RU2001122130A - The method of extraction of solid minerals by leaching (options) - Google Patents

The method of extraction of solid minerals by leaching (options)

Info

Publication number
RU2001122130A
RU2001122130A RU2001122130/03A RU2001122130A RU2001122130A RU 2001122130 A RU2001122130 A RU 2001122130A RU 2001122130/03 A RU2001122130/03 A RU 2001122130/03A RU 2001122130 A RU2001122130 A RU 2001122130A RU 2001122130 A RU2001122130 A RU 2001122130A
Authority
RU
Russia
Prior art keywords
wells
leaching
pumped
leaching agent
casing
Prior art date
Application number
RU2001122130/03A
Other languages
Russian (ru)
Inventor
Владимир Иванович Лунев
Михаил Степанович Паровинчак
Владимир Михайлович Зыков
Original Assignee
ООО "ТомГДК"
Томский политехнический университет
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ООО "ТомГДК", Томский политехнический университет filed Critical ООО "ТомГДК"
Priority to RU2001122130/03A priority Critical patent/RU2001122130A/en
Publication of RU2001122130A publication Critical patent/RU2001122130A/en

Links

Landscapes

  • Extraction Or Liquid Replacement (AREA)

Claims (3)

1. Способ добычи тердого полезного ископаемого выщелачиванием, заключающийся в том, что участок месторождения, подлежащий разработке, разбуривают технологическими скважинами по определенной сетке, скважины подготавливают к добыче полезного ископаемого, затем через устья скважин в пласт полезного ископаемого закачивают выщелачивающий агент, после чего из выдачных скважин отбирают продуктивные флюиды, отличающийся тем, что нагнетательными скважинами вскрывают нижезалегающий напорный водоносный горизонт, а выдачные скважины проходят до кровли пласта полезного ископаемого, после этого все скважины крепят обсадными трубами и цементируют затрубное пространство, затем выдачные скважины углубляют до подошвы пласта полезного ископаемого и оборудуют фильтрами, а в водоподающих скважинах, в интервале залегания пласта полезного ископаемого, перфорируют обсадную колонну и зацементированное затрубное пространство, затем через устья всех технологических скважин в пласт полезного ископаемого закачивают выщелачивающий агент, после чего в водоподающих скважинах, в интервале напорного водоносного горизонта, перфорируют обсадную колонну и зацементированное затрубное пространство и заглушивают устья фонтанирующих водоподающих скважин, а из выдачных скважин производят отбор продуктивных флюидов.1. The method of extraction of minerals by leaching, which consists in the fact that the plot of the field to be developed is drilled with technological wells on a specific grid, the wells are prepared for mining, then the leaching agent is pumped into the mineral layer through the mouths of the wells, and then the leaching agent is pumped out productive fluids are selected for wells, characterized in that injection wells open a lower-lying pressure aquifer, and delivery wells pass to the roof of the mineral reservoir, after that all the wells are fixed with casing and cement the annulus, then the delivery wells are deepened to the bottom of the mineral reservoir and equipped with filters, and in the water supply wells, in the interval of occurrence of the mineral reservoir, the casing and cemented annulus are perforated then, through the mouth of all technological wells, a leaching agent is pumped into the mineral layer, after which, in water supply wells, in the interval pressure aquifer, perforate the casing and cemented annulus and muffle the mouths of flowing water supply wells, and produce fluids are selected from the delivery wells. 2. Способ добычи твердого полезного ископаемого выщелачиванием, заключающийся в том, что участок месторождения, подлежащий разработке, разбуривают технологическими скважинами по определенной геометрической сетке, скважины подготавливают к добыче полезного ископаемого, затем через устья скважин в пласт полезного ископаемого закачивают выщелачивающий агент, после чего из выдачных скважин отбирают продуктивные флюиды, отличающийся тем, что выдачные и водоподающие скважины проходят до кровли пласта полезного ископаемого, скважины крепят обсадными трубами, а затрубное пространство цементируют, затем скважины оборудуют фильтрами, через устья всех технологических скважин в пласт полезного ископаемого закачивают выщелачивающий агент, после чего в водоподающих скважинах в интервале вышезалегающего напорного водоносного горизонта перфорируют обсадную колонну и зацементированное затрубное пространство и заглушивают устья фонтанирующих водоподающих скважин, а из выдачных скважин производят отбор продуктивных флюидов.2. The method of extraction of solid minerals by leaching, which consists in the fact that the plot of the field to be developed is drilled with technological wells according to a certain geometrical grid, the wells are prepared for mining, then the leaching agent is pumped into the mineral layer through the mouths of the wells, after which the leaching agent is pumped of producing wells, productive fluids are selected, characterized in that the issuing and water supplying wells extend to the top of the mineral layer, the crepe wells with casing pipes, and the annular space is cemented, then the wells are equipped with filters, the leaching agent is pumped through the mouths of all technological wells into the mineral layer, after which the casing and cemented annular space are perforated in the water supply wells and the cemented annulus is plugged and the wells are plugged wells, and from producing wells produce productive fluids are selected. 3. Способ добычи твердого полезного ископаемого выщелачиванием по пп.1 и 2, отличающийся тем, что скорость фильтрации выщелачивающего агента через пласт полезного ископаемого и вытеснения из него к выдачным скважинам продуктивных флюидов регулируют путем дозированного отбора воды из фонтанирующих водоподающих скважин или закачки в них воды из наземных источников.3. The method of extraction of solid minerals by leaching according to claims 1 and 2, characterized in that the filtration rate of the leaching agent through the mineral layer and displacing productive fluids from the supply wells to it is regulated by dosed selection of water from flowing wells or pumping water into them from ground sources.
RU2001122130/03A 2001-08-07 2001-08-07 The method of extraction of solid minerals by leaching (options) RU2001122130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001122130/03A RU2001122130A (en) 2001-08-07 2001-08-07 The method of extraction of solid minerals by leaching (options)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001122130/03A RU2001122130A (en) 2001-08-07 2001-08-07 The method of extraction of solid minerals by leaching (options)

Publications (1)

Publication Number Publication Date
RU2001122130A true RU2001122130A (en) 2003-06-20

Family

ID=35138029

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001122130/03A RU2001122130A (en) 2001-08-07 2001-08-07 The method of extraction of solid minerals by leaching (options)

Country Status (1)

Country Link
RU (1) RU2001122130A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2594912C2 (en) * 2015-08-07 2016-08-20 Владимир Иванович Лунев Method for development of deep water-flooded deposit of oolitic waste of ironstone ores
RU2600229C2 (en) * 2015-07-24 2016-10-20 Владимир Иванович Лунев Method of development of water-bearing deposit of ironstone ores of oolitic structure
RU2707611C2 (en) * 2018-11-07 2019-11-28 Петр Сергеевич Лунев Method for environmental development of iron-ore deposit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2600229C2 (en) * 2015-07-24 2016-10-20 Владимир Иванович Лунев Method of development of water-bearing deposit of ironstone ores of oolitic structure
RU2594912C2 (en) * 2015-08-07 2016-08-20 Владимир Иванович Лунев Method for development of deep water-flooded deposit of oolitic waste of ironstone ores
RU2707611C2 (en) * 2018-11-07 2019-11-28 Петр Сергеевич Лунев Method for environmental development of iron-ore deposit

Similar Documents

Publication Publication Date Title
CN101566053B (en) System and method to facilitate treatment and production in wellbore
RU2014114351A (en) HYDRAULIC GROUND RIP WITH HETEROGENEOUS APPANTS PLACEMENT USING HYDRAULIC SAND PUNCHING (OPTIONS)
RU2612061C1 (en) Recovery method of shale carbonate oil field
RU2001122130A (en) The method of extraction of solid minerals by leaching (options)
RU2008101051A (en) METHOD FOR OPERATING HYDROCARBON DEPOSITS
RU2627338C1 (en) Solid carbonate oil deposits development method
RU2001122000A (en) METHOD FOR DEVELOPING GAS-OIL DEPOSITS
RU2616052C1 (en) Method development of shaly carbonate oil pays
RU2135760C1 (en) Process of treatment of oil pool
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
RU2296217C1 (en) Well bottom zone treatment method
RU2232263C2 (en) Method for extracting of high-viscosity oil
RU2438008C1 (en) Procedure for simultaneous operation of several objects in producer and device for its implementation
RU2443853C1 (en) Development method of oil deposit with oil-water zones
RU2225938C1 (en) Methods for exploiting oil extracting wells
RU2002100556A (en) The method of pumping fluid into the reservoir
RU2005129982A (en) OIL STORY PRODUCTION METHOD
RU2217582C1 (en) Process of development of zonally-inhomogeneous oil field
RU150455U1 (en) DEVICE FOR REDUCING WATER FLOW TO A WELL INSTALLED AS A WELL COMPLETION ELEMENT
RU2212525C1 (en) Method of secondary tapping of oil and gas well producing formations
RU2413838C2 (en) Procedure for stabilised operation of watered fiery seam
RU2177541C2 (en) Method of directional hydraulic fracturing of formation
RU2162148C1 (en) Method of mineral leaching from producing horizons
RU2000125925A (en) METHOD FOR HYDRAULIC FRACTURING IN WELLS
RU2410528C1 (en) Method of protection against sand phenomena in well

Legal Events

Date Code Title Description
FA94 Acknowledgement of application withdrawn (non-payment of fees)

Effective date: 20041112