RU2008146085A - Испытания систем автоматики подстанций на систеином уровне - Google Patents
Испытания систем автоматики подстанций на систеином уровне Download PDFInfo
- Publication number
- RU2008146085A RU2008146085A RU2008146085/28A RU2008146085A RU2008146085A RU 2008146085 A RU2008146085 A RU 2008146085A RU 2008146085/28 A RU2008146085/28 A RU 2008146085/28A RU 2008146085 A RU2008146085 A RU 2008146085A RU 2008146085 A RU2008146085 A RU 2008146085A
- Authority
- RU
- Russia
- Prior art keywords
- ied
- test
- network
- ieds
- test environment
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0805—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
- H04L43/0817—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Selective Calling Equipment (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Maintenance And Management Of Digital Transmission (AREA)
Abstract
1. Способ проведения испытаний на системном уровне первого интеллектуального электронного устройства (ИЭУ) (21) системы автоматики подстанции (АП), в котором испытания функции системного уровня системы АП, с привлечением первого ИЭУ (21) и второго ИЭУ (22), проводят на основе сетевых сообщений, которые принимают в первом ИЭУ (21) через сеть (20) передачи данных, способ, содержащий ! подключают испытательное устройство (30), отличающееся от второго ИЭУ (22), к сети (20) передачи данных, ! считывают с помощью испытательного устройства (30) стандартное описание воплощенных функций устройства второго ИЭУ (22), ! передают с помощью испытательного устройства (30) сетевые сообщения, обозначающие поведение второго ИЭУ (22), в соответствии с упомянутой функцией системного уровня, через сеть (20) передачи данных в первое ИЭУ (21), и ! отслеживают поведение первого ИЭУ (21) в ответ на упомянутые сетевые сообщения. ! 2. Способ по п.1, отличающийся тем, что содержит ! устанавливают часть из всех ИЭУ системы АП в испытательной среде, ! детектирует с помощью испытательного устройства (30) ИЭУ, установленный в испытательной среде, ! идентифицирует ИЭУ системы АП, не установленные в испытательной среде, и ! передают с помощью испытательного устройства (30) сетевые сообщения, обозначающие поведение ИЭУ системы АП, не установленных в испытательной среде. ! 3. Способ по п.1, отличающийся тем, что содержит ! предоставляют рабочую станцию оператора (12) в качестве первого испытуемого ИЭУ. ! 4. Способ по п.1, отличающийся тем, что содержит ! выполняют испытательные последовательности или сценарии с помощью испытательного устройства (30). ! 5. Способ по п.4, отличающийся тем, ч
Claims (10)
1. Способ проведения испытаний на системном уровне первого интеллектуального электронного устройства (ИЭУ) (21) системы автоматики подстанции (АП), в котором испытания функции системного уровня системы АП, с привлечением первого ИЭУ (21) и второго ИЭУ (22), проводят на основе сетевых сообщений, которые принимают в первом ИЭУ (21) через сеть (20) передачи данных, способ, содержащий
подключают испытательное устройство (30), отличающееся от второго ИЭУ (22), к сети (20) передачи данных,
считывают с помощью испытательного устройства (30) стандартное описание воплощенных функций устройства второго ИЭУ (22),
передают с помощью испытательного устройства (30) сетевые сообщения, обозначающие поведение второго ИЭУ (22), в соответствии с упомянутой функцией системного уровня, через сеть (20) передачи данных в первое ИЭУ (21), и
отслеживают поведение первого ИЭУ (21) в ответ на упомянутые сетевые сообщения.
2. Способ по п.1, отличающийся тем, что содержит
устанавливают часть из всех ИЭУ системы АП в испытательной среде,
детектирует с помощью испытательного устройства (30) ИЭУ, установленный в испытательной среде,
идентифицирует ИЭУ системы АП, не установленные в испытательной среде, и
передают с помощью испытательного устройства (30) сетевые сообщения, обозначающие поведение ИЭУ системы АП, не установленных в испытательной среде.
3. Способ по п.1, отличающийся тем, что содержит
предоставляют рабочую станцию оператора (12) в качестве первого испытуемого ИЭУ.
4. Способ по п.1, отличающийся тем, что содержит
выполняют испытательные последовательности или сценарии с помощью испытательного устройства (30).
5. Способ по п.4, отличающийся тем, что содержит
сравнивает отклик первого ИЭУ (21) с испытательным сценарием.
6. Испытательная среда для испытаний системного уровня автоматики подстанции (АП) первого интеллектуального электронного устройства (ИЭУ) (21), в которой испытание функции системного уровня системы АП с привлечением первого ИЭУ (21) и второго ИЭУ (22) выполняют на основе сетевых сообщений, которые принимают в первом ИЭУ (21) через сеть (20) передачи данных, причем испытательная среда содержит первое испытательное устройство (30), отличающееся от второго ИЭУ (22), подключенное к сети передачи данных, выполненное с возможностью считывать стандартизированное описание воплощенных функций устройства второго ИЭУ (22) и выполненное с возможностью передачи сетевых сообщений, обозначающих поведение второго ИЭУ (22) в соответствии с упомянутой функцией системного уровня, через сеть (20) передачи данных в первое ИЭУ (21).
7. Испытательная среда по п.6, отличающаяся тем, что содержит средство сохранения и выполнения (32) сценария (31) испытания.
8. Испытательная среда по п.6, отличающаяся тем, что первое испытуемое ИЭУ представляет собой рабочую станцию (12) оператора системы АП.
9. Испытательная среда по п.6, отличающаяся тем, что содержит
второе испытательное устройство (30b), соединенное с сетью (20) передачи данных, независимое от первого испытательного устройства (30а) и выполненное с возможностью передачи сетевых сообщений, обозначающих поведение третьего ИЭУ в соответствии с упомянутой функцией системного уровня.
10. Испытательная среда по п.6, отличающаяся тем, что содержит удаленный генератор (42) сигнала, управляемый испытательным устройством (30), и предоставленный для подачи имитируемых сигналов обработки в аналоговые и двоичные входы первого ИЭУ (21).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP06405173.3 | 2006-04-24 | ||
EP06405173.3A EP1850142B2 (en) | 2006-04-24 | 2006-04-24 | System level testing for substation automation systems |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2008146085A true RU2008146085A (ru) | 2010-05-27 |
RU2402784C2 RU2402784C2 (ru) | 2010-10-27 |
Family
ID=37107420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2008146085/28A RU2402784C2 (ru) | 2006-04-24 | 2007-04-20 | Испытания систем автоматики подстанций на системном уровне |
Country Status (9)
Country | Link |
---|---|
US (1) | US20090070062A1 (ru) |
EP (1) | EP1850142B2 (ru) |
CN (1) | CN101432633B (ru) |
AT (1) | ATE421100T1 (ru) |
DE (1) | DE602006004846D1 (ru) |
ES (1) | ES2319568T3 (ru) |
PL (1) | PL1850142T3 (ru) |
RU (1) | RU2402784C2 (ru) |
WO (1) | WO2007122195A1 (ru) |
Families Citing this family (58)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2203754B1 (en) | 2007-10-25 | 2017-09-27 | ABB Research Ltd. | Operating a substation automation system |
EP2088444A1 (en) * | 2008-02-11 | 2009-08-12 | ABB Research Ltd. | System level testing for substation automation systems |
EP2139162B1 (en) * | 2008-06-26 | 2011-11-16 | ABB Research Ltd. | Configuring of an intelligent electronic device |
EP2207312B1 (en) * | 2009-01-07 | 2012-04-18 | ABB Research Ltd. | IED for, and method of engineering, an SA system |
WO2010118550A1 (en) | 2009-04-13 | 2010-10-21 | Abb Research Ltd. | Intelligent process interface and substation automation system |
WO2010125140A1 (en) * | 2009-04-30 | 2010-11-04 | Vestas Wind Systems A/S | Network in wind turbine |
US8949480B2 (en) * | 2009-05-11 | 2015-02-03 | GM Global Technology Operations LLC | Method and system for testing safety automation logic of a manufacturing cell |
EP2264967B1 (en) * | 2009-06-17 | 2017-12-13 | ABB Schweiz AG | Inter-bay substation automation application |
AU2010281298A1 (en) * | 2009-08-06 | 2011-09-08 | Rh Innovation Pty Ltd | Operator interface for automation systems |
CN102713772B (zh) * | 2009-08-14 | 2016-06-29 | Abb技术有限公司 | 用于变电站自动化系统的工程的方法和系统 |
ATE542330T1 (de) * | 2009-08-18 | 2012-02-15 | Abb Technology Ag | Analyse einer kommunikationsleistung einer ied |
EP2478380B1 (en) | 2009-09-14 | 2017-08-09 | ABB Schweiz AG | A method and a system for simulation in a substation |
CN101776717B (zh) * | 2009-12-25 | 2013-12-04 | 海洋王照明科技股份有限公司 | 一种应急电源转换测试网络系统、客户端及应急电源系统 |
KR101039456B1 (ko) * | 2010-07-28 | 2011-06-07 | 한국전력공사 | 변전자동화시스템의 클라이언트 적합성 시험 장치 및 그 방법 |
WO2012015508A1 (en) * | 2010-07-29 | 2012-02-02 | Spirae, Inc. | Dynamic distributed power grid control system |
US8816695B2 (en) * | 2010-10-27 | 2014-08-26 | General Electric Company | Method and system for interoperability testing |
CN101969232B (zh) * | 2010-10-29 | 2012-05-23 | 广东电网公司电力科学研究院 | 电网视频及环境监控系统的自动化测试方法及装置 |
CN102185380A (zh) * | 2011-05-11 | 2011-09-14 | 辽宁省电力有限公司抚顺供电公司 | 调度自动化仿真模拟装置 |
KR101823683B1 (ko) | 2011-07-01 | 2018-01-31 | 한국전력공사 | Iec 61850 기반의 변압기 탭 제어 신호에 대한 적합성 시험장치 및 그 방법 |
CN102539968B (zh) * | 2011-12-30 | 2014-06-04 | 长园深瑞继保自动化有限公司 | 智能变电站控制闭锁测试系统 |
WO2013102493A1 (en) * | 2012-01-04 | 2013-07-11 | Siemens Aktiengesellschaft | A system and a method to generate an interlocking mechanism for an electronic device to control a power system |
CN102590661B (zh) * | 2012-02-02 | 2014-04-02 | 江西省电力科学研究院 | 基于网络的智能变电站现场分布式智能测试方法 |
CN102608450B (zh) * | 2012-02-24 | 2014-07-02 | 江苏凌创电气自动化股份有限公司 | 适用于智能变电站的测试校验系统及校验方法 |
CN102664399A (zh) * | 2012-04-09 | 2012-09-12 | 华北电力大学 | Rtds-ems系统级闭环控制实验仿真平台搭建方法 |
CN102854856A (zh) * | 2012-08-29 | 2013-01-02 | 北京博电新力电气股份有限公司 | 基于智能变电站二次设备场景测试的控制器 |
CN102967839B (zh) * | 2012-11-21 | 2015-04-22 | 广东电网公司电力科学研究院 | 变电站在线监测通信系统的检测方法及装置 |
CN103116100A (zh) * | 2013-01-30 | 2013-05-22 | 中国海洋石油总公司 | 一种海上石油平台智能变电站设备状态监测系统 |
CN103166323B (zh) * | 2013-04-11 | 2014-11-26 | 上海毅昊自动化有限公司 | 基于保护装置二次回路模型实时在线监测系统 |
CN103439592B (zh) * | 2013-06-27 | 2016-12-28 | 国家电网公司 | 一种智能变电站现场智能测试方法 |
EP2854337A1 (en) * | 2013-09-27 | 2015-04-01 | ABB Technology AG | Testing of a substation automation system |
CN103699090B (zh) * | 2013-12-23 | 2016-03-23 | 山东康威通信技术股份有限公司 | 电力监控领域远程智能控制数据的装置及控制方法 |
CN103885438B (zh) * | 2014-03-20 | 2016-08-31 | 国家电网公司 | 一种变电站测控设备的自动测试系统和方法 |
CN103955190B (zh) * | 2014-04-29 | 2016-12-07 | 国家电网公司 | 一种用于分布式智能测试系统的网络控制方法 |
CN104393679B (zh) * | 2014-11-26 | 2016-09-07 | 国家电网公司 | 一种智能变电站状态信息代理方法 |
CN104601405B (zh) * | 2015-01-12 | 2018-08-03 | 国家电网公司 | 一种基于配置策略的站控层信息交互测试系统及方法 |
CN104778302B (zh) * | 2015-02-11 | 2017-11-14 | 广东电网有限责任公司电力科学研究院 | 变电站遥信信号与硬接点端子的关联应用方法及系统 |
CN105227350A (zh) * | 2015-08-31 | 2016-01-06 | 河北省电力建设调整试验所 | 基于crc校验码的智能变电站ied配置文件管控方法 |
CN105098989B (zh) * | 2015-09-02 | 2017-09-12 | 青海送变电工程公司 | 一种变电站失灵回路智能解决方法 |
CN105185207B (zh) * | 2015-10-20 | 2017-11-17 | 国网浙江省电力公司培训中心 | 一种分层分区结构的智能变电站培训系统 |
US20170147427A1 (en) * | 2015-11-23 | 2017-05-25 | Honeywell International, Inc. | System and method for software simulation for testing a safety manager platform |
CN105866677A (zh) * | 2016-06-08 | 2016-08-17 | 上海南华兰陵电气有限公司 | 一种10kV开关设备检验操作设备 |
CN106204326B (zh) * | 2016-07-11 | 2019-12-31 | 国网浙江省电力公司杭州供电公司 | 一种用于配电系统的配电终端ied设备检测方法 |
CN106169815B (zh) * | 2016-09-29 | 2018-10-16 | 广东电网有限责任公司肇庆供电局 | 站端自动化系统操作员工作站运行状态监测方法及系统 |
CN106533740A (zh) * | 2016-10-31 | 2017-03-22 | 国网福建省电力有限公司 | 一种虚实结合的智能变电站网络仿真方法及系统 |
US10935604B2 (en) * | 2017-02-22 | 2021-03-02 | Abb Schweiz Ag | Power distribution systems and methods of testing responses to electrical conditions using a communication network |
US10725091B2 (en) * | 2017-08-28 | 2020-07-28 | Teradyne, Inc. | Automated test system having multiple stages |
KR102014643B1 (ko) * | 2018-04-05 | 2019-10-21 | 한국전력공사 | 지능형 전자장치의 테스트 장치 및 이를 이용하여 지능형 전자 장치를 테스트하는 방법 |
US11128116B2 (en) * | 2018-10-08 | 2021-09-21 | Schweitzer Engineering Laboratories, Inc. | Electric power system protection device with active and testing configurations |
CN109283457B (zh) * | 2018-11-16 | 2020-11-17 | 国网山东省电力公司电力科学研究院 | 一种m-bus通信接口电气性能检测方法 |
CN110275509B (zh) * | 2019-05-24 | 2021-10-15 | 国网江苏省电力有限公司电力科学研究院 | 一种储能电站监控功能测试方法和系统 |
CN111178739A (zh) * | 2019-12-24 | 2020-05-19 | 国网北京市电力公司 | 变电站运行状态的评估方法及装置 |
CN111799889A (zh) * | 2020-07-24 | 2020-10-20 | 国网湖北省电力有限公司黄石供电公司 | 一种通用高效处理城网配网自动化终端的调试方法 |
CN112698584B (zh) * | 2020-12-29 | 2024-03-15 | 长沙诺思谱瑞仪器有限公司 | 一种变电站一键顺控仿真测试方法、装置、设备及介质 |
CN113341256B (zh) * | 2021-06-11 | 2022-08-05 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | 一种变电站继电保护系统检测方法、装置、设备及介质 |
CN113904312B (zh) * | 2021-10-19 | 2024-03-22 | 国网江苏省电力有限公司无锡供电分公司 | 智能站220kV母差保护组网光纤断链消缺方法及装置 |
CN114095396B (zh) * | 2021-11-15 | 2023-07-25 | 中国电力科学研究院有限公司 | 智能变电站数据通信检测方法、系统、设备及存储介质 |
CN114387852A (zh) * | 2021-11-29 | 2022-04-22 | 国网甘肃省电力公司天水供电公司 | 一种二次回路变电站一体化仿真培训系统 |
CN114584534B (zh) * | 2022-03-17 | 2023-12-05 | 国家电网有限公司 | 一种继电保护装置智能定值校核仪自动配置网络的方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5680324A (en) * | 1995-04-07 | 1997-10-21 | Schweitzer Engineering Laboratories, Inc. | Communications processor for electric power substations |
US5734576A (en) * | 1995-12-22 | 1998-03-31 | Eaton Corporation | Method and apparatus for remote testing of coordination of overcurrent protection devices in an electrical power system |
US5963734A (en) * | 1997-04-03 | 1999-10-05 | Abb Power T&D Company Inc. | Method and apparatus for configuring an intelligent electronic device for use in supervisory control and data acquisition system verification |
EP1228443A2 (en) * | 1999-06-15 | 2002-08-07 | General Electric Company | System and method for configuring, viewing and ordering a power system |
US6671635B1 (en) * | 2001-02-23 | 2003-12-30 | Power Measurement Ltd. | Systems for improved monitoring accuracy of intelligent electronic devices |
US6795789B2 (en) * | 2001-05-21 | 2004-09-21 | Omnicron Electronics Corp. Usa | System for testing of intelligent electronic devices with digital communications |
CN2566522Y (zh) * | 2002-03-26 | 2003-08-13 | 顺德特种变压器厂 | 一种变电站自动化装置 |
DE10333889A1 (de) * | 2003-07-22 | 2005-02-24 | Siemens Ag | Verfahren zum Erzeugen einer eine spezifische Automatisierungsanlage beschreibenden Strukturdarstellung |
EP1850109A1 (en) * | 2006-04-24 | 2007-10-31 | ABB Research Ltd | Intelligent electronic device configuration verification |
EP1850447A1 (en) * | 2006-04-24 | 2007-10-31 | Abb Research Ltd. | Intelligent electronic device configuration inspection |
-
2006
- 2006-04-24 ES ES06405173T patent/ES2319568T3/es active Active
- 2006-04-24 PL PL06405173T patent/PL1850142T3/pl unknown
- 2006-04-24 AT AT06405173T patent/ATE421100T1/de not_active IP Right Cessation
- 2006-04-24 EP EP06405173.3A patent/EP1850142B2/en active Active
- 2006-04-24 DE DE602006004846T patent/DE602006004846D1/de active Active
-
2007
- 2007-04-20 WO PCT/EP2007/053893 patent/WO2007122195A1/en active Application Filing
- 2007-04-20 CN CN2007800148331A patent/CN101432633B/zh active Active
- 2007-04-20 RU RU2008146085/28A patent/RU2402784C2/ru not_active IP Right Cessation
-
2008
- 2008-10-23 US US12/256,952 patent/US20090070062A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20090070062A1 (en) | 2009-03-12 |
PL1850142T3 (pl) | 2009-06-30 |
ES2319568T3 (es) | 2009-05-08 |
CN101432633B (zh) | 2011-12-07 |
RU2402784C2 (ru) | 2010-10-27 |
DE602006004846D1 (de) | 2009-03-05 |
EP1850142A1 (en) | 2007-10-31 |
CN101432633A (zh) | 2009-05-13 |
EP1850142B2 (en) | 2019-03-06 |
ATE421100T1 (de) | 2009-01-15 |
WO2007122195A1 (en) | 2007-11-01 |
EP1850142B1 (en) | 2009-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2008146085A (ru) | Испытания систем автоматики подстанций на систеином уровне | |
CN104298224A (zh) | 车载电子控制单元can总线通信自动化测试装置及系统 | |
CN103869190A (zh) | 基于实时仿真系统的配电终端自动闭环测试平台 | |
CN103728557B (zh) | 非侵入式继电保护系统闭环测试系统及方法 | |
CN109361562A (zh) | 一种基于关联网络设备接入的自动化测试方法 | |
US10317452B2 (en) | Testing device, testing method, and program for power system protection control system | |
CN109799806A (zh) | 一种阀控装置仿真测试方法与系统 | |
CN105071995A (zh) | 一种基于带外网络的网络设备巡检方法、装置及系统 | |
CN201072597Y (zh) | 用于航空电子飞行仪表的自动检测仪 | |
CN103699112A (zh) | 基于io信号故障仿真的航电自检测验证设备及其验证方法 | |
TW200624843A (en) | Automatic fault-testing of logic blocks using internal at-speed logic-BIST | |
CN108683578A (zh) | 一种就地化装置环网通讯测试方法和测试系统 | |
CN111060761A (zh) | 测试模拟装置、液体火箭发动机试验测试系统和测试方法 | |
KR20100066815A (ko) | Remote Terminal Unit 자동 테스트 장치 | |
US9755944B2 (en) | Apparatus for testing data communications on two wire combined power and data network systems for automation | |
CN104898005B (zh) | 继电保护混合输出的测试装置 | |
CN105827469A (zh) | 一种modbus tcp实现缺陷测试仪及其检测方法 | |
CN105490877A (zh) | 一种林业物联网监控系统可靠性测试方法 | |
CN116540681A (zh) | 控制器接口功能测试系统及测试方法 | |
CN102426304A (zh) | 直流微机保护装置的自动测试仪及测试方法 | |
CN109547064B (zh) | 台区识别系统 | |
CN204925371U (zh) | 标准源多模拟量输出的电能质量在线监测装置的测试系统 | |
CN104486779A (zh) | 移动通信终端慢时钟测试方法及其测试系统 | |
CN105511452A (zh) | 一种计量自动化测试装置 | |
CN111208379A (zh) | 一种便携式就地化母线保护子机测试装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20170421 |