RU2006123072A -
METHOD FOR DETERMINING WELLS FOR DRILLING NEW TEMPLES AT MATURE WATERWATER DEPOSITS
- Google Patents
METHOD FOR DETERMINING WELLS FOR DRILLING NEW TEMPLES AT MATURE WATERWATER DEPOSITS
Download PDF
Info
Publication number
RU2006123072A
RU2006123072ARU2006123072/03ARU2006123072ARU2006123072ARU 2006123072 ARU2006123072 ARU 2006123072ARU 2006123072/03 ARU2006123072/03 ARU 2006123072/03ARU 2006123072 ARU2006123072 ARU 2006123072ARU 2006123072 ARU2006123072 ARU 2006123072A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
1. Способ определения скважин для забуривания новых стволов на зрелых обводненных месторождениях, согласно которому на месторождении выбирают все перспективные скважины, в зонах дренирования которых могли бы находиться целики нефти, анализируют обводненность, анализируют отношение вода-нефть и затем анализируют коэффициент извлечения нефти при заводнении, по результатам анализа уточняют места концентрации целиков нефти, определяют их количество и расположение, по анализу кривой падения добычи во всех скважинах в местах концентрации целиков нефти и вокруг них получают динамические пластовые параметры в местах концентрации целиков нефти, по которым прогнозируют объем добычи запланированного нового ствола, выбирают скважину, из которой будет забуриваться новый ствол, выполняют анализ экономической эффективности и принимают решение по забуриванию нового ствола.1. A method for determining wells for drilling new shafts in mature watered fields, according to which all prospective wells are selected in the field, in the drainage zones of which oil pillars could be located, water cut is analyzed, the water-oil ratio is analyzed and then the oil recovery coefficient during water flooding is analyzed, according to the results of the analysis, the locations of the concentration of the pillars of oil are specified, their quantity and location are determined, according to the analysis of the production decline curve in all wells in the places of concentration the pillars of oil and around them receive dynamic reservoir parameters at the places of concentration of the pillars of oil, which predict the production volume of the planned new well, select the well from which the new well will be drilled, analyze the cost-effectiveness and decide on drilling the new well.2. Способ по п.1, согласно которому перспективные скважины выбирают по признаку наличия преждевременного прорыва воды.2. The method according to claim 1, according to which prospective wells are selected based on the presence of premature breakthrough of water.
RU2006123072/03A2006-06-292006-06-29Method of wells finding for side tracking on mature water cut deposits
RU2327031C2
(en)
Water exploration string capable of monitoring horizontal-section production flow and water content in horizontal and vertical well sections and operation method of water