RO97042B1 - Open pit mining process - Google Patents

Open pit mining process

Info

Publication number
RO97042B1
RO97042B1 RO125036A RO12503686A RO97042B1 RO 97042 B1 RO97042 B1 RO 97042B1 RO 125036 A RO125036 A RO 125036A RO 12503686 A RO12503686 A RO 12503686A RO 97042 B1 RO97042 B1 RO 97042B1
Authority
RO
Romania
Prior art keywords
mining process
open pit
pit mining
quarry
exploitation
Prior art date
Application number
RO125036A
Other languages
Romanian (ro)
Inventor
Gheorghe Stanila
Original Assignee
Institutul De Cercetari Inginerie Tehnologica Si De Proiectare A Lucrarilor De Constructii Si Instalatii Pentru Minereuri
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institutul De Cercetari Inginerie Tehnologica Si De Proiectare A Lucrarilor De Constructii Si Instalatii Pentru Minereuri filed Critical Institutul De Cercetari Inginerie Tehnologica Si De Proiectare A Lucrarilor De Constructii Si Instalatii Pentru Minereuri
Priority to RO125036A priority Critical patent/RO97042B1/en
Publication of RO97042B1 publication Critical patent/RO97042B1/en

Links

Landscapes

  • Silicates, Zeolites, And Molecular Sieves (AREA)

Abstract

Inventia se refera la un procedeu de exploatare în cariera a substantelor minerale utile. procedeul, conform inventiei, prevede ca derocarea sa fie executata pe fiecare treapta din grup în mod separat, decalat în plan si astfel dirijata, încât o parte din material este depus prin puscare direct pe treapta inferioara, iar o parte este deplasat la nivelul aceleiasi trepte inferioare, ce unde este evacuat.The invention relates to a process for the exploitation of useful minerals in the quarry. the method according to the invention requires that the tilting be executed on each step of the group separately, offset in the plane and so guided that part of the material is deposited directly by the lower step and a part is moved at the same level inferior, where it is evacuated.

RO125036A 1986-10-15 1986-10-15 Open pit mining process RO97042B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RO125036A RO97042B1 (en) 1986-10-15 1986-10-15 Open pit mining process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RO125036A RO97042B1 (en) 1986-10-15 1986-10-15 Open pit mining process

Publications (1)

Publication Number Publication Date
RO97042B1 true RO97042B1 (en) 1989-08-02

Family

ID=40905374

Family Applications (1)

Application Number Title Priority Date Filing Date
RO125036A RO97042B1 (en) 1986-10-15 1986-10-15 Open pit mining process

Country Status (1)

Country Link
RO (1) RO97042B1 (en)

Similar Documents

Publication Publication Date Title
AU3684884A (en) Improved wedge arrangement + related means for mounting means, base members, + bits, + combinations thereof for mining, road working or earth moving machinery
ES468810A1 (en) Plant for handling cement tiles and similar articles that require a seasoning and subsequent workings
AU608631B2 (en) Device to cut, drill or similarly machine rock, ore, concrete or similar
RO97042B1 (en) Open pit mining process
ZA747002B (en) Underground coal slurry concentrating sump
AU603091B2 (en) Process and device for loosening soil
EP0139257A3 (en) Branched polysilahydrocarbon precursors for silicon carbide
AU7310181A (en) Silicon carbide from polycarbosilanes
JO1481B1 (en) Process for separating water & solids from fuels, particularly from shale oil.
AU4595479A (en) Mining minerals, especially coal formations
SU641100A1 (en) Method of open-pit mining of mineral deposits
GB2207145B (en) Pyrolysis furnace for olefin production
Beatty Foraminiferal evidence for the development of anoxic conditions, Niobrara Formation (Upper Cretaceous) Boulder, Colorado, with paleoceanographic implications for the western interior seaway
SU669057A1 (en) Method of mining gently-sloping bed mineral deposits
AIGNER¹ et al. Sequence stratigraphy of the classic Germanic Triassic
PL256988A1 (en) Planer for underground mining
MY105220A (en) Fastening system.
PL276857A1 (en) Method for open-pit excavation of raw materials, especially from flooded deposits
RO90911B (en) Ceramic composition for glazed stoneware tiles
ATE100072T1 (en) PROCESSES FOR DEGRADING COAL TAR COMPONENTS WITH POT FUNGI.
AU490548B2 (en) Underground coal slurry concentrating sump
Ladnorg et al. Management of the change from underground to open-cast mining
RO97847B1 (en) Process for the hydrochlorination of acetylene to vinyl chloride
RO82513B1 (en) Process for obtaining 3-dimethyl-aminopropylmagnesium chloride
PL256989A1 (en) Planer for underground mining