RU2003112593A - METHOD FOR BUILDING A WELL FOR OPERATING A PRODUCTIVE OIL OR GAS DEPOSIT - Google Patents

METHOD FOR BUILDING A WELL FOR OPERATING A PRODUCTIVE OIL OR GAS DEPOSIT

Info

Publication number
RU2003112593A
RU2003112593A RU2003112593/03A RU2003112593A RU2003112593A RU 2003112593 A RU2003112593 A RU 2003112593A RU 2003112593/03 A RU2003112593/03 A RU 2003112593/03A RU 2003112593 A RU2003112593 A RU 2003112593A RU 2003112593 A RU2003112593 A RU 2003112593A
Authority
RU
Russia
Prior art keywords
cavity
production well
horizontal
well
reservoir
Prior art date
Application number
RU2003112593/03A
Other languages
Russian (ru)
Other versions
RU2245439C1 (en
Inventor
Александр Степанович Повалихин
Original Assignee
ОАО НПО "Буровая техника"
Filing date
Publication date
Application filed by ОАО НПО "Буровая техника" filed Critical ОАО НПО "Буровая техника"
Priority to RU2003112593/03A priority Critical patent/RU2245439C1/en
Priority claimed from RU2003112593/03A external-priority patent/RU2245439C1/en
Publication of RU2003112593A publication Critical patent/RU2003112593A/en
Application granted granted Critical
Publication of RU2245439C1 publication Critical patent/RU2245439C1/en

Links

Claims (6)

1. Способ строительства скважины для эксплуатации продуктивного пласта нефтяного или газового месторождения, включающий бурение эксплуатационной скважины, формирование в продуктивном пласте в контуре питания эксплуатационной скважины по крайней мере одного яруса основной дренажной системы путем забуривания из эксплуатационной скважины и проводки в радиальном направлении горизонтальных стволов, отличающийся тем, что забуривание каждого горизонтального ствола осуществляют выше продуктивного пласта и перед началом эксплуатации последнего полости горизонтальных стволов изолируют от полости эксплуатационной скважины.1. A method of constructing a well for operating a productive formation of an oil or gas field, comprising drilling an production well, forming at least one tier of the main drainage system in the productive formation in the supply circuit of the production well by drilling horizontal wells from the production well and radially guiding in the radial direction the fact that the drilling of each horizontal trunk is carried out above the reservoir and before the start of operation the ice cavity of horizontal shafts is isolated from the cavity of the production well. 2. Способ по п.1, отличающийся тем, что из полости эксплуатационной скважины забуривают горизонтальные стволы, проводят их в продуктивный пласт и формируют в последнем на другом уровне по крайней мере один дополнительный ярус горизонтальных стволов основной дренажной системы.2. The method according to claim 1, characterized in that horizontal trunks are drilled from the cavity of the production well, conducted into the reservoir and at least one additional horizontal layer of the main drainage system is formed in the latter at a different level. 3. Способ по одному из пп.1 и 2, отличающийся тем, что из полости эксплуатационной скважины забуривают горизонтальные стволы, проводят их в продуктивный пласт и формируют в контуре питания основной дренажной системы на одном уровне по крайней мере одну дополнительную дренажную систему.3. The method according to one of claims 1 and 2, characterized in that horizontal shafts are drilled from the cavity of the production well, conducted into the reservoir and formed at least one additional drainage system in the supply circuit of the main drainage system. 4. Способ по одному из пп.1-3, отличающийся тем, что полости эксплуатационной скважины и горизонтальных стволов в продуктивном пласте дополнительно связывают путем гидравлического разрыва пласта.4. The method according to one of claims 1 to 3, characterized in that the cavity of the production well and horizontal shafts in the reservoir are additionally connected by hydraulic fracturing. 5. Способ по одному из пп.1-4, отличающийся тем, что перед изоляцией полости эксплуатационной скважины от полости горизонтальных стволов в последних устанавливают фильтр.5. The method according to one of claims 1 to 4, characterized in that before the isolation of the cavity of the production well from the cavity of horizontal shafts, a filter is installed in the latter. 6. Способ по одному из пп.1-5, отличающийся тем, что перед изоляцией полости эксплуатационной скважины от полости горизонтальных стволов в последних размещают пористый олеофильный гидрофобный материал.6. The method according to one of claims 1 to 5, characterized in that before the isolation of the cavity of the production well from the cavity of horizontal shafts in the latter, a porous oleophilic hydrophobic material is placed.
RU2003112593/03A 2003-04-30 2003-04-30 Method for construction of well for operating productive bed of oil or gas deposit RU2245439C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2003112593/03A RU2245439C1 (en) 2003-04-30 2003-04-30 Method for construction of well for operating productive bed of oil or gas deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2003112593/03A RU2245439C1 (en) 2003-04-30 2003-04-30 Method for construction of well for operating productive bed of oil or gas deposit

Publications (2)

Publication Number Publication Date
RU2003112593A true RU2003112593A (en) 2004-11-20
RU2245439C1 RU2245439C1 (en) 2005-01-27

Family

ID=35139046

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2003112593/03A RU2245439C1 (en) 2003-04-30 2003-04-30 Method for construction of well for operating productive bed of oil or gas deposit

Country Status (1)

Country Link
RU (1) RU2245439C1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2865786C (en) * 2012-03-02 2016-09-20 Halliburton Energy Services, Inc. Subsurface well systems with multiple drain wells extending from a production well and methods for use thereof
RU2494215C1 (en) * 2012-04-12 2013-09-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method for multilateral well construction
WO2015069269A1 (en) * 2013-11-08 2015-05-14 Halliburton Energy Services, Inc. Pre-milled windows having a composite material covering
EP3126623B1 (en) * 2014-05-29 2019-03-27 Halliburton Energy Services, Inc. Forming multilateral wells
RU2580532C2 (en) * 2014-09-04 2016-04-10 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) Isolation method of brine water influx in well
RU2630514C1 (en) * 2016-05-25 2017-09-11 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of operation of production and water-bearing formations separated by impermeable interlayer, well with horizontal shafts and cracks of formation hydraulic fracturing
EA036665B1 (en) * 2016-11-28 2020-12-07 Республиканское Унитарное Предприятие "Производственное Объединение "Белоруснефть" Method for development of an isolated lithologically or tectonically screened heterogeneous oil-saturated reservoir
RU173485U1 (en) * 2017-02-13 2017-08-29 Общество с ограниченной ответственностью "ВОРМХОЛС Внедрение" Device for reducing water content in produced fluid in a well

Similar Documents

Publication Publication Date Title
US20070256826A1 (en) Multi-zone frac-packing using screen-conveyed linear charges
RU2459934C1 (en) Development method of multilayer non-homogeneous oil deposit
RU2003112593A (en) METHOD FOR BUILDING A WELL FOR OPERATING A PRODUCTIVE OIL OR GAS DEPOSIT
RU2612060C9 (en) Method of development of carbonate shaly oil deposits
WO2004065917B1 (en) Multi-lateral well with downhole gravity separation
RU2203405C1 (en) Method of development of oil field
RU2550642C1 (en) Method of oil field development with horizontal wells
RU2334098C1 (en) Method of high-viscosity oil pool development
RU2616052C1 (en) Method development of shaly carbonate oil pays
RU2245439C1 (en) Method for construction of well for operating productive bed of oil or gas deposit
RU2205935C1 (en) Method of multiple hole construction
RU2282023C1 (en) Development method for oil deposit having oil-water zones
RU2385408C1 (en) Method of development of oil or gas deposit
RU2001126020A (en) A method of developing an oil field
RU2283417C1 (en) Method for multibranch well erection
RU2182651C1 (en) Process of completion of well
RU2378502C1 (en) Method to develop oil formation
RU2188311C1 (en) Method of oil pool development
RU2616016C9 (en) Recovery method for solid carbonate reservoirs
RU2005101988A (en) METHOD FOR INTEGRATED DEVELOPMENT OF OIL DEPOSIT WITH A GAS CAP
RU2236567C1 (en) Method for extracting non-homogenous multibed oil deposit
RU2004125481A (en) METHOD FOR DEVELOPING DEPOSITS OF A MULTI-PLASTIC OIL DEPOSIT WITH WATER OIL ZONES AND / OR MASSIVE TYPE
RU2700153C1 (en) Accident elimination method in horizontal well equipped with liner filter
RU2268355C1 (en) Multizone oil reservoir development method
US1394192A (en) Process of drilling wells