RU2005132336A - SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY - Google Patents

SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY Download PDF

Info

Publication number
RU2005132336A
RU2005132336A RU2005132336/09A RU2005132336A RU2005132336A RU 2005132336 A RU2005132336 A RU 2005132336A RU 2005132336/09 A RU2005132336/09 A RU 2005132336/09A RU 2005132336 A RU2005132336 A RU 2005132336A RU 2005132336 A RU2005132336 A RU 2005132336A
Authority
RU
Russia
Prior art keywords
unit
accounting
event
execution
planning
Prior art date
Application number
RU2005132336/09A
Other languages
Russian (ru)
Inventor
Григорий Гемфриевич Дмитриев (RU)
Григорий Гемфриевич Дмитриев
Original Assignee
Григорий Гемфриевич Дмитриев (RU)
Григорий Гемфриевич Дмитриев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Григорий Гемфриевич Дмитриев (RU), Григорий Гемфриевич Дмитриев filed Critical Григорий Гемфриевич Дмитриев (RU)
Priority to RU2005132336/09A priority Critical patent/RU2005132336A/en
Priority to PCT/RU2006/000224 priority patent/WO2007046728A1/en
Publication of RU2005132336A publication Critical patent/RU2005132336A/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Claims (1)

Система планирования, контроля и учета для управления проектами и хозяйственной деятельностью с разграничением полномочий между пользователями, содержащая как минимум один блок ввода задания системе в электронном виде, как минимум один блок памяти и как минимум один блок отображения событий задания, отличающаяся тем, что система содержит блок обработки информации, который связан с блоком планирования проектов и хозяйственной деятельности по срокам, бюджетам и ресурсам и блоком исполнения и учета хозяйственных операций, которые, в свою очередь, сопоставляются между собой посредством блока сравнения информации, при этом блок планирования проектов и хозяйственной деятельности содержит для каждого планируемого события атрибуты времени и бюджета в отношении движения финансовых средств и ресурсов, и каждому из событий присваивается индивидуальный идентификатор, а блок исполнения и учета хозяйственных операций формирует и учитывает документы, относящиеся к исполнению запланированных событий, причем формирование документов по событию осуществляется с обязательным установлением связи между событием и документом путем выбора идентификатора соответствующего события, для исключения возможности бесконтрольного совершения хозяйственной операции с несоответствующим идентификатором и несоответствиями по срокам и бюджету, а фактическое исполнение бюджета и сроков запланированного события, зафиксированное в блоке исполнения и учета хозяйственных операций, отражается в блоке планирования проектов и хозяйственной деятельности и блоке отображения событий задания.A system of planning, control and accounting for managing projects and business activities with differentiation of powers between users, containing at least one unit for entering the task to the system in electronic form, at least one memory unit and at least one unit for displaying task events, characterized in that the system contains information processing unit, which is associated with the unit for project planning and economic activity by the terms, budgets and resources and the unit for the execution and accounting of business operations, which, in their the queue is compared with each other through a unit for comparing information, while the unit for project planning and economic activity contains attributes of time and budget for each planned event in relation to the movement of financial resources and resources, and each event is assigned an individual identifier, and the unit for execution and accounting of business operations generates and takes into account documents related to the execution of planned events, and the formation of documents for the event is carried out with mandatory establishing a relationship between the event and the document by selecting the identifier of the corresponding event, to exclude the possibility of uncontrolled transactions with an inappropriate identifier and discrepancies in terms and budget, and the actual execution of the budget and the timing of the planned event, recorded in the block of execution and accounting of business operations, is reflected in the block project planning and business activities and the unit display events of the task.
RU2005132336/09A 2005-10-20 2005-10-20 SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY RU2005132336A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
RU2005132336/09A RU2005132336A (en) 2005-10-20 2005-10-20 SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY
PCT/RU2006/000224 WO2007046728A1 (en) 2005-10-20 2006-04-28 Planning, monitoring and recording system for operating projects and economic activity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2005132336/09A RU2005132336A (en) 2005-10-20 2005-10-20 SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY

Publications (1)

Publication Number Publication Date
RU2005132336A true RU2005132336A (en) 2007-04-27

Family

ID=37962743

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2005132336/09A RU2005132336A (en) 2005-10-20 2005-10-20 SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY

Country Status (2)

Country Link
RU (1) RU2005132336A (en)
WO (1) WO2007046728A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636594A (en) * 2018-10-16 2019-04-16 深圳壹账通智能科技有限公司 Assets package management method, device, equipment and storage medium based on big data
CN110533377A (en) * 2019-01-16 2019-12-03 重庆金融资产交易所有限责任公司 Project monitoring and managing method, electronic device and readable storage medium storing program for executing
CN110175916B (en) * 2019-04-26 2023-07-18 创新先进技术有限公司 Fund flow checking method and device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5523942A (en) * 1994-03-31 1996-06-04 New England Mutual Life Insurance Company Design grid for inputting insurance and investment product information in a computer system
RU2137198C1 (en) * 1998-10-29 1999-09-10 Бекренев Виталий Леонидович Device for accounting, scheduling and testing operations with resources
US20030208545A1 (en) * 2002-05-01 2003-11-06 Eaton Eric Thomas Instant message communication system for providing notification of one or more events and method therefor
RU37244U1 (en) * 2003-12-09 2004-04-10 Федеральное государственное унитарное предприятие "Научно-исследовательский и проектный институт геофизических методов разведки океана" INFORMATION AND ANALYTICAL SYSTEM FOR MODELING AND EVALUATING THE ENTERPRISE
RU44189U1 (en) * 2004-08-12 2005-02-27 Государственный научный центр - Федеральное государственное унитарное геологическое предприятие "Южное научно-производственное объединение по морским геологоразведочным работам" (ГНЦ ФГУГП "ЮЖМОРГЕОЛОГИЯ") AUTOMATED WORKPLACE OF THE MANAGER IN THE STRUCTURE OF MANAGEMENT OF THE SCIENTIFIC CENTER

Also Published As

Publication number Publication date
WO2007046728A1 (en) 2007-04-26

Similar Documents

Publication Publication Date Title
US20200019907A1 (en) System and computer program for multi-party project schedule collaboration, synchronization and execution
Gunnigle et al. Weathering the storm? Multinational companies and human resource management through the global financial crisis
Day et al. Integrated block sharing: a win–win strategy for hospitals and surgeons
Nieminen et al. Organisational control in programme teams: An empirical study in change programme context
US20110302003A1 (en) System And Method To Measure, Aggregate And Analyze Exact Effort And Time Productivity
Bukowitz et al. Human capital measurement
White et al. Organizational processes to meet new performance criteria: Chinese pharmaceutical firms in transition
Coates et al. Engineering management: operational design coordination
US10445447B1 (en) System and method for transitioning between executing models
RU2005132336A (en) SYSTEM OF PLANNING, MONITORING AND ACCOUNTING FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY
Balasubramanian et al. Capacity allocation and flexibility in primary care
US20080109291A1 (en) Executing and Tracking Strategic Plans
Korsakienė et al. Factors impacting and restricting success of organisational changes
US20110093364A1 (en) Systems, methods and computer products for pharmaceutical samples management
Dehghan et al. The necessity of establishing business intelligence competency centers for achievement of BI projects
US8271372B1 (en) System and method for econometrically-based grant management
Andrulis et al. Collaborative government services: Building for the future
RU51763U1 (en) INTEGRATED PLANNING, MONITORING AND ACCOUNTING SYSTEM FOR PROJECT MANAGEMENT AND ECONOMIC ACTIVITY
Hassler et al. Should UI Benefits Really Fall over Time?
Bedeley et al. Examining the role of business analytics in healthcare value chain
Vaidyanathan INTEGRATED CONTROL MECHANISMS TOWARD PROJECT MANAGEMENT SUCCESS.
Uppin et al. Application of ABC analysis for material management and planning and scheduling using MSP
Tyson The impact of advancements in manufacturing and information technology on management accounting systems
US20240330835A1 (en) Method, System and Computer Program Product for Assessing Labor Efficiency of Knowledge Work such as Software Development Work
Bacun Multidimensional preemptive coordination as collaborative risk management tool

Legal Events

Date Code Title Description
FZ9A Application not withdrawn (correction of the notice of withdrawal)

Effective date: 20070621

FA92 Acknowledgement of application withdrawn (lack of supplementary materials submitted)

Effective date: 20071217