RU2213861C1 - Method of treatment of bottomhole formation zone - Google Patents
Method of treatment of bottomhole formation zone Download PDFInfo
- Publication number
- RU2213861C1 RU2213861C1 RU2002118236/03A RU2002118236A RU2213861C1 RU 2213861 C1 RU2213861 C1 RU 2213861C1 RU 2002118236/03 A RU2002118236/03 A RU 2002118236/03A RU 2002118236 A RU2002118236 A RU 2002118236A RU 2213861 C1 RU2213861 C1 RU 2213861C1
- Authority
- RU
- Russia
- Prior art keywords
- pressure
- zone
- tubing string
- formation
- treated
- Prior art date
Links
Landscapes
- Physical Or Chemical Processes And Apparatus (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
Abstract
Description
Изобретение относится к нефтяной промышленности и может быть использовано при стимуляции скважин. The invention relates to the oil industry and can be used for stimulation of wells.
Известен способ обработки призабойной зоны пласта (см. патент РФ 2168621, Е 21 В 43/25, 10.06.01), включающий спуск в скважину имплозионного устройства в интервал обрабатываемого пласта, продавку в него обрабатывающего состава, проведение выдержки, многократное имплозионное воздействие при давлении на забое меньше пластового до стабилизации динамического уровня в затрубном пространстве. A known method of processing the bottom-hole zone of the formation (see RF patent 2168621, E 21 B 43/25, 06/10/01), including the descent into the well of an implosion device in the interval of the treated formation, pushing the treatment compound into it, holding the shutter, repeated implosion exposure at pressure at the bottom less than the reservoir to stabilize the dynamic level in the annulus.
Известный способ позволяет выносить продукты реакции из призабойной зоны после химического воздействия на нее, однако он не обеспечивает достаточно полного реагирования при воздействии. The known method allows the removal of reaction products from the bottomhole zone after chemical exposure to it, however, it does not provide a sufficiently complete response when exposed.
Наиболее близким по технической сущности и достигаемому результату к предлагаемому является способ обработки призабойной зоны пласта и добычи нефти (см. патент РФ 2029078, Е 21 В 43/25, 20.02.95), включающий разобщение скважины выше обрабатываемого пропластка, заполнение зоны обрабатываемого пропластка обрабатывающим составом, проведение технологической выдержки, создание депрессии в зоне обрабатываемого пропластка откачкой жидкости в зону выше места разобщения в межтрубном пространстве, восстановление давления в зоне обрабатываемого пропластка перетоком обрабатывающего состава из зоны выше места разобщения. The closest in technical essence and the achieved result to the proposed one is a method of processing the bottom-hole formation zone and oil production (see RF patent 2029078, Е 21 В 43/25, 02.20.95), including the separation of the well above the treated layer, filling the zone of the treated layer with a processing composition, carrying out technological exposure, creating depression in the area of the treated interlayer by pumping liquid into the area above the place of separation in the annulus, restoring pressure in the area of the treated interlay by overflow of the processing compound from the zone above the place of separation.
Известный способ позволяет производить очистку призабойной зоны от загрязнений, однако глубина очистки недостаточна. The known method allows the cleaning of the bottom-hole zone from contamination, however, the depth of treatment is insufficient.
Технической задачей, на решение которой направлено заявляемое изобретение, является повышение эффективности способа за счет увеличения охвата воздействием на призабойную зону обрабатывающим составом, улучшения условий его реагирования и выноса продуктов реакции из пласта. The technical problem to be solved by the claimed invention is directed is to increase the efficiency of the method by increasing the coverage by treating the bottom-hole zone with a treatment compound, improving the conditions for its reaction and removal of reaction products from the formation.
Техническая задача решается тем, что в способе обработки призабойной зоны пласта, включающем разобщение скважины выше обрабатываемого пропластка, заполнение зоны обрабатываемого пропластка обрабатывающим составом, проведение технологической выдержки, создание депрессии и восстановление давления в зоне обрабатываемого пропластка откачкой из нее продукции в пространство выше места разобщения и перетоком из него обрабатывающего состава, в скважину на колонне насосно-компрессорных труб спускают генератор импульсов давления и размещают его над местом разобщения, после закачки обрабатывающего состава в призабойную зону воздействуют на нее импульсами давления до падения давления в зоне обрабатываемого пропластка до пластового, проводят технологическую выдержку, при которой воздействуют на призабойную зону циклами депрессии и восстановления давления подъемом и спуском столба жидкости в колонне насосно-компрессорных труб, затем откачивают продукты реакции, при этом снижением уровня в колонне насосно-компрессорных труб создают в зоне обрабатываемого пропластка давление ниже пластового и воздействуют на призабойную зону циклами депрессии и восстановления давления подъемом и спуском столба жидкости в колонне насосно-компрессорных труб. The technical problem is solved by the fact that in the method for processing the bottom-hole zone of the formation, including uncoupling the well above the treated layer, filling the zone of the treated layer with a treatment compound, holding the process, creating depression and restoring pressure in the zone of the treated layer by pumping products into the space above the place of separation and by the flow of the processing compound from it, a pressure pulse generator is lowered into the well on the tubing string and placing they are placed above the isolation point, after pumping the treatment compound into the bottom-hole zone, they are exposed to pressure pulses until the pressure in the zone of the treated interlayer drops to the formation, technological shutter speed is applied, during which the bottom-hole zone is affected by depression and pressure recovery cycles by raising and lowering the liquid column in the column tubing, then the reaction products are pumped out, while lowering the level in the tubing string create in the zone of the treated layer ix below formation and affect the bottom zone cycles of depression and recovery lifting and lowering the pressure of the liquid column in the column tubing.
Проведенные исследования показали, что, во-первых, спуск в скважину на колонне насосно-компрессорных труб генератора импульсов давления с размещением его над местом разобщения скважины и воздействие на призабойную зону после закачки в нее обрабатывающего состава импульсами давления до падения давления в зоне обрабатываемого пропластка до пластового обеспечивает создание новых и расширение старых каналов фильтрации в призабойной зоне и поступление в них обрабатывающего состава при репрессии на пласт в режиме импульсного скачка давления в зоне обрабатываемого пропластка, который улучшает поступление обрабатывающего состава в каналы фильтрации и увеличивает охват призабойной зоны химическим воздействием по толщине и глубине пласта. The studies showed that, firstly, the descent of the pressure pulse generator into the well on the tubing string with its placement above the separation site of the well and the impact on the bottom-hole zone after the treatment composition is pumped into it with pressure pulses until the pressure drops in the area of the treated layer to reservoir ensures the creation of new and expansion of the old filtration channels in the bottomhole zone and the arrival of the processing composition in them when repression to the reservoir in the pulse pressure mode formation in the area of the treated layer, which improves the flow of the processing composition into the filtration channels and increases the coverage of the bottomhole zone by chemical exposure along the thickness and depth of the formation.
Во-вторых, проведение технологической выдержки в условиях пластового давления в зоне обрабатываемого пропластка и воздействие на призабойную зону циклами депрессии и восстановления давления подъемом и спуском столба жидкости в колонне насосно-компрессорных труб позволяет обрабатывающему составу совершать в призабойной зоне движения к скважине и обратно, которые дают возможность не контактировавшей со стенками каналов фильтрации части обрабатывающего состава занять место контактировавшей и отреагировавшей части и тем самым обеспечить реагирование всего объема, закаченного в призабойную зону обрабатывающего состава. При таком динамическом режиме обрабатывающий состав полнее отмывает призабойную зону от загрязнения, не загоняя при этом продукты реакции вглубь пласта, а вынося их к стволу скважины из узких в более широкие каналы за счет превышения скорости фильтрации в призабойной зоне при создании депрессии, чем при восстановлении давления в зоне обрабатываемого пропластка. Secondly, carrying out technological soaking under reservoir pressure in the zone of the treated layer and impacting the bottom-hole zone with depression and pressure recovery cycles by raising and lowering the liquid column in the tubing string allows the treatment compound to move in the bottom-hole zone to and from the well, make it possible for the part of the processing composition not in contact with the walls of the filtration channels to take the place of the contacted and reacted part and thereby provide read the response of the entire volume pumped into the bottomhole zone of the processing composition. In this dynamic mode, the processing composition more fully launders the bottomhole zone from contamination, without driving the reaction products deeper into the formation, and moving them to the wellbore from narrow to wider channels due to the excess filtration rate in the bottomhole zone when creating depression than when pressure is restored in the area of the treated layer.
Кроме того, откачка продуктов реакции при давлении, созданном в зоне обрабатываемого пропластка ниже пластового снижением уровня в колонне насосно-компрессорных труб и воздействие при этом на призабойную зону циклами депрессии и восстановления давления подъемом и спуском столба жидкости в колонне насосно-компрессорных труб, обеспечивает лучший вынос продуктов реакции из пласта при пульсирующем режиме течения в призабойной зоне откачиваемой продукции, когда за счет резкого увеличения скорости происходит отрыв продуктов реакции от стенок каналов фильтрации, а также вынос их из узких в более широкие каналы и дальнейшее движение к скважине. In addition, the pumping of reaction products at a pressure created in the zone of the treated layer below the reservoir by lowering the level in the tubing string and thereby affecting the bottom-hole zone with depression and pressure recovery by raising and lowering the liquid column in the tubing string provides the best the removal of reaction products from the reservoir with a pulsating flow regime in the bottomhole zone of the pumped-out product, when due to a sharp increase in speed, the reaction products detach from The flow of filtration channels, as well as their removal from narrow to wider channels and further movement to the well.
Совокупность отличительных признаков предлагаемого способа обработки призабойной зоны пласта позволяет увеличить охват воздействием на призабойную зону обрабатывающим составом, улучшить условия его реагирования и взаимодействия с призабойной зоной и выноса продуктов реакции из нее и таким образом повысить эффективность обработки. The set of distinctive features of the proposed method for processing the bottom-hole zone of the formation allows to increase the coverage by exposure to the bottom-hole zone by the treatment composition, to improve the conditions for its reaction and interaction with the bottom-hole zone and the removal of reaction products from it, and thereby increase the efficiency of processing.
Способ осуществляют следующим образом. The method is as follows.
В скважину на колонне насосно-компрессорных труб спускают генератор импульсов давления с размещенным над ним пакером, который устанавливают выше обрабатываемого пропластка и разобщают межтрубное пространство от зоны обрабатываемого пропластка. По колонне насосно-компрессорных труб обрабатывающий состав подают в зону обрабатываемого пропластка и закачивают в призабойную зону. В качестве обрабатывающего состава используют, например, растворители асфальтосмолистых и парафиногидратных отложений, раствор соляной кислоты, смесь растворов соляной и плавиковой кислоты и т.п., включают в работу генератор и воздействуют на призабойную зону импульсами давления до тех пор, пока давление в зоне обрабатываемого пропластка, определяемое высотой столба жидкости в колонне насосно-компрессорных труб и его удельным весом, не снизится до пластового при снижении уровня в ней за счет поступления в призабойную зону обрабатывающего состава под действием веса столба жидкости в колонне насосно-компрессорных труб. Затем проводят технологическую выдержку для прохождения реакции закаченного в призабойную зону обрабатывающего состава с отложениями в ней или с породой, при которой на призабойную зону воздействуют циклами депрессии и восстановления давления до пластового в зоне обрабатываемого пропластка подъемом и спуском с помощью сваба столба жидкости в колонне насосно-компрессорных труб. После этого по колонне насосно-компрессорных труб свабированием откачивают продукцию и поддерживают в ней такой уровень жидкости, при котором давление в зоне обрабатываемого пропластка ниже пластового, при этом воздействуют на призабойную зону циклами более глубокой депрессии и восстановления давления в зоне обрабатываемого пропластка до величины, определяемой столбом жидкости в колонне насосно-компрессорных труб, подъемом и спуском с помощью сваба столба жидкости в ней. Одновременно с откачиваемой продукцией удаляют из призабойной зоны продукты реакции. A pressure pulse generator is lowered into a well on a tubing string with a packer placed above it, which is installed above the treated layer and the annulus is separated from the zone of the treated layer. The processing composition is fed through the tubing string to the zone of the treated layer and pumped into the bottomhole zone. As a treating composition, for example, solvents of asphalt-resinous and paraffin hydrate deposits, a solution of hydrochloric acid, a mixture of hydrochloric and hydrofluoric acid solutions, and the like, are used, the generator is turned on and the pressure pulses are applied to the bottom-hole zone until the pressure in the zone of the treated the layer, determined by the height of the liquid column in the tubing string and its specific gravity, will not decrease to the formation layer when the level in it decreases due to the entry into the bottomhole zone its composition under the action of the weight of the liquid column in the tubing string. Then, technological exposure is carried out to undergo the reaction of the treatment composition pumped into the bottomhole zone with deposits in it or with the rock, in which the bottomhole zone is affected by cycles of depression and pressure recovery to the reservoir in the zone of the treated layer by lifting and lowering with the help of a swab of a liquid column in the pump compressor pipes. After that, the product is swabbed through the tubing string and the liquid level is maintained in it so that the pressure in the zone of the treated layer is lower than the reservoir, while the bottom-hole zone is affected by cycles of deeper depression and pressure recovery in the zone of the processed layer to a value determined a column of liquid in the tubing string, ascent and descent using a swab of a column of liquid in it. Simultaneously with the pumped product, reaction products are removed from the bottomhole zone.
Пример конкретного выполнения. В скважину глубиной 1275 м спускают на колонне насосно-компрессорных труб ⌀ 73 мм генератор импульсов давления с размещенным под ним пакером. Генератор импульсов давления представляет собой цилиндр с клапаном в нижней части, имеющий такой же диаметр, как и колонна насосно-компрессорных труб, соединенный с ней патрубком диаметром 89 мм и длиной 10 м. Пакер устанавливают над интервалом перфорации 1240-1247 м на глубине 1235 м и разобщают межтрубное пространство над пакером с подпакерной зоной обрабатываемого пропластка. По колонне насосно-компрессорных труб через клапан цилиндра в призабойную зону закачивают 10 м3 12 %-ного водного раствора соляной кислоты. Для включения в работу генератора импульсов давления в колонну насосно-компрессорных труб спускают сваб до клапана цилиндра, а затем сваб поднимают в патрубок большего диаметра, при этом клапан закрыт и под свабом образуется разрежение. После выхода сваба в патрубок большего диаметра столб жидкости в колонне насосно-компрессорных труб устремляется по зазору между свабом и патрубком в цилиндр и, ударяясь в клапан, открывает его и создает под ним импульс давления (гидроудар), который передается в призабойную зону с минимальными потерями, так как пакер исключает гашение его в межтрубном пространстве, при этом в призабойную зону поступает часть жидкости из колонны насосно-компрессорных труб и уровень в ней снижается. Спуск-подъем сваба аналогичным образом повторяют до снижения уровня жидкости в колонне насосно-компрессорных труб до 340 м, при котором давление в интервале перфорации снижается до пластового. Сваб из колонны насосно-компрессорных труб извлекают и сбросом в нее груза открывают клапан цилиндра и соединяют подпакерную зону с полостью насосно-компрессорных труб. Проводят технологическую выдержку для прохождения реакции кислоты с породой в течение 16 часов. В колонну насосно-компрессорных труб спускают сваб до патрубка большего диаметра и поднимают его на 100-150 м, при этом под свабом в зоне обрабатываемого пропластка под пакером создается глубокая депрессия на пласт и начинается движение флюида к скважине, затем сваб опускают на прежний уровень, при этом начинается движение флюида в пласте от скважины под давлением, превышающим пластовое в зоне обрабатываемого пропластка за счет увеличения столба жидкости в колонне насосно-компрессорных труб в результате притока продукции из пласта при подъеме сваба. После снижения уровня в колонне насосно-компрессорных труб до 340 м и давления в интервале перфорации до пластового спуск-подъем сваба аналогичным образом повторяют до окончания технологической выдержки. После этого свабированием откачивают продукцию из скважины, снижают уровень в колонне насосно-компрессорных труб до 750 м, создают депрессию на пласт и обеспечивают приток продукции из него. Сваб спускают до патрубка большого диаметра и поднимают на 100-150 м, при этом под свабом в зоне обрабатываемого пропластка создают более глубокую депрессию на пласт и более интенсивный приток из него, затем сваб опускают до прежнего уровня и снижают депрессию и приток из пласта. Аналогичным способом спуск-подъем сваба проводят до поднятия уровня жидкости в колонне насосно-компрессорных труб до 340 м и давления в интервале перфорации до пластового. Свабированием вновь откачивают продукцию из скважины и снижают уровень в колонне насосно-компрессорных труб до 740 м и повторяют операцию спуска-подъема сваба. Откачку продукции из скважины и операцию спуска-подъема сваба проводят до выноса продуктов реакции из призабойной зоны пласта.An example of a specific implementation. A pressure pulse generator with a packer placed underneath it is lowered into a well with a depth of 1275 m on a tubing string of ⌀ 73 mm. The pressure pulse generator is a cylinder with a valve in the lower part, having the same diameter as the tubing string, connected to it by a pipe with a diameter of 89 mm and a length of 10 m. The packer is installed over the perforation interval of 1240-1247 m at a depth of 1235 m and disconnect the annular space above the packer with a sub-packer zone of the treated layer. 10 m 3 of a 12% aqueous hydrochloric acid solution is pumped through the cylinder string through the cylinder valve into the bottomhole zone. To turn on the pressure pulse generator, the swab is lowered into the tubing string to the cylinder valve, and then the swab is lifted into the larger diameter pipe, while the valve is closed and a vacuum forms under the swab. After the swab exits into the larger diameter pipe, the liquid column in the tubing string rushes along the gap between the swab and the pipe into the cylinder and, hitting the valve, opens it and creates a pressure impulse (water hammer) under it, which is transmitted to the bottom-hole zone with minimal losses , since the packer eliminates its extinction in the annulus, while part of the fluid from the tubing string enters the bottomhole zone and the level in it decreases. The swath lowering-lifting is likewise repeated until the liquid level in the tubing string is reduced to 340 m, at which the pressure in the perforation interval is reduced to reservoir. The swab is removed from the tubing string and, by dumping cargo into it, the cylinder valve is opened and the under-packer zone is connected to the cavity of the tubing. Spend technological exposure to undergo a reaction of acid with the rock for 16 hours. A swab is lowered into the tubing string to a pipe of a larger diameter and lifted by 100-150 m, while under the swab in the area of the treated layer under the packer a deep depression is created on the formation and the fluid begins to move to the well, then the swab is lowered to the previous level, this starts the movement of fluid in the reservoir from the well under pressure exceeding the reservoir in the area of the treated layer due to an increase in the liquid column in the tubing string as a result of the influx of production from the reservoir under Birmingham swab. After lowering the level in the tubing string to 340 m and the pressure in the perforation interval to the formation descent, the swab is similarly repeated until the end of the technological exposure. After this, the products are pumped out of the well by swabbing, the level in the tubing string is reduced to 750 m, they create a depression on the formation and provide an influx of production from it. The swab is lowered to a large diameter pipe and raised to 100-150 m, while under the swab in the area of the treated layer create a deeper depression on the reservoir and a more intensive inflow from it, then the swab is lowered to the previous level and reduce depression and inflow from the reservoir. In a similar way, the swab descent is carried out until the liquid level in the tubing string reaches 340 m and the pressure in the perforation interval to the reservoir. Swabbing again pumped out the product from the well and reduced the level in the tubing string to 740 m and repeated the operation of lowering and raising the swab. Pumping products from the well and the operation of lowering and raising the swab is carried out before the removal of the reaction products from the bottomhole formation zone.
В результате обработки призабойной зоны дебит скважины по нефти увеличился в 2,5 раза. As a result of the treatment of the bottom-hole zone, the oil production rate increased by 2.5 times.
Технико-экономическая эффективность предлагаемого способа обработки призабойной зоны пласта складывается за счет реагирования всего объема обрабатывающего состава, увеличения охвата воздействия и полного выноса продуктов реакции из призабойной зоны. The technical and economic efficiency of the proposed method for processing the bottom-hole formation zone is formed by responding to the entire volume of the treatment composition, increasing the coverage of the impact and the complete removal of the reaction products from the bottom-hole zone.
Применение предложенного способа позволит увеличить дебит добывающих и приемистость нагнетательных скважин. The application of the proposed method will increase the production rate and injection rate of injection wells.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2002118236/03A RU2213861C1 (en) | 2002-07-09 | 2002-07-09 | Method of treatment of bottomhole formation zone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2002118236/03A RU2213861C1 (en) | 2002-07-09 | 2002-07-09 | Method of treatment of bottomhole formation zone |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2213861C1 true RU2213861C1 (en) | 2003-10-10 |
Family
ID=31989311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2002118236/03A RU2213861C1 (en) | 2002-07-09 | 2002-07-09 | Method of treatment of bottomhole formation zone |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2213861C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2467164C2 (en) * | 2010-06-01 | 2012-11-20 | Открытое Акционерное Общество "Научно-исследовательский институт по нефтепромысловой химии" (ОАО "НИИнефтепромхим") | Method of bottom hole formation zone processing |
RU2474682C2 (en) * | 2007-09-28 | 2013-02-10 | Шлюмбергер Текнолоджи Б.В. | Method and system for interpretation of swabbing tests using non-linear regression |
-
2002
- 2002-07-09 RU RU2002118236/03A patent/RU2213861C1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
РЕМИЙЧУК Р.С. и др. Применение струйных аппаратов при освоении скважин, Москва, ВНИИОЭНГ, 1988, с.46-47. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2474682C2 (en) * | 2007-09-28 | 2013-02-10 | Шлюмбергер Текнолоджи Б.В. | Method and system for interpretation of swabbing tests using non-linear regression |
RU2467164C2 (en) * | 2010-06-01 | 2012-11-20 | Открытое Акционерное Общество "Научно-исследовательский институт по нефтепромысловой химии" (ОАО "НИИнефтепромхим") | Method of bottom hole formation zone processing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2490442C1 (en) | Method for well completion | |
RU2327027C2 (en) | Processing method of bottomhole zone | |
RU2322578C2 (en) | Method for dynamic bottomhole zone treatment in high-temperature low-permeable reservoirs | |
RU2652412C1 (en) | Method of acidizing bottomhole formation zone with carbonate reservoir | |
RU2374437C1 (en) | Method hydraulic reservoir factoring execution without lifting downhole assembly | |
RU2520221C1 (en) | Treatment method of bottomhole zone | |
RU2261986C1 (en) | Method for complex well bottom zone treatment | |
RU2213861C1 (en) | Method of treatment of bottomhole formation zone | |
RU2703093C2 (en) | Treatment method of borehole zone of low-permeable bed and device for its implementation | |
RU2376453C2 (en) | Method of chemical reagent impulsive implosion bottom hole treatment, equipment for its execution | |
RU2423604C1 (en) | Procedure for development of payable carbonate bed | |
RU2740505C1 (en) | Acid treatment method of open horizontal shaft of wells | |
RU2511167C1 (en) | Treatment method for bottomhole zone of well equipped with bottom-hole oil pump | |
RU2330953C1 (en) | Method of treatment of bottomhole zone of bed | |
RU2483200C1 (en) | Method of hydrodynamic action on bottom-hole formation zone | |
RU2520989C1 (en) | Bottomhole zone treatment method for horizontal well | |
RU2183742C2 (en) | Method of formation producing zone treatment | |
RU2225938C1 (en) | Methods for exploiting oil extracting wells | |
RU2213859C2 (en) | Device for stimulation and cleaning of bottomhole formation zone | |
RU2278967C1 (en) | Method for bottomhole zone of terrigenous formation treatment | |
RU2244815C1 (en) | Method for hydraulic fracturing of bed | |
RU2769862C1 (en) | Method for reagent-wave hydropercussion treatment of borehole zone of reservoirs with hard-to-recover oil reserves | |
RU2512222C1 (en) | Method for bottomhole zone treatment | |
RU2506420C1 (en) | Method of formation treatment | |
RU2355879C1 (en) | Procedure of treatment of well bottomhole zone |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PC4A | Invention patent assignment |
Effective date: 20060705 |
|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20070710 |