RU2013105427A - METHOD FOR CONTROLLING BOTTOM-HOLE PARAMETERS DURING A WELL DRILLING - Google Patents

METHOD FOR CONTROLLING BOTTOM-HOLE PARAMETERS DURING A WELL DRILLING Download PDF

Info

Publication number
RU2013105427A
RU2013105427A RU2013105427/03A RU2013105427A RU2013105427A RU 2013105427 A RU2013105427 A RU 2013105427A RU 2013105427/03 A RU2013105427/03 A RU 2013105427/03A RU 2013105427 A RU2013105427 A RU 2013105427A RU 2013105427 A RU2013105427 A RU 2013105427A
Authority
RU
Russia
Prior art keywords
well
cable
extension
length
undocking
Prior art date
Application number
RU2013105427/03A
Other languages
Russian (ru)
Other versions
RU2643380C2 (en
Inventor
Сергей Георгиевич Фурсин
Original Assignee
Сергей Георгиевич Фурсин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сергей Георгиевич Фурсин filed Critical Сергей Георгиевич Фурсин
Priority to RU2013105427A priority Critical patent/RU2643380C2/en
Publication of RU2013105427A publication Critical patent/RU2013105427A/en
Application granted granted Critical
Publication of RU2643380C2 publication Critical patent/RU2643380C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions

Abstract

Способ контроля забойных параметров в процессе бурения скважины, включающий углубление скважины на интервале контроля с наращиванием бурильной колонны и проработкой ствола скважины до и после наращивания колонны, спуск на каротажной лебедке и закрепление в колонне на устье нижнего отрезка кабеля, связанного с забойным прибором, ввод в колонну через лубрикатор вертлюга и шаровой клапан верхнего отрезка кабеля, связанного с измерительно-регистрирующей аппаратурой на устье, периодическую стыковку-расстыковку через индуктивный соединитель верхнего и нижнего отрезков кабеля и измерение в процессе углубления скважины забойных параметров с помощью высокоскоростного кабельного канала связи, отличающийся тем, что, с целью упрощения способа и повышения эффективности его использования, в том числе в аварийных ситуациях, например, при угрозе нефтегазового выброса, стыковку-расстыковку верхнего и нижнего отрезков кабеля совмещают с одной из технологических операций в скважине, а именно, проработкой ствола при наращивании колонны и проводят при каждом наращивании в автоматическом режиме с использованием текущих данных бурения, а также малогабаритной лебедки, дополнительно введенной для верхнего отрезка кабеля, имеющего меньшие значения диаметра и прочности чем нижний отрезок кабеля, при этом малогабаритную лебедку устанавливают на вертлюге над лубрикатором и снабжают электродвигателем, тормозом, системой датчиков и блоком управления, а также барабаном с емкостью, соответствующей длине интервала контроля.A method for controlling downhole parameters during a well drilling process, including deepening a well in a control interval with a drill string extension and working out a well bore before and after a drill string extension, launching on a logging winch and securing a lower cable section connected with the downhole tool to the mouth of the well, inputting it into the column through the swivel lubricator and the ball valve of the upper length of the cable associated with the measuring and recording equipment at the mouth, the periodic docking-undocking through the inductive spruce of the upper and lower lengths of the cable and measurement of downhole parameters in the process of deepening the well using a high-speed cable communication channel, characterized in that, in order to simplify the method and increase the efficiency of its use, including in emergency situations, for example, when there is a threat of oil and gas discharge, docking-undocking of the upper and lower cable lengths is combined with one of the technological operations in the well, namely, by working out the trunk during the extension of the string and is carried out automatically at each extension Using the current drilling data, as well as a small winch, additionally introduced for the upper cable segment, which has smaller diameter and strength than the lower cable segment, the small winch is mounted on a swivel above the lubricator and equipped with an electric motor, brake, sensor system and unit control, as well as a drum with a capacity corresponding to the length of the control interval.

Claims (1)

Способ контроля забойных параметров в процессе бурения скважины, включающий углубление скважины на интервале контроля с наращиванием бурильной колонны и проработкой ствола скважины до и после наращивания колонны, спуск на каротажной лебедке и закрепление в колонне на устье нижнего отрезка кабеля, связанного с забойным прибором, ввод в колонну через лубрикатор вертлюга и шаровой клапан верхнего отрезка кабеля, связанного с измерительно-регистрирующей аппаратурой на устье, периодическую стыковку-расстыковку через индуктивный соединитель верхнего и нижнего отрезков кабеля и измерение в процессе углубления скважины забойных параметров с помощью высокоскоростного кабельного канала связи, отличающийся тем, что, с целью упрощения способа и повышения эффективности его использования, в том числе в аварийных ситуациях, например, при угрозе нефтегазового выброса, стыковку-расстыковку верхнего и нижнего отрезков кабеля совмещают с одной из технологических операций в скважине, а именно, проработкой ствола при наращивании колонны и проводят при каждом наращивании в автоматическом режиме с использованием текущих данных бурения, а также малогабаритной лебедки, дополнительно введенной для верхнего отрезка кабеля, имеющего меньшие значения диаметра и прочности чем нижний отрезок кабеля, при этом малогабаритную лебедку устанавливают на вертлюге над лубрикатором и снабжают электродвигателем, тормозом, системой датчиков и блоком управления, а также барабаном с емкостью, соответствующей длине интервала контроля. A method for controlling downhole parameters during a drilling process, including deepening a well in the monitoring interval with a drill string extension and working out a well bore before and after a drill string extension, launching on a logging winch and securing a lower cable section connected with the downhole tool to the mouth of the well, inputting it into the column through the swivel lubricator and the ball valve of the upper length of the cable associated with the measuring and recording equipment at the mouth, the periodic docking-undocking through the inductive spruce of the upper and lower lengths of the cable and measurement of downhole parameters in the process of deepening the well using a high-speed cable communication channel, characterized in that, in order to simplify the method and increase the efficiency of its use, including in emergency situations, for example, when there is a threat of oil and gas discharge, Docking-undocking of the upper and lower cable segments is combined with one of the technological operations in the well, namely, by working out the trunk during the extension of the string and is carried out automatically at each extension Using the current drilling data, as well as a small winch, additionally introduced for the upper cable length, which has smaller diameter and strength than the lower cable length, the small winch is mounted on a swivel above the lubricator and equipped with an electric motor, brake, sensor system and unit control, as well as a drum with a capacity corresponding to the length of the control interval.
RU2013105427A 2013-02-08 2013-02-08 Method for monitoring bottom-hole parameters during well drilling RU2643380C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013105427A RU2643380C2 (en) 2013-02-08 2013-02-08 Method for monitoring bottom-hole parameters during well drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013105427A RU2643380C2 (en) 2013-02-08 2013-02-08 Method for monitoring bottom-hole parameters during well drilling

Publications (2)

Publication Number Publication Date
RU2013105427A true RU2013105427A (en) 2014-08-20
RU2643380C2 RU2643380C2 (en) 2018-02-01

Family

ID=51384111

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013105427A RU2643380C2 (en) 2013-02-08 2013-02-08 Method for monitoring bottom-hole parameters during well drilling

Country Status (1)

Country Link
RU (1) RU2643380C2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2724723C1 (en) * 2020-02-10 2020-06-25 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Method of continuous control of extracted fluid parameters during well development and device for its implementation

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4129709C1 (en) * 1991-09-06 1992-12-03 Bergwerksverband Gmbh
GB2377951B (en) * 2001-07-25 2004-02-04 Schlumberger Holdings Method and system for drilling a wellbore having cable based telemetry
RU2289690C2 (en) * 2005-02-03 2006-12-20 Сергей Георгиевич Фурсин Method for controlling bottom parameters of well
RU2309249C2 (en) * 2005-11-24 2007-10-27 Общество с ограниченной ответственностью Научно-производственная фирма "ВНИИГИС-Забойные телеметрические системы" (ООО НПФ "ВНИИГИС-ЗТС") Bottomhole telemetering system with wired communication channel
RU60619U1 (en) * 2006-02-15 2007-01-27 Открытое акционерное общество Научно-производственное объединение "Буровая техника" (ОАО НПО "Буровая техника") TELEMETRIC SYSTEM FOR MONITORING WIRE AND HORIZONTAL WELL
RU2401378C1 (en) * 2009-08-06 2010-10-10 Николай Викторович Беляков Method of drilling inclined and horizontal well bores

Also Published As

Publication number Publication date
RU2643380C2 (en) 2018-02-01

Similar Documents

Publication Publication Date Title
MX2014010758A (en) Method and assembly for conveying well logging tools.
MX2015000752A (en) A system and method for wireline tool pump-down operations.
MY166114A (en) Method of and apparatus for drilling a subterranean borehole
WO2009151774A3 (en) Wireline drilling system and method
MX369043B (en) An improved method and device for making a lateral opening out of a wellbore.
MX2015002851A (en) Method for surveying drill holes, drilling arrangement, and borehole survey assembly.
CN204126569U (en) Two cylinder pneumatic water-cooled brake automatic driller
WO2014210539A3 (en) Stabilizer
RU2013105427A (en) METHOD FOR CONTROLLING BOTTOM-HOLE PARAMETERS DURING A WELL DRILLING
CN202832296U (en) Drill rod lifting device on drilling equipment
CN203905872U (en) Release device for screen pipe horizontal well production profile test
PH12016502426A1 (en) Downhole tool
GB2556767A (en) Method and system for monitoring the performance of oil or gas drilling equipment
CN104213851B (en) Rotary drilling rig down-the-hole breaks rock and bores oil pipe swivel coupling hole end rotary device
CN209277889U (en) A kind of tunnel piercing device
CN203114204U (en) Spiral drill collar having high resistance to abrasion
CN204782939U (en) Pumping, well workover car
CN102828703B (en) Traveling slip capable of pressurizing and lifting underground tubular column on any position
CN203515478U (en) Production drill pipe joint bleeder
CN203978352U (en) Hydraulic pressure sampling underground drill rig
CN203688820U (en) Underwater exploration equipment
CN205206803U (en) Oil field logging perforation insulating rod formula head harness of windowing
CN203531894U (en) Electric soil auger
CN210033484U (en) Drilling tool for drilling anchor cable hole by using rock drilling trolley
CN209053612U (en) A kind of interchangeable borehole log bridle chest-developing bar of weakness screw

Legal Events

Date Code Title Description
FA93 Acknowledgement of application withdrawn (no request for examination)

Effective date: 20160209

HE9A Changing address for correspondence with an applicant
FZ9A Application not withdrawn (correction of the notice of withdrawal)

Effective date: 20160601

MM4A The patent is invalid due to non-payment of fees

Effective date: 20180205