RU2012144856A - METHOD FOR SIMULTANEOUS-SEPARATE OPERATION OF A MULTI-PLASTIC WELL TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION - Google Patents

METHOD FOR SIMULTANEOUS-SEPARATE OPERATION OF A MULTI-PLASTIC WELL TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION Download PDF

Info

Publication number
RU2012144856A
RU2012144856A RU2012144856/03A RU2012144856A RU2012144856A RU 2012144856 A RU2012144856 A RU 2012144856A RU 2012144856/03 A RU2012144856/03 A RU 2012144856/03A RU 2012144856 A RU2012144856 A RU 2012144856A RU 2012144856 A RU2012144856 A RU 2012144856A
Authority
RU
Russia
Prior art keywords
installation
rod
packer
pump
bypass line
Prior art date
Application number
RU2012144856/03A
Other languages
Russian (ru)
Other versions
RU2515630C1 (en
Inventor
Марат Хуснуллович Аминев
Александр Владимирович Лукин
Фааи Тахирович Шамилов
Original Assignee
Общество с ограниченной ответственностью Научно-производственная фирма "Пакер"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" filed Critical Общество с ограниченной ответственностью Научно-производственная фирма "Пакер"
Priority to RU2012144856/03A priority Critical patent/RU2515630C1/en
Publication of RU2012144856A publication Critical patent/RU2012144856A/en
Application granted granted Critical
Publication of RU2515630C1 publication Critical patent/RU2515630C1/en

Links

Abstract

1. Установка для одновременно-раздельной эксплуатации многопластовой скважины, содержащая колонну труб, колонну штанг, один или два пакера, два насоса, верхний из которых выполнен штанговым, а нижний - электропогружным с электродвигателем и кабелем, отличающаяся тем, что оснащена комплектом байпасной линии, расположенным выше установки электропогружного насоса, причем штанговый насос установлен внутри комплекта байпасной линии.2. Установка по п.1, отличающаяся тем, что установка электропогружного насоса помещена в кожух.3. Установка по п.1, отличающаяся тем, что нижняя часть колонны труб выполнена с заглушкой.4. Установка по п.3, отличающаяся тем, что содержит нижние перепускные клапана, располагаемые под и над нижним продуктивным пластом, над нижним пакером установлены узел безопасности, телескопическое соединение, верхние перепускные клапана, располагаемые под и над верхним продуктивным пластом, над верхним пакером установлен разъединитель колонны, при этом между нижним и верхним пакерами имеются трубы меньшего диаметра, нижний конец которых присоединен к полому подвижному штоку телескопического соединения, а верхний конец соединен с переводником перекрестного сечения, причем трубы меньшего диаметра пропущены внутри центрального канала верхних перепускных клапанов.5. Установка по п.1, отличающаяся тем, что выше верхнего пакера установлена муфта перекрестного сечения или перфорированная труба, в которой размещен переводник.6. Установка по п.1, отличающаяся тем, что пакер выполнен с кабельным вводом.7. Установка по п.1, отличающаяся тем, что насос, установленный внутри комплекта байпасной линии, выполнен вин1. Installation for simultaneous and separate operation of a multilayer well, comprising a pipe string, a string of booms, one or two packers, two pumps, the upper of which is made by a rod, and the lower is electric submersible with an electric motor and cable, characterized in that it is equipped with a bypass line kit, located above the installation of the electric submersible pump, with the sucker rod pump installed inside the bypass line kit. 2. Installation according to claim 1, characterized in that the installation of an electric submersible pump is placed in a casing. 3. Installation according to claim 1, characterized in that the lower part of the pipe string is made with a plug. The installation according to claim 3, characterized in that it contains a lower bypass valve located below and above the lower reservoir, a safety assembly, a telescopic connection, an upper bypass valve located below and above the upper reservoir, a disconnector is installed above the upper packer columns, while between the lower and upper packers there are pipes of smaller diameter, the lower end of which is connected to the hollow movable rod of the telescopic connection, and the upper end is connected to the cross-sectional source, with pipes of a smaller diameter passing through the central channel of the upper bypass valves. 5. Installation according to claim 1, characterized in that a cross-section sleeve or perforated pipe in which the sub is placed is installed above the upper packer. Installation according to claim 1, characterized in that the packer is made with cable entry. Installation according to claim 1, characterized in that the pump installed inside the bypass line kit is made of wines

Claims (19)

1. Установка для одновременно-раздельной эксплуатации многопластовой скважины, содержащая колонну труб, колонну штанг, один или два пакера, два насоса, верхний из которых выполнен штанговым, а нижний - электропогружным с электродвигателем и кабелем, отличающаяся тем, что оснащена комплектом байпасной линии, расположенным выше установки электропогружного насоса, причем штанговый насос установлен внутри комплекта байпасной линии.1. Installation for simultaneous and separate operation of a multilayer well containing a pipe string, a string of booms, one or two packers, two pumps, the upper of which is made by a rod, and the lower is electric submersible with an electric motor and cable, characterized in that it is equipped with a bypass line kit, located above the installation of the electric submersible pump, and the sucker rod pump is installed inside the bypass line kit. 2. Установка по п.1, отличающаяся тем, что установка электропогружного насоса помещена в кожух.2. Installation according to claim 1, characterized in that the installation of an electric submersible pump is placed in a casing. 3. Установка по п.1, отличающаяся тем, что нижняя часть колонны труб выполнена с заглушкой.3. Installation according to claim 1, characterized in that the lower part of the pipe string is made with a plug. 4. Установка по п.3, отличающаяся тем, что содержит нижние перепускные клапана, располагаемые под и над нижним продуктивным пластом, над нижним пакером установлены узел безопасности, телескопическое соединение, верхние перепускные клапана, располагаемые под и над верхним продуктивным пластом, над верхним пакером установлен разъединитель колонны, при этом между нижним и верхним пакерами имеются трубы меньшего диаметра, нижний конец которых присоединен к полому подвижному штоку телескопического соединения, а верхний конец соединен с переводником перекрестного сечения, причем трубы меньшего диаметра пропущены внутри центрального канала верхних перепускных клапанов.4. The installation according to claim 3, characterized in that it contains lower bypass valves located below and above the lower reservoir, above the lower packer there is a safety assembly, telescopic connection, upper bypass valves located below and above the upper reservoir, above the upper packer a column disconnector is installed, while between the lower and upper packers there are pipes of smaller diameter, the lower end of which is connected to the hollow movable rod of the telescopic connection, and the upper end is connected to the odnikom cross-section, the smaller diameter pipe passed inside the central channel upper overflow valves. 5. Установка по п.1, отличающаяся тем, что выше верхнего пакера установлена муфта перекрестного сечения или перфорированная труба, в которой размещен переводник.5. Installation according to claim 1, characterized in that a cross-section sleeve or perforated pipe in which the sub is placed is installed above the upper packer. 6. Установка по п.1, отличающаяся тем, что пакер выполнен с кабельным вводом.6. Installation according to claim 1, characterized in that the packer is made with a cable entry. 7. Установка по п.1, отличающаяся тем, что насос, установленный внутри комплекта байпасной линии, выполнен винтовым.7. Installation according to claim 1, characterized in that the pump installed inside the bypass line kit is made screw. 8. Установка по п.7, отличающаяся тем, что оснащена верхним и нижним якорями, расположенными соответственно над и под комплектом байпасной линии.8. Installation according to claim 7, characterized in that it is equipped with upper and lower anchors located respectively above and below the bypass line kit. 9. Установка по п.6, отличающаяся тем, что оснащена обратным клапаном, расположенным над установкой электропогружного насоса.9. Installation according to claim 6, characterized in that it is equipped with a check valve located above the installation of an electric submersible pump. 10. Способ одновременно-раздельной эксплуатации многопластовой скважины двумя погружными насосами, включающий размещение в скважине насосной установки, содержащей колонну труб, колонну штанг, два пакера, два насоса, верхний из которых выполнен штанговым, а нижний - электропогружным с электродвигателем и кабелем, запуск скважины в нужном режиме и ее эксплуатацию, отличающийся тем, что соединяют нижние перепускные клапана, нижний пакер, узел безопасности, прикрепляют телескопическое соединение без полого подвижного штока к колонне труб, затем присоединяют к установке верхние перепускные клапана, далее в телескопическое соединение спускают полый подвижный шток, в который вкручивают трубы меньшего диаметра, при этом осуществляют подгонку труб и соединяют колонну труб меньшего диаметра с муфтой перекрестного сечения или с переводником, установленным в перфорированной трубе, присоединяют верхний пакер, монтируют разъединитель колонны, осуществляют спуск собранной установки на колонне труб до заданного интервала и перевод пакеров в рабочее положение, производят отсоединение в разъединителе колонны и подъем колонны труб, затем в скважину на колонне труб спускают извлекаемую часть разъединителя колонны, электропогружной насос, расположенный внутри кожуха, и комплект байпасной линии, состыковывают оставляемую и извлекаемую части разъединителя колонны, осуществляют спуск штангового насоса.10. The method of simultaneous and separate operation of a multilayer well with two submersible pumps, comprising placing a pumping unit in the well containing a pipe string, a rod string, two packers, two pumps, the upper of which is made by a rod, and the lower one by electric submersible with an electric motor and cable, launching the well in the required mode and its operation, characterized in that they connect the lower bypass valves, the lower packer, the safety assembly, attach the telescopic connection without a hollow movable rod to the pipe string, thereby, the upper bypass valves are connected to the installation, then a hollow movable rod is lowered into the telescopic connection, into which pipes of smaller diameter are screwed, while pipes are fitted and the pipe string of smaller diameters is connected with a cross-section coupling or with an adapter installed in a perforated pipe, the upper packer, mount the disconnector of the column, carry out the descent of the assembled installation on the pipe string to a predetermined interval and transfer the packers to the working position, disconnect in the column of the disconnector and lifting the pipe string, and then into the well on a pipe string is lowered retrievable part of the column disconnector submersible pump disposed within the housing, and a set of bypass line spliced leaves and extract of column disconnector carried sucker rod pump descent. 11. Способ по п.10 отличающийся тем, что установку электропогружного насоса помещают в кожух.11. The method according to claim 10, characterized in that the installation of an electric submersible pump is placed in a casing. 12. Способ по п.10 отличающийся тем, что низ колонны труб выполняют с заглушкой.12. The method according to claim 10, characterized in that the bottom of the pipe string is performed with a plug. 13. Способ одновременно-раздельной эксплуатации многопластовой скважины двумя погружными насосами, включающий размещение в скважине насосной установки, содержащей колонну труб, колонну штанг, один пакер, два насоса, верхний из которых выполнен штанговым, а нижний - электропогружным с электродвигателем и кабелем, запуск скважины в нужном режиме и ее эксплуатацию, отличающийся тем, что соединяют установку электропогружного насоса, пакер с кабельным вводом, комплект байпасной линии, переводят пакер с кабельным вводом в рабочее положение, осуществляют спуск штангового насоса.13. The method of simultaneous and separate operation of a multilayer well with two submersible pumps, including placing a pumping unit in the well containing a pipe string, a rod string, one packer, two pumps, the upper of which is made by a rod, and the lower one by electric submersible with an electric motor and cable, the well is launched in the required mode and its operation, characterized in that they connect the installation of an electric submersible pump, a packer with a cable entry, a set of bypass lines, transfer the packer with a cable entry to the operating position, They trigger the rod pump. 14. Способ по п.13 отличающийся тем, что применяют винтовой насос.14. The method according to item 13, characterized in that they use a screw pump. 15. Способ по п.14 отличающийся тем, что установку оборудуют верхним и нижним якорями, расположенными над и под комплектом байпасной линии.15. The method according to 14, characterized in that the installation is equipped with upper and lower anchors located above and below the bypass line kit. 16. Способ по п.13 отличающийся тем, что установку оснащают обратным клапаном, расположенным над установкой электропогружного насоса.16. The method according to item 13, wherein the installation is equipped with a check valve located above the installation of an electric submersible pump. 17. Комплект байпасной линии, состоящий из верхнего и нижнего блоков, между которыми установлены две параллельные линии оборудования, одна из которых включает в себя последовательно соединенные между собой переводник, кожух штангового насоса, фильтр, переходник, на который установлен конус, входящий в соответствующую выточку нижнего блока, другая линия оборудования включает в себя соединенные между собой полированный шток и трубу, при этом к верхней части верхнего блока и к нижней части нижнего блока прикреплены соответственно верхний и нижний патрубки, а на наружной поверхности верхнего и нижнего блоков, параллельно их оси, выполнены продольные пазы для укладки кабеля.17. A bypass line set consisting of upper and lower blocks, between which two parallel lines of equipment are installed, one of which includes a sub in series, a rod pump casing, a filter, an adapter on which a cone is installed, which is included in the corresponding recess of the lower block, another line of equipment includes a polished rod and a pipe connected to each other, while the upper and the lower are attached to the upper part of the upper block and the lower part of the lower block the lower branch pipes, and on the outer surface of the upper and lower blocks, parallel to their axis, longitudinal grooves are made for laying the cable. 18. Комплект байпасной линии по п.17, отличающийся тем, что к верхнему патрубку присоединена муфта.18. The bypass line set according to claim 17, characterized in that a coupling is connected to the upper nozzle. 19. Комплект байпасной линии по п.17, отличающийся тем, что подвижное соединение полированного штока с верхним блоком уплотнено манжетами и кольцами, поджатыми снизу крышкой, зафиксированной болтами. 19. The bypass line set according to claim 17, characterized in that the movable connection of the polished rod to the upper block is sealed with cuffs and rings, pressed down from the bottom by a cover fixed by bolts.
RU2012144856/03A 2012-10-22 2012-10-22 Method of simultaneous separate operation of multiple-zone well by two submersible pumps and equipment for its implementation RU2515630C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012144856/03A RU2515630C1 (en) 2012-10-22 2012-10-22 Method of simultaneous separate operation of multiple-zone well by two submersible pumps and equipment for its implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012144856/03A RU2515630C1 (en) 2012-10-22 2012-10-22 Method of simultaneous separate operation of multiple-zone well by two submersible pumps and equipment for its implementation

Publications (2)

Publication Number Publication Date
RU2012144856A true RU2012144856A (en) 2014-04-27
RU2515630C1 RU2515630C1 (en) 2014-05-20

Family

ID=50515258

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012144856/03A RU2515630C1 (en) 2012-10-22 2012-10-22 Method of simultaneous separate operation of multiple-zone well by two submersible pumps and equipment for its implementation

Country Status (1)

Country Link
RU (1) RU2515630C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236897A (en) * 2020-04-13 2020-06-05 冯新永 Oil pumping device of electric screw pump capable of separately pumping and separating oil submersible

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2569526C1 (en) * 2014-11-17 2015-11-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" Unit for dual operation of wells
RU183576U1 (en) * 2018-07-17 2018-09-26 Общество с ограниченной ответственностью ПКТБ "Техпроект" BYPASS SYSTEM FOR SIMULTANEOUSLY SEPARATE OPERATION
RU2713290C1 (en) * 2019-03-22 2020-02-04 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский государственный нефтяной технический университет" Well pumping unit for simultaneous separate operation of two formations

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5335732A (en) * 1992-12-29 1994-08-09 Mcintyre Jack W Oil recovery combined with injection of produced water
RU2284410C2 (en) * 2004-05-31 2006-09-27 Роберт Харрасович Фассахов Downhole pumping plant for oil production and water injection in formation
RU2405925C1 (en) * 2009-08-24 2010-12-10 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" (ООО НПФ "Пакер") Oil well pumping unit for simultaneous separate operation of two reservoirs
RU99820U1 (en) * 2010-06-25 2010-11-27 Олег Марсович Гарипов GARIPOV'S Borehole Pumping Packer Installation
RU2464413C1 (en) * 2011-04-22 2012-10-20 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Borehole pump unit for simultaneous operation of two beds with gas bypass from under parker space (versions)
RU109209U1 (en) * 2011-06-08 2011-10-10 Закрытое Акционерное Общество "Новомет-Пермь" PUMPING UNIT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS IN A WELL
RU109792U1 (en) * 2011-06-29 2011-10-27 Владимир Александрович Афанасьев EQUIPMENT FOR SIMULTANEOUS-SEPARATE OIL PRODUCTION FROM TWO LAYERS

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236897A (en) * 2020-04-13 2020-06-05 冯新永 Oil pumping device of electric screw pump capable of separately pumping and separating oil submersible

Also Published As

Publication number Publication date
RU2515630C1 (en) 2014-05-20

Similar Documents

Publication Publication Date Title
RU2012144856A (en) METHOD FOR SIMULTANEOUS-SEPARATE OPERATION OF A MULTI-PLASTIC WELL TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION
WO2011156157A3 (en) Compact cable suspended pumping system for dewatering gas wells
RU2550842C1 (en) Oil-well sucker-rod pumping unit (versions)
RU2009130494A (en) HARIPOV PUMP INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF WELLS (OPTIONS)
RU2534876C1 (en) Double-packer installation for operation of well with electrically driven pump, simultaneous isolation of untight interval and circulation valve
CN203214025U (en) Layered oil extraction pipe string
RU2331758C2 (en) Downhole packer system with pump (versions)
WO2011008391A3 (en) Lift wash-through facility
CN104514703A (en) Nonmetal pipe submersible screw pump oil extraction device
RU2005114603A (en) PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO LAYERS IN A WELL
RU166401U1 (en) DEVICE FOR REMOVING A FILTER FROM A DRILLING WELL
RU158027U1 (en) ESP BYPASS LINE DEVICE FOR CASING COLUMN DIAMETER 168 MM AND 178 MM
RU2654301C1 (en) Bypass system of pumping unit
CN203114261U (en) Supporting type high-pressure layering water injection tubular column
CN202866764U (en) Combination pump deep pumping device
RU2565619C1 (en) Bidirectional oil well pump
RU183576U1 (en) BYPASS SYSTEM FOR SIMULTANEOUSLY SEPARATE OPERATION
CN105089630B (en) Horizontal well bar conveys dynamic logging technique rod tube column and application method
RU2382176C1 (en) Underground equipment with device for cleaning of settling well of methane-coal hole during its development and maintenance
RU2273721C2 (en) Packer installation device
CN111335852A (en) Oil-water separate production pipe column and oil-water separate production method
RU2436934C1 (en) Installation for simultaneous separate water pumping into reservoirs
CN103527152A (en) Liquid drainage system
CN103742116A (en) 70-MPa sand blaster
RU2016114067A (en) INSTALLATION FOR SIMULTANEOUSLY SEPARATE OPERATION OF TWO LAYERS OF ONE WELL