RU118723U1 - HEAT SUPPLY SYSTEM - Google Patents

HEAT SUPPLY SYSTEM Download PDF

Info

Publication number
RU118723U1
RU118723U1 RU2011145678/12U RU2011145678U RU118723U1 RU 118723 U1 RU118723 U1 RU 118723U1 RU 2011145678/12 U RU2011145678/12 U RU 2011145678/12U RU 2011145678 U RU2011145678 U RU 2011145678U RU 118723 U1 RU118723 U1 RU 118723U1
Authority
RU
Russia
Prior art keywords
generator
electric
pump
valves
emergency
Prior art date
Application number
RU2011145678/12U
Other languages
Russian (ru)
Inventor
Николай Федорович Котеленец
Евгений Викторович Ежов
Александр Сергеевич Иванов
Original Assignee
Закрытое акционерное общество "ОПТИМА"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Закрытое акционерное общество "ОПТИМА" filed Critical Закрытое акционерное общество "ОПТИМА"
Priority to RU2011145678/12U priority Critical patent/RU118723U1/en
Application granted granted Critical
Publication of RU118723U1 publication Critical patent/RU118723U1/en

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

1. Система аварийного теплоснабжения, содержащая линию перепуска давления, установленную в первичном контуре до теплообменника и включающую в себя турбину и приводимый ею в действие электрический генератор, отличающаяся тем, что во вторичном контуре теплоснабжения установлен аварийный электронасос, установленный параллельно основному электронасосу посредством двух задвижек с электроприводом, а к электрическим двигателям насоса и задвижек через переключатель присоединяется электрический генератор линии перепуска давления. ! 2. Система по п.1, отличающаяся тем, что для управления системой теплоснабжения последняя снабжена контроллером. ! 3. Система по п.2, отличающаяся тем, что в качестве генератора используется асинхронная машина с параллельно подключенным блоком конденсаторов, а на выходе генератора установлены последовательно соединенные выпрямитель и аккумулятор, выход которого через преобразователь частоты соединен с электрическими двигателями аварийного насоса и задвижек. ! 4. Система по п.3, отличающаяся тем, что между генератором и выпрямителем установлен согласующий трансформатор. !5. Система по п.2, отличающаяся тем, что в качестве генератора используется синхронная машина, а на выходе генератора установлены последовательно соединенные выпрямитель и аккумулятор, выход которого через преобразователь частоты соединен с электрическими двигателями аварийного насоса и задвижек. ! 6. Система по п.5, отличающаяся тем, что между генератором и выпрямителем установлен согласующий трансформатор. 1. An emergency heat supply system containing a pressure bypass line installed in the primary circuit up to the heat exchanger and including a turbine and an electric generator driven by it, characterized in that an emergency electric pump is installed in the secondary heat supply circuit, installed parallel to the main electric pump by means of two valves with by an electric drive, and an electric generator of the pressure bypass line is connected to the electric motors of the pump and valves through a switch. ! 2. The system according to claim 1, characterized in that the latter is equipped with a controller to control the heat supply system. ! 3. The system according to claim 2, characterized in that an asynchronous machine with a parallel connected capacitor bank is used as a generator, and a series-connected rectifier and a battery are installed at the generator output, the output of which is connected through a frequency converter to the electric motors of the emergency pump and valves. ! 4. The system according to claim 3, characterized in that a matching transformer is installed between the generator and the rectifier. !five. The system according to claim 2, characterized in that a synchronous machine is used as a generator, and a rectifier and a battery connected in series are installed at the generator output, the output of which is connected through a frequency converter to the electric motors of the emergency pump and valves. ! 6. The system according to claim 5, characterized in that a matching transformer is installed between the generator and the rectifier.

Description

Полезная модель относится к области теплоэнергетики и может быть использована в системах магистральных сетей теплоснабжения.The utility model relates to the field of heat power engineering and can be used in systems of heating mains.

В настоящее время широко используются системы централизованного отопления потребителей по независимой схеме, показанной на фиг.1. Тепловая энергия из первичного контура 5 через теплообменник 3 передается во вторичный контур теплоснабжения, к которому подключены устройства обогрева 1 и в котором установлен элеватор 2. Циркуляция теплоносителя во вторичном контуре осуществляется электронасосом 4. В случае аварийного отключения электрической энергии электронасос 4 останавливается, и циркуляция теплоносителя во вторичном контуре прекращается. При длительном перерыве в электроснабжении в холодное время года это приводит к размораживанию тепловой сети, разрыву трубопроводов и батарей отопления и необходимости их дорогостоящего ремонта или замены перед повторным подключением потребителей тепловой энергии после восстановления электроснабжения.Currently, widely used systems of centralized heating of consumers according to the independent scheme shown in figure 1. Thermal energy from the primary circuit 5 is transferred through the heat exchanger 3 to the secondary heat supply circuit, to which the heating devices 1 are connected and in which the elevator 2 is installed. The heat carrier is circulated in the secondary circuit by the electric pump 4. In the event of an emergency blackout, the electric pump 4 stops and the coolant circulates in the secondary circuit is terminated. With a long interruption in power supply in the cold season, this leads to a defrosting of the heating network, rupture of pipelines and radiators and the need for their costly repair or replacement before reconnecting consumers of heat energy after restoration of power supply.

Наиболее близким аналогом является система рекуперации избыточного давления магистральных сетей водо- и теплоснабжения (см. патент РФ №2239752, С1, класс F24D 17/00 от 22.12.2003 г.). Эта система (см. фиг.2) содержит параллельно подключенную к прямому 6 и обратному 7 трубопроводам первичного контура теплоснабжения линию перепуска давления, включающую турбину 9 и запорно-регулирующий клапан 12. Линия перепуска давления через входную 10 и выходную 11 задвижки установлена последовательно запорно-регулирующему клапану 12 и параллельно входной магистральной задвижке 13. Она содержит также асинхронный генератор 14, приводимый во вращение турбиной 9 и соединенный через инвертор 15 с сетью собственных нужд за счетчиком электроэнергии 19. Параллельно генератору 14 включается блок конденсаторов 16 и балластная нагрузка 17. Для управления системой рекуперации энергии предусмотрен контроллер 18 (пунктирными линиями показаны каналы связи контроллера). На схеме показан также теплообменник 8. При наличии избыточного давления в первичной тепловой сети генератор 14 вырабатывает электрическую энергию, поступающую в сеть.The closest analogue is the overpressure recovery system for the main networks of water and heat supply (see RF patent No. 2239752, C1, class F24D 17/00 of December 22, 2003). This system (see Fig. 2) contains a pressure bypass line connected in parallel to the direct 6 and return 7 pipelines of the primary heat supply circuit, including a turbine 9 and a shut-off and control valve 12. A pressure by-pass line through the inlet 10 and outlet 11 of the valve is installed in series with the shut-off the control valve 12 and parallel to the input main valve 13. It also contains an asynchronous generator 14, driven by rotation of the turbine 9 and connected through the inverter 15 to the auxiliary network with an electric meter and 19. Simultaneously the generator 14 includes a capacitor bank 16 and ballast load 17. To control the energy recovery system is provided controller 18 (shown in dashed lines controller communication channels). The diagram also shows the heat exchanger 8. In the presence of excess pressure in the primary heat network, the generator 14 generates electrical energy entering the network.

К недостаткам этой системы относится невозможность обеспечения циркуляции теплоносителя во вторичном контуре при перерыве электроснабжения. Вся вырабатываемая в этом случае генератором электроэнергия рассеивается в балластной нагрузке.The disadvantages of this system include the inability to ensure circulation of the coolant in the secondary circuit during a power outage. All electricity generated in this case by the generator is dissipated in the ballast load.

Задачей полезной модели является обеспечение циркуляции теплоносителя во вторичном контуре при перерыве электроснабжения.The objective of the utility model is to ensure circulation of the coolant in the secondary circuit during a power outage.

Указанный технический результат достигается за счет установки во вторичном контуре параллельно основному дополнительного аварийного насоса, получающего питание от генератора, установленного в первичном контуре теплоснабжения. Аварийный насос подключается во вторичный контур с помощью двух задвижек с электроприводом параллельно основному насосу, а генератор снабжен переключателем, позволяющим при перерыве в электроснабжении переключать генератор с сети на электродвигатель аварийного насоса и электродвигатели задвижек.The specified technical result is achieved by installing in the secondary circuit parallel to the main additional emergency pump, powered by a generator installed in the primary heat supply circuit. The emergency pump is connected to the secondary circuit using two valves with an electric drive parallel to the main pump, and the generator is equipped with a switch that allows the generator to be switched from the mains to the emergency pump motor and gate valves electric motors during a break in the power supply.

Таким образом, система теплоснабжения содержит линию перепуска давления, установленную в первичном контуре до теплообменника, и включающую в себя турбину и приводимый ею в действие электрический генератор. Во вторичном контуре теплоснабжения параллельно основному электронасосу посредством двух задвижек с электроприводом установлен аварийный электронасос. К электрическим двигателям насоса и задвижек через переключатель присоединяется электрический генератор линии перепуска давления.Thus, the heat supply system contains a pressure transfer line installed in the primary circuit to the heat exchanger, and includes a turbine and an electric generator driven by it. In the secondary heat supply circuit, an emergency electric pump is installed parallel to the main electric pump by means of two valves with an electric drive. An electric generator of the pressure bypass line is connected to the electric motors of the pump and valves through a switch.

На чертеже фиг.3 представлена схема теплоснабжения с аварийным электронасосом. Схема содержит параллельно подключенный к прямому 21 и обратному 22 трубопроводам первичного контура теплоснабжения линию перепуска давления, включающую турбину 24 и запорно-регулирующий клапан 27. Линия перепуска давления через входную 25 и выходную 26 задвижки установлена последовательно запорно-регулирующему клапану 27 и параллельно входной задвижке 28. Она содержит также электрический генератор 29, приводимый во вращение турбиной 24 и соединенный через инвертор 30 с сетью собственных нужд за счетчиком электроэнергии 33. Параллельно генератору 29 включается блок конденсаторов 31 и балластная нагрузка 32. Для управления системой рекуперации энергии предусмотрен контроллер 34 (пунктирными линиями показаны каналы связи контроллера). На схеме показан также теплообменник 23. При наличии избыточного давления в первичной тепловой сети генератор 29 вырабатывает электрическую энергию, поступающую в сеть. Электрический генератор снабжен датчиком частоты вращения 35.In the drawing of figure 3 presents a diagram of heat supply with an emergency electric pump. The circuit contains a pressure bypass line connected in parallel to the direct 21 and return 22 pipelines of the primary heat supply circuit, including a turbine 24 and a shut-off and control valve 27. A pressure by-pass line through the inlet 25 and outlet 26 of the valve is installed in series with the shut-off and control valve 27 and parallel to the inlet valve 28 It also contains an electric generator 29, driven by a turbine 24 and connected through an inverter 30 to an auxiliary network using an electricity meter 33. In parallel, the generator RU 29 includes a block of capacitors 31 and a ballast load 32. To control the energy recovery system, a controller 34 is provided (controller channels are shown in dashed lines). The heat exchanger 23 is also shown in the diagram. In the presence of excess pressure in the primary heat network, the generator 29 generates electric energy entering the network. The electric generator is equipped with a speed sensor 35.

Во вторичном контуре параллельно основному насосу 36 с помощью двух задвижек с электроприводом 37 и 38 подключен дополнительный аварийный насос 39, причем к электрическим двигателям аварийного насоса и задвижек через переключатель присоединяется электрический генератор 29 линии перепуска давления.In the secondary circuit parallel to the main pump 36 using two valves with an electric actuator 37 and 38, an additional emergency pump 39 is connected, and an electric generator 29 of the pressure bypass line is connected to the electric motors of the emergency pump and valves through the switch.

На выходе электрического генератора 29 через согласующий трансформатор 40 установлены последовательно соединенные выпрямитель 41 и аккумулятор 42, выход которого через преобразователь частоты 43 соединен с электрическими двигателями аварийного насоса 39 и задвижек.At the output of the electric generator 29, through the matching transformer 40, a rectifier 41 and a battery 42 are connected in series, the output of which through the frequency converter 43 is connected to the electric motors of the emergency pump 39 and valves.

Согласующий трансформатор необходим для согласования уровня напряжения, выдаваемого электрогенератором, с напряжением заряда аккумуляторной батареи.A matching transformer is needed to match the voltage level generated by the electric generator with the charge voltage of the battery.

Согласующий трансформатор в предлагаемой системе может отсутствовать, если согласование уровней напряжений не требуется, что зависит от параметров электрогенератора и аккумуляторной батареи.The matching transformer in the proposed system may be absent if coordination of voltage levels is not required, which depends on the parameters of the generator and the battery.

На схеме во вторичном контуре теплоснабжения также показаны устройства обогрева 44.The diagram in the secondary heat supply circuit also shows heating devices 44.

В случае прерывания электроснабжения основной насос 36 вторичного контура останавливается, в результате чего прекращается подача тепла потребителям, при этом сеть перестает потреблять электроэнергию, вырабатываемую генератором 29. Однако работоспособность вторичного контура может быть восстановлена путем направления энергии от генератора 29 на питание электродвигателя аварийного насоса 39 и электродвигателей задвижек 37 и 38.In case of interruption of the power supply, the primary secondary circuit pump 36 is stopped, as a result of which the heat supply to the consumers is stopped, while the network ceases to consume electricity generated by the generator 29. However, the secondary circuit can be restored by directing energy from the generator 29 to the power of the emergency pump motor 39 and electric motors of valves 37 and 38.

В качестве электрического генератора 29 в системе используется асинхронная машина с параллельно подключенным блоком конденсаторов 31, а на выходе асинхронной машины установлены последовательно соединенные выпрямитель и аккумулятор, выход которого через преобразователь частоты соединен с электрическими двигателями аварийного насоса и задвижек.As an electric generator 29, the system uses an asynchronous machine with a parallel block of capacitors 31, and at the output of the asynchronous machine, a rectifier and a battery are connected in series, the output of which is connected through the frequency converter to the electric motors of the emergency pump and valves.

В качестве электрического генератора 29 может быть использована синхронная машина, на выходе которой установлены последовательно соединенные выпрямитель и аккумулятор, выход которого через преобразователь частоты соединен с электрическими двигателями аварийного насоса и задвижек.As an electric generator 29, a synchronous machine can be used, at the output of which a rectifier and a battery are connected in series, the output of which is connected through a frequency converter to the electric motors of the emergency pump and valves.

Между генератором и выпрямителем может быть установлен согласующий трансформатор.A matching transformer can be installed between the generator and the rectifier.

Техническим результатом является бесперебойная работа циркуляционного насоса системы отопления при аварийном отключении электроснабжения.The technical result is the uninterrupted operation of the circulation pump of the heating system during an emergency power outage.

Claims (6)

1. Система аварийного теплоснабжения, содержащая линию перепуска давления, установленную в первичном контуре до теплообменника и включающую в себя турбину и приводимый ею в действие электрический генератор, отличающаяся тем, что во вторичном контуре теплоснабжения установлен аварийный электронасос, установленный параллельно основному электронасосу посредством двух задвижек с электроприводом, а к электрическим двигателям насоса и задвижек через переключатель присоединяется электрический генератор линии перепуска давления.1. An emergency heat supply system comprising a pressure bypass line installed in the primary circuit to the heat exchanger and including a turbine and an electric generator driven by it, characterized in that an emergency electric pump is installed in the secondary heat supply circuit, installed parallel to the main electric pump by means of two valves with electric drive, and the electric generator of the pressure bypass line is connected to the electric motors of the pump and valves through the switch. 2. Система по п.1, отличающаяся тем, что для управления системой теплоснабжения последняя снабжена контроллером.2. The system according to claim 1, characterized in that for controlling the heat supply system, the latter is equipped with a controller. 3. Система по п.2, отличающаяся тем, что в качестве генератора используется асинхронная машина с параллельно подключенным блоком конденсаторов, а на выходе генератора установлены последовательно соединенные выпрямитель и аккумулятор, выход которого через преобразователь частоты соединен с электрическими двигателями аварийного насоса и задвижек.3. The system according to claim 2, characterized in that the generator uses an asynchronous machine with a parallel block of capacitors, and a rectifier and a battery are connected at the output of the generator, the output of which is connected through the frequency converter to the electric motors of the emergency pump and valves. 4. Система по п.3, отличающаяся тем, что между генератором и выпрямителем установлен согласующий трансформатор.4. The system according to claim 3, characterized in that a matching transformer is installed between the generator and the rectifier. 5. Система по п.2, отличающаяся тем, что в качестве генератора используется синхронная машина, а на выходе генератора установлены последовательно соединенные выпрямитель и аккумулятор, выход которого через преобразователь частоты соединен с электрическими двигателями аварийного насоса и задвижек.5. The system according to claim 2, characterized in that a synchronous machine is used as a generator, and a rectifier and a battery are connected in series at the output of the generator, the output of which is connected through a frequency converter to the electric motors of the emergency pump and valves. 6. Система по п.5, отличающаяся тем, что между генератором и выпрямителем установлен согласующий трансформатор.
Figure 00000001
6. The system according to claim 5, characterized in that a matching transformer is installed between the generator and the rectifier.
Figure 00000001
RU2011145678/12U 2011-11-11 2011-11-11 HEAT SUPPLY SYSTEM RU118723U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011145678/12U RU118723U1 (en) 2011-11-11 2011-11-11 HEAT SUPPLY SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011145678/12U RU118723U1 (en) 2011-11-11 2011-11-11 HEAT SUPPLY SYSTEM

Publications (1)

Publication Number Publication Date
RU118723U1 true RU118723U1 (en) 2012-07-27

Family

ID=46851103

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011145678/12U RU118723U1 (en) 2011-11-11 2011-11-11 HEAT SUPPLY SYSTEM

Country Status (1)

Country Link
RU (1) RU118723U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2577714C1 (en) * 2014-12-10 2016-03-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Дальневосточный Федеральный Университет" (Двфу) Method of heating system operation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2577714C1 (en) * 2014-12-10 2016-03-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Дальневосточный Федеральный Университет" (Двфу) Method of heating system operation

Similar Documents

Publication Publication Date Title
EP1881177B1 (en) Modular power generating system
CN100555129C (en) Modular energy-generating system
CN107516905B (en) Multi-element coupling energy storage system
US8179000B2 (en) Photovoltaic system with battery and reserve power plant
US20150214787A1 (en) Ac motor drive powered concurrently by ac grid and dc solar array
CN103683467B (en) A kind of independent photovoltaic electric power system with self-starting function
WO2013000185A1 (en) Grid-connected inverter
CN106356911B (en) Method and apparatus for operating mini/mini central heating power supply station for independent house
CN104950946A (en) Heat radiation control system of high-voltage frequency converter
JP5072394B2 (en) Cogeneration equipment
JP2011217590A (en) Air conditioning system
CN114976108A (en) Fuel cell cogeneration system and control method
JP2006220066A (en) Cogeneration device
CN104135027A (en) Photovoltaic variable frequency air conditioner and power supply control method thereof
TW201330438A (en) Fault tolerant turbine speed control system
JP5782817B2 (en) Waste heat recovery device
RU118723U1 (en) HEAT SUPPLY SYSTEM
CN204046190U (en) Photovoltaic frequency conversion air conditioner
CN110679079B (en) Hydraulic power generation grid-connected system
CN217904028U (en) Direct-hanging frequency modulation system based on molten salt and electric energy storage
RU178735U1 (en) AUTONOMOUS ELECTRIC UNIT
RU2695633C1 (en) Modular electric power plant
CN115207961A (en) Wind-solar-energy-storage-based complementary oil production well site direct-current micro-grid system
TWM512065U (en) Renewable energy power supply device for providing AC/AC power supply device with hybrid power
JP6694757B2 (en) Hot water supply system

Legal Events

Date Code Title Description
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20121112