PL84707B1 - - Google Patents

Download PDF

Info

Publication number
PL84707B1
PL84707B1 PL14014070A PL14014070A PL84707B1 PL 84707 B1 PL84707 B1 PL 84707B1 PL 14014070 A PL14014070 A PL 14014070A PL 14014070 A PL14014070 A PL 14014070A PL 84707 B1 PL84707 B1 PL 84707B1
Authority
PL
Poland
Prior art keywords
concrete
steel
reinforcement
lining
inserts
Prior art date
Application number
PL14014070A
Other languages
English (en)
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL14014070A priority Critical patent/PL84707B1/pl
Publication of PL84707B1 publication Critical patent/PL84707B1/pl

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
PL14014070A 1970-04-20 1970-04-20 PL84707B1 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14014070A PL84707B1 (de) 1970-04-20 1970-04-20

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL14014070A PL84707B1 (de) 1970-04-20 1970-04-20

Publications (1)

Publication Number Publication Date
PL84707B1 true PL84707B1 (de) 1976-04-30

Family

ID=19951561

Family Applications (1)

Application Number Title Priority Date Filing Date
PL14014070A PL84707B1 (de) 1970-04-20 1970-04-20

Country Status (1)

Country Link
PL (1) PL84707B1 (de)

Similar Documents

Publication Publication Date Title
CN101429869B (zh) 双曲隧道
CN102937030B (zh) 深部巷道围岩分区破裂的锚注一体化支护方法
CN111305877B (zh) 一种高海拔地区强烈岩爆地段隧道施工方法
CN101852083A (zh) 大变形易冒落破碎松散巷道的快速支护方法及装置
CN104358572A (zh) 大倾角急倾斜煤层自然垮落充填护巷无煤柱开采技术
Du Plessis et al. Investigating the use of polymer-modified cementitious thin spray-on liners as stope face support
CN105673037A (zh) 深井软岩巷道围岩承压环稳定性控制方法
Shi et al. Sub-horizontal reinforcement of weathered granite before tunneling beneath a spillway
Cao et al. Non-pillar mining of upper coal seam layers with double-roadway driving using a flexible-formwork pre-cast partition wall
CN201972707U (zh) 一种夹心锚筋混凝土沿空隔离墙
US1876205A (en) Monolithic construction
CN117072172A (zh) 一种富水围岩深大竖井主-被动支护结构设计方法
PL84707B1 (de)
Rozenbaum et al. Deformational criteria for the stability of roof rocks and rock bolts
CN107893669A (zh) 一种用于巷道支护的u型钢套棚结构
Grimstad Behaviour of steel fibre reinforced shotcrete during large deformations in squeezing rock
CN110145348A (zh) 一种欧标新奥法标准下长系统锚杆施工方法
Singh et al. Review of fill mining technology in Canada
CN105568938B (zh) 一种改变既有卧式水闸液压闸门承力方式的方法
Piede Model test study on double lining of tunnels
Li et al. Numerical Simulation Analysis of Construction Support of Intersection Section in Extra-long Water Diversion Project Tunnels
CN109882206A (zh) 一种用于控制煤矿破碎围岩的多支护协同方法
CN207620813U (zh) 一种用于巷道支护的u型钢套棚结构
CN219932191U (zh) 巷道竹混支护结构
Kalabegishvili Engineer Solutions Decreasing Seepage Losses From Enguri Pressure Tunnel