RU2146329C1 - Method for treating bottom-hole zone of well - Google Patents

Method for treating bottom-hole zone of well Download PDF

Info

Publication number
RU2146329C1
RU2146329C1 RU99116773A RU99116773A RU2146329C1 RU 2146329 C1 RU2146329 C1 RU 2146329C1 RU 99116773 A RU99116773 A RU 99116773A RU 99116773 A RU99116773 A RU 99116773A RU 2146329 C1 RU2146329 C1 RU 2146329C1
Authority
RU
Russia
Prior art keywords
solvent
well
hole zone
asphalt
resin
Prior art date
Application number
RU99116773A
Other languages
Russian (ru)
Inventor
А.Ф. Закиров
М.Ш. Залятов
Н.Г. Ибрагимов
Ф.Ф. Халиуллин
А.В. Янин
Original Assignee
Открытое акционерное общество "НОКРАТОЙЛ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "НОКРАТОЙЛ" filed Critical Открытое акционерное общество "НОКРАТОЙЛ"
Priority to RU99116773A priority Critical patent/RU2146329C1/en
Application granted granted Critical
Publication of RU2146329C1 publication Critical patent/RU2146329C1/en

Links

Landscapes

  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

FIELD: oil production industry. SUBSTANCE: according to method, well is washed by solvent of asphalt-resin-paraffin depositions. Solvent is pressure-forced into bottom-hole zone of well and implosive treatment is performed. For treatment of bottom-hole zone, selected is well in area of deposit with lower bed pressure. Used in function of solvent for asphalt-resin-paraffin depositions is 3-6% solution in organic solvent of mixture of heavy pyrolysis resin and diproxamine in proportion of (9-11):1. Filling of well with solvent is carried out beginning from lower perforation holes up to well head. After that, first technological pause is made during 12-24 h. Pressure-forcing of solvent into bottom-hole zone is performed in amount 1.5-2.5 cub.m/m of perforation interval. Then, second technological pause is made during 12-24 h and solvent is replaced with plugging liquid. Thermo-implosive treatment is undertaken at implosive operation. At injectivity of well after filling it with solvent of asphalt-resin-paraffin depositions beginning from lower perforation holes up to well head, undertaken is pressure-forcing of solvent into bottom-hole zone in amount of 1.5-2.5 cub.m/m of perforation interval. Application of aforesaid method improves efficiency of treatment together with increased output from well. EFFECT: higher efficiency. 1 cl

Description

Изобретение относится к нефтяной промышленности и может быть использовано при обработке призабойной зоны скважины. The invention relates to the oil industry and can be used in the treatment of the bottom-hole zone of the well.

Известен способ обработки призабойной зоны добывающей скважины, включающий заполнение интервала продуктивного пласта скважины раствором для обработки призабойной зоны скважины, технологическую выдержку, вакуумно-импульсное воздействие с одновременной откачкой продуктов реакции и повторение операций [1]. A known method of processing the bottom-hole zone of a producing well, including filling the interval of a productive formation of a well with a solution for treating a bottom-hole zone of a well, technological shutter speed, vacuum-pulse action with simultaneous pumping of reaction products and repeating operations [1].

Известный способ недостаточно эффективен при обработке сильно закольматированных призабойных зон скважин. The known method is not effective enough in the processing of highly stained well bottom zones.

Наиболее близким к изобретению по технической сущности является способ обработки призабойной зоны скважины, включающий промывку скважины растворителем асфальтосмолопарафиновых отложений с частичной его продавкой в призабойную зону скважины, имплозионное воздействие с одновременной откачкой продуктов реакции, заполнение интервала продуктивного пласта скважины раствором для обработки призабойной зоны скважины, технологическую выдержку, при повторении операций после каждого заполнения интервала продуктивного пласта скважины раствором для обработки призабойной зоны скважины его продавку нефтью в призабойную зону скважины [2]. Closest to the invention, the technical essence is a method for treating a bottom-hole zone of a well, including washing the well with a solvent of asphalt-resin-paraffin deposits and partially selling it into the bottom-hole zone of the well, implosive action with simultaneous pumping of reaction products, filling the interval of the productive formation with a solution for processing the bottom-hole zone of the well, technological exposure, when repeating operations after each filling of the interval of the productive formation well a thief to treat the bottom-hole zone of a well, its selling oil to the bottom-hole zone of a well [2].

Известный способ недостаточно эффективен при обработке сильно закольматированных призабойных зон скважин. The known method is not effective enough in the processing of highly stained well bottom zones.

В изобретении решается задача повышения эффективности обработки призабойной зоны скважины, увеличение продуктивности скважины. The invention solves the problem of increasing the efficiency of processing the bottom-hole zone of the well, increasing the productivity of the well.

Задача решается тем, что в способе обработки призабойной зоны скважины, включающем промывку скважины растворителем асфальтосмолопарафиновых отложений, продавку растворителя в призабойную зону скважины, имплозионное воздействие, согласно изобретению, для обработки призабойной зоны выбирают скважину на участке залежи с пониженным пластовым давлением, в качестве растворителя асфальтосмолопарафиновых отложений используют 3-6%-ный раствор в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении (9-11): 1, заполнение скважины растворителем ведут, начиная от нижних перфорационных отверстий до устья скважины, после чего проводят первую технологическую выдержку в течение 12-24 ч, продавку растворителя в призабойную зону ведут в объеме 1,5 - 2,5 м3/м интервала перфорации, после чего проводят вторую технологическую выдержку в течение 12 - 24 ч и замену растворителя на жидкость глушения, а при имплозионном воздействии проводят термоимплозионное воздействие.The problem is solved in that in the method for processing the bottom-hole zone of a well, including washing the well with a solvent of asphalt-tar-paraffin deposits, injecting the solvent into the bottom-hole zone of the well, the implosion effect, according to the invention, for treating the bottom-hole zone, select a well in the area of the reservoir with reduced formation pressure, asphalt asphalt deposits use a 3-6% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in the ratio (9-11): 1, zap ying solvent wells are starting from the bottom of the perforations to the wellhead, followed by a first exposure process for 12-24 h, the solvent prodavku lead in the bottom zone of 1.5 - 2.5 m 3 / m perforation interval after which is followed by a second technological exposure for 12 to 24 hours and the replacement of the solvent with a kill fluid, and with implosion exposure, they carry out thermal implosion exposure.

При наличии приемистости скважины после заполнения растворителем асфальтосмолопарафиновых отложений начиная от нижних перфорационных отверстий до устья скважины проводят продавку растворителя в призабойную зону в объеме 1,5-2,5 м3/м интервала перфорации.In the presence of injectivity of the well after filling the asphalt-resin-paraffin deposits with the solvent, starting from the lower perforations to the wellhead, the solvent is forced into the bottomhole zone in the amount of 1.5-2.5 m 3 / m of the perforation interval.

Признаками изобретения являются:
1. промывка скважины растворителем асфальтосмолопарафиновых отложений;
2. продавка растворителя в призабойную зону скважины;
3. имплозионное воздействие;
4. для обработки призабойной зоны выбор скважины на участке залежи с пониженным пластовым давлением;
5. в качестве растворителя асфальтосмолопарафиновых отложений использование 3-6%-ного раствора в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении (9-11): 1;
6. заполнение скважины растворителем начиная от нижних перфорационных отверстий до устья скважины;
7. первая технологическая выдержка в течение 12 - 24 ч;
8. продавка растворителя в призабойную зону в объеме 1,5 - 2,5 м3/м интервала перфорации;
9. вторая технологическая выдержка в течение 12 - 24 час.;
10. замена растворителя на жидкость глушения;
11. при имплозионном воздействии проведение термоимплозионного воздействия.
The features of the invention are:
1. flushing the well with a solvent of asphalt-resin-paraffin deposits;
2. the sale of solvent in the bottomhole zone of the well;
3. implosive effects;
4. for processing the bottom-hole zone, selecting a well in the area of the reservoir with reduced reservoir pressure;
5. as a solvent for asphalt-resin-paraffin deposits, the use of a 3-6% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in the ratio (9-11): 1;
6. filling the well with solvent starting from the lower perforations to the wellhead;
7. The first technological exposure for 12 to 24 hours;
8. selling solvent to the bottomhole zone in the amount of 1.5 - 2.5 m 3 / m perforation interval;
9. the second technological exposure for 12 to 24 hours .;
10. replacing the solvent with a kill fluid;
11. during implosion exposure, conduct thermosimpliation effects.

12. при наличии приемистости скважины после заполнения растворителем асфальтосмолопарафиновых отложений начиная от нижних перфорационных отверстий до устья скважины проводят продавку растворителя в призабойную зону в объеме 1,5-2,5 м3/м интервала перфорации.12. in the presence of injectivity of the well after filling the asphalt-resin-paraffin deposits with the solvent, starting from the lower perforation holes to the wellhead, the solvent is forced into the bottomhole zone in the amount of 1.5-2.5 m 3 / m of the perforation interval.

Сущность изобретения
При работе нефтедобывающих скважин происходит постепенное снижение их продуктивности. В предложенном способе решается задача повышения продуктивности скважин. Задача решается следующим образом.
SUMMARY OF THE INVENTION
During the operation of oil producing wells, their productivity gradually decreases. The proposed method solves the problem of increasing the productivity of wells. The problem is solved as follows.

Выбирают скважину для обработки на участке залежи с пониженным пластовым давлением. Пониженное пластовое давление необходимо, т. к. технология предусматривает заполнение скважины жидкостью малой плотности. Спускают в скважину колонну насосно-компрессорных труб ниже или на уровень нижних перфорационных отверстий. Заполняют скважину растворителем асфальтосмолопарафиновых отложений, состоящим из 3-6%-ного раствора в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении (9 - 11): 1, начиная от нижних перфорационных отверстий до устья скважины. При наличии приемистости скважины продавливают растворитель в призабойную зону в объеме 1,5 - 2,5 м3/м интервала перфорации. Проводят первую технологическую выдержку в течение 12 - 24 ч. Продавливают растворитель в призабойную зону в объеме 1,5 - 2,5 м3/м интервала перфорации. Проводят вторую технологическую выдержку в течение 12-24 ч. В результате воздействия растворителя растворяются асфальтосмолопарафиновые отложения в призабойной зоне и стволе скважины. Заменяют растворитель на жидкость глушения и проводят термоимплозионное воздействие, в результате которого растворенные асфальтосмолопарафиновые отложения удаляются из призабойной зоны в имплозионную камеру и извлекаются из скважины. Происходит очистка призабойной зоны, продуктивность скважины увеличивается.A well is selected for processing at a site of a reservoir with a reduced reservoir pressure. A reduced reservoir pressure is necessary, because the technology involves filling the well with low-density fluid. A tubing string is lowered into the well below or to the level of the lower perforations. The well is filled with a solvent of asphalt-resin-paraffin deposits, consisting of a 3-6% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in the ratio (9 - 11): 1, starting from the lower perforations to the wellhead. In the presence of injectivity of the well, the solvent is pushed into the bottomhole zone in the amount of 1.5 - 2.5 m 3 / m perforation interval. The first technological exposure is carried out for 12-24 hours. The solvent is pushed into the bottomhole zone in a volume of 1.5-2.5 m 3 / m perforation interval. A second technological exposure is carried out for 12-24 hours. As a result of the solvent, asphalt-resin-paraffin deposits are dissolved in the bottomhole zone and the wellbore. The solvent is replaced with a kill fluid and a thermoimplosion effect is carried out, as a result of which the dissolved asphalt-resin-paraffin deposits are removed from the bottomhole zone into the implosion chamber and removed from the well. The bottom-hole zone is being cleaned up, well productivity is increasing.

3-6%-ный раствор в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении (9 - 11): 1 выпускается в соответствии с ТУ 39- 12996507-ОП-001-97. Смола пиролизная тяжелая выпускается в соответствии с ТУ 38. 1021256-89, дипроксамин - в соответствии с ТУ 6-14-617-76. В качестве органического растворителя используют дистиллят, широкую фракцию легких углеводородов и т. п. A 3-6% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in the ratio (9 - 11): 1 is produced in accordance with TU 39-12996507-OP-001-97. Heavy pyrolysis resin is produced in accordance with TU 38. 1021256-89, diproxamine - in accordance with TU 6-14-617-76. As an organic solvent, distillate, a wide fraction of light hydrocarbons, etc. are used.

3-6%-ный раствор в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении (9-11): 1 представляет собой жидкость темно-коричневого цвета с плотностью 0,6814 г/см3, с кинематической вязкостью не более 60 мм2/с, с температурой застывания - 15oC, показателем преломления 1,3882.A 3-6% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in the ratio (9-11): 1 is a dark brown liquid with a density of 0.6814 g / cm 3 , with a kinematic viscosity of not more than 60 mm 2 / s, with a pour point of 15 o C, a refractive index of 1.3882.

Примеры конкретного выполнения
Пример 1. Обрабатывают призабойную зону добывающей скважины глубиной 1700 м, вскрывшей продуктивный пласт толщиной 3 м. Выбирают скважину для обработки на участке залежи с пониженным пластовым давлением, равным 13 МПа (начальное пластовое давление равно 17 МПа). Спускают в скважину колонну насосно-компрессорных труб ниже нижних перфорационных отверстий. Заполняют скважину растворителем асфальтосмолопарафиновых отложений, состоящим из 5%-ного раствора в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении 10: 1 начиная от нижних перфорационных отверстий до устья скважины. Проводят первую технологическую выдержку в течение 24 ч. Продавливают растворитель в призабойную зону в объеме 6 м3 (2 м3/м интервала перфорации). Проводят вторую технологическую выдержку в течение 24 ч.
Case Studies
Example 1. The bottom-hole zone of a producing well with a depth of 1700 m, which uncovered a productive formation of 3 m thickness, is treated. A well is selected for processing in the reservoir area with a low reservoir pressure of 13 MPa (initial reservoir pressure is 17 MPa). A tubing string is lowered into the well below the lower perforations. The well is filled with a solvent of asphalt-resin-paraffin deposits, consisting of a 5% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in a ratio of 10: 1 starting from the lower perforations to the wellhead. The first technological exposure is carried out for 24 hours. The solvent is pushed into the bottom-hole zone in a volume of 6 m 3 (2 m 3 / m perforation interval). A second technological exposure is carried out for 24 hours.

Заменяют растворитель на жидкость глушения - воду с плотностью 1,16 г/см3. Проводят термоимплозионное воздействие с помощью имплозионного устройства, состоящего из буровой трубы и порохового заряда.Replace the solvent with a kill fluid - water with a density of 1.16 g / cm 3 . Thermal implosion is carried out using an implosion device consisting of a drill pipe and a powder charge.

Пример 2. Выполняют, как пример 1. При наличии приемистости скважины после заполнения растворителем асфальтосмолопарафиновых отложений начиная от нижних перфорационных отверстий до устья скважины проводят продавливание растворителя в призабойную зону в объеме 2 м3/м интервала перфорации.Example 2. Perform, as example 1. In the presence of injectivity of the well after filling the solvent with asphalt-resin-paraffin deposits from the lower perforations to the wellhead, the solvent is forced through the bottom zone in a volume of 2 m 3 / m perforation interval.

До обработки призабойной зоны дебит скважины был 7 т/сут, после обработки стал 12,5 т/сут. Обводненность добываемой продукции не изменилась и осталась на уровне 35%. Before treatment of the bottom-hole zone, the flow rate of the well was 7 tons / day, after treatment it became 12.5 tons / day. The water cut of the extracted products did not change and remained at the level of 35%.

Изменение соотношения тяжелой пиролизной смолы и дипроксамина в пределах (9 - 11): 1 и количества смеси тяжелой пиролизной смолы и дипроксамина в органическом растворителе в пределах 3-6%, продавливание нагретого растворителя нефтью в призабойную зону в пределах 1,5- 2,5 м3/м интервала перфорации, проведение технологической выдержки в пределах 12-24 ч приводит к аналогичному результату.The change in the ratio of heavy pyrolysis resin and diproxamine in the range of (9 - 11): 1 and the amount of a mixture of heavy pyrolysis resin and diproxamine in an organic solvent in the range of 3-6%, forcing the heated solvent with oil into the bottomhole zone in the range of 1.5 - 2.5 m 3 / m perforation interval, holding technological exposure within 12-24 hours leads to a similar result.

Применение предложенного способа позволит увеличить продуктивность скважин. The application of the proposed method will increase the productivity of the wells.

Источники информации, принятые во внимание при составлении заявки:
1. Патент РФ N 2029078, кл. Е 21 В 43/25, опублик. 1995.
Sources of information taken into account when preparing the application:
1. RF patent N 2029078, cl. E 21 B 43/25, published. 1995.

2. Патент РФ N 2117145, кл. Е 21 В 43/25, опублик. 1998 г. - прототип. 2. RF patent N 2117145, class. E 21 B 43/25, published. 1998 - a prototype.

Claims (2)

1. Способ обработки призабойной зоны скважины, включающий промывку скважины растворителем асфальтосмолопарафиновых отложений, продавку растворителя в призабойную зону скважины и имплозионное воздействие с удалением загрязнений, отличающийся тем, что для обработки призабойной зоны выбирают скважину на участке залежи с пониженным пластовым давлением, в качестве растворителя асфальтосмолопарафиновых отложений используют 3 - 6%-ный раствор в органическом растворителе смеси тяжелой пиролизной смолы и дипроксамина в соотношении (9 - 11) : 1, заполнение скважины растворителем ведут, начиная от нижних перфорационных отверстий до устья скважины, проводят первую технологическую выдержку в течение 12 - 24 ч, продавку растворителя в призабойную зону ведут в объеме 1,5 - 2,5 м3/м интервала перфорации, проводят вторую технологическую выдержку в течение 12 - 24 ч и осуществляют замену растворителя на жидкость глушения, а затем осуществляют термоимплозионное воздействие.1. The method of processing the bottom-hole zone of the well, including washing the well with a solvent of asphalt-tar-paraffin deposits, pumping the solvent into the bottom-hole zone of the well and implosion treatment with the removal of contaminants, characterized in that for treating the bottom-hole zone, a well is selected in the area of the reservoir with reduced reservoir pressure, as an asphalt deposits use a 3 - 6% solution in an organic solvent of a mixture of heavy pyrolysis resin and diproxamine in the ratio (9 - 11): 1, s complements are well solvent, starting from the bottom of the perforations to the wellhead, a first process is carried out exposure for 12 - 24 hours, the solvent prodavku lead in the bottom zone of 1.5 - 2.5 m 3 / m perforation interval, a second process exposure for 12 to 24 hours and carry out the replacement of the solvent with a killing fluid, and then carry out thermal impact. 2. Способ по п.1, отличающийся тем, что при наличии приемистости скважины после заполнения растворителем асфальтосмолопарафиновых отложений начиная от нижних перфорационных отверстий до устья скважины проводят продавку растворителя в призабойную зону в объеме 1,5 - 2,5 м3/м интервала перфорации.2. The method according to claim 1, characterized in that in the presence of injectivity of the well after filling with the asphalt-resin-paraffin deposits from the lower perforation holes to the wellhead, the solvent is pumped into the bottomhole zone in the amount of 1.5 - 2.5 m 3 / m perforation interval .
RU99116773A 1999-08-09 1999-08-09 Method for treating bottom-hole zone of well RU2146329C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU99116773A RU2146329C1 (en) 1999-08-09 1999-08-09 Method for treating bottom-hole zone of well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU99116773A RU2146329C1 (en) 1999-08-09 1999-08-09 Method for treating bottom-hole zone of well

Publications (1)

Publication Number Publication Date
RU2146329C1 true RU2146329C1 (en) 2000-03-10

Family

ID=20223353

Family Applications (1)

Application Number Title Priority Date Filing Date
RU99116773A RU2146329C1 (en) 1999-08-09 1999-08-09 Method for treating bottom-hole zone of well

Country Status (1)

Country Link
RU (1) RU2146329C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102977867A (en) * 2012-12-27 2013-03-20 河北华运鸿业化工有限公司 Protective agent for hydrocarbon reservoir and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102977867A (en) * 2012-12-27 2013-03-20 河北华运鸿业化工有限公司 Protective agent for hydrocarbon reservoir and preparation method thereof
CN102977867B (en) * 2012-12-27 2015-04-15 河北华运鸿业化工有限公司 Protective agent for hydrocarbon reservoir and preparation method thereof

Similar Documents

Publication Publication Date Title
RU2533393C1 (en) Large-volume acid treatment method for carbonate bed
RU2304710C1 (en) Well bottom zone treatment process
RU2261986C1 (en) Method for complex well bottom zone treatment
RU2599156C1 (en) Method of interval treatment of bottom hole zone of horizontal well shaft
RU2146329C1 (en) Method for treating bottom-hole zone of well
RU2004116889A (en) METHOD FOR TREATING A BOREHOLE BOTTOM ZONE
RU2146003C1 (en) Method of treatment of face zone of well
RU2612693C1 (en) Method to reduce water inflow in production wells without lifting of downhole pumping equipment
RU2560453C1 (en) Well repair method
RU2183742C2 (en) Method of formation producing zone treatment
RU2695908C1 (en) Well completion method
RU2278967C1 (en) Method for bottomhole zone of terrigenous formation treatment
RU2095560C1 (en) Method for treating down-hole zone of oil bed
RU2213210C1 (en) Method of development of formation with difficult to recover oil reserves
RU2268997C1 (en) Method for bottomhole formation area treatment
RU2344279C1 (en) Method of high-viscosity oil pool development
RU2144616C1 (en) Method for interval-after-interval treatment of bottom-hole zone of horizontal wells
RU2159322C1 (en) Process of action on face zone of well
RU2095546C1 (en) Method for treatment of wells
RU2790071C1 (en) Well treatment method
RU2160359C1 (en) Technique of complex action of face zone of well
RU2780980C1 (en) Method for developing an oil deposit of a mature field
RU2750004C1 (en) Method for completing and intensifying inflow of well with carbonate reservoirs
RU2117151C1 (en) Method of treating bottom zone of well
RU2704087C2 (en) Method of well operation and device for implementation thereof

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20090810