RU2008111021A - METHOD OF DEVELOPMENT WHEN RESERVING WELLS AND OIL DEPOSITS IN GENERAL - Google Patents

METHOD OF DEVELOPMENT WHEN RESERVING WELLS AND OIL DEPOSITS IN GENERAL Download PDF

Info

Publication number
RU2008111021A
RU2008111021A RU2008111021/03A RU2008111021A RU2008111021A RU 2008111021 A RU2008111021 A RU 2008111021A RU 2008111021/03 A RU2008111021/03 A RU 2008111021/03A RU 2008111021 A RU2008111021 A RU 2008111021A RU 2008111021 A RU2008111021 A RU 2008111021A
Authority
RU
Russia
Prior art keywords
wells
reservoir
interval
perforation
well
Prior art date
Application number
RU2008111021/03A
Other languages
Russian (ru)
Other versions
RU2379492C2 (en
Inventor
Эрнест Сумбатович Закиров (RU)
Эрнест Сумбатович Закиров
Илья Михайлович Индрупский (RU)
Илья Михайлович Индрупский
Даниил Павлович Аникеев (RU)
Даниил Павлович Аникеев
Сумбат Набиевич Закиров (RU)
Сумбат Набиевич Закиров
Рашид Ахмаевич Резванов (RU)
Рашид Ахмаевич Резванов
Вячеслав Алексеевич Морев (RU)
Вячеслав Алексеевич Морев
Original Assignee
Эрнест Сумбатович Закиров (RU)
Эрнест Сумбатович Закиров
Илья Михайлович Индрупский (RU)
Илья Михайлович Индрупский
Даниил Павлович Аникеев (RU)
Даниил Павлович Аникеев
Сумбат Набиевич Закиров (RU)
Сумбат Набиевич Закиров
Рашид Ахмаевич Резванов (RU)
Рашид Ахмаевич Резванов
Вячеслав Алексеевич Морев (RU)
Вячеслав Алексеевич Морев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Эрнест Сумбатович Закиров (RU), Эрнест Сумбатович Закиров, Илья Михайлович Индрупский (RU), Илья Михайлович Индрупский, Даниил Павлович Аникеев (RU), Даниил Павлович Аникеев, Сумбат Набиевич Закиров (RU), Сумбат Набиевич Закиров, Рашид Ахмаевич Резванов (RU), Рашид Ахмаевич Резванов, Вячеслав Алексеевич Морев (RU), Вячеслав Алексеевич Морев filed Critical Эрнест Сумбатович Закиров (RU)
Priority to RU2008111021/03A priority Critical patent/RU2379492C2/en
Publication of RU2008111021A publication Critical patent/RU2008111021A/en
Application granted granted Critical
Publication of RU2379492C2 publication Critical patent/RU2379492C2/en

Links

Landscapes

  • Earth Drilling (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

1. Способ разработки при расконсервации скважин и нефтяной залежи в целом, включающий использование системы вертикально-латерального заводнения и фонтанного или механизированного способа добычи нефти, отличающийся тем, что в расконсервируемые простаивающие скважины спускают заливочные трубы выше кровли продуктивного пласта и осуществляют цементирование забоя скважины под давлением на высоту более толщины пласта; в скважинах, расконсервируемых в качестве добывающих, полученный цементный стакан разбуривают на глубину не более половины интервала продуктивного пласта, считая от кровли, дополнительно создают зумпф для спуска перфорационного оборудования и выполняют повторную перфорацию в интервале не более половины продуктивного пласта, считая от кровли, затем запускают скважину в добычу нефти фонтанным или механизированным способом; в скважинах, расконсервируемых в качестве нагнетательных, полученный цементный стакан разбуривают до подошвы пласта и создают зумпф для перфорационного оборудования, выполняют повторную перфорацию в интервале нижней одной трети пласта и запускают скважину под нагнетание воды. ! 2. Способ по п.1, отличающийся тем, что для снижения вероятности потери герметичности цементного камня выше или ниже интервала перфорации создание перфорационных отверстий выполняют методом гидропескоструйной перфорации.1. The development method for re-conservation of wells and the oil reservoir as a whole, including the use of a system of vertical-lateral waterflooding and a fountain or mechanized method of oil production, characterized in that the fill pipes are lowered into the unreserved idle wells above the top of the reservoir and cementing the bottom of the well under pressure to a height greater than the thickness of the reservoir; in wells mothballed as producing, the resulting cement cup is drilled to a depth of not more than half of the interval of the reservoir, counting from the roof, an additional sump is created to lower the perforating equipment and repeated perforation in the interval of not more than half of the reservoir, counting from the roof, is then launched a well in oil production fountain or mechanized way; in wells mothballed as injection wells, the resulting cement cup is drilled to the bottom of the formation and a sump for perforation equipment is created, repeated perforation is performed in the interval of the lower one third of the formation and the well is launched under water injection. ! 2. The method according to claim 1, characterized in that to reduce the likelihood of loss of tightness of the cement stone above or below the perforation interval, the creation of perforations is performed by the method of hydro-sandblasting.

Claims (2)

1. Способ разработки при расконсервации скважин и нефтяной залежи в целом, включающий использование системы вертикально-латерального заводнения и фонтанного или механизированного способа добычи нефти, отличающийся тем, что в расконсервируемые простаивающие скважины спускают заливочные трубы выше кровли продуктивного пласта и осуществляют цементирование забоя скважины под давлением на высоту более толщины пласта; в скважинах, расконсервируемых в качестве добывающих, полученный цементный стакан разбуривают на глубину не более половины интервала продуктивного пласта, считая от кровли, дополнительно создают зумпф для спуска перфорационного оборудования и выполняют повторную перфорацию в интервале не более половины продуктивного пласта, считая от кровли, затем запускают скважину в добычу нефти фонтанным или механизированным способом; в скважинах, расконсервируемых в качестве нагнетательных, полученный цементный стакан разбуривают до подошвы пласта и создают зумпф для перфорационного оборудования, выполняют повторную перфорацию в интервале нижней одной трети пласта и запускают скважину под нагнетание воды.1. The development method for re-conservation of wells and the oil reservoir as a whole, including the use of a system of vertical-lateral waterflooding and a fountain or mechanized method of oil production, characterized in that the fill pipes are lowered into the unreserved idle wells above the top of the reservoir and cementing the bottom of the well under pressure to a height greater than the thickness of the reservoir; in wells mothballed as producing, the resulting cement cup is drilled to a depth of not more than half of the interval of the reservoir, counting from the roof, an additional sump is created to lower the perforating equipment and repeated perforation in the interval of not more than half of the reservoir, counting from the roof, is then launched a well in oil production fountain or mechanized way; in wells mothballed as injection wells, the resulting cement cup is drilled to the bottom of the formation and a sump for perforation equipment is created, repeated perforation is performed in the interval of the lower one third of the formation and the well is launched under water injection. 2. Способ по п.1, отличающийся тем, что для снижения вероятности потери герметичности цементного камня выше или ниже интервала перфорации создание перфорационных отверстий выполняют методом гидропескоструйной перфорации. 2. The method according to claim 1, characterized in that to reduce the likelihood of loss of tightness of the cement stone above or below the perforation interval, the creation of perforations is performed by the method of hydro-sandblasting.
RU2008111021/03A 2008-03-24 2008-03-24 Development method at wells re-entry and oil field in general RU2379492C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2008111021/03A RU2379492C2 (en) 2008-03-24 2008-03-24 Development method at wells re-entry and oil field in general

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2008111021/03A RU2379492C2 (en) 2008-03-24 2008-03-24 Development method at wells re-entry and oil field in general

Publications (2)

Publication Number Publication Date
RU2008111021A true RU2008111021A (en) 2009-09-27
RU2379492C2 RU2379492C2 (en) 2010-01-20

Family

ID=41169063

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2008111021/03A RU2379492C2 (en) 2008-03-24 2008-03-24 Development method at wells re-entry and oil field in general

Country Status (1)

Country Link
RU (1) RU2379492C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058812A (en) * 2019-12-30 2020-04-24 中国地质大学(武汉) Experimental device for simulating collapse and accumulation reservoir body edge water drive oil extraction

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2598612C2 (en) * 2012-01-18 2016-09-27 Мерск Сепплай Сервис А/С Method of well drilling
RU2531074C2 (en) * 2012-09-28 2014-10-20 Общество с ограниченной ответственностью "Дельта++" Method for arrangement of vertical and lateral flooding
CN106246150B (en) * 2016-09-18 2018-06-01 中国石油天然气股份有限公司 Oil field fracturing transformation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058812A (en) * 2019-12-30 2020-04-24 中国地质大学(武汉) Experimental device for simulating collapse and accumulation reservoir body edge water drive oil extraction
CN111058812B (en) * 2019-12-30 2024-05-28 中国地质大学(武汉) Experimental device for simulating side water driven oil extraction of collapse and accumulation reservoir

Also Published As

Publication number Publication date
RU2379492C2 (en) 2010-01-20

Similar Documents

Publication Publication Date Title
RU2387812C1 (en) Method to develop oil poll with oil-in-water systems
RU2007124182A (en) METHOD FOR HYDRAULIC RIGGING IN A WELL
RU2014131481A (en) OIL PRODUCTION METHOD
RU2011117402A (en) METHOD FOR OIL PRODUCTION AND OTHER RESERVOIR FLUIDS FROM THE COLLECTOR (OPTIONS)
RU2008111021A (en) METHOD OF DEVELOPMENT WHEN RESERVING WELLS AND OIL DEPOSITS IN GENERAL
RU2283947C1 (en) Method for oil pool development with horizontal wells
RU2334098C1 (en) Method of high-viscosity oil pool development
RU2008101051A (en) METHOD FOR OPERATING HYDROCARBON DEPOSITS
RU2550642C1 (en) Method of oil field development with horizontal wells
MX2010001988A (en) Method for enhanced recovery of oil from oil reservoirs.
RU2007121718A (en) METHOD FOR IMPROVING HYDRODYNAMIC COMMUNICATION OF A WELL WITH A PRODUCTIVE FORM
RU2627338C1 (en) Solid carbonate oil deposits development method
RU2005117051A (en) METHOD FOR DEVELOPING DEPOSITS OF HIGH-VISCOUS OIL
CN106468161A (en) A kind of oil production method for fractured carbonate rock water logging heavy crude reservoir
RU2443853C1 (en) Development method of oil deposit with oil-water zones
RU2007104999A (en) METHOD FOR IMPLEMENTING VERTICAL FILLING OF OIL DEPOSIT
RU2004125555A (en) METHOD FOR DEVELOPING A CARBONATE MULTIPLAYER OIL DEPOSIT OF PORO-CRACKED POROSITY
RU2012141519A (en) METHOD FOR ORGANIZING VERTICAL-LATERAL FLOODING
RU2282025C1 (en) Oil field development method
RU2012101395A (en) METHOD FOR DEVELOPING AN OIL DEPOSIT LOCATED UNDER A GAS DEPOSIT AND SEPARATED FROM IT BY AN IMPRESSIBLE PLASTIC
RU2334097C1 (en) Method of high-viscosity oil pool development
RU2454533C1 (en) Development method of non-homogeneous oil deposit at late stage of development
RU2242594C1 (en) Method for extraction of sedimentologically screened oil-saturated lens by one well
RU2004100326A (en) METHOD FOR DEVELOPING OIL DEPOSITS IN A CARBONATE OR TERRIGENIC LAYER WITH DEVELOPED MACRO-CRACKING
RU2001126020A (en) A method of developing an oil field

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20120325

NF4A Reinstatement of patent

Effective date: 20130710

MM4A The patent is invalid due to non-payment of fees

Effective date: 20160325