RU2015102990A - РЕГУЛИРОВАНИЕ ДАВЛЕНИЯ ПРИ БУРЕНИИ СКВАЖИНЫ С ПОЛОЖЕНИЕМ ШТУЦЕРА, ОПРЕДЕЛЯЕМЫМ С ПОМОЩЬЮ КРИВОЙ КОЭФФИЦИЕНТА Cv - Google Patents
РЕГУЛИРОВАНИЕ ДАВЛЕНИЯ ПРИ БУРЕНИИ СКВАЖИНЫ С ПОЛОЖЕНИЕМ ШТУЦЕРА, ОПРЕДЕЛЯЕМЫМ С ПОМОЩЬЮ КРИВОЙ КОЭФФИЦИЕНТА Cv Download PDFInfo
- Publication number
- RU2015102990A RU2015102990A RU2015102990A RU2015102990A RU2015102990A RU 2015102990 A RU2015102990 A RU 2015102990A RU 2015102990 A RU2015102990 A RU 2015102990A RU 2015102990 A RU2015102990 A RU 2015102990A RU 2015102990 A RU2015102990 A RU 2015102990A
- Authority
- RU
- Russia
- Prior art keywords
- coefficient
- pressure
- well
- curve
- fitting
- Prior art date
Links
- 238000000034 method Methods 0.000 claims abstract 31
- 238000005553 drilling Methods 0.000 claims abstract 6
- 239000012530 fluid Substances 0.000 claims abstract 2
- 238000005259 measurement Methods 0.000 claims 3
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/02—Valve arrangements for boreholes or wells in well heads
- E21B34/025—Chokes or valves in wellheads and sub-sea wellheads for variably regulating fluid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Earth Drilling (AREA)
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
- Fluid-Pressure Circuits (AREA)
- Drilling And Boring (AREA)
- Control Of Transmission Device (AREA)
Abstract
1. Способ регулирования давления в стволе скважины, содержащий:определение требуемого положения штуцера, причем определение выполняется на основе кривой коэффициента Cv для штуцера; икорректировку настройки штуцера с приведением его в положение, обеспечивающее получение требуемого обратного давления в стволе скважины.2. Способ по п. 1, в котором кривая коэффициента Cv устанавливает соотношение между коэффициентом Cv штуцера и положением штуцера.3. Способ по п. 1, в котором определение выполняется в ответ на возникновение разности между фактическим давлением в скважине и требуемым давлением в скважине.4. Способ по п. 1, в котором определение выполняется в ответ на возникновение разности между фактическим давлением в скважине и требуемым давлением в скважине.5. Способ по п. 1, дополнительно содержащий калибрование кривой коэффициента Cv.6. Способ по п. 5, в котором калибрование выполняется во время бурения.7. Способ по п. 5, в котором калибрование выполняется с помощью измерений датчиков расхода и давления.8. Способ по п. 5, в котором калибрование выполняется периодически.9. Способ по п. 1, в котором определение дополнительно содержит определение требуемого обратного давления, вычисление требуемого коэффициента Cv, соответствующего требуемому обратному давлению, и определение требуемого положения, которое соответствует требуемому коэффициенту Cv.10. Способ по п. 1, в котором корректировка положения штуцера дополнительно содержит передачу на программируемый логический контроллер индикации требуемого положения штуцера.11. Система бурения ствола скважины, содержащая:регулируемый штуцер, который дросселирует поток текучей среды из ствола скважины; исистема
Claims (30)
1. Способ регулирования давления в стволе скважины, содержащий:
определение требуемого положения штуцера, причем определение выполняется на основе кривой коэффициента Cv для штуцера; и
корректировку настройки штуцера с приведением его в положение, обеспечивающее получение требуемого обратного давления в стволе скважины.
2. Способ по п. 1, в котором кривая коэффициента Cv устанавливает соотношение между коэффициентом Cv штуцера и положением штуцера.
3. Способ по п. 1, в котором определение выполняется в ответ на возникновение разности между фактическим давлением в скважине и требуемым давлением в скважине.
4. Способ по п. 1, в котором определение выполняется в ответ на возникновение разности между фактическим давлением в скважине и требуемым давлением в скважине.
5. Способ по п. 1, дополнительно содержащий калибрование кривой коэффициента Cv.
6. Способ по п. 5, в котором калибрование выполняется во время бурения.
7. Способ по п. 5, в котором калибрование выполняется с помощью измерений датчиков расхода и давления.
8. Способ по п. 5, в котором калибрование выполняется периодически.
9. Способ по п. 1, в котором определение дополнительно содержит определение требуемого обратного давления, вычисление требуемого коэффициента Cv, соответствующего требуемому обратному давлению, и определение требуемого положения, которое соответствует требуемому коэффициенту Cv.
10. Способ по п. 1, в котором корректировка положения штуцера дополнительно содержит передачу на программируемый логический контроллер индикации требуемого положения штуцера.
11. Система бурения ствола скважины, содержащая:
регулируемый штуцер, который дросселирует поток текучей среды из ствола скважины; и
система управления, которая сравнивает фактическое давление в скважине с требуемым давлением в скважине и в ответ на возникновение разности между фактическим и требуемым давлением в скважине корректирует положение штуцера, приводя его к заданному положению, которое соответствует требуемому коэффициенту Cv штуцера.
12. Система по п. 11, в которой связь между заданным положением и требуемым коэффициентом Cv устанавливается кривой коэффициента Cv для штуцера.
13. Система по п. 12, в которой кривая коэффициента Cv калибруется системой управления.
14. Система по п. 13, в которой кривая Cv калибруется во время бурения.
15. Система по п. 13, в которой кривая коэффициента Cv калибруется с помощью измерений датчиков расхода и давления.
16. Система по п. 13, в которой кривая коэффициента Cv калибруется периодически.
17. Система по п. 11, в которой индикация заданного положения штуцера передается на программируемый логический контроллер системы управления.
18. Система по п. 11, в которой система управления автоматически корректирует настройку штуцера в ответ на возникновение заданной разности между фактическим давлением в скважине и требуемым давлением в скважине.
19. Система по п. 11, в которой при заданном положении штуцера получают требуемое обратное давление в линии, соединенной со стволом скважины.
20. Способ регулирования давления в стволе скважины, содержащий:
сравнение фактического давления в скважине с требуемым давлением в скважине; и
в ответ на возникновение разности между фактическим и требуемым давлением в скважине корректировку настройки штуцера для приведения его в заданное положение, соответствующее требуемому коэффициенту Cv штуцера.
21. Способ по п. 20, в котором корректировка выполняется автоматически в ответ на возникновение заданной разности между фактическим давлением в скважине и требуемым давлением в скважине.
22. Способ по п. 20, в котором связь между заданным положением и требуемым коэффициентом Cv штуцера устанавливается кривой Cv.
23. Способ по п. 22, дополнительно содержащий калибрование кривой коэффициента Cv.
24. Способ по п. 23, в котором калибрование выполняется во время бурения.
25. Способ по п. 23, в котором калибрование выполняется с помощью измерений датчиков расхода и давления.
26. Способ по п. 23, в котором калибрование выполняется периодически.
27. Способ по п. 20, дополнительно содержащий определение требуемого обратного давления, подаваемого в ствол скважины, вычисление требуемого коэффициента Cv, соответствующего требуемому обратному давлению, и определение положения штуцера, которое соответствует требуемому коэффициенту Cv.
28. Способ по п. 20, в котором корректировка положения штуцера дополнительно содержит передачу на программируемый логический контроллер индикации заданного положения штуцера.
29. Способ по п. 20, дополнительно содержащий определение заданного положения на основе кривой коэффициента Cv для штуцера.
30. Способ по п. 20, в котором корректировка положения штуцера дает требуемое обратное давление в линии, соединенной со стволом скважины.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2012/045234 WO2014007797A1 (en) | 2012-07-02 | 2012-07-02 | Pressure control in drilling operations with choke position determined by cv curve |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2015102990A true RU2015102990A (ru) | 2016-08-20 |
Family
ID=49882375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015102990A RU2015102990A (ru) | 2012-07-02 | 2012-07-02 | РЕГУЛИРОВАНИЕ ДАВЛЕНИЯ ПРИ БУРЕНИИ СКВАЖИНЫ С ПОЛОЖЕНИЕМ ШТУЦЕРА, ОПРЕДЕЛЯЕМЫМ С ПОМОЩЬЮ КРИВОЙ КОЭФФИЦИЕНТА Cv |
Country Status (8)
Country | Link |
---|---|
US (1) | US10047578B2 (ru) |
EP (1) | EP2852732A4 (ru) |
BR (1) | BR112014032979B1 (ru) |
CA (1) | CA2877697A1 (ru) |
MX (1) | MX353875B (ru) |
RU (1) | RU2015102990A (ru) |
SA (1) | SA113340690B1 (ru) |
WO (1) | WO2014007797A1 (ru) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SG11201505463RA (en) | 2013-03-13 | 2015-08-28 | Halliburton Energy Services Inc | Diverting flow in a drilling fluid circulation system to regulate drilling fluid pressure |
BR112017001650A2 (pt) * | 2014-07-28 | 2018-01-30 | Epp Kevin | sistema, e, método para operar um sistema |
US9995098B2 (en) * | 2014-10-08 | 2018-06-12 | Weatherford Technology Holdings, Llc | Choke control tuned by flow coefficient for controlled pressure drilling |
US10415357B2 (en) | 2014-12-10 | 2019-09-17 | Seaboard International Inc. | Frac flow-back control and/or monitoring system and methods |
US9988866B2 (en) | 2014-12-12 | 2018-06-05 | Halliburton Energy Services, Inc. | Automatic choke optimization and selection for managed pressure drilling |
US10060208B2 (en) * | 2015-02-23 | 2018-08-28 | Weatherford Technology Holdings, Llc | Automatic event detection and control while drilling in closed loop systems |
GB2541926B (en) * | 2015-09-04 | 2021-07-14 | Equinor Energy As | System and method for monitoring the state of a choke valve in a managed pressure drilling system |
US10107052B2 (en) | 2016-02-05 | 2018-10-23 | Weatherford Technology Holdings, Llc | Control of hydraulic power flowrate for managed pressure drilling |
US10227838B2 (en) | 2016-05-10 | 2019-03-12 | Weatherford Technology Holdings, Llc | Drilling system and method having flow measurement choke |
WO2018165643A1 (en) * | 2017-03-10 | 2018-09-13 | Schlumberger Technology Corporation | Automated choke control apparatus and methods |
US20200200930A1 (en) * | 2018-12-20 | 2020-06-25 | Schlumberger Technology Corporation | Validating Accuracy of Sensor Measurements |
US11021918B2 (en) * | 2018-12-28 | 2021-06-01 | ADS Services LLC | Well control system having one or more adjustable orifice choke valves and method |
WO2020231996A1 (en) * | 2019-05-16 | 2020-11-19 | Ameriforge Group Inc. | Improved closed-loop hydraulic drilling |
GB2591309B (en) | 2020-01-23 | 2024-07-10 | Ntdrill Holdings Llc | Drilling choke with matched actuator |
US11333010B2 (en) | 2020-05-13 | 2022-05-17 | Saudi Arabian Oil Company | Smart choke valve to regulate well sand production |
WO2021231833A1 (en) * | 2020-05-14 | 2021-11-18 | Schlumberger Technology Corporation | Annulus pressure release system |
US11414954B2 (en) * | 2020-07-06 | 2022-08-16 | Saudi Arabian Oil Company | Smart choke valve to assess and regulate production flow |
US11702896B2 (en) | 2021-03-05 | 2023-07-18 | Weatherford Technology Holdings, Llc | Flow measurement apparatus and associated systems and methods |
US11661805B2 (en) | 2021-08-02 | 2023-05-30 | Weatherford Technology Holdings, Llc | Real time flow rate and rheology measurement |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4253530A (en) * | 1979-10-09 | 1981-03-03 | Dresser Industries, Inc. | Method and system for circulating a gas bubble from a well |
US5273112A (en) * | 1992-12-18 | 1993-12-28 | Halliburton Company | Surface control of well annulus pressure |
US6484816B1 (en) * | 2001-01-26 | 2002-11-26 | Martin-Decker Totco, Inc. | Method and system for controlling well bore pressure |
US7407019B2 (en) * | 2005-03-16 | 2008-08-05 | Weatherford Canada Partnership | Method of dynamically controlling open hole pressure in a wellbore using wellhead pressure control |
US7610251B2 (en) * | 2006-01-17 | 2009-10-27 | Halliburton Energy Services, Inc. | Well control systems and associated methods |
FI120472B (fi) * | 2006-06-06 | 2009-10-30 | Metso Automation Oy | Ohjausmenetelmä ja ohjausjärjestelmä virtausta säätävää venttiiliä varten |
MX2009004270A (es) * | 2006-10-23 | 2009-07-02 | Mi Llc | Metodo y aparato para controlar la presion del fondo de un pozo en una formacion subterranea durante la operacion de una bomba de plataforma petrolifera. |
WO2009156878A1 (en) * | 2008-06-27 | 2009-12-30 | Cameron International Corporation | Choke valve with flow impeding recesses |
US8281875B2 (en) * | 2008-12-19 | 2012-10-09 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
GB2477880B (en) | 2008-12-19 | 2012-12-19 | Halliburton Energy Serv Inc | Pressure and flow control in drilling operations |
US9328573B2 (en) * | 2009-10-05 | 2016-05-03 | Halliburton Energy Services, Inc. | Integrated geomechanics determinations and wellbore pressure control |
US8899348B2 (en) * | 2009-10-16 | 2014-12-02 | Weatherford/Lamb, Inc. | Surface gas evaluation during controlled pressure drilling |
CN201593387U (zh) * | 2010-02-03 | 2010-09-29 | 中国石油天然气集团公司 | 一种钻井环空压力精细控制系统 |
CN102454372A (zh) * | 2010-10-19 | 2012-05-16 | 中国石油化工集团公司 | 一种井筒压力管理系统及方法 |
US9995098B2 (en) * | 2014-10-08 | 2018-06-12 | Weatherford Technology Holdings, Llc | Choke control tuned by flow coefficient for controlled pressure drilling |
US9988866B2 (en) * | 2014-12-12 | 2018-06-05 | Halliburton Energy Services, Inc. | Automatic choke optimization and selection for managed pressure drilling |
US10227838B2 (en) * | 2016-05-10 | 2019-03-12 | Weatherford Technology Holdings, Llc | Drilling system and method having flow measurement choke |
-
2012
- 2012-07-02 CA CA2877697A patent/CA2877697A1/en not_active Abandoned
- 2012-07-02 US US14/412,631 patent/US10047578B2/en active Active
- 2012-07-02 EP EP12880350.9A patent/EP2852732A4/en not_active Withdrawn
- 2012-07-02 MX MX2014015368A patent/MX353875B/es active IP Right Grant
- 2012-07-02 RU RU2015102990A patent/RU2015102990A/ru not_active Application Discontinuation
- 2012-07-02 BR BR112014032979-6A patent/BR112014032979B1/pt not_active IP Right Cessation
- 2012-07-02 WO PCT/US2012/045234 patent/WO2014007797A1/en active Application Filing
-
2013
- 2013-06-30 SA SA113340690A patent/SA113340690B1/ar unknown
Also Published As
Publication number | Publication date |
---|---|
WO2014007797A1 (en) | 2014-01-09 |
AU2012384529A1 (en) | 2015-01-15 |
US10047578B2 (en) | 2018-08-14 |
EP2852732A4 (en) | 2016-06-08 |
SA113340690B1 (ar) | 2016-03-27 |
BR112014032979B1 (pt) | 2021-09-28 |
MX2014015368A (es) | 2015-07-06 |
CA2877697A1 (en) | 2014-01-09 |
BR112014032979A2 (pt) | 2017-06-27 |
US20150240579A1 (en) | 2015-08-27 |
EP2852732A1 (en) | 2015-04-01 |
MX353875B (es) | 2018-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2015102990A (ru) | РЕГУЛИРОВАНИЕ ДАВЛЕНИЯ ПРИ БУРЕНИИ СКВАЖИНЫ С ПОЛОЖЕНИЕМ ШТУЦЕРА, ОПРЕДЕЛЯЕМЫМ С ПОМОЩЬЮ КРИВОЙ КОЭФФИЦИЕНТА Cv | |
EP4265881A3 (en) | A method of controlling a downhole flow control device | |
GB2488724A (en) | Wireline-adjustable downhole flow control devices and methods for using same | |
GB2546665A (en) | Choke control tuned by flow coefficient for controlled pressure drilling | |
KR102303943B1 (ko) | 질량 유량 컨트롤러를 통해 유동을 모니터링하는 시스템 및 방법 | |
WO2017158006A3 (en) | Method and system for measuring the roughness of a ground surface | |
EP4056949A3 (en) | Systems and methods for calibrating unstable sensors | |
WO2013049511A3 (en) | Methods for in-situ calibration of a flow controller | |
WO2014152755A3 (en) | Pressure-based gas flow controller with dynamic self-calibration | |
WO2014178920A3 (en) | Intelligent electronic water flow regulation system | |
JP2017532538A5 (ru) | ||
WO2014135973A8 (en) | System and method for improved indicated flow in mass flow controllers | |
CA2854703C (en) | System and method for controlling a wind turbine | |
WO2014055598A3 (en) | Apparatus, system, and method for controlling the flow of drilling fluid in a wellbore | |
WO2012125022A3 (en) | Arrangement comprising a gas delivery control system and a central heating installation and gas delivery control method | |
MX2019002360A (es) | Metodo de calibracion de medidor de flujo y aparato relacionado. | |
WO2010057621A3 (de) | Vorrichtung und verfahren zum messen einer von einem tier bei einem melkvorgang abgegebenen milchmenge | |
MX2010005447A (es) | Herramienta de prueba de orificio profundo recuperable. | |
WO2013060441A3 (de) | Verfahren zur korrektur von offset-drift-effekten einer thermischen messeinrichtung, thermische messeinrichtung und gasdurchflussmessgerät | |
RU2017113637A (ru) | Устройство для подачи отопительной теплой воды для центрального отопления и централизованного теплоснабжения и способ управления | |
CN104456967A (zh) | 一种恒定水温的控制方法和系统 | |
AU2017276327B2 (en) | Hitch position encoder with reference indicator for agricultural work vehicle | |
ES2720608T3 (es) | Método para la calibración del control de flujo de sistemas altamente transitorios | |
TW201600735A (zh) | 用於封閉系統中之液壓控制之方法 | |
GB2474378A (en) | Systems and methods for updating valve cracking current in mass flow controllers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FA94 | Acknowledgement of application withdrawn (non-payment of fees) |
Effective date: 20170728 |