RU2013135469A - Система и способ для выполнения операций интенсификации добычи в скважине - Google Patents
Система и способ для выполнения операций интенсификации добычи в скважине Download PDFInfo
- Publication number
- RU2013135469A RU2013135469A RU2013135469/03A RU2013135469A RU2013135469A RU 2013135469 A RU2013135469 A RU 2013135469A RU 2013135469/03 A RU2013135469/03 A RU 2013135469/03A RU 2013135469 A RU2013135469 A RU 2013135469A RU 2013135469 A RU2013135469 A RU 2013135469A
- Authority
- RU
- Russia
- Prior art keywords
- intensification
- plan
- optimized
- calculation
- drilling
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract 30
- 238000004519 manufacturing process Methods 0.000 title claims abstract 16
- 238000005553 drilling Methods 0.000 claims abstract 21
- 230000000638 stimulation Effects 0.000 claims abstract 13
- 238000012512 characterization method Methods 0.000 claims abstract 11
- 238000005457 optimization Methods 0.000 claims abstract 7
- 230000015572 biosynthetic process Effects 0.000 claims abstract 4
- 239000002131 composite material Substances 0.000 claims 5
- 238000010586 diagram Methods 0.000 claims 2
- 238000011156 evaluation Methods 0.000 claims 1
- 238000002347 injection Methods 0.000 claims 1
- 239000007924 injection Substances 0.000 claims 1
- 239000004576 sand Substances 0.000 claims 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/17—Interconnecting two or more wells by fracturing or otherwise attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics And Detection Of Objects (AREA)
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Electrotherapy Devices (AREA)
- Catching Or Destruction (AREA)
Abstract
1. Способ выполнения операции интенсификации для буровой, имеющей резервуар, размещенный в подземной формации, включающий:выполнение определения характеристик резервуара при помощи модели определения характеристик резервуара для генерации геомеханической модели на основе объединенных данных о буровой;генерацию плана интенсификации путем выполнения планирования бурения, расчет участков, расчет интенсификации и прогноз добычи на основе геомеханической модели; иоптимизацию плана интенсификации путем повторения расчета интенсификации и прогноза добычи в цикле с обратной связью, пока не будет создан оптимизированный план интенсификации.2. Способ по п.1, отличающийся тем, что объединенные данные буровой содержат интегрированное сочетание петрофизических, геомеханических, геологических и геофизических данных.3. Способ по п.2, отличающийся тем, что дополнительно включает измерение по меньшей мере части этого сочетания петрофизических, геомеханических, геологических и геофизических данных на буровой.4. Способ по п.1, отличающийся тем, что оптимизация плана интенсификации включает повторение планирования бурения, расчета участков, расчета интенсификации и прогноза добычи в петле обратной связи, пока не будет сгенерирован оптимизированный план интенсификации.5. Способ по п.1, отличающийся тем, что дополнительно включает выполнение оптимизированного плана интенсификации на буровой.6. Способ по п.5, отличающийся тем, что дополнительно включает измерение данных в реальном времени из буровой во время выполнения оптимизированного плана интенсификации.7. Способ по п.6, отличающийся тем, что дополнительно включает
Claims (32)
1. Способ выполнения операции интенсификации для буровой, имеющей резервуар, размещенный в подземной формации, включающий:
выполнение определения характеристик резервуара при помощи модели определения характеристик резервуара для генерации геомеханической модели на основе объединенных данных о буровой;
генерацию плана интенсификации путем выполнения планирования бурения, расчет участков, расчет интенсификации и прогноз добычи на основе геомеханической модели; и
оптимизацию плана интенсификации путем повторения расчета интенсификации и прогноза добычи в цикле с обратной связью, пока не будет создан оптимизированный план интенсификации.
2. Способ по п.1, отличающийся тем, что объединенные данные буровой содержат интегрированное сочетание петрофизических, геомеханических, геологических и геофизических данных.
3. Способ по п.2, отличающийся тем, что дополнительно включает измерение по меньшей мере части этого сочетания петрофизических, геомеханических, геологических и геофизических данных на буровой.
4. Способ по п.1, отличающийся тем, что оптимизация плана интенсификации включает повторение планирования бурения, расчета участков, расчета интенсификации и прогноза добычи в петле обратной связи, пока не будет сгенерирован оптимизированный план интенсификации.
5. Способ по п.1, отличающийся тем, что дополнительно включает выполнение оптимизированного плана интенсификации на буровой.
6. Способ по п.5, отличающийся тем, что дополнительно включает измерение данных в реальном времени из буровой во время выполнения оптимизированного плана интенсификации.
7. Способ по п.6, отличающийся тем, что дополнительно включает выполнение интерпретации в реальном времени на основе данных, измеряемых в реальном времени.
8. Способ по п.7, отличающийся тем, что дополнительно включает выполнение расчета интенсификации и прогноза добычи в реальном времени на основе интерпретации в реальном времени.
9. Способ по п.8, отличающийся тем, что дополнительно включает оптимизацию в реальном времени оптимизированного плана интенсификации путем повторения расчета интенсификации и прогноза добычи в реальном времени в петле обратной связи, пока не будет сгенерирован оптимизированный план интенсификации.
10. Способ по п.9, отличающийся тем, что дополнительно включает управление операцией интенсификации на основе оптимизированного плана интенсификации в реальном времени.
11. Способ по п.10, отличающийся тем, что дополнительно включает оценку буровой после выполнения оптимизированного плана интенсификации.
12. Способ по п.11, отличающийся тем, что дополнительно включает обновление модели определения характеристик резервуара на основе оценки.
13. Способ по п.12, отличающийся тем, что дополнительно включает повторение выполнения определения характеристик резервуара, генерацию и оптимизацию при помощи обновленной модели определения характеристик резервуара.
14. Способ по п.1, отличающийся тем, что дополнительно включает калибровку плана интенсификации скважины.
15. Способ по п.14, отличающийся тем, что дополнительно включает выполнение калиброванного оптимизированного плана интенсификации скважины.
16. Способ по п.1, отличающийся тем, что дополнительно включает обновление модели определения характеристик резервуара на основе оценки данных в реальном времени, собранных во время выполнения оптимизированного плана интенсификации.
17. Способ по п.1, отличающийся тем, что расчет участков выполняют путем определения границ по диаграмме ствола скважины, идентификации продуктивных зон вдоль ствола скважины на основе границ; указания единиц излома в продуктивных зонах; расчета участков на основе единиц излома и расчета мест перфорации на основе рассчитанных участков.
18. Способ по п.1, отличающийся тем, что расчет участков выполняют путем генерации ряда показателей качества из ряда диаграмм, сочетания ряда показателей качества для образования сводного показателя качества; сочетания сводного показателя качества с данными напряжения для образования объединенного показателя напряжения и сводного качества, определения классификаций для блоков объединенного показателя напряжения и сводного качества, определения участков вдоль объединенного показателя напряжения и сводного качества на основе классификаций и выборочного позиционирования перфораций в участках на основе классификаций.
19. Способ по п.1, отличающийся тем, что расчет интенсификации выполняют с помощью модели излома.
20. Способ по п.1, отличающийся тем, что прогноз добычи выполняют с использованием финансовых входных данных.
21. Способ по п.1, отличающийся тем, что резервуар содержит, по меньшей мере, один песчаный резервуар с плотным газом и сланцевый резервуар.
22. Система выполнения операции интенсификации для буровой, имеющей резервуар, размещенный в подземной формации, содержащая:
инструмент интенсификации, содержащий:
блок определения характеристик резервуара, который выполняет определение характеристик резервуара с помощью модели определения характеристик резервуара для генерации геомеханической модели на основе данных буровой, содержащих объединенные данные буровой;
блок планирования интенсификации, который генерирует план интенсификации путем выполнения планирования бурения, расчета участков, расчета интенсификации и прогноза добычи на основе геомеханической модели; и
оптимизатор, который оптимизирует план интенсификации путем повторения расчета интенсификации и прогноза добычи в петле обратной связи, пока оптимизированный план интенсификации не будет сгенерирован.
23. Система по п.22, отличающаяся тем, что дополнительно содержит, по меньшей мере, один скважинный инструмент, размещенный в стволе скважины, по меньшей мере, один скважинный инструмент, функционально подключаемый к инструменту интенсификации.
24. Система по п.23, отличающаяся тем, что, по меньшей мере, один скважинный прибор содержит, по меньшей мере, канатный инструмент, бурильный инструмент, перфорационный инструмент, нагнетательный инструмент или их сочетание.
25. Система по п.23, отличающаяся тем, что, по меньшей мере, один скважинный инструмент содержит по меньшей мере один датчик для измерения параметров буровой.
26. Система по п.22, отличающаяся тем, что дополнительно содержит блок, который выполняет оптимизацию в реальном времени оптимизированного плана интенсификации путем повторения расчета интенсификации и прогноза добычи в реальном времени, пока не будет сгенерирован оптимизированный план интенсификации.
27. Система по п.26, отличающаяся тем, что дополнительно содержит обновитель, который обновляет модель определения характеристик резервуара на основе оптимизированного плана интенсификации в реальном времени.
28. Система по п.22, отличающаяся тем, что инструмент интенсификации размещается в наземном блоке, скважинном инструменте или их сочетании.
29. Система по п.22, отличающаяся тем, что дополнительно содержит калибратор для калибровки оптимизированного плана интенсификации.
30. Система по п.22, отличающаяся тем, что блок планирования интенсификации содержит инструмент расчета участков, инструмент расчета интенсификации и инструмент планирования бурения.
31. Система по п.22, отличающееся тем, что дополнительно содержит наземный блок, функционально соединяемый с оптимизатором.
32. Способ выполнения операции интенсификации для буровой, имеющей резервуар, размещенный в подземной формации, включающий:
выполнение определения характеристик резервуара при помощи модели определения характеристик резервуара для генерации геомеханической модели на основе объединенных данных о буровой;
генерацию плана интенсификации путем выполнения планирования бурения, расчет участков, расчет интенсификации и прогноз добычи на основе на геомеханической модели;
оптимизацию плана интенсификации путем повторения расчета интенсификации и прогноза добычи в цикле с обратной связью, пока не будет создан оптимизированный план интенсификации;
выполнение в реальном времени оптимизированного плана интенсификации;
оптимизацию в реальном времени оптимизированного плана интенсификации путем повторения расчета интенсификации и прогноза добычи в реальном времени в петле обратной связи, пока не будет сгенерирован оптимизированный план интенсификации; и
обновление модели определения характеристик резервуара на основе оптимизированного плана интенсификации в реальном времени.
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201061460372P | 2010-12-30 | 2010-12-30 | |
US61/460,372 | 2010-12-30 | ||
US201161464134P | 2011-02-28 | 2011-02-28 | |
US61/464,134 | 2011-02-28 | ||
PCT/IB2011/055998 WO2012090175A2 (en) | 2010-12-30 | 2011-12-28 | System and method for performing downhole stimulation operations |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2013135469A true RU2013135469A (ru) | 2015-02-10 |
RU2569116C2 RU2569116C2 (ru) | 2015-11-20 |
Family
ID=46383580
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2013135469/03A RU2569116C2 (ru) | 2010-12-30 | 2011-12-28 | Система и способ для выполнения операций интенсификации добычи в скважине |
RU2013135493/03A RU2561114C2 (ru) | 2010-12-30 | 2011-12-28 | Система и способ для выполнения операций интенсификации добычи в скважине |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2013135493/03A RU2561114C2 (ru) | 2010-12-30 | 2011-12-28 | Система и способ для выполнения операций интенсификации добычи в скважине |
Country Status (8)
Country | Link |
---|---|
US (3) | US9228425B2 (ru) |
CN (2) | CN103282600B (ru) |
AU (2) | AU2011350663B2 (ru) |
CA (2) | CA2823115A1 (ru) |
GB (2) | GB2500332B (ru) |
MX (2) | MX336561B (ru) |
RU (2) | RU2569116C2 (ru) |
WO (2) | WO2012090174A2 (ru) |
Families Citing this family (141)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9228425B2 (en) | 2007-01-29 | 2016-01-05 | Schlumberger Technology Corporation | System and method for performing downhole stimulation operations |
US9135475B2 (en) * | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US20110320182A1 (en) * | 2007-08-01 | 2011-12-29 | Austin Geomodeling | Method and system for dynamic, three-dimensional geological interpretation and modeling |
MX343973B (es) * | 2007-09-13 | 2016-11-30 | M-I Llc | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. |
WO2012087864A2 (en) * | 2010-12-20 | 2012-06-28 | Schlumberger Technology Coproration | Method of utilizing subterranean formation data for improving treatment operations |
EP2699947A2 (en) * | 2011-01-28 | 2014-02-26 | Services Pétroliers Schlumberger | Method for estimating a logging tool response in a layered formation |
WO2015003028A1 (en) * | 2011-03-11 | 2015-01-08 | Schlumberger Canada Limited | Method of calibrating fracture geometry to microseismic events |
AU2012332270A1 (en) | 2011-11-04 | 2014-05-29 | Schlumberger Technology B.V. | Modeling of interaction of hydraulic fractures in complex fracture networks |
US10422208B2 (en) | 2011-11-04 | 2019-09-24 | Schlumberger Technology Corporation | Stacked height growth fracture modeling |
CA2852635C (en) * | 2011-12-08 | 2016-12-06 | Halliburton Energy Services, Inc. | Permeability prediction systems and methods using quadratic discriminant analysis |
US8967249B2 (en) | 2012-04-13 | 2015-03-03 | Schlumberger Technology Corporation | Reservoir and completion quality assessment in unconventional (shale gas) wells without logs or core |
US10267131B2 (en) * | 2012-08-13 | 2019-04-23 | Schlumberger Technology Corporation | Competition between transverse and axial hydraulic fractures in horizontal well |
RU2604565C2 (ru) * | 2012-09-12 | 2016-12-10 | Бп Эксплорейшн Оперейтинг Компани Лимитед | Система и способ для определения количества удерживаемого углеводородного флюида |
US10240436B2 (en) * | 2012-09-20 | 2019-03-26 | Schlumberger Technology Corporation | Method of treating subterranean formation |
EP2904530B1 (en) | 2012-12-13 | 2018-10-10 | Landmark Graphics Corporation | System, method and computer program product for determining placement of perforation intervals using facies, fluid boundaries, geobodies and dynamic fluid properties |
US10655442B2 (en) * | 2012-12-28 | 2020-05-19 | Schlumberger Technology Corporation | Method for wellbore stimulation optimization |
WO2014116249A1 (en) * | 2013-01-28 | 2014-07-31 | Halliburton Energy Services, Inc. | Systems and methods for monitoring wellbore fluids using microanalysis of real-time pumping data |
MX358853B (es) * | 2013-02-21 | 2018-09-06 | Halliburton Energy Services Inc | Sistemas y métodos para la creación de pozos optimizados en una formación de lutita. |
US10329884B2 (en) * | 2013-04-19 | 2019-06-25 | Schlumberger Technology Corporation | Total gas in place estimate |
US10001000B2 (en) * | 2013-07-22 | 2018-06-19 | Halliburton Energy Services, Inc. | Simulating well system fluid flow based on a pressure drop boundary condition |
US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
BR112016001947A2 (pt) | 2013-08-07 | 2017-08-01 | Landmark Graphics Corp | métodos e sistemas de calibração de modelo de terra estático usando testes de permeabilidade |
US20160186496A1 (en) * | 2013-08-08 | 2016-06-30 | Energy Holdings Limited | Methods and apparatus for well productivity |
US9677393B2 (en) * | 2013-08-28 | 2017-06-13 | Schlumberger Technology Corporation | Method for performing a stimulation operation with proppant placement at a wellsite |
US11125912B2 (en) * | 2013-11-25 | 2021-09-21 | Schlumberger Technology Corporation | Geologic feature splitting |
US20150176387A1 (en) * | 2013-12-20 | 2015-06-25 | Schlumberger Technology Corporation | Perforation strategy |
FR3019582B1 (fr) * | 2014-04-07 | 2016-09-30 | Ifp Energies Now | Procede de surveillance de site d'exploration et d'exploitation d'hydrocarbures non conventionnels |
US20150370934A1 (en) * | 2014-06-24 | 2015-12-24 | Schlumberger Technology Corporation | Completion design based on logging while drilling (lwd) data |
WO2016004137A1 (en) | 2014-06-30 | 2016-01-07 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
US11634979B2 (en) * | 2014-07-18 | 2023-04-25 | Nextier Completion Solutions Inc. | Determining one or more parameters of a well completion design based on drilling data corresponding to variables of mechanical specific energy |
WO2016022301A1 (en) | 2014-08-04 | 2016-02-11 | Schlumberger Canada Limited | In situ stress properties |
EP3186477A4 (en) | 2014-08-28 | 2018-03-28 | Landmark Graphics Corporation | Optimizing multistage hydraulic fracturing design based on three-dimensional (3d) continuum damage mechanics |
US10428642B2 (en) | 2014-10-01 | 2019-10-01 | Halliburton Energy Services, Inc. | Transposition of logs onto horizontal wells |
US10400550B2 (en) | 2014-10-24 | 2019-09-03 | Halliburton Energy Services, Inc. | Shale fracturing characterization and optimization using three-dimensional fracture modeling and neural network |
US10385670B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
US10385686B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
US20160161933A1 (en) * | 2014-12-04 | 2016-06-09 | Weatherford Technology Holdings, Llc | System and method for performing automated fracture stage design |
WO2016108891A1 (en) | 2014-12-31 | 2016-07-07 | Halliburton Energy Services, Inc. | Optimizing running operations |
US10329882B2 (en) | 2014-12-31 | 2019-06-25 | Halliburton Energy Services, Inc. | Optimizing completion operations |
EP3186476B1 (en) | 2014-12-31 | 2020-07-08 | Halliburton Energy Services, Inc. | Optimizing stimulation and fluid management operations |
WO2016122792A1 (en) | 2015-01-28 | 2016-08-04 | Schlumberger Canada Limited | Method of performing wellsite fracture operations with statistical uncertainties |
CA2978553C (en) | 2015-03-02 | 2022-06-21 | C&J Energy Services, Inc. | Well completion system and method |
WO2016140982A1 (en) * | 2015-03-05 | 2016-09-09 | Schlumberger Technology Corporation | Microseismic behavior prediction |
US9958572B2 (en) * | 2015-03-31 | 2018-05-01 | Halliburton Energy Services, Inc. | Synthetic test beds for fracturing optimization and methods of manufacture and use thereof |
US20160326853A1 (en) * | 2015-05-08 | 2016-11-10 | Schlumberger Technology Corporation | Multiple wellbore perforation and stimulation |
CN105257252A (zh) * | 2015-06-08 | 2016-01-20 | 中国石油集团川庆钻探工程有限公司 | 利用测井资料优选页岩气水平井分簇射孔井段的方法 |
CN105426650A (zh) * | 2015-06-08 | 2016-03-23 | 中国石油集团川庆钻探工程有限公司 | 利用测井资料优选页岩气井压裂改造井段的方法 |
GB2539238B (en) * | 2015-06-10 | 2021-01-27 | Ikon Science Innovation Ltd | Method and apparatus for reservoir analysis and fracture design in a rock layer |
US20170002630A1 (en) * | 2015-07-02 | 2017-01-05 | Schlumberger Technology Corporation | Method of performing additional oilfield operations on existing wells |
WO2017027342A1 (en) | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Method of performing complex fracture operations at a wellsite having ledged fractures |
US10920538B2 (en) | 2015-08-07 | 2021-02-16 | Schlumberger Technology Corporation | Method integrating fracture and reservoir operations into geomechanical operations of a wellsite |
WO2017027433A1 (en) | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite |
WO2017027068A1 (en) | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Well management on cloud computing system |
US10019541B2 (en) * | 2015-09-02 | 2018-07-10 | GCS Solutions, Inc. | Methods for estimating formation pressure |
US10920552B2 (en) | 2015-09-03 | 2021-02-16 | Schlumberger Technology Corporation | Method of integrating fracture, production, and reservoir operations into geomechanical operations of a wellsite |
US20180306016A1 (en) * | 2015-10-15 | 2018-10-25 | Schlumberger Technology Corporation | Stimulation treatment conductivity analyzer |
WO2017074869A1 (en) | 2015-10-28 | 2017-05-04 | Halliburton Energy Services, Inc. | Near real-time return-on-fracturing-investment optimization for fracturing shale and tight reservoirs |
MX2018005522A (es) * | 2015-11-03 | 2018-12-19 | Weatherford Tech Holdings Llc | Sistemas y metodos para evaluar y optimizar eficiencia de estimulacion utilizando desviadores. |
US20170138191A1 (en) * | 2015-11-17 | 2017-05-18 | Baker Hughes Incorporated | Geological asset uncertainty reduction |
US20180100390A1 (en) * | 2015-11-17 | 2018-04-12 | Baker Hughes, A Ge Company, Llc | Geological asset uncertainty reduction |
US10883346B2 (en) | 2015-12-18 | 2021-01-05 | Schlumberger Technology Corporation | Method of performing a perforation using selective stress logging |
US9988881B2 (en) * | 2016-04-15 | 2018-06-05 | Baker Hughes, A Ge Company, Llc | Surface representation for modeling geological surfaces |
CN108150140B (zh) * | 2016-05-06 | 2021-03-16 | 延安大学 | 一种基于压力振荡的页岩气水平井作业装置 |
US11454102B2 (en) * | 2016-05-11 | 2022-09-27 | Baker Hughes, LLC | Methods and systems for optimizing a drilling operation based on multiple formation measurements |
US10619469B2 (en) * | 2016-06-23 | 2020-04-14 | Saudi Arabian Oil Company | Hydraulic fracturing in kerogen-rich unconventional formations |
US10060227B2 (en) | 2016-08-02 | 2018-08-28 | Saudi Arabian Oil Company | Systems and methods for developing hydrocarbon reservoirs |
WO2018052438A1 (en) | 2016-09-16 | 2018-03-22 | Halliburton Energy Services, Inc. | Dynamically optimizing a pumping schedule for stimulating a well |
US20190361146A1 (en) * | 2017-01-13 | 2019-11-28 | Ground Truth Consulting | System and method for predicting well production |
US11047220B2 (en) * | 2017-01-31 | 2021-06-29 | Halliburton Energy Services, Inc. | Real-time optimization of stimulation treatments for multistage fracture stimulation |
US10605054B2 (en) | 2017-02-15 | 2020-03-31 | General Electric Co. | System and method for generating a schedule to extract a resource from a reservoir |
US10914139B2 (en) * | 2017-02-22 | 2021-02-09 | Weatherford Technology Holdings, Llc | Systems and methods for optimization of the number of diverter injections and the timing of the diverter injections relative to stimulant injection |
RU2730576C1 (ru) * | 2017-05-02 | 2020-08-24 | Шлюмберже Текнолоджи Б.В. | Способ прогнозирования гидроразрыва пласта, способ гидроразрыва пласта, способы прогнозирования рисков гидроразрыва пласта |
US11624326B2 (en) | 2017-05-21 | 2023-04-11 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
US10942293B2 (en) * | 2017-07-21 | 2021-03-09 | Halliburton Energy Services, Inc. | Rock physics based method of integrated subsurface reservoir characterization for use in optimized stimulation design of horizontal wells |
CA3066346C (en) | 2017-08-04 | 2022-05-03 | Halliburton Energy Services, Inc. | Methods for enhancing hydrocarbon production from subterranean formations using electrically controlled propellant |
CN109555520A (zh) * | 2017-09-26 | 2019-04-02 | 中国石油天然气股份有限公司 | 双层试油管柱及试油方法 |
US11341298B2 (en) | 2017-12-05 | 2022-05-24 | Schlumberger Technology Corporation | Method for reservoir stimulation analysis and design based on lagrangian approach |
CN109958416B (zh) * | 2017-12-22 | 2022-01-11 | 中国石油化工股份有限公司 | 一种变孔径变孔密均匀进液进砂的多簇射孔压裂方法 |
RU2672292C1 (ru) * | 2018-01-10 | 2018-11-13 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Способ разработки нефтяной залежи горизонтальными скважинами с проведением многостадийного гидроразрыва пласта |
WO2019246564A1 (en) * | 2018-06-21 | 2019-12-26 | Halliburton Energy Services, Inc. | Evaluating hydraulic fracturing breakdown effectiveness |
WO2020097060A2 (en) | 2018-11-05 | 2020-05-14 | Schlumberger Technology Corporation | Fracturing operations pump fleet balance controller |
US11573159B2 (en) | 2019-01-08 | 2023-02-07 | Saudi Arabian Oil Company | Identifying fracture barriers for hydraulic fracturing |
US11560845B2 (en) | 2019-05-15 | 2023-01-24 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
WO2021016515A1 (en) | 2019-07-24 | 2021-01-28 | Saudi Arabian Oil Company | Oxidizing gasses for carbon dioxide-based fracturing fluids |
US11492541B2 (en) | 2019-07-24 | 2022-11-08 | Saudi Arabian Oil Company | Organic salts of oxidizing anions as energetic materials |
CN112392472B (zh) * | 2019-08-19 | 2022-08-02 | 中国石油天然气股份有限公司 | 确定页岩与邻近油层一体化开发方式的方法及装置 |
US11449645B2 (en) * | 2019-09-09 | 2022-09-20 | Halliburton Energy Services, Inc. | Calibrating a diversion model for a hydraulic fracturing well system |
CA3092865C (en) | 2019-09-13 | 2023-07-04 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US10895202B1 (en) | 2019-09-13 | 2021-01-19 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11002189B2 (en) | 2019-09-13 | 2021-05-11 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US10815764B1 (en) | 2019-09-13 | 2020-10-27 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US10961914B1 (en) | 2019-09-13 | 2021-03-30 | BJ Energy Solutions, LLC Houston | Turbine engine exhaust duct system and methods for noise dampening and attenuation |
US11555756B2 (en) | 2019-09-13 | 2023-01-17 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
CA3092829C (en) | 2019-09-13 | 2023-08-15 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
CA3197583A1 (en) | 2019-09-13 | 2021-03-13 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11015594B2 (en) | 2019-09-13 | 2021-05-25 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
WO2021138355A1 (en) | 2019-12-31 | 2021-07-08 | Saudi Arabian Oil Company | Viscoelastic-surfactant fracturing fluids having oxidizer |
US11352548B2 (en) | 2019-12-31 | 2022-06-07 | Saudi Arabian Oil Company | Viscoelastic-surfactant treatment fluids having oxidizer |
US11339321B2 (en) | 2019-12-31 | 2022-05-24 | Saudi Arabian Oil Company | Reactive hydraulic fracturing fluid |
US11715034B2 (en) * | 2020-01-16 | 2023-08-01 | Saudi Arabian Oil Company | Training of machine learning algorithms for generating a reservoir digital twin |
US11473001B2 (en) | 2020-01-17 | 2022-10-18 | Saudi Arabian Oil Company | Delivery of halogens to a subterranean formation |
US11473009B2 (en) | 2020-01-17 | 2022-10-18 | Saudi Arabian Oil Company | Delivery of halogens to a subterranean formation |
US11268373B2 (en) | 2020-01-17 | 2022-03-08 | Saudi Arabian Oil Company | Estimating natural fracture properties based on production from hydraulically fractured wells |
US11365344B2 (en) | 2020-01-17 | 2022-06-21 | Saudi Arabian Oil Company | Delivery of halogens to a subterranean formation |
US11549894B2 (en) | 2020-04-06 | 2023-01-10 | Saudi Arabian Oil Company | Determination of depositional environments |
US11578263B2 (en) | 2020-05-12 | 2023-02-14 | Saudi Arabian Oil Company | Ceramic-coated proppant |
US11708829B2 (en) | 2020-05-12 | 2023-07-25 | Bj Energy Solutions, Llc | Cover for fluid systems and related methods |
US10968837B1 (en) | 2020-05-14 | 2021-04-06 | Bj Energy Solutions, Llc | Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge |
US11428165B2 (en) | 2020-05-15 | 2022-08-30 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11208880B2 (en) | 2020-05-28 | 2021-12-28 | Bj Energy Solutions, Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US11208953B1 (en) | 2020-06-05 | 2021-12-28 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11109508B1 (en) | 2020-06-05 | 2021-08-31 | Bj Energy Solutions, Llc | Enclosure assembly for enhanced cooling of direct drive unit and related methods |
US11066915B1 (en) | 2020-06-09 | 2021-07-20 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
US11111768B1 (en) | 2020-06-09 | 2021-09-07 | Bj Energy Solutions, Llc | Drive equipment and methods for mobile fracturing transportation platforms |
US10954770B1 (en) | 2020-06-09 | 2021-03-23 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
CN113803042B (zh) * | 2020-06-12 | 2023-08-01 | 中国石油化工股份有限公司 | 一种单段单簇密集压裂方法及系统 |
US11933153B2 (en) | 2020-06-22 | 2024-03-19 | Bj Energy Solutions, Llc | Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control |
US11939853B2 (en) | 2020-06-22 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units |
US11125066B1 (en) | 2020-06-22 | 2021-09-21 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11028677B1 (en) | 2020-06-22 | 2021-06-08 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11473413B2 (en) | 2020-06-23 | 2022-10-18 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11466680B2 (en) | 2020-06-23 | 2022-10-11 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US11149533B1 (en) | 2020-06-24 | 2021-10-19 | Bj Energy Solutions, Llc | Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
US11220895B1 (en) | 2020-06-24 | 2022-01-11 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11193360B1 (en) | 2020-07-17 | 2021-12-07 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
RU2745640C1 (ru) * | 2020-07-28 | 2021-03-29 | Публичное акционерное общество "Нефтяная компания "Роснефть" (ПАО "НК "Роснефть") | Способ разработки газовых залежей в низкопроницаемых кремнистых опоковидных коллекторах |
CN112036741B (zh) * | 2020-08-28 | 2022-10-11 | 四川长宁天然气开发有限责任公司 | 一种页岩气钻井工程智能调度方法及系统 |
CN111810144B (zh) * | 2020-08-28 | 2023-04-21 | 四川长宁天然气开发有限责任公司 | 一种页岩气井工程智能调度方法及系统 |
CN114439472A (zh) * | 2020-11-02 | 2022-05-06 | 中国石油天然气股份有限公司 | 油田新项目评价方案优化方法及装置 |
US11542815B2 (en) | 2020-11-30 | 2023-01-03 | Saudi Arabian Oil Company | Determining effect of oxidative hydraulic fracturing |
RU2750805C1 (ru) * | 2020-12-18 | 2021-07-02 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Способ интенсификации работы скважины бурением боковых стволов |
US11898430B2 (en) * | 2021-05-12 | 2024-02-13 | Halliburton Energy Services, Inc. | Adjusting wellbore operations in target wellbore using trained model from reference wellbore |
US11639654B2 (en) | 2021-05-24 | 2023-05-02 | Bj Energy Solutions, Llc | Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods |
CN113530514A (zh) * | 2021-06-11 | 2021-10-22 | 烟台杰瑞石油装备技术有限公司 | 一种油田作业试剂制备的控制方法及系统 |
US11719083B2 (en) | 2021-08-17 | 2023-08-08 | Saudi Arabian Oil Company | Maintaining integrity of lower completion for multi-stage fracturing |
US11525935B1 (en) | 2021-08-31 | 2022-12-13 | Saudi Arabian Oil Company | Determining hydrogen sulfide (H2S) concentration and distribution in carbonate reservoirs using geomechanical properties |
CN113653477B (zh) * | 2021-09-09 | 2022-04-05 | 大庆亿莱检验检测技术服务有限公司 | 一种利用多项示踪手段综合评价压裂效果的方法 |
US11859469B2 (en) | 2021-10-20 | 2024-01-02 | Saudi Arabian Oil Company | Utilizing natural gas flaring byproducts for liquid unloading in gas wells |
US11885790B2 (en) | 2021-12-13 | 2024-01-30 | Saudi Arabian Oil Company | Source productivity assay integrating pyrolysis data and X-ray diffraction data |
US11921250B2 (en) | 2022-03-09 | 2024-03-05 | Saudi Arabian Oil Company | Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation |
Family Cites Families (68)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3721960A (en) | 1969-07-14 | 1973-03-20 | Schlumberger Technology Corp | Methods and apparatus for processing well logging data |
US4502121A (en) * | 1971-02-02 | 1985-02-26 | Schlumberger Technology Corporation | Machine method for determining the presence and location of hydrocarbon deposits within a subsurface earth formation |
US4584874A (en) | 1984-10-15 | 1986-04-29 | Halliburton Company | Method for determining porosity, clay content and mode of distribution in gas and oil bearing shaly sand reservoirs |
US5170378A (en) | 1989-04-04 | 1992-12-08 | The British Petroleum Company P.L.C. | Hydraulic impedance test method |
US5070457A (en) | 1990-06-08 | 1991-12-03 | Halliburton Company | Methods for design and analysis of subterranean fractures using net pressures |
US5279366A (en) * | 1992-09-01 | 1994-01-18 | Scholes Patrick L | Method for wireline operation depth control in cased wells |
US5551516A (en) | 1995-02-17 | 1996-09-03 | Dowell, A Division Of Schlumberger Technology Corporation | Hydraulic fracturing process and compositions |
US6435277B1 (en) | 1996-10-09 | 2002-08-20 | Schlumberger Technology Corporation | Compositions containing aqueous viscosifying surfactants and methods for applying such compositions in subterranean formations |
US6258859B1 (en) | 1997-06-10 | 2001-07-10 | Rhodia, Inc. | Viscoelastic surfactant fluids and related methods of use |
US7283061B1 (en) | 1998-08-28 | 2007-10-16 | Marathon Oil Company | Method and system for performing operations and for improving production in wells |
US6876959B1 (en) | 1999-04-29 | 2005-04-05 | Schlumberger Technology Corporation | Method and apparatus for hydraulic fractioning analysis and design |
US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6508307B1 (en) | 1999-07-22 | 2003-01-21 | Schlumberger Technology Corporation | Techniques for hydraulic fracturing combining oriented perforating and low viscosity fluids |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US20020013687A1 (en) | 2000-03-27 | 2002-01-31 | Ortoleva Peter J. | Methods and systems for simulation-enhanced fracture detections in sedimentary basins |
AU2002239619A1 (en) | 2000-12-08 | 2002-06-18 | Peter J. Ortoleva | Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories |
AU2002333644A1 (en) | 2001-09-17 | 2003-04-01 | Glaxo Group Limited | Dry powder medicament formulations |
RU2208153C2 (ru) * | 2001-10-02 | 2003-07-10 | Закрытое акционерное общество Научно-производственная фирма "Самарские Горизонты" | Система управления процессом бурения |
US6834233B2 (en) | 2002-02-08 | 2004-12-21 | University Of Houston | System and method for stress and stability related measurements in boreholes |
US6926081B2 (en) | 2002-02-25 | 2005-08-09 | Halliburton Energy Services, Inc. | Methods of discovering and correcting subterranean formation integrity problems during drilling |
US20050058606A1 (en) | 2002-12-16 | 2005-03-17 | Boehringer Ingelheim Pharma Gmbh & Co. Kg | Tiotropium containing HFC solution formulations |
US7114567B2 (en) | 2003-01-28 | 2006-10-03 | Schlumberger Technology Corporation | Propped fracture with high effective surface area |
US20040209780A1 (en) | 2003-04-18 | 2004-10-21 | Harris Phillip C. | Methods of treating subterranean formations using hydrophobically modified polymers and compositions of the same |
US7054751B2 (en) | 2004-03-29 | 2006-05-30 | Halliburton Energy Services, Inc. | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
US20050284637A1 (en) | 2004-06-04 | 2005-12-29 | Halliburton Energy Services | Methods of treating subterranean formations using low-molecular-weight fluids |
US7672825B2 (en) | 2004-06-25 | 2010-03-02 | Shell Oil Company | Closed loop control system for controlling production of hydrocarbon fluid from an underground formation |
US20060015310A1 (en) | 2004-07-19 | 2006-01-19 | Schlumberger Technology Corporation | Method for simulation modeling of well fracturing |
WO2007013883A2 (en) | 2004-10-04 | 2007-02-01 | Hexion Specialty Chemicals Inc. | Method of estimating fracture geometry, compositions and articles used for the same |
US7386431B2 (en) | 2005-03-31 | 2008-06-10 | Schlumberger Technology Corporation | Method system and program storage device for simulating interfacial slip in a hydraulic fracturing simulator software |
US7369979B1 (en) * | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
CN101379498B (zh) | 2006-01-31 | 2012-05-30 | 兰德马克绘图公司 | 使用物理和代理仿真器的用于快速更新油气田生产模型的方法和系统 |
US20070272407A1 (en) | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US7953587B2 (en) | 2006-06-15 | 2011-05-31 | Schlumberger Technology Corp | Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs |
US7450053B2 (en) | 2006-09-13 | 2008-11-11 | Hexion Specialty Chemicals, Inc. | Logging device with down-hole transceiver for operation in extreme temperatures |
US7398829B2 (en) | 2006-09-18 | 2008-07-15 | Schlumberger Technology Corporation | Methods of limiting leak off and damage in hydraulic fractures |
US7998909B2 (en) | 2006-09-28 | 2011-08-16 | Schlumberger Technology Corporation | Foaming agent for subterranean formations treatment, and methods of use thereof |
AU2007313395B2 (en) | 2006-10-13 | 2013-11-07 | Exxonmobil Upstream Research Company | Enhanced shale oil production by in situ heating using hydraulically fractured producing wells |
US7925482B2 (en) | 2006-10-13 | 2011-04-12 | Object Reservoir, Inc. | Method and system for modeling and predicting hydraulic fracture performance in hydrocarbon reservoirs |
US7565929B2 (en) | 2006-10-24 | 2009-07-28 | Schlumberger Technology Corporation | Degradable material assisted diversion |
US7565278B2 (en) | 2006-12-04 | 2009-07-21 | Chevron U.S.A. Inc. | Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures |
US7928040B2 (en) | 2007-01-23 | 2011-04-19 | Halliburton Energy Services, Inc. | Compositions and methods for breaking a viscosity increasing polymer at very low temperature used in downhole well applications |
US9228425B2 (en) | 2007-01-29 | 2016-01-05 | Schlumberger Technology Corporation | System and method for performing downhole stimulation operations |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US9135475B2 (en) | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US7669655B2 (en) | 2007-02-13 | 2010-03-02 | Bj Services Company | Method of fracturing a subterranean formation at optimized and pre-determined conditions |
US7908230B2 (en) | 2007-02-16 | 2011-03-15 | Schlumberger Technology Corporation | System, method, and apparatus for fracture design optimization |
US9074454B2 (en) | 2008-01-15 | 2015-07-07 | Schlumberger Technology Corporation | Dynamic reservoir engineering |
US8577660B2 (en) | 2008-01-23 | 2013-11-05 | Schlumberger Technology Corporation | Three-dimensional mechanical earth modeling |
US8793111B2 (en) * | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
US8200465B2 (en) * | 2008-06-18 | 2012-06-12 | Terratek Inc. | Heterogeneous earth models for a reservoir field |
US8670966B2 (en) * | 2008-08-04 | 2014-03-11 | Schlumberger Technology Corporation | Methods and systems for performing oilfield production operations |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US9085975B2 (en) | 2009-03-06 | 2015-07-21 | Schlumberger Technology Corporation | Method of treating a subterranean formation and forming treatment fluids using chemo-mathematical models and process control |
US8498852B2 (en) | 2009-06-05 | 2013-07-30 | Schlumberger Tehcnology Corporation | Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon |
US8898044B2 (en) | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
US8886502B2 (en) | 2009-11-25 | 2014-11-11 | Halliburton Energy Services, Inc. | Simulating injection treatments from multiple wells |
US8386226B2 (en) | 2009-11-25 | 2013-02-26 | Halliburton Energy Services, Inc. | Probabilistic simulation of subterranean fracture propagation |
US8392165B2 (en) | 2009-11-25 | 2013-03-05 | Halliburton Energy Services, Inc. | Probabilistic earth model for subterranean fracture simulation |
US8437962B2 (en) | 2009-11-25 | 2013-05-07 | Halliburton Energy Services, Inc. | Generating probabilistic information on subterranean fractures |
US20130144532A1 (en) | 2009-12-21 | 2013-06-06 | Schlumberger Technology Corporation | Identification of reservoir geometry from microseismic event clouds |
US8731889B2 (en) | 2010-03-05 | 2014-05-20 | Schlumberger Technology Corporation | Modeling hydraulic fracturing induced fracture networks as a dual porosity system |
AU2011241875B2 (en) * | 2010-04-12 | 2015-09-17 | Schlumberger Technology B.V. | Automatic stage design of hydraulic fracture treatments using fracture height and in-situ stress |
US20130140031A1 (en) | 2010-12-30 | 2013-06-06 | Schlumberger Technology Corporation | System and method for performing optimized downhole stimulation operations |
US8905133B2 (en) | 2011-05-11 | 2014-12-09 | Schlumberger Technology Corporation | Methods of zonal isolation and treatment diversion |
RU2014107705A (ru) | 2011-07-28 | 2015-09-10 | Шлюмбергер Текнолоджи Б.В. | Система и способ выполнения операций разрыва в стволе скважины |
CA2843469A1 (en) | 2011-07-28 | 2013-01-31 | Schlumberger Canada Limited | System and method for performing wellbore fracture operations |
US9027641B2 (en) | 2011-08-05 | 2015-05-12 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well using propellant pre-fracturing |
US9262713B2 (en) | 2012-09-05 | 2016-02-16 | Carbo Ceramics Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
-
2011
- 2011-12-28 US US13/338,784 patent/US9228425B2/en active Active
- 2011-12-28 AU AU2011350663A patent/AU2011350663B2/en not_active Ceased
- 2011-12-28 AU AU2011350664A patent/AU2011350664B2/en not_active Ceased
- 2011-12-28 RU RU2013135469/03A patent/RU2569116C2/ru active
- 2011-12-28 MX MX2013007565A patent/MX336561B/es unknown
- 2011-12-28 CA CA2823115A patent/CA2823115A1/en not_active Abandoned
- 2011-12-28 GB GB1310333.8A patent/GB2500332B/en active Active
- 2011-12-28 MX MX2013007476A patent/MX350756B/es active IP Right Grant
- 2011-12-28 CN CN201180063746.1A patent/CN103282600B/zh not_active Expired - Fee Related
- 2011-12-28 US US13/338,732 patent/US9556720B2/en active Active
- 2011-12-28 CA CA2823116A patent/CA2823116A1/en not_active Abandoned
- 2011-12-28 RU RU2013135493/03A patent/RU2561114C2/ru active
- 2011-12-28 CN CN201180063745.7A patent/CN103370494B/zh not_active Expired - Fee Related
- 2011-12-28 WO PCT/IB2011/055997 patent/WO2012090174A2/en active Application Filing
- 2011-12-28 GB GB1310311.4A patent/GB2500517B/en active Active
- 2011-12-28 WO PCT/IB2011/055998 patent/WO2012090175A2/en active Application Filing
-
2016
- 2016-01-04 US US14/987,073 patent/US10563493B2/en active Active
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2013135469A (ru) | Система и способ для выполнения операций интенсификации добычи в скважине | |
US10942293B2 (en) | Rock physics based method of integrated subsurface reservoir characterization for use in optimized stimulation design of horizontal wells | |
US8762118B2 (en) | Modeling hydraulic fractures | |
US20070272407A1 (en) | Method and system for development of naturally fractured formations | |
CN104040376B (zh) | 用于执行增产作业的系统和方法 | |
US20140151033A1 (en) | System and method for performing wellbore fracture operations | |
US20180216441A1 (en) | Shale fracturing characterization and optimization using three-dimensional fracture modeling and neural network | |
CA3100391C (en) | Well operations involving synthetic fracture injection test | |
US20150371345A1 (en) | System, Method and Computer Program Product for Predicting Well Production | |
BRPI1101799A2 (pt) | unidade de otimização da operação de perfuração para determinar pelo menos uma propriedade da trajetória de poço em um reservatório em um campo de petróleo, sistema para otimizar uma operação de perfuração de um reservatório em um campo de petróleo, e método para otimizar uma operação de perfuração em um reservatório em um campo de petróleo | |
US11401803B2 (en) | Determining fracture surface area in a well | |
US20170002630A1 (en) | Method of performing additional oilfield operations on existing wells | |
RU2610454C2 (ru) | Способ определения местоположения точек интенсификации разрыва пласта с использованием минералогического состава, а также соответствующие система и программный продукт | |
US20170234999A1 (en) | Reducing Microseismic Monitoring Uncertainty | |
CN105467438A (zh) | 一种基于三模量的泥页岩地应力三维地震表征方法 | |
RU2014120155A (ru) | Оптимизация модели с несколькими периодами для экономического оценивания регуляторов расхода | |
Liang et al. | Accelerating development optimization in the Bakken using an integrated fracture diagnostic pilot | |
CN110851991A (zh) | 一种地下水流数值模拟方法 | |
Kabir et al. | Understanding variable well performance in a chalk reservoir | |
Tătaru et al. | Identifying undrained layers from mature gas reservoirs using reservoir simulation and high resolution geophysical investigation | |
Mohamed et al. | Drilling and 4D seismic calibrated geomechanical model: Enabling extended-reach drilling well design in complex subsalt GOM play | |
Carpenter | Production Response in the Denver-Julesburg Basin | |
McLean et al. | Technical Aspects Controlling the Emerging Eagle Ford Play East of the San Marcos Arch | |
Kozhakhmetova | Dynamic Modeling of an Underground Gas Storage Facility, History Matching and Prediction | |
Burgdorff et al. | Near real-time geomechanical modelling update and completion optimisation in the fold belt area of PNG: a case study with Oil Search Ltd |