RU2013142794A - METHOD FOR DEVELOPING GAS-OIL DEPOSITS - Google Patents

METHOD FOR DEVELOPING GAS-OIL DEPOSITS Download PDF

Info

Publication number
RU2013142794A
RU2013142794A RU2013142794/03A RU2013142794A RU2013142794A RU 2013142794 A RU2013142794 A RU 2013142794A RU 2013142794/03 A RU2013142794/03 A RU 2013142794/03A RU 2013142794 A RU2013142794 A RU 2013142794A RU 2013142794 A RU2013142794 A RU 2013142794A
Authority
RU
Russia
Prior art keywords
gas
oil
formation
well
cap
Prior art date
Application number
RU2013142794/03A
Other languages
Russian (ru)
Other versions
RU2547530C1 (en
Inventor
Александр Станиславович Тимчук
Николай Николаевич Иванцов
Original Assignee
Общество с ограниченной ответственностью "Тюменский нефтяной научный центр" (ООО "ТННЦ")
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Тюменский нефтяной научный центр" (ООО "ТННЦ") filed Critical Общество с ограниченной ответственностью "Тюменский нефтяной научный центр" (ООО "ТННЦ")
Priority to RU2013142794/03A priority Critical patent/RU2547530C1/en
Publication of RU2013142794A publication Critical patent/RU2013142794A/en
Application granted granted Critical
Publication of RU2547530C1 publication Critical patent/RU2547530C1/en

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Edible Oils And Fats (AREA)

Abstract

Способ разработки газонефтяных залежей, включающий бурение горизонтального ствола добывающей скважины в нефтяной части пласта и горизонтально-восходящего ствола, пересекающего газонефтяной контакт, перфорацию эксплуатационной колонны со вскрытием нефтяной части и газовой шапки, подъем пластовых флюидов на поверхность, в том числе за счет естественного газлифта, отличающийся тем, что перфорацию эксплуатационной колонны в газовой шапке осуществляют в двух противоположных частях скважины в пределах отдельно взятого пласта, управление перетоками газообразных и жидких флюидов в скважине между различными интервалами перфораций выполняют с помощью регулируемых с поверхности перепускных устройств, при этом добычу газа в заданных контролируемых объемах осуществляют независимо из одного или двух интервалов вскрытия газовой шапки как по заколонному пространству, так и по насосно-компрессорной трубе для создания газлифтного режима подъема жидкости на поверхность, при этом решают задачу контроля перемещения газонефтяного контакта, когда добычей газа создают в газовой шапке воронку депрессии над районом добычи жидких флюидов в нефтяной части, тем самым поддерживают стабильность газонефтяного контакта с отсрочкой времени формирования конуса газа, при этом ствол скважины в нефтяной части проводят на расстоянии от газовой шапки не менее ½ толщины нефтяной части.A method for developing gas and oil deposits, including drilling a horizontal wellbore of an producing well in the oil part of the formation and a horizontally ascending well that crosses the gas-oil contact, perforating the production string with opening the oil part and the gas cap, raising formation fluids to the surface, including due to natural gas lift, characterized in that the perforation of the production string in the gas cap is carried out in two opposite parts of the well within a single formation, control the flow of gaseous and liquid fluids in the well between different intervals of perforations is performed using surface-controlled bypass devices, while gas production in predetermined controlled volumes is carried out independently from one or two opening intervals of the gas cap both in the annular space and in the tubing to create a gas-lift mode of lifting the liquid to the surface, while solving the problem of controlling the movement of the gas-oil contact, when gas production is created in the gas PKE funnel depression over the area of liquid fluids in oil extraction portion, thereby supporting gas contact stability with a delay time of formation gas cone, and the wellbore in the oil portion is performed at a distance from the gas cap is not less than ½ the thickness of the oil portion.

Claims (1)

Способ разработки газонефтяных залежей, включающий бурение горизонтального ствола добывающей скважины в нефтяной части пласта и горизонтально-восходящего ствола, пересекающего газонефтяной контакт, перфорацию эксплуатационной колонны со вскрытием нефтяной части и газовой шапки, подъем пластовых флюидов на поверхность, в том числе за счет естественного газлифта, отличающийся тем, что перфорацию эксплуатационной колонны в газовой шапке осуществляют в двух противоположных частях скважины в пределах отдельно взятого пласта, управление перетоками газообразных и жидких флюидов в скважине между различными интервалами перфораций выполняют с помощью регулируемых с поверхности перепускных устройств, при этом добычу газа в заданных контролируемых объемах осуществляют независимо из одного или двух интервалов вскрытия газовой шапки как по заколонному пространству, так и по насосно-компрессорной трубе для создания газлифтного режима подъема жидкости на поверхность, при этом решают задачу контроля перемещения газонефтяного контакта, когда добычей газа создают в газовой шапке воронку депрессии над районом добычи жидких флюидов в нефтяной части, тем самым поддерживают стабильность газонефтяного контакта с отсрочкой времени формирования конуса газа, при этом ствол скважины в нефтяной части проводят на расстоянии от газовой шапки не менее ½ толщины нефтяной части.A method for developing gas and oil deposits, including drilling a horizontal wellbore of an producing well in the oil part of the formation and a horizontally ascending well that crosses the gas-oil contact, perforating the production string with opening the oil part and the gas cap, raising formation fluids to the surface, including due to natural gas lift, characterized in that the perforation of the production string in the gas cap is carried out in two opposite parts of the well within a single formation, control the flow of gaseous and liquid fluids in the well between different intervals of perforations is performed using surface-controlled bypass devices, while gas production in predetermined controlled volumes is carried out independently from one or two opening intervals of the gas cap both in the annular space and in the tubing to create a gas-lift mode of lifting the liquid to the surface, while solving the problem of controlling the movement of the gas-oil contact, when gas production is created in the gas PKE funnel depression over the area of liquid fluids in oil extraction portion, thereby supporting gas contact stability with a delay time of formation gas cone, and the wellbore in the oil portion is performed at a distance from the gas cap is not less than ½ the thickness of the oil portion.
RU2013142794/03A 2013-09-19 2013-09-19 Method of development of gas-and-oil reservoirs RU2547530C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013142794/03A RU2547530C1 (en) 2013-09-19 2013-09-19 Method of development of gas-and-oil reservoirs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013142794/03A RU2547530C1 (en) 2013-09-19 2013-09-19 Method of development of gas-and-oil reservoirs

Publications (2)

Publication Number Publication Date
RU2013142794A true RU2013142794A (en) 2015-03-27
RU2547530C1 RU2547530C1 (en) 2015-04-10

Family

ID=53286518

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013142794/03A RU2547530C1 (en) 2013-09-19 2013-09-19 Method of development of gas-and-oil reservoirs

Country Status (1)

Country Link
RU (1) RU2547530C1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2580330C1 (en) * 2015-04-15 2016-04-10 Ильдар Зафирович Денисламов Method of developing oil reservoir
RU2610485C1 (en) * 2015-11-19 2017-02-13 Открытое акционерное общество "Нефтяная компания "Роснефть" Method of developing oil and gas deposits
RU2622418C1 (en) * 2016-04-06 2017-06-15 Ильдар Зафирович Денисламов Method of oil formation development
RU2625125C1 (en) * 2016-06-11 2017-07-11 Открытое акционерное общество "Татнефть" им. В.Д.Шашина Excavation method of bituminic deposits with gas cap

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4445574A (en) * 1980-03-24 1984-05-01 Geo Vann, Inc. Continuous borehole formed horizontally through a hydrocarbon producing formation
RU2107810C1 (en) * 1996-04-19 1998-03-27 Сумбат Набиевич Закиров Method for development of oil and gas deposits
RU2154156C2 (en) * 1998-06-22 2000-08-10 Предприятие "Астраханьгазпром" РАО "Газпром" Method of oil-gas pool development
RU2260681C2 (en) * 2001-08-06 2005-09-20 Ухтинский государственный технический университет (УГТУ) Oil and gas deposit development method

Also Published As

Publication number Publication date
RU2547530C1 (en) 2015-04-10

Similar Documents

Publication Publication Date Title
RU2012145848A (en) SYSTEM AND METHOD FOR IMPROVED PRODUCTION OF FLUID FROM GAS WELLS
TN2014000038A1 (en) System and method for production of reservoir fluids
MY157181A (en) Apparatus and method to remotely control fluid flow in tubular strings and wellbore annulus
WO2015061655A3 (en) Re-fracture apparatus and method for wellbore
WO2012083047A3 (en) Multi-zone fracturing completion
RU2013142794A (en) METHOD FOR DEVELOPING GAS-OIL DEPOSITS
MY168742A (en) Controlled production and injection
GB2546904A (en) Shopper-centric social networking system
WO2013186569A3 (en) Subterranean formation methods and apparatus
EA201690289A1 (en) SYSTEM AND METHODS OF STRUGGLE AGAINST SANDING
GB2566619A (en) Hydraulic fracturing system and method
WO2015054267A3 (en) Systems and methods for enhancing steam distribution and production in sagd operations
GB2538903A (en) Dual stripper apparatus
SA517381177B1 (en) Internally Trussed High-Expansion Support for Inflow Control Device Sealing Applications
CA2844345C (en) Single vertical or inclined well thermal recovery process
WO2014138301A3 (en) Through tubing perpendicular boring
RU2013142746A (en) METHOD OF IMPROVED GRAVITATIONAL DRAINAGE IN A HYDROGEN HYDROLASTIC
GB2554209A (en) Providing communication between wellbores through directional hydraulic fracturing
MX2015009616A (en) Method and device for cleaning control particles in a wellbore.
MX2015012588A (en) Enhanced oil production using control of well casing gas pressure.
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
GB2535405A (en) Biodegradable, food grade shale stabilizer for use in oil and gas wells
RU2001122000A (en) METHOD FOR DEVELOPING GAS-OIL DEPOSITS
RU2011135866A (en) DESCRIPTION OF A GASKLE OR HORIZONTAL WELL WITH THE POSSIBILITY OF REGULATING A WATER FLOW AND SELECTIVE WATERPROOFING
RU137844U1 (en) DESIGN OF MULTI-BOTTOM GAS WELL FOR NON-PACKER OPERATION

Legal Events

Date Code Title Description
HE9A Changing address for correspondence with an applicant
MM4A The patent is invalid due to non-payment of fees

Effective date: 20190920