RU1771498C - Method for building hydraulic fill structures - Google Patents

Method for building hydraulic fill structures

Info

Publication number
RU1771498C
RU1771498C SU914919234A SU4919234A RU1771498C RU 1771498 C RU1771498 C RU 1771498C SU 914919234 A SU914919234 A SU 914919234A SU 4919234 A SU4919234 A SU 4919234A RU 1771498 C RU1771498 C RU 1771498C
Authority
RU
Russia
Prior art keywords
water
fixed surface
card
supplied
washing
Prior art date
Application number
SU914919234A
Other languages
Russian (ru)
Inventor
Александр Александрович Огарков
Валерий Геннадьевич Пантелеев
Original Assignee
Нижегородский архитектурно-строительный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Нижегородский архитектурно-строительный институт filed Critical Нижегородский архитектурно-строительный институт
Priority to SU914919234A priority Critical patent/RU1771498C/en
Application granted granted Critical
Publication of RU1771498C publication Critical patent/RU1771498C/en

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

Использование: в гидротехническом строительстве, в частности.при возведении намывных отвалов промышленного производства: эолоотвалов. хвостохранилищ. шламохранилищ и других. Сущность изобретени : способ заключаетс  в том. что по окончании намыва карты 2 в напорный пульпопровод б в его конечную часть подают цементирующий материал, а в начало русловых потоков 3 по напорному водоводу 7 - воду расходом, обеспечивающим смачивание незатопленных площадей между руслами 3. с образованием потока 4. распредел ющего цементирующий материал по всей площади закрепл емой поверхности 1. В процессе цементации до образовани  корки периодически смачивают закрепл емую поверхность 1 водой расходом , обеспечивающим полное затопление карты 2. 2 ил.Usage: in hydraulic engineering, in particular. In the construction of alluvial dumps of industrial production: aerial dumps. tailings. sludge repositories and others. SUMMARY OF THE INVENTION: the method is as follows. that at the end of the washing up of the card 2, cementing material is fed into the pressure pulp conduit b, and water is supplied to the beginning of the channel flows 3 through the pressure conduit 7, which ensures wetting of the unfilled areas between the channels 3. with the formation of a stream 4. distributing the cementing material along the entire area of the fixed surface 1. During cementation, the fixed surface 1 is periodically moistened with a fixed surface 1 with water at a rate that ensures complete flooding of the map 2. 2 sludge.

Description

11

изооретение относитс  к гидротехническому строительству и может быть применено , в частости, при возведении намывных отвалов отходов промышленного производства зо готвалов. хвостохранилищ, шла- мохранилищ и других.Isooretion refers to hydraulic engineering and can be used, in particular, in the construction of landfills for industrial waste dumping. tailings, sludges and others.

Цель изобретени  - упрощение и удешевление производства работ, а также повышение эффективности Закреплени  поверхности сооружени .The purpose of the invention is to simplify and reduce the cost of work, as well as increase the efficiency of fixing the surface of the structure.

На фиг. 1 представлен план сооружени : на фиг. 2 - разрез А-А на фиг. 1.In FIG. 1 is a construction plan: FIG. 2 is a section AA in FIG. 1.

Схема включает закрепл емую поверхность карты 1. работающие карты намыва 2. русловые потоки 3. поток 4. затапливающим закрепл емую поверхность 1, разделительные дамбы 5. напорный пульпопровод 6. Запорный водовод 7. задвижки 8. установленные на выпусках напорного пульпопровода б и напорного водовода 7. отстойный пруд 9. водоприемный элемент 10. водовод оборотной воды 11.The scheme includes a fixed surface of the card 1. working alluvial cards 2. channel flows 3. flow 4. flooding the fixed surface 1, dividing dams 5. pressure slurry piping 6. Locking water conduit 7. valves 8. installed on the outlets of pressure discharge slurry conduit b and pressure water conduit 7. A settling pond 9. A water receiving element 10. A return water conduit 11.

Способ заключаемс  в следующем.The method is as follows.

В начале отсылают ограждающие дамбы 5. Затем из напорного пульпопровода б подают пульпу на карту намыва 2. По окончании намыва карты 2 в напорный пульпопровод 6. в его конечную часть, подаетс  цементирующий материал попадающий в русловые потоки 3 а по напорному водово- ду 7 подают в начало русловых потоков 3 воду таким суммарным расходом, чтобы произошел перелив пульпы и воды через борта русел 3 с образованием потока 4. затапливающего закрепл емую поверхность 1 и распредел ющего цементирующий материал по этой г.оверхмости С помощью задвижек 8 установленных на выпусках напорного пульпопровода 6 и напорного водовода 7. осуществл ют регулирование подаваемых на закрепл емую поверхность 1 расходов пульпы и воды и их переключение. После того как на закрепл емой поверхности 1 произойдет распределение цементирующего материала и начнетс  его цементаци , на закрепл емую поверхность 1 из напорного водовода 7 периодически подают воду тем же суммарным расходом. обеспечивающим полное смачивание закрепл емой поверхности 1 до образовани  качественной защитной корки.At the beginning, the enclosing dams 5 are sent. Then, pulp is fed from the pressure pulp line b to the alluvial map 2. At the end of the allotment of card 2, pressure pulp line 6. is fed into its final part, cementing material enters the channel flows 3 and is fed through pressure water conduit 7 to the beginning of channel flows 3 water with such a total flow rate that there is overflow of pulp and water through the sides of channels 3 with the formation of stream 4. flooding the fixed surface 1 and distributing cementing material along this surface Using valves 8 installed on the outlets of pressure pulp conduit 6 and pressure conduit 7. control the flow of pulp and water supplied to the fixed surface 1 and regulate them. After the cementing material is distributed on the fixed surface 1 and its cementation begins, water is periodically supplied to the fixed surface 1 from the discharge conduit 7 with the same total flow rate. providing complete wetting of the fixed surface 1 to form a high-quality protective peel.

Claims (1)

Данный способ позвол ет повысить эффективность закреплени  намытой поверхности и по сравнению с известными способами не оказы вает вредного воздействи  на окружающую среду, не снижает надежности сооружени , а также упрощает и удешевл ет производство работ по предотвращению пылени  намытых поверхностей. Формула изобретени  Способ возведени  намывного сооружени , включающий разделение сооружени  дамбами на карты и последующий намыв материала на карты путем циклической подачи пульпы по пульпопроводу, отличающийс  тем, что. с целью упрощени  и удешевлени  производства работ, а также повышени  эффективности закреплени  поверхности сооружени , по окончании намыва каждой карты в конечную часть пульпопровода подают цементирующий материал , а в место падени  струи пульпы воду расходом, обеспечивающим смачивание всей поверхности карты, а в процессе цементации до образовани  корки периодически смачивают закрепл емую поверхность водой, расходом обеспечивающим полное затопление поверхности картыThis method improves the efficiency of fixing the washed surface and, in comparison with the known methods, does not have a harmful effect on the environment, does not reduce the reliability of the structure, and also simplifies and reduces the cost of work to prevent dusting of the washed surfaces. SUMMARY OF THE INVENTION A method for erecting an alluvial structure, comprising dividing the structure with dams into cards and then washing the material onto the cards by cyclically feeding the pulp through a slurry pipeline, characterized in that. in order to simplify and reduce the cost of the work, as well as increase the efficiency of fixing the surface of the structure, after the completion of the washing of each card, cementing material is supplied to the final part of the slurry pipeline, and water is supplied to the place where the pulp stream falls, providing wetting of the entire surface of the card, and during cementation to form the crusts periodically wet the fixed surface with water, the flow rate ensuring complete flooding of the map surface
SU914919234A 1991-03-12 1991-03-12 Method for building hydraulic fill structures RU1771498C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU914919234A RU1771498C (en) 1991-03-12 1991-03-12 Method for building hydraulic fill structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU914919234A RU1771498C (en) 1991-03-12 1991-03-12 Method for building hydraulic fill structures

Publications (1)

Publication Number Publication Date
RU1771498C true RU1771498C (en) 1992-10-23

Family

ID=21565076

Family Applications (1)

Application Number Title Priority Date Filing Date
SU914919234A RU1771498C (en) 1991-03-12 1991-03-12 Method for building hydraulic fill structures

Country Status (1)

Country Link
RU (1) RU1771498C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Рекомендации по проектированию зо- лошлакоотвалоа тепловых электрических станций. П26-85 ВНИИТ. Л. 1986. с. G4...67. Авторское свидетельство СССР Ns 1139794,кл Е 02 В 7/OG. 1983. *

Similar Documents

Publication Publication Date Title
ES8300486A1 (en) Installation for spreading clay muds for rehabilitating soils.
RU1771498C (en) Method for building hydraulic fill structures
CN109183971A (en) A kind of storage pond and its Accrete clearing device
Amerson et al. Infiltration as affected by compaction, fines and contact area of gravel.
DE4014798A1 (en) Under-ground mine backfilling system - delivers compacted clay sediment to mixer simultaneously with powder
CN218027941U (en) Ore dressing production water route cyclic utilization system
SU1756479A1 (en) Closed-circuit water system for development of placer minerals
SU810879A1 (en) Method of erecting soil structures
SU1020494A1 (en) Method of storing waste of concentration plants
SU1134664A1 (en) Method of hydraulic filling of hydraulic structure
SU912612A1 (en) Chamber feeder
SU1073383A1 (en) Mine water-pumping installation
SU1449629A1 (en) Method of erecting an earth dam
SU947268A1 (en) Hydraulic engineering unit
NO984926L (en) Surface-consolidation
SU1258938A1 (en) Method of constructing hydraulically deposited structures in water basins
SU1073369A1 (en) Inter-soil watering method
DE69903577T2 (en) METHOD FOR PRODUCING A ROAD COVER WITH HEAT TRANSFER ELEMENT
SU1291672A1 (en) Method of constructing drainage system
Brand Blackheath Water Treatment Plant, Cape Town
SU1139794A1 (en) Method of erecting hydraulically deposited structures
SU1260440A1 (en) Amelioration system for soil desalination
Haraszti et al. Sedimentation of flume and wash water
SU1441018A1 (en) Drying and moisturizing system
SU708007A1 (en) Construction seam cementing method