RU2005135364A -
METHOD FOR ELIMINATING A GAS WELL WITH INTER-COLUMNED GAS MANAGEMENT
- Google Patents
METHOD FOR ELIMINATING A GAS WELL WITH INTER-COLUMNED GAS MANAGEMENT
Download PDF
Info
Publication number
RU2005135364A
RU2005135364ARU2005135364/03ARU2005135364ARU2005135364ARU 2005135364 ARU2005135364 ARU 2005135364ARU 2005135364/03 ARU2005135364/03 ARU 2005135364/03ARU 2005135364 ARU2005135364 ARU 2005135364ARU 2005135364 ARU2005135364 ARU 2005135364A
Государственное образовательное учреждение высшего профессионального образовани "Тюменский государственный нефтегазовый университет" (RU)
Государственное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное образовательное учреждение высшего профессионального образовани "Тюменский государственный нефтегазовый университет" (RU), Государственное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет"filedCriticalГосударственное образовательное учреждение высшего профессионального образовани "Тюменский государственный нефтегазовый университет" (RU)
Priority to RU2005135364/03ApriorityCriticalpatent/RU2305754C2/en
Publication of RU2005135364ApublicationCriticalpatent/RU2005135364A/en
Application grantedgrantedCritical
Publication of RU2305754C2publicationCriticalpatent/RU2305754C2/en
Curing Cements, Concrete, And Artificial Stone
(AREA)
Claims (1)
Способ ликвидации газовой скважины с межколонными газопроявлениями, включающий глушение скважины, извлечение лифтовой колонны, установку цементного моста над продуктивным пластом, выполнение перфорационных отверстий в эксплуатационной колонне, закачку через них в заколонное пространство тампонажного раствора, установку цементного моста в башмаке кондуктора, заполнение ствола скважины в интервале многолетнемерзлых пород незамерзающей жидкости, демонтажа на устье фонтанной арматуры и колонной головки, установку на устье бетонной тумбы, отличающийся тем, что в заколонное пространство закачивают и продавливают под давлением величиной в пределах 0,7-0,8 давления опрессовки эксплуатационной колонны и цементного моста облегченную герметизирующую композицию, а после ее затвердевания в заколонном пространстве интервал перфорации дополнительно перекрывают расширяющимся цементным раствором, обеспечивающим высокую растекаемость, при этом в качестве облегченной герметизирующей композиции используют композицию, включающую портландцемент, эпоксиполиуритановый полимер ЭПУ-01-Б, алюмосиликатные микросферы, поливинилхлорид, латекс, триметилхлорсилоксан ТМХС и отвердитель при следующем соотношении компонентов, мас.%:A method of eliminating a gas well with annular gas manifests, including killing the well, extracting the lift string, installing a cement bridge over the reservoir, making perforations in the production string, pumping grout through the annulus, installing the cement bridge in the shoe of the conductor, filling the wellbore in the interval of permafrost rocks of non-freezing fluid, dismantling at the mouth of the fountain reinforcement and column head, installation at the mouth of concrete mbas, characterized in that a lightweight sealing composition is pumped and pressed into the annular space under a pressure of 0.7-0.8 pressures of the test casing and cement bridge, and after it hardens in the annular space, the perforation interval is additionally closed by expanding cement mortar, providing high flowability, while as a lightweight sealing composition using a composition comprising Portland cement, epoxy polyurethane polymer PU-01-B, aluminosilicate microspheres, polyvinyl chloride, latex, trimetilhlorsiloksan TMHS and hardener in the following ratio, wt.%:ПортландцементPortland cement15,0-16,015.0-16.0Эпоксиполиуритановый полимер ЭПУ-01-БEpoxy polyurethane polymer EPU-01-B45,0-47,045.0-47.0Алюмосиликатные микросферыAluminosilicate Microspheres1,2-2,71.2-2.7Поливинилхлорид (наполнитель)Polyvinyl chloride (filler)18,0-18,518.0-18.5ЛатексLatex13,5-13,813.5-13.8Триметилхлорсилоксан ТМХСTrimethylchlorosiloxane TMHS0,10.1ОтвердительHardener5,4-5,55.4-5.5
а в качестве расширяющегося цементного раствора используют композицию, включающую тампонажный порландцемент, алюмосиликатные полые микросферы, гидрокарбоалюминатную добавку, гипс, пластификатор, воду или хлористый кальций при следующем соотношений компонентов, мас.%:and as an expanding cement mortar, a composition is used, including grouting porland cement, aluminosilicate hollow microspheres, hydrocarbon aluminate additive, gypsum, plasticizer, water or calcium chloride in the following ratio of components, wt.%:Тампонажный портландцементGrouting Portland cement85-90;85-90;Алюмосиликатные полые микросферыAluminosilicate Hollow Microspheres10-15;10-15;Гидрокарбоалюминатная добавкаHydrocarboaluminate additive2-4;2-4;ГипсGypsum2-4;2-4;ПластификаторPlasticizer0,2;0.2;Вода или 4%-ный раствор хлористого кальцияWater or 4% calcium chloride solutionостальноеrest
RU2005135364/03A2005-11-142005-11-14Abandonment method for well with gas show in tubing-casing annulus
RU2305754C2
(en)
Method for elimination of underground reservoirs of formation hydrocarbon raw material with reservoirs constructed in rock salt and other rocks, including permafrost, as well as in natural forming karstic cavities