RU2023201C1 - River diversion hydroelectric power station - Google Patents

River diversion hydroelectric power station Download PDF

Info

Publication number
RU2023201C1
RU2023201C1 SU4917929A RU2023201C1 RU 2023201 C1 RU2023201 C1 RU 2023201C1 SU 4917929 A SU4917929 A SU 4917929A RU 2023201 C1 RU2023201 C1 RU 2023201C1
Authority
RU
Russia
Prior art keywords
hydroelectric power
bypass channel
power station
river
turbines
Prior art date
Application number
Other languages
Russian (ru)
Inventor
Владимир Георгиевич Керов
Original Assignee
Владимир Георгиевич Керов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Владимир Георгиевич Керов filed Critical Владимир Георгиевич Керов
Priority to SU4917929 priority Critical patent/RU2023201C1/en
Application granted granted Critical
Publication of RU2023201C1 publication Critical patent/RU2023201C1/en

Links

Images

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

FIELD: hydroelectric power stations. SUBSTANCE: turbines and generators are installed in the bypass channel. Additional turbines and generators are installed at the area where bypass channel is connected to the river and in the bypass channel downstream forming cascade. The hydroelectric power station is damless. EFFECT: enhanced efficiency. 1 dwg

Description

Изобретение относится к гидроэнергетике. The invention relates to hydropower.

Целью изобретения является создание конструкции стационарной бесплотинной деривационной гидроэлектростанции с повышенным по сравнению с прототипом КПД с равномерным распределением получения электроэнергии вдоль обводного канала. The aim of the invention is the creation of the design of a stationary damless derivational hydroelectric power station with an increased efficiency compared to the prototype with a uniform distribution of electricity production along the bypass channel.

На чертеже представлена каскадная деривационная гидроэлектростанция, установленная на реке. The drawing shows a cascade derivational hydroelectric station installed on the river.

От реки 1 проводится обводной канал 2 с суммарными углами падения участком канала между каскадами гидроэлектростанций меньшими, чем угол падения реки. На обводном канале 2 на бетонных основаниях 3 устанавливаются несколько каскадных гидроэлектростанций, состоящих из турбин 4, муфт 5 и генераторов 6. A bypass channel 2 is drawn from river 1 with the total angles of incidence of the channel section between the cascades of hydroelectric power stations smaller than the angle of incidence of the river. On the bypass channel 2 on concrete bases 3, several cascade hydroelectric power plants are installed, consisting of turbines 4, couplings 5 and generators 6.

Гидроэлектростанция работает следующим образом. Hydroelectric power works as follows.

Вода из реки 1 впадает в искусственный обводной канал 2 на участке реки "а", вращает турбины 4, передающие вращение на муфты 5 и генераторы 6 первого каскада, затем по обводному каналу 2 попадает на турбину 4 второго каскада и т. д. Water from the river 1 flows into the artificial bypass channel 2 on the “a” section of the river, rotates the turbines 4, transmitting rotation to the couplings 5 and generators 6 of the first cascade, then through the bypass channel 2 it flows to the turbine 4 of the second cascade, etc.

Преимуществами такой каскадной деривационной гидроэлектростанции является ее бесплотинная технология, позволяющая получать экологически чистую электроэнергию на равнинных реках, особенно повышение КПД и мощности по сравнению с прототипом, равномерное распределение получения электроэнергии вдоль обводного канала. The advantages of such a cascade derivational hydroelectric power station are its damless technology, which allows for the production of environmentally friendly electricity on lowland rivers, especially an increase in efficiency and power compared to the prototype, and a uniform distribution of electricity generation along the bypass channel.

Claims (1)

РЕЧНАЯ ДЕРИВАЦИОННАЯ ГИДРОЭЛЕКТРОСТАНЦИЯ, содержащая обводной канал, турбины и генераторы, установленные в нем, отличающаяся тем, что гидроэлектростанция дополнительно снабжена турбинами и генераторами, установленными на стыке реки и обводного канала и в обводном канале вниз по течению с образованием каскада, при этом гидроэлектростанция выполнена бесплотинной. A RIVER DERIVATIVE HYDROELECTRIC POWER PLANT containing a bypass channel, turbines and generators installed in it, characterized in that the hydroelectric power station is additionally equipped with turbines and generators installed at the junction of the river and the bypass channel and in the bypass channel downstream to form a cascade, while the hydroelectric power station is made damless .
SU4917929 1991-03-11 1991-03-11 River diversion hydroelectric power station RU2023201C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4917929 RU2023201C1 (en) 1991-03-11 1991-03-11 River diversion hydroelectric power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4917929 RU2023201C1 (en) 1991-03-11 1991-03-11 River diversion hydroelectric power station

Publications (1)

Publication Number Publication Date
RU2023201C1 true RU2023201C1 (en) 1994-11-15

Family

ID=21564330

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4917929 RU2023201C1 (en) 1991-03-11 1991-03-11 River diversion hydroelectric power station

Country Status (1)

Country Link
RU (1) RU2023201C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2483159C1 (en) * 2011-11-16 2013-05-27 Александр Иосифович Минченко Cascade hydroelectric power plant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Чугаев Р.Р. "Гидротехнические сооружения", Учеб.пособие для студ.гидротехн.спец.вузов, 2-е изд., ч.II, М., Агропромиздат, 1985 г., стр.276 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2483159C1 (en) * 2011-11-16 2013-05-27 Александр Иосифович Минченко Cascade hydroelectric power plant

Similar Documents

Publication Publication Date Title
Paish Micro-hydropower: status and prospects
RU2023201C1 (en) River diversion hydroelectric power station
JPH10299636A (en) Same water multistage hydro-electric power generation
JPS6047883A (en) Power plant accompanied by natural flow-down pipeline
CN113202679A (en) Stream supporting, mounting and generating device
KR101590070B1 (en) Hydroelectric power generation apparatus and waterwheel for the same
Yondri et al. Utilization of Potential Water Energy in Irrigation Channels for Pico-Hydro Power Plant
RU2740328C1 (en) Electric power generation device in water supply systems
RU2023806C1 (en) Hydroelectric power station
CN219587695U (en) Pipeline power generation assembly
RU2052657C1 (en) Device for generating power
SU1633057A1 (en) Method of influencing thermal conditions of a river
RU2017885C1 (en) River power station
SU1199969A1 (en) Tidal power plant
RU1828940C (en) Diversion hydroelectric plant
JPS54134237A (en) Tidal electric generator
RU2012713C1 (en) Hydroelectric power plant
RU92011593A (en) DERIVATION HYDROELECTRIC POWER STATION
RU92001863A (en) PIPELINE HYDROELECTRIC POWER STATION
RU92011592A (en) DERIVATION HYDROELECTRIC POWER STATION
RU1803599C (en) Hydroelectric plant
RU96124052A (en) AUTOMATIC HYDRAULIC POWER PLANT
Deodas Small Hydel Development in India
RU92001989A (en) WATERFLOW HYDROELECTRIC POWER STATION WITH CURVED GOLD
RU93045155A (en) HYDROTURBINE FOR MOUNTAIN RIVERS AND WATERFALLS