Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by îNTREPRINDEREA DE CONDUCTORI ELECTRICI EMAILATIfiledCriticalîNTREPRINDEREA DE CONDUCTORI ELECTRICI EMAILATI
Priority to RO107287ApriorityCriticalpatent/RO84058B1/ro
Publication of RO84058A2publicationCriticalpatent/RO84058A2/ro
Publication of RO84058B1publicationCriticalpatent/RO84058B1/ro
Heat Treatment Of Strip Materials And Filament Materials
(AREA)
Abstract
Procedeul realizeaza emailarea în dublu strat pe instalatii-standard, emailarea facîndu-se succesiv pe doua instalatii cu regimuri tehnologice corespunzatoare. Instalatia este realizata din doua instalatii-standard de emailat, montate fata în fata, echipate cu un derulator cu role de ghidare fara frînare, cuptor de recoacere tubular cu capacitate de recoacere marita prin intermediul unui generator electric de abur tehnologic, prevazut cu doua termoregulatoare, cu suporturi de supraînaltare cu role de ghidare si de directionare care asigura functionarea în tandem a instalatiilor de emailare.
RO107287A1982-04-191982-04-19PROCEDEU SI INSTALATIE PENTRU EMAILAREA CONDUCTOARELOR îN TANDEM
RO84058B1
(ro)