RU2013127746A - METHOD FOR CONTROLLING THE INPUT AND TURNING OFF THE SECTIONAL SWITCHES OF TIRES OF TWO-TRANSFORMER SUBSTATION WHEN RESTORING THE NORMAL WIRING DIAGRAM OF THE RING NETWORK - Google Patents

METHOD FOR CONTROLLING THE INPUT AND TURNING OFF THE SECTIONAL SWITCHES OF TIRES OF TWO-TRANSFORMER SUBSTATION WHEN RESTORING THE NORMAL WIRING DIAGRAM OF THE RING NETWORK Download PDF

Info

Publication number
RU2013127746A
RU2013127746A RU2013127746/07A RU2013127746A RU2013127746A RU 2013127746 A RU2013127746 A RU 2013127746A RU 2013127746/07 A RU2013127746/07 A RU 2013127746/07A RU 2013127746 A RU2013127746 A RU 2013127746A RU 2013127746 A RU2013127746 A RU 2013127746A
Authority
RU
Russia
Prior art keywords
busbar
power supply
transformer substation
time
restoring
Prior art date
Application number
RU2013127746/07A
Other languages
Russian (ru)
Other versions
RU2542747C2 (en
Inventor
Леонид Дмитриевич Суров
Original Assignee
Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) filed Critical Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ)
Priority to RU2013127746/07A priority Critical patent/RU2542747C2/en
Publication of RU2013127746A publication Critical patent/RU2013127746A/en
Application granted granted Critical
Publication of RU2542747C2 publication Critical patent/RU2542747C2/en

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)
  • Keying Circuit Devices (AREA)

Abstract

Способ контроля включения вводного и отключения секционного выключателей шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети, заключающийся в фиксации бросков тока и в измерении времени между ними, отличающийся тем, что с момента появления напряжения на трансформаторе основного источника питания начинают отсчет суммарного времени, равного времени выдержки включения вводного выключателя шин основного источника питания и времени выдержки отключения секционного выключателя шин подстанции и, если к моменту окончания отсчета суммарного времени происходит уменьшение рабочего тока, потребляемого от резервного источника питания на значение, определяемое резервируемой нагрузкой линии основного источника питания, то делают вывод о включении вводного и отключении секционного выключателей шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети.A method for controlling the on and off switching of the sectional busbar switches of a two-transformer substation when restoring the normal power supply circuit of the ring network, which consists in fixing the inrush currents and in measuring the time between them, characterized in that from the moment the voltage appears on the transformer of the main power source, the total time equal to the exposure time of the main busbar power supply circuit breaker and the shutdown time of the busbar busbar substations and, if at the end of the countdown of the total time, the operating current consumed from the backup power source decreases by a value determined by the reserved load of the main power supply line, then it is concluded that the bus section switches of the two-transformer substation are turned on and off when the normal ring power supply is restored network.

Claims (1)

Способ контроля включения вводного и отключения секционного выключателей шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети, заключающийся в фиксации бросков тока и в измерении времени между ними, отличающийся тем, что с момента появления напряжения на трансформаторе основного источника питания начинают отсчет суммарного времени, равного времени выдержки включения вводного выключателя шин основного источника питания и времени выдержки отключения секционного выключателя шин подстанции и, если к моменту окончания отсчета суммарного времени происходит уменьшение рабочего тока, потребляемого от резервного источника питания на значение, определяемое резервируемой нагрузкой линии основного источника питания, то делают вывод о включении вводного и отключении секционного выключателей шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети. A method for controlling the on and off switching of the sectional busbar switches of a two-transformer substation when restoring the normal power supply circuit of the ring network, which consists in fixing the inrush currents and in measuring the time between them, characterized in that from the moment the voltage appears on the transformer of the main power source, the total time equal to the exposure time of the main busbar power supply circuit breaker and the shutdown time of the busbar busbar substations and, if at the end of the countdown of the total time, the operating current consumed from the backup power source decreases by a value determined by the reserved load of the main power supply line, then it is concluded that the bus section switches of the two-transformer substation are turned on and off when the normal ring power supply is restored network.
RU2013127746/07A 2013-06-18 2013-06-18 Method to control switching of disconnect switch on and switching busbar sectionalising switch off at double-transformer substation during recovery of normal power supply circuit of ring network RU2542747C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013127746/07A RU2542747C2 (en) 2013-06-18 2013-06-18 Method to control switching of disconnect switch on and switching busbar sectionalising switch off at double-transformer substation during recovery of normal power supply circuit of ring network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013127746/07A RU2542747C2 (en) 2013-06-18 2013-06-18 Method to control switching of disconnect switch on and switching busbar sectionalising switch off at double-transformer substation during recovery of normal power supply circuit of ring network

Publications (2)

Publication Number Publication Date
RU2013127746A true RU2013127746A (en) 2014-12-27
RU2542747C2 RU2542747C2 (en) 2015-02-27

Family

ID=53278371

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013127746/07A RU2542747C2 (en) 2013-06-18 2013-06-18 Method to control switching of disconnect switch on and switching busbar sectionalising switch off at double-transformer substation during recovery of normal power supply circuit of ring network

Country Status (1)

Country Link
RU (1) RU2542747C2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2169979C1 (en) * 2000-02-14 2001-06-27 Орловский государственный аграрный университет Method for checking automatic backup control center for failure to operate in response to short circuit
GB0323645D0 (en) * 2003-10-09 2003-11-12 Kelman Ltd System and apparatus for detecting and monitoring circuit breaker operation
RU2394331C1 (en) * 2009-05-12 2010-07-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method to control cut-off of line main circuit breaker at cut-off fault of sectionalising circuit breaker in its repeated cut-in at stable short circuit in circular circuit
RU2463695C1 (en) * 2011-07-21 2012-10-10 Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method for control of actuation failure of circuit breaker of automatic load transfer station in ring network

Also Published As

Publication number Publication date
RU2542747C2 (en) 2015-02-27

Similar Documents

Publication Publication Date Title
WO2014153151A3 (en) Systems and methods for detecting and determiniing sources of power disturbances in connection with effective remediation
MX2018012988A (en) Solid-state line disturbance circuit interrupter.
RU2017109678A (en) INTEGRATED POWER DISTRIBUTION SYSTEM AND MODULE FOR VEHICLE
BRPI0804505A2 (en) transformer that automatically adjusts the voltage of three phase power supply
JP2014096913A5 (en)
MX2021015092A (en) Electrical energy saving system.
JP6223803B2 (en) DC breaker
IN2014DN09153A (en)
RU2013127746A (en) METHOD FOR CONTROLLING THE INPUT AND TURNING OFF THE SECTIONAL SWITCHES OF TIRES OF TWO-TRANSFORMER SUBSTATION WHEN RESTORING THE NORMAL WIRING DIAGRAM OF THE RING NETWORK
CN203387397U (en) Soft starting circuit structure of large-power photovoltaic inverter auxiliary power supply
RU2013123533A (en) METHOD FOR MONITORING THE FAILURE TO TURN OFF THE SECTIONAL SWITCH OF TIRES OF A TWO TRANSFORMER SUBSTATION WHEN RESTORING A NORMAL RING ELECTRICAL SCHEME
RU2639295C2 (en) Current protection device
CN204615501U (en) A kind of flameproof high-voltage vacuum distribution equipment for mining of DC operation
RU139872U1 (en) AUTOMATIC NETWORK SWITCHING DEVICE
RU103249U1 (en) DEVICE FOR AUTOMATIC START-UP
RU2565065C2 (en) 110 kv (and higher) switching device
RU2502175C1 (en) Control method of trip of network station switch of automatic load transfer at restoration of normal electric power supply circuit of ring network
CN203434591U (en) Security-isolation insulating power-off device
RU100683U1 (en) POWER SUPPLY SYSTEM
RU2012122933A (en) METHOD FOR MONITORING FALSE TURNING OFF THE SECTIONAL TIRE SWITCH WHEN OPERATING THE RING NETWORK IN THE SUBSTATION RESERVATION MODE
RU2351050C1 (en) Device of shunt compensation for power transmission line
RU2536808C1 (en) Control method of recovery of normal circuit of electric power supply of ring network with reference automation
RU2502174C1 (en) Control method of trip of isolating switch of substation buses with further trip of main switch and switch-on of standby switch of ring network line
RU2551379C2 (en) Method for control of successful automatic load transfer for busbars of double-transformer substation
RU148504U1 (en) DIAGRAM OF THE RING MULTI-SECTION AUTOMATIC TURNING ON THE RESERVE OF POWER SUPPLY

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20150619