступенью испарителя, и в верхнем сетевом подогревателе турбины.The method of operation of a thermal power plant, in which the steam exhausted in the turbine is condensed in a condenser, for which cold circulating water is supplied to the latter, the heated circulating water after the condenser and the supply water from the consumers are sent to the evaporator of the heat pump installation for evaporating the refrigerant before being supplied to consumers the mains water is heated in the lower and upper network heaters of the turbine, the leakages of the mains water are compensated by make-up water, which is heated in the heat condenser installation and is treated in a water treatment plant, characterized in that the heated circulating water is cooled in the first stage of the evaporator of the heat pump installation, and the mains water coming from consumers is cooled in the second stage of the evaporator of the heat pump installation, the make-up water is heated in the first stage of the condenser of the heat pump installation, associated with the first stage of the evaporator, and the heating of the mains water is carried out sequentially in the lower network heater, in the second stage of the condenser it is warm the pump unit associated with the second stage of the evaporator and the heater in the upper network turbine.
RU2005112680/06A 2005-04-26 2005-04-26 Method of operation of thermal power station RU2279556C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2005112680/06A RU2279556C1 (en) 2005-04-26 2005-04-26 Method of operation of thermal power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2005112680/06A RU2279556C1 (en) 2005-04-26 2005-04-26 Method of operation of thermal power station

Publications (1)

Publication Number Publication Date
RU2279556C1 true RU2279556C1 (en) 2006-07-10

Family

ID=36830734

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2005112680/06A RU2279556C1 (en) 2005-04-26 2005-04-26 Method of operation of thermal power station

Country Status (1)

Country Link
RU (1) RU2279556C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2566251C1 (en) * 2014-05-05 2015-10-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный авиационный технический университет" Heating method of delivery water at thermal power plant

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2566251C1 (en) * 2014-05-05 2015-10-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный авиационный технический университет" Heating method of delivery water at thermal power plant

Similar Documents

Publication Publication Date Title
RU2269014C2 (en) Thermal power station
RU2268372C2 (en) Thermoelectric power station
RU2570131C2 (en) Operating method of thermal power plant
RU2566248C1 (en) Method of disposal of heat energy generated by electric power station
RU2279554C1 (en) Method of operation of thermal power station
RU2279553C1 (en) Method of operation of thermal power station
RU2279556C1 (en) Method of operation of thermal power station
RU2275515C1 (en) Thermal power station
RU2279552C1 (en) Method of thermal power station
RU2279555C1 (en) Method of operation of thermal power station
CN109488401A (en) Heat-pump-type afterheat utilizing system
RU91598U1 (en) HEAT ELECTRIC STATION
RU2276273C1 (en) Thermal power station
RU2275514C1 (en) Thermal power station
RU2275511C1 (en) Thermal power station
RU2303145C1 (en) Thermal power station
RU2275513C1 (en) Thermal power station
RU2406830C1 (en) Operating method of thermal power plant
CN111023617A (en) Device and method for cooling dead steam cooling water based on refrigeration mode
RU2275512C2 (en) Method of operation of thermal power station
RU2269013C2 (en) Method of operation of thermal power station
RU2562745C1 (en) Utilisation method of heat energy generated by thermal power plant
RU2269015C2 (en) Thermal power station
RU2689233C1 (en) Method for increasing energy efficiency of a power plant and device for its implementation
RU122124U1 (en) HEAT ELECTRIC STATION WITH HEAT PUMP INSTALLATION

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20070427

NF4A Reinstatement of patent

Effective date: 20100320

MM4A The patent is invalid due to non-payment of fees

Effective date: 20130427