RU2012107308A - Способ и устройство многоступенчатой обработки для интенсификации притока многоствольной скважины - Google Patents
Способ и устройство многоступенчатой обработки для интенсификации притока многоствольной скважины Download PDFInfo
- Publication number
- RU2012107308A RU2012107308A RU2012107308/03A RU2012107308A RU2012107308A RU 2012107308 A RU2012107308 A RU 2012107308A RU 2012107308/03 A RU2012107308/03 A RU 2012107308/03A RU 2012107308 A RU2012107308 A RU 2012107308A RU 2012107308 A RU2012107308 A RU 2012107308A
- Authority
- RU
- Russia
- Prior art keywords
- lateral
- well
- sidetracks
- drilling
- wellbore
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract 30
- 238000005553 drilling Methods 0.000 claims abstract 20
- 230000015572 biosynthetic process Effects 0.000 claims abstract 6
- 239000012530 fluid Substances 0.000 claims 3
- 238000009434 installation Methods 0.000 claims 1
- 238000002955 isolation Methods 0.000 claims 1
- 238000005086 pumping Methods 0.000 claims 1
- 238000002360 preparation method Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Abstract
1. Способ подготовки скважины, содержащий следующие стадии:формирование скважины с множеством боковых стволов;осуществление гидроразрыва множества боковых стволов скважины без остановки во время одной мобилизации.2. Способ по п.1, в котором гидроразрыв множества боковых стволов скважины содержит соединение колонны насосно-компрессорных труб гидроразрыва последовательно с каждым боковым стволом из множества боковых стволов скважины во время одной мобилизации.3. Способ по п.2, дополнительно содержащий изоляцию каждого бокового ствола скважины после его гидроразрыва.4. Способ по п.1, в котором формирование скважины содержит заканчивание каждого бокового ствола скважины после бурения каждого бокового ствола скважины.5. Способ по п.1, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины и затем групповое заканчивание множества боковых стволов скважины.6. Способ по п.4, в котором формирование скважины и гидроразрыв множества боковых стволов скважины содержит бурение и гидроразрыв первого бокового ствола скважины, установку пробки в первом боковом стволе скважины и последующие бурение и гидроразрыв второго бокового ствола скважины.7. Способ по п.6, дополнительно содержащий удаление пробки из первого бокового ствола скважины и в конечном итоге эксплуатацию множества боковых стволов скважины.8. Способ по п.5, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины, и гидроразрыв множества боковых стволов скважины содержит последовательный гидроразрыв множества боковых стволов скважины после бурения всех бок�
Claims (22)
1. Способ подготовки скважины, содержащий следующие стадии:
формирование скважины с множеством боковых стволов;
осуществление гидроразрыва множества боковых стволов скважины без остановки во время одной мобилизации.
2. Способ по п.1, в котором гидроразрыв множества боковых стволов скважины содержит соединение колонны насосно-компрессорных труб гидроразрыва последовательно с каждым боковым стволом из множества боковых стволов скважины во время одной мобилизации.
3. Способ по п.2, дополнительно содержащий изоляцию каждого бокового ствола скважины после его гидроразрыва.
4. Способ по п.1, в котором формирование скважины содержит заканчивание каждого бокового ствола скважины после бурения каждого бокового ствола скважины.
5. Способ по п.1, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины и затем групповое заканчивание множества боковых стволов скважины.
6. Способ по п.4, в котором формирование скважины и гидроразрыв множества боковых стволов скважины содержит бурение и гидроразрыв первого бокового ствола скважины, установку пробки в первом боковом стволе скважины и последующие бурение и гидроразрыв второго бокового ствола скважины.
7. Способ по п.6, дополнительно содержащий удаление пробки из первого бокового ствола скважины и в конечном итоге эксплуатацию множества боковых стволов скважины.
8. Способ по п.5, в котором формирование скважины содержит бурение всех боковых стволов множества боковых стволов скважины, и гидроразрыв множества боковых стволов скважины содержит последовательный гидроразрыв множества боковых стволов скважины после бурения всех боковых стволов скважины.
9. Способ по п.8, дополнительно содержащий использование извлекаемой пробки для изоляции, по меньшей мере, одного бокового ствола во время гидроразрыва.
10. Способ подготовки скважины, содержащий следующие стадии:
бурение множества боковых стволов скважины;
гидроразрыв множества боковых стволов скважины при одной мобилизации посредством последовательной изоляции боковых стволов из множества боковых стволов скважины и подачи текучей среды гидроразрыва к каждому последовательно изолируемому боковому стволу скважины;
заканчивание каждого бокового ствола скважины.
11. Способ по п.10, в котором бурение множества боковых стволов скважины содержит бурение множества, в общем, горизонтальных боковых стволов скважины.
12. Способ по п.10, в котором гидроразрыв множества боковых стволов скважины содержит гидроразрыв каждого бокового ствола перед бурением следующего в последовательности бокового ствола.
13. Способ по п.10, в котором гидроразрыв множества боковых стволов скважины содержит гидроразрыв каждого бокового ствола после бурения всех боковых стволов из множества боковых стволов скважины.
14. Способ по п.10, в котором последовательная изоляция боковых стволов скважины содержит установку съемной пробки.
15. Способ по п.10, дополнительно содержащий использование хвостовика с задвижками в каждом боковом стволе скважины для управления гидроразрывом каждого бокового ствола скважины.
16. Способ подготовки скважины, содержащий следующие стадии:
подача оборудования гидроразрыва к забою в ствол скважины с помощью буровой установки;
изоляция каждого бокового ствола из множества боковых стволов скважины; и
закачка текучей среды гидроразрыва в каждый изолированный боковой ствол скважины до осуществления гидроразрыва множества боковых стволов скважины во время одной мобилизации буровой установки.
17. Способ по п.16, в котором закачка текучей среды гидроразрыва осуществляется непрерывно во время гидроразрыва множества боковых стволов скважины.
18. Способ по п.16, содержащий гидроразрыв каждого бокового ствола скважины перед бурением следующего в последовательности бокового ствола скважины.
19. Способ по п.16, содержащий бурение всех боковых стволов скважины перед гидроразрывом.
20. Способ по п.16, в котором подача оборудования гидроразрыва в скважину содержит подачу колонны насосно-компрессорных труб гидроразрыва в скважину.
21. Способ по п.20, в котором подача оборудования гидроразрыва в скважину содержит гидравлическое соединение колонны насосно-компрессорных труб гидроразрыва с множеством боковых стволов скважины, по одному боковому стволу скважины за один раз.
22. Способ по п.21, дополнительно содержащий установку пробки над каждым боковым стволом скважины после гидроразрыва и перемещение колонны насосно-компрессорных труб гидроразрыва к следующему в последовательности боковому стволу скважины.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US21394909P | 2009-07-31 | 2009-07-31 | |
US61/213,949 | 2009-07-31 | ||
PCT/IB2010/053385 WO2011013056A2 (en) | 2009-07-31 | 2010-07-26 | Methods and apparatus for multilateral multistage stimulation of a well |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2012107308A true RU2012107308A (ru) | 2013-09-10 |
RU2553705C2 RU2553705C2 (ru) | 2015-06-20 |
Family
ID=43525907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2012107308/03A RU2553705C2 (ru) | 2009-07-31 | 2010-07-26 | Способ многоступенчатой обработки для интенсификации притока многоствольной скважины |
Country Status (7)
Country | Link |
---|---|
US (1) | US8220547B2 (ru) |
EP (1) | EP2459845B1 (ru) |
CA (1) | CA2691769C (ru) |
DK (1) | DK2459845T3 (ru) |
MX (1) | MX2012001439A (ru) |
RU (1) | RU2553705C2 (ru) |
WO (1) | WO2011013056A2 (ru) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2669419C2 (ru) * | 2014-07-31 | 2018-10-11 | Хэллибертон Энерджи Сервисиз, Инк. | Операции, выполняемые в стволе скважины с использованием многотрубной системы |
CN113417636A (zh) * | 2021-05-31 | 2021-09-21 | 中煤科工集团重庆研究院有限公司 | 一种梳状穿层定向长钻孔分支孔煤层段精准水力压裂工艺 |
Families Citing this family (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8800652B2 (en) | 2011-10-09 | 2014-08-12 | Saudi Arabian Oil Company | Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well |
US9140102B2 (en) | 2011-10-09 | 2015-09-22 | Saudi Arabian Oil Company | System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well |
CN102587889B (zh) * | 2012-02-10 | 2015-04-22 | 中国矿业大学 | 模拟固相颗粒封堵煤岩裂隙的实验系统 |
EA039924B1 (ru) * | 2012-10-16 | 2022-03-29 | Хэллибертон Энерджи Сервисиз, Инк. | Изоляция разветвления многоствольной скважины |
US8794328B2 (en) * | 2012-10-16 | 2014-08-05 | Halliburton Energy Services, Inc. | Multilateral bore junction isolation |
WO2014062166A1 (en) | 2012-10-16 | 2014-04-24 | Halliburton Energy Services, Inc. | Multilateral bore junction isolation |
US9234408B2 (en) * | 2013-02-21 | 2016-01-12 | Halliburton Energy Services, Inc. | Systems and methods for optimized well creation in a shale formation |
US20160265332A1 (en) | 2013-09-13 | 2016-09-15 | Production Plus Energy Services Inc. | Systems and apparatuses for separating wellbore fluids and solids during production |
EP3036394A4 (en) * | 2013-12-20 | 2017-03-08 | Halliburton Energy Services, Inc. | Multilateral wellbore stimulation |
US10597993B2 (en) | 2014-03-24 | 2020-03-24 | Heal Systems Lp | Artificial lift system |
US10280727B2 (en) | 2014-03-24 | 2019-05-07 | Heal Systems Lp | Systems and apparatuses for separating wellbore fluids and solids during production |
MX2016012330A (es) | 2014-03-24 | 2017-01-13 | Production Plus Energy Services Inc | Sistemas y aparatos para separar fluidos y solidos de un orificio de pozo durante la produccion. |
SG11201608790RA (en) * | 2014-05-29 | 2016-11-29 | Halliburton Energy Services Inc | Forming multilateral wells |
WO2015187297A1 (en) * | 2014-06-04 | 2015-12-10 | Halliburton Energy Services, Inc. | Whipstock and deflector assembly for multilateral wellbores |
US11125471B2 (en) * | 2014-06-04 | 2021-09-21 | The Johns Hopkins University | Method for a radiator EGS to harvest geothermal energy |
US9416638B2 (en) | 2014-06-24 | 2016-08-16 | Saudi Arabian Oil Company | Multi-lateral well system |
CN106661927B (zh) * | 2014-07-28 | 2019-12-27 | 哈里伯顿能源服务公司 | 接合输送的完井工具和操作 |
MY185724A (en) * | 2014-09-17 | 2021-05-31 | Halliburton Energy Services Inc | Completion deflector for intelligent completion of well |
US20170247990A1 (en) * | 2014-11-20 | 2017-08-31 | Apache Corporation | Method for drilling and fracture treating multiple wellbores |
CA2977373A1 (en) | 2015-02-27 | 2016-09-01 | Schlumberger Canada Limited | Vertical drilling and fracturing methodology |
RU2591999C1 (ru) * | 2015-04-21 | 2016-07-20 | Шлюмберже Текнолоджи Б.В. | Способ ориентирования трещин гидравлического разрыва в подземном пласте, вскрытом горизонтальными стволами |
US9644463B2 (en) | 2015-08-17 | 2017-05-09 | Lloyd Murray Dallas | Method of completing and producing long lateral wellbores |
WO2017061979A1 (en) * | 2015-10-05 | 2017-04-13 | Halliburton Energy Services, Inc. | Isolating a multi-lateral well with a barrier |
US9957787B2 (en) | 2015-10-20 | 2018-05-01 | Lloyd Murray Dallas | Method of enhanced oil recovery from lateral wellbores |
US10408033B2 (en) | 2015-11-10 | 2019-09-10 | University Of Houston System | Well design to enhance hydrocarbon recovery |
US10883313B2 (en) * | 2015-11-10 | 2021-01-05 | Halliburton Energy Services, Inc. | Apparatus and method for drilling deviated wellbores |
CA2915624C (en) | 2015-12-18 | 2022-08-30 | Modern Wellbore Solutions Ltd. | Tool assembly and process for drilling branched or multilateral wells with whipstock |
CN105741022B (zh) * | 2016-01-26 | 2019-11-19 | 中国石油大学(北京) | 关联失效影响下的页岩气压裂管柱风险排序方法及装置 |
WO2017209753A1 (en) * | 2016-06-02 | 2017-12-07 | Halliburton Energy Services, Inc. | Multilateral intelligent completion with stackable isolation |
US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US11162321B2 (en) * | 2016-09-14 | 2021-11-02 | Thru Tubing Solutions, Inc. | Multi-zone well treatment |
CA3029797C (en) | 2016-09-15 | 2021-01-12 | Halliburton Energy Services, Inc. | Hookless hanger for a multilateral wellbore |
WO2018129136A1 (en) | 2017-01-04 | 2018-07-12 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extnded tunnels |
WO2019014161A1 (en) | 2017-07-10 | 2019-01-17 | Schlumberger Technology Corporation | CONTROLLED PIPE RELEASE |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US10450813B2 (en) | 2017-08-25 | 2019-10-22 | Salavat Anatolyevich Kuzyaev | Hydraulic fraction down-hole system with circulation port and jet pump for removal of residual fracking fluid |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
US11125026B2 (en) * | 2018-10-24 | 2021-09-21 | Saudi Arabian Oil Company | Completing slim-hole horizontal wellbores |
US10927654B2 (en) | 2019-05-23 | 2021-02-23 | Saudi Arabian Oil Company | Recovering hydrocarbons in multi-layer reservoirs with coiled tubing |
CA3230236A1 (en) * | 2021-11-09 | 2023-05-19 | Conocophillips Company | Method and apparatus for acid stimulation |
US20230228171A1 (en) * | 2022-01-18 | 2023-07-20 | Halliburton Energy Services, Inc. | Lateral locating assembly having one or more production ports |
US11873705B1 (en) | 2022-10-20 | 2024-01-16 | Saudi Arabian Oil Company | Multi-stage fracturing techniques in oil and gas |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2097529C1 (ru) * | 1995-06-30 | 1997-11-27 | Малое внедренческое предприятие "Экобур" | Способ бурения скважины |
US6446727B1 (en) | 1998-11-12 | 2002-09-10 | Sclumberger Technology Corporation | Process for hydraulically fracturing oil and gas wells |
US6394184B2 (en) | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US6615920B1 (en) * | 2000-03-17 | 2003-09-09 | Marathon Oil Company | Template and system of templates for drilling and completing offset well bores |
SE0004829D0 (sv) * | 2000-12-22 | 2000-12-22 | Pharmacia Groningen Bv | Methods of obtaining ophthalmic lenses providing the eye with reduced aberrations |
FR2833154B1 (fr) * | 2001-12-12 | 2004-11-19 | Ioltechnologie Production | Cassette et injecteur de lentille intraoculaire souple et procede d'injection de telles lentilles |
US6712148B2 (en) | 2002-06-04 | 2004-03-30 | Halliburton Energy Services, Inc. | Junction isolation apparatus and methods for use in multilateral well treatment operations |
US7070276B2 (en) * | 2003-12-04 | 2006-07-04 | Rensselaer Polytechnic Institute | Apparatus and method for accommodative stimulation of an eye and simultaneous ipsilateral accommodative imaging |
RU2280163C1 (ru) * | 2004-12-14 | 2006-07-20 | Дальневосточный государственный технический университет | Способ гидроразрыва горных пород |
US7267172B2 (en) * | 2005-03-15 | 2007-09-11 | Peak Completion Technologies, Inc. | Cemented open hole selective fracing system |
RU2289010C1 (ru) * | 2005-06-14 | 2006-12-10 | Общество с ограниченной ответственностью "Татнефть-Бурение" | Способ бурения разветвленных стволов в горизонтальной скважине |
US7441604B2 (en) | 2005-10-26 | 2008-10-28 | Baker Hughes Incorporated | Fracking multiple casing exit laterals |
JP5042740B2 (ja) * | 2007-08-03 | 2012-10-03 | 株式会社ニデック | 眼内レンズ選択装置及びプログラム |
US7963325B2 (en) * | 2007-12-05 | 2011-06-21 | Schlumberger Technology Corporation | Method and system for fracturing subsurface formations during the drilling thereof |
US7878655B2 (en) * | 2008-09-29 | 2011-02-01 | Sifi Diagnostic Spa | Systems and methods for implanting and examining intraocular lens |
-
2010
- 2010-01-11 US US12/685,513 patent/US8220547B2/en active Active
- 2010-02-02 CA CA2691769A patent/CA2691769C/en not_active Expired - Fee Related
- 2010-07-26 WO PCT/IB2010/053385 patent/WO2011013056A2/en active Application Filing
- 2010-07-26 DK DK10742300.6T patent/DK2459845T3/en active
- 2010-07-26 MX MX2012001439A patent/MX2012001439A/es active IP Right Grant
- 2010-07-26 EP EP10742300.6A patent/EP2459845B1/en active Active
- 2010-07-26 RU RU2012107308/03A patent/RU2553705C2/ru active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2669419C2 (ru) * | 2014-07-31 | 2018-10-11 | Хэллибертон Энерджи Сервисиз, Инк. | Операции, выполняемые в стволе скважины с использованием многотрубной системы |
US10465452B2 (en) | 2014-07-31 | 2019-11-05 | Halliburton Energy Services, Inc. | Wellbore operations using a multi-tube system |
CN113417636A (zh) * | 2021-05-31 | 2021-09-21 | 中煤科工集团重庆研究院有限公司 | 一种梳状穿层定向长钻孔分支孔煤层段精准水力压裂工艺 |
Also Published As
Publication number | Publication date |
---|---|
EP2459845A2 (en) | 2012-06-06 |
EP2459845B1 (en) | 2019-01-02 |
US20110024121A1 (en) | 2011-02-03 |
DK2459845T3 (en) | 2019-04-23 |
CA2691769A1 (en) | 2011-01-31 |
WO2011013056A8 (en) | 2012-08-09 |
WO2011013056A3 (en) | 2011-05-26 |
CA2691769C (en) | 2013-03-26 |
WO2011013056A2 (en) | 2011-02-03 |
RU2553705C2 (ru) | 2015-06-20 |
US8220547B2 (en) | 2012-07-17 |
MX2012001439A (es) | 2012-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2012107308A (ru) | Способ и устройство многоступенчатой обработки для интенсификации притока многоствольной скважины | |
US7735559B2 (en) | System and method to facilitate treatment and production in a wellbore | |
CN106223922B (zh) | 页岩气水平井支撑剂缝内屏蔽暂堵分段压裂工艺 | |
US10920531B2 (en) | Wellbore isolation while placing valves on production | |
RU2015156402A (ru) | Способ улучшенной добычи углеводородов с использованием множественных искусственно образованных трещин | |
NO337861B1 (no) | Flersone-kompletteringssystem | |
RU2485290C1 (ru) | Способ разработки горизонтальной скважиной пласта с зонами различной проницаемости | |
RU2318999C1 (ru) | Способ поинтервальной обработки призабойной зоны горизонтальной скважины | |
US20090260814A1 (en) | System and Method to Facilitate Treatement and Sand Control in a Wellbore | |
AU2012295502B2 (en) | Processes for fracturing a well | |
WO2010120469A4 (en) | Open hole frac system | |
RU2012127785A (ru) | Способ гидроразрыва пласта с селективной закачкой потока | |
RU2296213C2 (ru) | Насосная пакерная установка для эксплуатации пластов скважины | |
US9926772B2 (en) | Apparatus and methods for selectively treating production zones | |
RU2528309C1 (ru) | Способ разработки нефтяной залежи горизонтальными скважинами с проведением многократного гидравлического разрыва пласта | |
RU2708747C1 (ru) | Способ многократного гидравлического разрыва пласта в горизонтальном стволе скважины | |
RU2451789C2 (ru) | Способ эксплуатации залежи углеводородов | |
RU2415258C1 (ru) | Способ обработки призабойной зоны добывающей скважины | |
RU2708745C1 (ru) | Способ разработки участка слабопроницаемого нефтяного пласта | |
Mazerov | Innovative systems enhance ability to achieve selective isolated production in horizontal wells | |
RU2531964C1 (ru) | Конструкция горизонтального ствола скважины | |
AU2014318414B2 (en) | Apparatus and methods for selectively treating production zones | |
McNeil | CT Fracturing Method With Downhole Mixing Designed To Optimize Shale Completions | |
CN110359896A (zh) | 一种双分支井压裂工艺方法 | |
Bybee | New Opportunities for Time-Sensitive Gulf of Mexico Completions |