RU2035548C1 - Method for building structures - Google Patents

Method for building structures Download PDF

Info

Publication number
RU2035548C1
RU2035548C1 RU92013025A RU92013025A RU2035548C1 RU 2035548 C1 RU2035548 C1 RU 2035548C1 RU 92013025 A RU92013025 A RU 92013025A RU 92013025 A RU92013025 A RU 92013025A RU 2035548 C1 RU2035548 C1 RU 2035548C1
Authority
RU
Russia
Prior art keywords
grillage
foundation
piles
working medium
foundation mat
Prior art date
Application number
RU92013025A
Other languages
Russian (ru)
Other versions
RU92013025A (en
Inventor
М.И. Перцовский
С.М. Перцовский
Original Assignee
Акционерное общество "Институт "Гидроспецпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество "Институт "Гидроспецпроект" filed Critical Акционерное общество "Институт "Гидроспецпроект"
Priority to RU92013025A priority Critical patent/RU2035548C1/en
Publication of RU92013025A publication Critical patent/RU92013025A/en
Application granted granted Critical
Publication of RU2035548C1 publication Critical patent/RU2035548C1/en

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

FIELD: civil engineering; foundations. SUBSTANCE: method involves making piles and a foundation mat having upper and lower parts mounted in a spaced relation to each other. Adjustable accessories are placed between the parts. The foundation mat is loaded with a service load, the piles and the lower side of the foundation mat are drawn together. The upper part of the foundation mat has bearing members supported by the base ground between the piles. Flexible reservoirs filled with working medium are useable as adjustable accessories, the reservoirs being connected to a working medium supply source. In the course of the foundation mat being loaded with the service load until the upper part of the foundation mat reaches settlement value being equal to 0.3-0.6 of the permissible settlement of the structure controllable discharge of the working medium from the reservoirs is carried out performing its replacement with a hardening material. Slots penetrating through the foundation mat in its lower part are made for the flexible reservoirs to be installed. EFFECT: prevented non-uniform settlement, enhanced load- bearing capacity of the foundation. 2 cl, 1 dwg

Description

Изобретение относится к строительству и может быть использовано при возведении сооружений. The invention relates to construction and can be used in the construction of structures.

Известен способ возведения сооружения, включающий выполнение свай, ростверков и плиты [1]
Недостатком данного способа является высокая сложность и трудоемкость работ.
A known method of construction, including the implementation of piles, grillages and slabs [1]
The disadvantage of this method is the high complexity and complexity of the work.

Наиболее близким к изобретению по технической сущности является принятый за прототип способ возведения сооружения, включающий выполнение свай, ростверка, составного по высоте из установленных с зазором друг относительно друга нижней и верхней частей и размещенных в зазоре регулируемых приспособлений, нагружение ростверка полезной нагрузкой [2]
Недостатком данного способа является неравномерность осадок и невысокая несущая способность фундамента.
Closest to the invention in technical essence is the method of construction of the structure adopted for the prototype, including the implementation of piles, grillage, the height of the lower and upper parts installed with a gap relative to each other and adjustable devices placed in the gap, loading the grill with a payload [2]
The disadvantage of this method is the unevenness of the sediment and the low bearing capacity of the foundation.

Задачей изобретения является предотвращение неравномерных осадок и повышение несущей способности фундамента. The objective of the invention is to prevent uneven precipitation and increase the bearing capacity of the foundation.

Указанная задача решается за счет того, что в способе возведения сооружения, включающем выполнение свай, ростверка, составного по высоте из установленных с зазором друг относительно друга нижней и верхней частей и размещенных в зазоре регулируемых приспособлений, нагружение ростверка полезной нагрузкой, сваи соединяют с нижней частью ростверка, а верхнюю часть ростверка выполняют с опиранием на участках между сваями на грунт основания, причем в качестве регулируемых приспособлений используют эластичные, заполненные рабочей средой емкости, соединенные с источником рабочей среды, а в процессе нагружения ростверка полезной нагрузкой при достижении осадки верхней части ростверка, равной 0,3-0,6 допустимой величины осадки сооружения, осуществляют регулируемый отвод рабочей среды из емкостей с одновременным замещением ее твердеющим материалом, причем в нижней части ростверка выполняют сквозные пазы под эластичные емкости. This problem is solved due to the fact that in the method of construction of the structure, including the implementation of piles, grillage, the height of the installed from the gap relative to each other lower and upper parts and placed in the gap of the adjustable devices, loading the grillage with a payload, the piles are connected to the lower part grillage, and the upper part of the grillage is based on sections between piles on the foundation soil, and flexible, filled with working medium containers are used as adjustable devices springs connected to the source of the working medium, and in the process of loading the grillage with a payload when reaching a draft of the upper part of the grillage equal to 0.3-0.6 of the permissible precipitation of the structure, carry out an adjustable discharge of the working medium from the containers with its simultaneous replacement with hardening material, and in the lower part of the grillage, through grooves are made for elastic containers.

На чертеже изображен фундамент возводимого сооружения в фундамент с насосами подачи и отвода жидкой рабочей среды и твердеющего раствора, общий вид. The drawing shows the foundation of the erected structure into the foundation with pumps for supplying and discharging liquid working medium and hardening mortar, general view.

Предлагаемый способ возведения сооружения осуществляют следующим образом. The proposed method of construction is as follows.

Сваи 1 погружают в грунт, после чего сваи соединяют с нижней 2 частью ростверка, затем возводят верхнюю часть 3 ростверка с обеспечением между частями 2 и 3 ростверка зазоров 4, в которых размещают эластичные емкости 5, которые заполняют рабочей средой 6, например водой, подаваемой с помощью насоса 7, например СО-49, от источника рабочей среды (на чертеже не показан). Затем на части 3 ростверка возводят сооружение 8, и в процессе нагружения фундамента полезной нагрузкой от возводимого сооружения при достижении осадки верхней части 3 ростверка, равной 0,3-0,6 допустимой величины осадки сооружения, осуществляют регулируемый отвод рабочей среды из емкостей 5 с помощью насоса 7 с одновременным замещением ее твердеющим материалом 9, например цементным раствором, с помощью насоса 10, например, СО-49. Piles 1 are immersed in the ground, after which the piles are connected to the lower 2 part of the grillage, then the upper part 3 of the grillage is erected to provide gaps 4 between parts 2 and 3 of the grillage, in which elastic containers 5 are placed, which are filled with a working medium 6, for example, water supplied using a pump 7, for example, СО-49, from a source of a working medium (not shown in the drawing). Then, structure 8 is erected on part 3 of the grillage, and in the process of loading the foundation with the payload of the structure being erected, when the settlement of the upper part 3 of the grillage is reached, equal to 0.3-0.6 of the permissible value of the settlement of the structure, an adjustable discharge of the working medium from containers 5 is carried out using pump 7 while replacing it with hardening material 9, for example cement mortar, using pump 10, for example, СО-49.

Для более фиксированного расположения емкостей 5 в ростверках могут быть выполнены сквозные пазы 11. For a more fixed arrangement of containers 5 in grillages, through grooves 11 can be made.

Использование описанного способа возведения сооружения позволяет предотвратить осадки фундамента и сооружения, обусловленные залеганием неоднородных грунтов под фундаментом, а также повысить несущую способность фундамента. Using the described method of building construction allows to prevent precipitation of the foundation and structures caused by the occurrence of heterogeneous soils under the foundation, as well as to increase the bearing capacity of the foundation.

Claims (2)

1. СПОСОБ ВОЗВЕДЕНИЯ СООРУЖЕНИЯ, включающий выполнение свай, ростверка, составного по высоте из установленных с зазором одна относительно другой нижней и верхней частей и размещенных в зазоре регулируемых приспособлений, нагружение ростверка полезной нагрузкой, отличающийся тем, что сваи соединяют с нижней частью ростверка, а верхнюю часть ростверка выполняют с опиранием на участках между сваями на грунт основания, причем в качестве регулируемых приспособлений используют эластичные, заполненные рабочей средой емкости, соединенные с источником рабочей среды, а в процессе нагружения ростверка полезной нагрузкой по достижении осадки верхней части ростверка, равной 0,3 0,6 допустимой величины осадки сооружения, осуществляют регулируемый отвод рабочей среды из емкости с одновременным замещением ее твердеющим материалом. 1. METHOD OF CONSTRUCTION OF THE STRUCTURE, including the execution of piles, grillage, height-adjustable from the lower and upper parts installed with a gap relative to one another and placed in the gap of adjustable devices, loading the grillage with a payload, characterized in that the piles connect to the lower part of the grillage, and the upper part of the grillage is based on sections between piles on the foundation soil, and flexible containers filled with a working medium connected to the working medium with a grinder, and in the process of loading the grillage with a payload upon reaching a draft of the upper part of the grillage equal to 0.3 0.6 of the permissible precipitation of the structure, an adjustable discharge of the working medium from the tank is carried out with the simultaneous replacement of it with hardening material. 2. Способ по п.1, отличающийся тем, что в нижней части ростверка выполняют сквозные пазы под эластичные емкости. 2. The method according to claim 1, characterized in that in the lower part of the grillage, through grooves are made for elastic containers.
RU92013025A 1992-12-21 1992-12-21 Method for building structures RU2035548C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU92013025A RU2035548C1 (en) 1992-12-21 1992-12-21 Method for building structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU92013025A RU2035548C1 (en) 1992-12-21 1992-12-21 Method for building structures

Publications (2)

Publication Number Publication Date
RU92013025A RU92013025A (en) 1995-02-20
RU2035548C1 true RU2035548C1 (en) 1995-05-20

Family

ID=20133997

Family Applications (1)

Application Number Title Priority Date Filing Date
RU92013025A RU2035548C1 (en) 1992-12-21 1992-12-21 Method for building structures

Country Status (1)

Country Link
RU (1) RU2035548C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MD4096C1 (en) * 2009-06-01 2011-09-30 Институт Энергетики Академии Наук Молдовы Portable foundation device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР N 312016, кл. E 02D 27/20, 1968. *
2. Авторское свидетельство СССР N 920114, кл. E 02D 27/12, 1982. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MD4096C1 (en) * 2009-06-01 2011-09-30 Институт Энергетики Академии Наук Молдовы Portable foundation device

Similar Documents

Publication Publication Date Title
EP0032132A2 (en) Erection of a structure on piles
EA014008B1 (en) Method of raising a building
CN102071693B (en) Construction method of variable section cement-soil gravity type retaining wall
JPS60156818A (en) Compacted deep layer foundation construction and its construction method and apparatus
JP3126896B2 (en) Restoration method for uneven settlement structures
US4787779A (en) Method and apparatus for raising and supporting a foundation
RU2035548C1 (en) Method for building structures
AU719522B2 (en) Combination reinforcement for floor on piles
CN111593725A (en) Vibroflotation gravel pile and construction method thereof
EA000773B1 (en) Method for founding of a building or plant construction and apparatus for the use of the method
JPH08296248A (en) Construction method for recovery of differentially settled building
RU2728072C9 (en) Device for pile foundation for machines with dynamic loads and vibration-sensitive equipment
SU1294919A1 (en) Foundation for building or structure
RU2117101C1 (en) Method for consolidation of pile foundation of supports for electric power lines
CN221855544U (en) Ground inclined support anchor-pulling structure and foundation pit support
RU2731969C1 (en) Slab foundation on non-uniform compressible base with possibility of adjusting of heeling
RU2722905C1 (en) Device for pile foundation for machines with dynamic loads and vibration-sensitive equipment
CN218204294U (en) Soft soil foundation composite reinforcing structure
RU2056478C1 (en) Method for reinforcing bases and foundations on sagging ground in hindered conditions
RU2117104C1 (en) Method for consolidation of pile foundation for support of electric power line
CN113463457B (en) Roadbed structure for penetrating through slurry section and construction method thereof
RU2722907C1 (en) Device for pile foundation for machines with dynamic loads and vibration-sensitive equipment
CN208965573U (en) A kind of soft band civil engineering pile foundation construction structure
RU2142534C1 (en) Pile foundation
RU2209881C2 (en) Joint for integration of foundation and column