RU2010140778A - METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OILS AND BITUMEN - Google Patents

METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OILS AND BITUMEN Download PDF

Info

Publication number
RU2010140778A
RU2010140778A RU2010140778/03A RU2010140778A RU2010140778A RU 2010140778 A RU2010140778 A RU 2010140778A RU 2010140778/03 A RU2010140778/03 A RU 2010140778/03A RU 2010140778 A RU2010140778 A RU 2010140778A RU 2010140778 A RU2010140778 A RU 2010140778A
Authority
RU
Russia
Prior art keywords
formation
temperature
working agent
opening
injection
Prior art date
Application number
RU2010140778/03A
Other languages
Russian (ru)
Other versions
RU2455473C2 (en
Inventor
Раис Салихович Хисамов (RU)
Раис Салихович Хисамов
Ильшат Мухаметович Бакиров (RU)
Ильшат Мухаметович Бакиров
Марат Инкилапович Амерханов (RU)
Марат Инкилапович Амерханов
Александр Иванович Арзамасцев (RU)
Александр Иванович Арзамасцев
Лилия Рафагатовна Оснос (RU)
Лилия Рафагатовна Оснос
Original Assignee
Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU)
Открытое акционерное общество "Татнефть" имени В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU), Открытое акционерное общество "Татнефть" имени В.Д. Шашина filed Critical Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU)
Priority to RU2010140778/03A priority Critical patent/RU2455473C2/en
Publication of RU2010140778A publication Critical patent/RU2010140778A/en
Application granted granted Critical
Publication of RU2455473C2 publication Critical patent/RU2455473C2/en

Links

Landscapes

  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

Способ разработки залежи высоковязких нефтей и битумов, включающий вскрытие верхнего и нижнего интервалов скважины в пределах пласта, разобщение скважины между интервалами вскрытия, циклическую закачку рабочего агента в виде пара в пласт через верхний интервал вскрытия и отбор продукции пласта через нижний интервал вскрытия, отличающийся тем, что расстояние между интервалами вскрытия не менее 5 м, а отбор продукции пласта ведут постоянно, при этом закачку рабочего агента прекращают при повышении температуры продукции пласта, отбираемой из нижнего интервала, до температуры, равной 70-90% от температуры прорыва рабочего агента, а возобновляют закачку рабочего агента при снижении температуры продукции пласта, отбираемой из нижнего интервала, до температуры, равной 50-70% от температуры прорыва рабочего агента, определяемой из физических свойств пласта и расстояния между интервалами вскрытия, после образования паровой камеры в пределах верхнего интервала вскрытия скважину переводят в нагнетательную. The method of developing deposits of high viscosity oils and bitumen, including opening the upper and lower intervals of the well within the formation, separating the well between the opening intervals, cyclic injection of the working agent in the form of steam into the formation through the upper opening interval and selecting production of the formation through the lower opening interval, characterized in that the distance between the autopsy intervals is at least 5 m, and the formation production is constantly being selected, while the injection of the working agent is stopped when the temperature of the formation production is increased, d from the lower interval, to a temperature equal to 70-90% of the breakthrough temperature of the working agent, and the injection of the working agent is resumed when the temperature of the production of the formation taken from the lower interval decreases to a temperature equal to 50-70% of the breakthrough temperature of the working agent, determined from the physical properties of the formation and the distance between the opening intervals, after the formation of the steam chamber within the upper opening interval, the well is transferred to the injection.

Claims (1)

Способ разработки залежи высоковязких нефтей и битумов, включающий вскрытие верхнего и нижнего интервалов скважины в пределах пласта, разобщение скважины между интервалами вскрытия, циклическую закачку рабочего агента в виде пара в пласт через верхний интервал вскрытия и отбор продукции пласта через нижний интервал вскрытия, отличающийся тем, что расстояние между интервалами вскрытия не менее 5 м, а отбор продукции пласта ведут постоянно, при этом закачку рабочего агента прекращают при повышении температуры продукции пласта, отбираемой из нижнего интервала, до температуры, равной 70-90% от температуры прорыва рабочего агента, а возобновляют закачку рабочего агента при снижении температуры продукции пласта, отбираемой из нижнего интервала, до температуры, равной 50-70% от температуры прорыва рабочего агента, определяемой из физических свойств пласта и расстояния между интервалами вскрытия, после образования паровой камеры в пределах верхнего интервала вскрытия скважину переводят в нагнетательную. The method of developing deposits of high viscosity oils and bitumen, including opening the upper and lower intervals of the well within the formation, separating the well between the opening intervals, cyclic injection of the working agent in the form of steam into the formation through the upper opening interval and selecting production of the formation through the lower opening interval, characterized in that the distance between the autopsy intervals is at least 5 m, and the formation production is constantly being selected, while the injection of the working agent is stopped when the temperature of the formation production is increased, d from the lower interval, to a temperature equal to 70-90% of the breakthrough temperature of the working agent, and the injection of the working agent is resumed when the temperature of the production of the formation taken from the lower interval decreases to a temperature equal to 50-70% of the breakthrough temperature of the working agent, determined from the physical properties of the formation and the distance between the opening intervals, after the formation of the steam chamber within the upper opening interval, the well is transferred to the injection.
RU2010140778/03A 2010-10-05 2010-10-05 Development method of high-viscosity oil and bitumen deposit RU2455473C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010140778/03A RU2455473C2 (en) 2010-10-05 2010-10-05 Development method of high-viscosity oil and bitumen deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010140778/03A RU2455473C2 (en) 2010-10-05 2010-10-05 Development method of high-viscosity oil and bitumen deposit

Publications (2)

Publication Number Publication Date
RU2010140778A true RU2010140778A (en) 2012-04-10
RU2455473C2 RU2455473C2 (en) 2012-07-10

Family

ID=46031477

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010140778/03A RU2455473C2 (en) 2010-10-05 2010-10-05 Development method of high-viscosity oil and bitumen deposit

Country Status (1)

Country Link
RU (1) RU2455473C2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2505668C1 (en) * 2012-07-27 2014-01-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of developing oil pool using horizontal multibranch wells
RU2550635C1 (en) * 2014-04-22 2015-05-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method for high-viscosity oil or bitumen field
RU2555713C1 (en) * 2014-06-03 2015-07-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of deposit of high-viscosity oil or bitumen
RU2559983C1 (en) * 2014-06-17 2015-08-20 Общество с ограниченной ответственностью "ЛУКОЙЛ-Инжиниринг" ООО "ЛУКОЙЛ-Инжиниринг" Method of high-viscosity massive oil pool development
RU2630001C1 (en) * 2016-12-07 2017-09-05 Александр Семенович Кундин Method for oil formation development

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4445574A (en) * 1980-03-24 1984-05-01 Geo Vann, Inc. Continuous borehole formed horizontally through a hydrocarbon producing formation
RU2067168C1 (en) * 1994-01-05 1996-09-27 Государственное научно-производственное предприятие "Пилот" Method for heat displacement of oil from horizontal well
RU2211318C2 (en) * 2000-11-21 2003-08-27 Открытое акционерное общество "Всероссийский нефтегазовый научно-исследовательский институт им. акад. А.П. Крылова" Method of recovery of viscous oil with heat stimulation of formation
RU2206728C1 (en) * 2002-05-18 2003-06-20 Всероссийский нефтегазовый научно-исследовательский институт (ОАО ВНИИнефть) Method of high-viscocity oil production
RU2285117C2 (en) * 2004-12-07 2006-10-10 Государственное образовательное учреждение высшего профессионального образования "Ухтинский государственный технический университет" (УГТУ) Method for extracting hydrocarbon deposits
RU2274742C1 (en) * 2005-06-07 2006-04-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for high-viscous oil or bitumen field development

Also Published As

Publication number Publication date
RU2455473C2 (en) 2012-07-10

Similar Documents

Publication Publication Date Title
RU2012153453A (en) METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OIL AND / OR BITUMEN WITH WATER OIL ZONES
RU2010140778A (en) METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OILS AND BITUMEN
EA201690816A1 (en) METHOD OF OIL PRODUCTION FROM OIL-LAYER
MY182901A (en) Method for recovering petroleum
EA201500695A1 (en) METHOD OF OIL PRODUCTION
RU2012157795A (en) METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OILS OR BITUMEN UNDER HEAT EXPOSURE
EA201400880A1 (en) METHOD OF OIL EXTRACTION
BR112017003542A2 (en) method for improving steam usage in a sag-assisted gravitational drainage process for crude oil recovery
RU2016101183A (en) OIL SYSTEM AND METHOD
BR112014015843A8 (en) methods and apparatus for producing non-woven fibrous webs
MX2016013557A (en) Production of 2-substituted 4-methyl-tetrahydropyrans from starting materials containing 2-alkyl-4,4-dimethyl-1,3-dioxanes.
BR112015016629A2 (en) method of assessing the efficiency of asphaltene inhibitor
BR112012024953A2 (en) improved in situ combustion process to reduce the viscosity of oil contained in a reservoir
EA201892054A1 (en) EFFECTING OWN SOURCES PLASTIC CURRENT ENVIRONMENT FOR INCREASING OIL RECOVERY
WO2016004323A3 (en) Laser based production of syngas from underground coal deposits
RU2011122331A (en) METHOD FOR DEVELOPING A SUPERVISIBLE OIL DEPOSIT
RU2010151388A (en) METHOD FOR DEVELOPMENT OF OIL DEPOSIT USING HORIZONTAL EXPRESSIVE WELLS
RU2016107747A (en) METHOD FOR REMOVING BITUMEN TO IMPROVE LAYER PERMEABILITY
WO2013102544A3 (en) Device and method for obtaining carbonic substances from oil sands
RU2012151762A (en) METHOD FOR DEVELOPMENT OF OIL DEPOSIT WITH CARBONATE COLLECTOR
EA201490694A1 (en) METHOD OF EXTRACTING OIL FROM UNDERGROUND DEPOSIT
CA2788414C (en) Process for producing viscous mineral oil from underground deposits
EA201391042A1 (en) MULTI-STAGE METHOD OF OIL PRODUCTION USING MICROORGANISMS
EA201390965A1 (en) METHOD AND COMPOSITION FOR THE TERTIARY OIL PRODUCTION METHOD FROM THE LAYER CONTAINING OIL
RU2012139783A (en) METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OILS OR BITUMENS

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20161006