RU2012107308A - Способ и устройство многоступенчатой обработки для интенсификации притока многоствольной скважины - Google Patents

Способ и устройство многоступенчатой обработки для интенсификации притока многоствольной скважины Download PDF

Info

Publication number
RU2012107308A
RU2012107308A RU2012107308/03A RU2012107308A RU2012107308A RU 2012107308 A RU2012107308 A RU 2012107308A RU 2012107308/03 A RU2012107308/03 A RU 2012107308/03A RU 2012107308 A RU2012107308 A RU 2012107308A RU 2012107308 A RU2012107308 A RU 2012107308A
Authority
RU
Russia
Prior art keywords
lateral
well
sidetracks
drilling
wellbore
Prior art date
Application number
RU2012107308/03A
Other languages
English (en)
Other versions
RU2553705C2 (ru
Inventor
Крейг СКИТС
Гари Е. ДЖИЛЛ
Аббас МАХДИ
Original Assignee
Шлюмбергер Текнолоджи Б.В.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шлюмбергер Текнолоджи Б.В. filed Critical Шлюмбергер Текнолоджи Б.В.
Publication of RU2012107308A publication Critical patent/RU2012107308A/ru
Application granted granted Critical
Publication of RU2553705C2 publication Critical patent/RU2553705C2/ru

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

1. Способ подготовки скважины, содержащий следующие стадии:формирование скважины с множеством боковых стволов;осуществление гидроразрыва множества боковых стволов скважины без остановки во время одной мобилизации.2. Способ по п.1, в котором гидроразрыв множества боковых стволов скважины содержит соединение колонны насосно-компрессорных труб гидроразрыва последовательно с каждым боковым стволом из множества боковых стволов скважины во время одной мобилизации.3. Способ по п.2, дополнительно содержащий изоляцию каждого бокового ствола скважины после его гидроразрыва.4. Способ по п.1, в котором формирование скважины содержит заканчивание каждого бокового ствола скважины после бурения каждого бокового ствола скважины.5. Способ по п.1, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины и затем групповое заканчивание множества боковых стволов скважины.6. Способ по п.4, в котором формирование скважины и гидроразрыв множества боковых стволов скважины содержит бурение и гидроразрыв первого бокового ствола скважины, установку пробки в первом боковом стволе скважины и последующие бурение и гидроразрыв второго бокового ствола скважины.7. Способ по п.6, дополнительно содержащий удаление пробки из первого бокового ствола скважины и в конечном итоге эксплуатацию множества боковых стволов скважины.8. Способ по п.5, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины, и гидроразрыв множества боковых стволов скважины содержит последовательный гидроразрыв множества боковых стволов скважины после бурения всех бок�

Claims (22)

1. Способ подготовки скважины, содержащий следующие стадии:
формирование скважины с множеством боковых стволов;
осуществление гидроразрыва множества боковых стволов скважины без остановки во время одной мобилизации.
2. Способ по п.1, в котором гидроразрыв множества боковых стволов скважины содержит соединение колонны насосно-компрессорных труб гидроразрыва последовательно с каждым боковым стволом из множества боковых стволов скважины во время одной мобилизации.
3. Способ по п.2, дополнительно содержащий изоляцию каждого бокового ствола скважины после его гидроразрыва.
4. Способ по п.1, в котором формирование скважины содержит заканчивание каждого бокового ствола скважины после бурения каждого бокового ствола скважины.
5. Способ по п.1, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины и затем групповое заканчивание множества боковых стволов скважины.
6. Способ по п.4, в котором формирование скважины и гидроразрыв множества боковых стволов скважины содержит бурение и гидроразрыв первого бокового ствола скважины, установку пробки в первом боковом стволе скважины и последующие бурение и гидроразрыв второго бокового ствола скважины.
7. Способ по п.6, дополнительно содержащий удаление пробки из первого бокового ствола скважины и в конечном итоге эксплуатацию множества боковых стволов скважины.
8. Способ по п.5, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины, и гидроразрыв множества боковых стволов скважины содержит последовательный гидроразрыв множества боковых стволов скважины после бурения всех боковых стволов скважины.
9. Способ по п.8, дополнительно содержащий использование извлекаемой пробки для изоляции, по меньшей мере, одного бокового ствола во время гидроразрыва.
10. Способ подготовки скважины, содержащий следующие стадии:
бурение множества боковых стволов скважины;
гидроразрыв множества боковых стволов скважины при одной мобилизации посредством последовательной изоляции боковых стволов из множества боковых стволов скважины и подачи текучей среды гидроразрыва к каждому последовательно изолируемому боковому стволу скважины;
заканчивание каждого бокового ствола скважины.
11. Способ по п.10, в котором бурение множества боковых стволов скважины содержит бурение множества, в общем, горизонтальных боковых стволов скважины.
12. Способ по п.10, в котором гидроразрыв множества боковых стволов скважины содержит гидроразрыв каждого бокового ствола перед бурением следующего в последовательности бокового ствола.
13. Способ по п.10, в котором гидроразрыв множества боковых стволов скважины содержит гидроразрыв каждого бокового ствола после бурения всех боковых стволов из множества боковых стволов скважины.
14. Способ по п.10, в котором последовательная изоляция боковых стволов скважины содержит установку съемной пробки.
15. Способ по п.10, дополнительно содержащий использование хвостовика с задвижками в каждом боковом стволе скважины для управления гидроразрывом каждого бокового ствола скважины.
16. Способ подготовки скважины, содержащий следующие стадии:
подача оборудования гидроразрыва к забою в ствол скважины с помощью буровой установки;
изоляция каждого бокового ствола из множества боковых стволов скважины; и
закачка текучей среды гидроразрыва в каждый изолированный боковой ствол скважины до осуществления гидроразрыва множества боковых стволов скважины во время одной мобилизации буровой установки.
17. Способ по п.16, в котором закачка текучей среды гидроразрыва осуществляется непрерывно во время гидроразрыва множества боковых стволов скважины.
18. Способ по п.16, содержащий гидроразрыв каждого бокового ствола скважины перед бурением следующего в последовательности бокового ствола скважины.
19. Способ по п.16, содержащий бурение всех боковых стволов скважины перед гидроразрывом.
20. Способ по п.16, в котором подача оборудования гидроразрыва в скважину содержит подачу колонны насосно-компрессорных труб гидроразрыва в скважину.
21. Способ по п.20, в котором подача оборудования гидроразрыва в скважину содержит гидравлическое соединение колонны насосно-компрессорных труб гидроразрыва с множеством боковых стволов скважины, по одному боковому стволу скважины за один раз.
22. Способ по п.21, дополнительно содержащий установку пробки над каждым боковым стволом скважины после гидроразрыва и перемещение колонны насосно-компрессорных труб гидроразрыва к следующему в последовательности боковому стволу скважины.
RU2012107308/03A 2009-07-31 2010-07-26 Способ многоступенчатой обработки для интенсификации притока многоствольной скважины RU2553705C2 (ru)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US21394909P 2009-07-31 2009-07-31
US61/213,949 2009-07-31
PCT/IB2010/053385 WO2011013056A2 (en) 2009-07-31 2010-07-26 Methods and apparatus for multilateral multistage stimulation of a well

Publications (2)

Publication Number Publication Date
RU2012107308A true RU2012107308A (ru) 2013-09-10
RU2553705C2 RU2553705C2 (ru) 2015-06-20

Family

ID=43525907

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012107308/03A RU2553705C2 (ru) 2009-07-31 2010-07-26 Способ многоступенчатой обработки для интенсификации притока многоствольной скважины

Country Status (7)

Country Link
US (1) US8220547B2 (ru)
EP (1) EP2459845B1 (ru)
CA (1) CA2691769C (ru)
DK (1) DK2459845T3 (ru)
MX (1) MX2012001439A (ru)
RU (1) RU2553705C2 (ru)
WO (1) WO2011013056A2 (ru)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2669419C2 (ru) * 2014-07-31 2018-10-11 Хэллибертон Энерджи Сервисиз, Инк. Операции, выполняемые в стволе скважины с использованием многотрубной системы
CN113417636A (zh) * 2021-05-31 2021-09-21 中煤科工集团重庆研究院有限公司 一种梳状穿层定向长钻孔分支孔煤层段精准水力压裂工艺

Families Citing this family (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8800652B2 (en) 2011-10-09 2014-08-12 Saudi Arabian Oil Company Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
US9140102B2 (en) 2011-10-09 2015-09-22 Saudi Arabian Oil Company System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
CN102587889B (zh) * 2012-02-10 2015-04-22 中国矿业大学 模拟固相颗粒封堵煤岩裂隙的实验系统
EA039924B1 (ru) * 2012-10-16 2022-03-29 Хэллибертон Энерджи Сервисиз, Инк. Изоляция разветвления многоствольной скважины
US8794328B2 (en) * 2012-10-16 2014-08-05 Halliburton Energy Services, Inc. Multilateral bore junction isolation
WO2014062166A1 (en) 2012-10-16 2014-04-24 Halliburton Energy Services, Inc. Multilateral bore junction isolation
US9234408B2 (en) * 2013-02-21 2016-01-12 Halliburton Energy Services, Inc. Systems and methods for optimized well creation in a shale formation
US20160265332A1 (en) 2013-09-13 2016-09-15 Production Plus Energy Services Inc. Systems and apparatuses for separating wellbore fluids and solids during production
EP3036394A4 (en) * 2013-12-20 2017-03-08 Halliburton Energy Services, Inc. Multilateral wellbore stimulation
US10597993B2 (en) 2014-03-24 2020-03-24 Heal Systems Lp Artificial lift system
US10280727B2 (en) 2014-03-24 2019-05-07 Heal Systems Lp Systems and apparatuses for separating wellbore fluids and solids during production
MX2016012330A (es) 2014-03-24 2017-01-13 Production Plus Energy Services Inc Sistemas y aparatos para separar fluidos y solidos de un orificio de pozo durante la produccion.
SG11201608790RA (en) * 2014-05-29 2016-11-29 Halliburton Energy Services Inc Forming multilateral wells
WO2015187297A1 (en) * 2014-06-04 2015-12-10 Halliburton Energy Services, Inc. Whipstock and deflector assembly for multilateral wellbores
US11125471B2 (en) * 2014-06-04 2021-09-21 The Johns Hopkins University Method for a radiator EGS to harvest geothermal energy
US9416638B2 (en) 2014-06-24 2016-08-16 Saudi Arabian Oil Company Multi-lateral well system
CN106661927B (zh) * 2014-07-28 2019-12-27 哈里伯顿能源服务公司 接合输送的完井工具和操作
MY185724A (en) * 2014-09-17 2021-05-31 Halliburton Energy Services Inc Completion deflector for intelligent completion of well
US20170247990A1 (en) * 2014-11-20 2017-08-31 Apache Corporation Method for drilling and fracture treating multiple wellbores
CA2977373A1 (en) 2015-02-27 2016-09-01 Schlumberger Canada Limited Vertical drilling and fracturing methodology
RU2591999C1 (ru) * 2015-04-21 2016-07-20 Шлюмберже Текнолоджи Б.В. Способ ориентирования трещин гидравлического разрыва в подземном пласте, вскрытом горизонтальными стволами
US9644463B2 (en) 2015-08-17 2017-05-09 Lloyd Murray Dallas Method of completing and producing long lateral wellbores
WO2017061979A1 (en) * 2015-10-05 2017-04-13 Halliburton Energy Services, Inc. Isolating a multi-lateral well with a barrier
US9957787B2 (en) 2015-10-20 2018-05-01 Lloyd Murray Dallas Method of enhanced oil recovery from lateral wellbores
US10408033B2 (en) 2015-11-10 2019-09-10 University Of Houston System Well design to enhance hydrocarbon recovery
US10883313B2 (en) * 2015-11-10 2021-01-05 Halliburton Energy Services, Inc. Apparatus and method for drilling deviated wellbores
CA2915624C (en) 2015-12-18 2022-08-30 Modern Wellbore Solutions Ltd. Tool assembly and process for drilling branched or multilateral wells with whipstock
CN105741022B (zh) * 2016-01-26 2019-11-19 中国石油大学(北京) 关联失效影响下的页岩气压裂管柱风险排序方法及装置
WO2017209753A1 (en) * 2016-06-02 2017-12-07 Halliburton Energy Services, Inc. Multilateral intelligent completion with stackable isolation
US11840909B2 (en) 2016-09-12 2023-12-12 Schlumberger Technology Corporation Attaining access to compromised fractured production regions at an oilfield
US11162321B2 (en) * 2016-09-14 2021-11-02 Thru Tubing Solutions, Inc. Multi-zone well treatment
CA3029797C (en) 2016-09-15 2021-01-12 Halliburton Energy Services, Inc. Hookless hanger for a multilateral wellbore
WO2018129136A1 (en) 2017-01-04 2018-07-12 Schlumberger Technology Corporation Reservoir stimulation comprising hydraulic fracturing through extnded tunnels
WO2019014161A1 (en) 2017-07-10 2019-01-17 Schlumberger Technology Corporation CONTROLLED PIPE RELEASE
US11203901B2 (en) 2017-07-10 2021-12-21 Schlumberger Technology Corporation Radial drilling link transmission and flex shaft protective cover
US10450813B2 (en) 2017-08-25 2019-10-22 Salavat Anatolyevich Kuzyaev Hydraulic fraction down-hole system with circulation port and jet pump for removal of residual fracking fluid
US11193332B2 (en) 2018-09-13 2021-12-07 Schlumberger Technology Corporation Slider compensated flexible shaft drilling system
US11125026B2 (en) * 2018-10-24 2021-09-21 Saudi Arabian Oil Company Completing slim-hole horizontal wellbores
US10927654B2 (en) 2019-05-23 2021-02-23 Saudi Arabian Oil Company Recovering hydrocarbons in multi-layer reservoirs with coiled tubing
CA3230236A1 (en) * 2021-11-09 2023-05-19 Conocophillips Company Method and apparatus for acid stimulation
US20230228171A1 (en) * 2022-01-18 2023-07-20 Halliburton Energy Services, Inc. Lateral locating assembly having one or more production ports
US11873705B1 (en) 2022-10-20 2024-01-16 Saudi Arabian Oil Company Multi-stage fracturing techniques in oil and gas

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2097529C1 (ru) * 1995-06-30 1997-11-27 Малое внедренческое предприятие "Экобур" Способ бурения скважины
US6446727B1 (en) 1998-11-12 2002-09-10 Sclumberger Technology Corporation Process for hydraulically fracturing oil and gas wells
US6394184B2 (en) 2000-02-15 2002-05-28 Exxonmobil Upstream Research Company Method and apparatus for stimulation of multiple formation intervals
US6615920B1 (en) * 2000-03-17 2003-09-09 Marathon Oil Company Template and system of templates for drilling and completing offset well bores
SE0004829D0 (sv) * 2000-12-22 2000-12-22 Pharmacia Groningen Bv Methods of obtaining ophthalmic lenses providing the eye with reduced aberrations
FR2833154B1 (fr) * 2001-12-12 2004-11-19 Ioltechnologie Production Cassette et injecteur de lentille intraoculaire souple et procede d'injection de telles lentilles
US6712148B2 (en) 2002-06-04 2004-03-30 Halliburton Energy Services, Inc. Junction isolation apparatus and methods for use in multilateral well treatment operations
US7070276B2 (en) * 2003-12-04 2006-07-04 Rensselaer Polytechnic Institute Apparatus and method for accommodative stimulation of an eye and simultaneous ipsilateral accommodative imaging
RU2280163C1 (ru) * 2004-12-14 2006-07-20 Дальневосточный государственный технический университет Способ гидроразрыва горных пород
US7267172B2 (en) * 2005-03-15 2007-09-11 Peak Completion Technologies, Inc. Cemented open hole selective fracing system
RU2289010C1 (ru) * 2005-06-14 2006-12-10 Общество с ограниченной ответственностью "Татнефть-Бурение" Способ бурения разветвленных стволов в горизонтальной скважине
US7441604B2 (en) 2005-10-26 2008-10-28 Baker Hughes Incorporated Fracking multiple casing exit laterals
JP5042740B2 (ja) * 2007-08-03 2012-10-03 株式会社ニデック 眼内レンズ選択装置及びプログラム
US7963325B2 (en) * 2007-12-05 2011-06-21 Schlumberger Technology Corporation Method and system for fracturing subsurface formations during the drilling thereof
US7878655B2 (en) * 2008-09-29 2011-02-01 Sifi Diagnostic Spa Systems and methods for implanting and examining intraocular lens

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2669419C2 (ru) * 2014-07-31 2018-10-11 Хэллибертон Энерджи Сервисиз, Инк. Операции, выполняемые в стволе скважины с использованием многотрубной системы
US10465452B2 (en) 2014-07-31 2019-11-05 Halliburton Energy Services, Inc. Wellbore operations using a multi-tube system
CN113417636A (zh) * 2021-05-31 2021-09-21 中煤科工集团重庆研究院有限公司 一种梳状穿层定向长钻孔分支孔煤层段精准水力压裂工艺

Also Published As

Publication number Publication date
EP2459845A2 (en) 2012-06-06
EP2459845B1 (en) 2019-01-02
US20110024121A1 (en) 2011-02-03
DK2459845T3 (en) 2019-04-23
CA2691769A1 (en) 2011-01-31
WO2011013056A8 (en) 2012-08-09
WO2011013056A3 (en) 2011-05-26
CA2691769C (en) 2013-03-26
WO2011013056A2 (en) 2011-02-03
RU2553705C2 (ru) 2015-06-20
US8220547B2 (en) 2012-07-17
MX2012001439A (es) 2012-06-21

Similar Documents

Publication Publication Date Title
RU2012107308A (ru) Способ и устройство многоступенчатой обработки для интенсификации притока многоствольной скважины
US7735559B2 (en) System and method to facilitate treatment and production in a wellbore
CN106223922B (zh) 页岩气水平井支撑剂缝内屏蔽暂堵分段压裂工艺
US10920531B2 (en) Wellbore isolation while placing valves on production
RU2015156402A (ru) Способ улучшенной добычи углеводородов с использованием множественных искусственно образованных трещин
NO337861B1 (no) Flersone-kompletteringssystem
RU2485290C1 (ru) Способ разработки горизонтальной скважиной пласта с зонами различной проницаемости
RU2318999C1 (ru) Способ поинтервальной обработки призабойной зоны горизонтальной скважины
US20090260814A1 (en) System and Method to Facilitate Treatement and Sand Control in a Wellbore
AU2012295502B2 (en) Processes for fracturing a well
WO2010120469A4 (en) Open hole frac system
RU2012127785A (ru) Способ гидроразрыва пласта с селективной закачкой потока
RU2296213C2 (ru) Насосная пакерная установка для эксплуатации пластов скважины
US9926772B2 (en) Apparatus and methods for selectively treating production zones
RU2528309C1 (ru) Способ разработки нефтяной залежи горизонтальными скважинами с проведением многократного гидравлического разрыва пласта
RU2708747C1 (ru) Способ многократного гидравлического разрыва пласта в горизонтальном стволе скважины
RU2451789C2 (ru) Способ эксплуатации залежи углеводородов
RU2415258C1 (ru) Способ обработки призабойной зоны добывающей скважины
RU2708745C1 (ru) Способ разработки участка слабопроницаемого нефтяного пласта
Mazerov Innovative systems enhance ability to achieve selective isolated production in horizontal wells
RU2531964C1 (ru) Конструкция горизонтального ствола скважины
AU2014318414B2 (en) Apparatus and methods for selectively treating production zones
McNeil CT Fracturing Method With Downhole Mixing Designed To Optimize Shale Completions
CN110359896A (zh) 一种双分支井压裂工艺方法
Bybee New Opportunities for Time-Sensitive Gulf of Mexico Completions