RU2005133619A - METHOD FOR PROTECTING CAREERS FROM UNDERGROUND WATERS - Google Patents
METHOD FOR PROTECTING CAREERS FROM UNDERGROUND WATERS Download PDFInfo
- Publication number
- RU2005133619A RU2005133619A RU2005133619/03A RU2005133619A RU2005133619A RU 2005133619 A RU2005133619 A RU 2005133619A RU 2005133619/03 A RU2005133619/03 A RU 2005133619/03A RU 2005133619 A RU2005133619 A RU 2005133619A RU 2005133619 A RU2005133619 A RU 2005133619A
- Authority
- RU
- Russia
- Prior art keywords
- protecting
- careers
- injection wells
- create
- water
- Prior art date
Links
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2005133619/03A RU2320873C2 (en) | 2005-10-31 | 2005-10-31 | Method for pit protection against underground water inflows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2005133619/03A RU2320873C2 (en) | 2005-10-31 | 2005-10-31 | Method for pit protection against underground water inflows |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2005133619A true RU2005133619A (en) | 2007-05-10 |
RU2320873C2 RU2320873C2 (en) | 2008-03-27 |
Family
ID=38107651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2005133619/03A RU2320873C2 (en) | 2005-10-31 | 2005-10-31 | Method for pit protection against underground water inflows |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2320873C2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518707A (en) * | 2018-12-19 | 2019-03-26 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of advanced plugging structure of high-pressure high-flow underground water and method for blocking |
-
2005
- 2005-10-31 RU RU2005133619/03A patent/RU2320873C2/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518707A (en) * | 2018-12-19 | 2019-03-26 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of advanced plugging structure of high-pressure high-flow underground water and method for blocking |
CN109518707B (en) * | 2018-12-19 | 2023-09-19 | 中国电建集团贵阳勘测设计研究院有限公司 | Advanced plugging structure and plugging method for high-pressure high-flow groundwater |
Also Published As
Publication number | Publication date |
---|---|
RU2320873C2 (en) | 2008-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Younger et al. | Mining impacts on the fresh water environment: technical and managerial guidelines for catchment scale management | |
Cooper | Subsidence hazards due to the dissolution of Permian gypsum in England: investigation and remediation | |
Day | Karstic problems in the construction of Milwaukee’s Deep Tunnels | |
CN108755836A (en) | Mine water resource method of comprehensive utilization based on mine water underground storage | |
Sun | Discussion on some key technical issues for design and construction of undersea tunnels. | |
Waltham | Control the drainage: the gospel accorded to sinkholes | |
Malie et al. | Spatial distribution and tectonic framework of fossil tubular concretions as onshore analogues of cold seep plumbing systems, North Island of New Zealand | |
Tan | Urban geology of Kuala Lumpur and Ipoh, Malaysia | |
RU2005133619A (en) | METHOD FOR PROTECTING CAREERS FROM UNDERGROUND WATERS | |
Younger | How can we be sure fracking will not pollute aquifers? Lessons from a major longwall coal mining analogue (Selby, Yorkshire, UK) | |
Baechler | The geology and hydrogeology of faults on Cape Breton Island, Nova Scotia, Canada: an overview | |
RU2005135292A (en) | METHOD FOR PROTECTING CAREERS FROM UNDERGROUND WATERS | |
Farrant et al. | Hypogenic caves in the UK | |
RU2005137758A (en) | METHOD FOR PIPING PIPELINE IN A HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES | |
Morton et al. | Hydrogeology of the Venetia diamond mine, South Africa | |
RU2011118324A (en) | METHOD OF COMBINED DEPOSIT DEVELOPMENT | |
Naurzgaliyev et al. | Impact of Drain Length on Well Performance in Karachaganak Field | |
RU2386490C2 (en) | Method for burial of solid domestic wastes in permafrost soils | |
RU2603865C1 (en) | Method of offshore prospecting well construction and elimination | |
RU2002101168A (en) | The method of open development of mineral deposits | |
Butz | Where has all the limestone gone?: Plumbing the depths of Canberra | |
Vylita et al. | Travertine deposits of the Karlovy Vary thermal water system | |
Stevanović | Tapping of karst groundwater | |
Green et al. | Quarrying impacts on groundwater flow paths | |
Galiyeva et al. | Wastes Injection Projects in North Caspian Sea Area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20091101 |