Pierwszenstwo: Zgloszenie ogloszono: 30.05.1973 Opis patentowy opublikowano: 21.04.1975 76864 KI. 5c, 13/08 MKP E21d 13/08 C1YTELNIA Urzedu Patentowego Polskie] ImktKW- 'I ^im'\ Twórcywynalazku: Leonard Pluta, Franciszek Morawski Uprawniony z patentu tymczasowego: Glówny Instytut Górnictwa, Katowice (Polska) Sposób ciagnienia urobku i opuszczania materialów oraz uklad nad- i podszybia do stosowania tego sposobu Przedmiotem wynalazku jest sposób ciagnienia urobku i opuszczania materialów na dól kopalni za pomoca wyciagu skipoklatkowego oraz uklad nad i podszybia do stosowania tego sposobu.Znany dotychczas sposób ciagnienia urobku i opuszczania materialu do kopalni za pomoca wyciagu skipo¬ klatkowego polegal na tym, ze wyciag ciagnal urobek do góry lub tez sluzyl do opuszczania wozów z materia¬ lem na dól kopalni. Jednoczesnosc obu tych czynnosci dotychczas byla niemozliwa, a to ze wzgledu na nie przystosowanie do tego celu ani nadszybia, ani tez podszybia. Znane sa jednak przypadki wykorzystywania wyciagu skipoklatkowego do ciagnienia urobku w naczyniu skipowym i wozów w klatce znajdujacej sie nad tym naczyniem. W takich przypadkach wyciag musial byc dwukrotnie zatrzymywany i to zarówno na nadszybiu jak i na podszybiu. Wada takiego sposobu ciagnienia urobku i opuszczania materialu jest bardzo znaczne obnizenie wydajnosci wyciagu, wskutek wydluzania sie czasu postoju wyciagu i zmniejszenia sredniej predkoscijazdy.Wymienionych wad i niedogodnosci nie ma sposób bedacy przedmiotem niniejszego wynalazku. Istota tego sposobu polega na tym, ze na nadszybiu, na jednym poziomie postojowym, najkorzystniej na zrebie szybu, laduje sie do klatki wyciagu wozy z materialem i jednoczesnie wyladowuje sie urobek z naczynia skipowego.Natomiast na podszybiu laduje sie urobek do naczynia skipowego i jednoczesnie przeladowuje sie wozy z klatki wyciagu. Zaleta sposobu wedlug wynalazku jest znaczne zwiekszenie wydajnosci urzadzenia wyciagowego co osiagnieto przez skrócenie do minimum czasu przy jednoczesnym zaladunku i rozladunku tego urzadzenia.Przedmiotem wynalazku jest równiez uklad nad i podszybia do stosowania opisanego wyzej sposobu ciag¬ nienia urobku i opuszczania materialu za pomoca wyciagu skipoklatkowego. Istota tego ukladu polega na tym, ze nadszybie ma wezel odbiorczy urobku umieszczony poza osia szybu ponizej jego zrebu w odleglosci „1" do tego zrebu. Poza tym wezel odbiorczy znajduje sie ponizej otworu wysypowego naczynia skipowego, a klatka wyciagu znajduje sie na poziomie zrebu szybu. Natomiast podszybie ma dwa poziomy, z których jeden polozony wyzej jest przeznaczony dla obiegu wozów z urobkiem i laczy sie poprzez zbiornik urobku i urzadzenia dozujace z zsuwnia podajaca urobek bezposrednio do naczynia skipowego. Drugi poziom polozony nizej jest przeznaczony do obiegu wozów z materialem i zjazdu ludzi. Oba te niezalezne poziomy sa ze soba polaczone za pomoca dwóch2 76864 zbieznych w stosunku do siebie wyrobisk. Zaleta takiego ukladu nad i podszybia jest bardzo duza przepustowosc urzadzenia wyciagowego, poniewaz umozliwia on jednoczesnosc rozladunku i zaladunku zarówno naczynia ski¬ powego jak i klatki wyciagu.Przedmiot wynalazku jest dokladniej wyjasniony na rysunku, na którym fig. 1 przedstawia osiowy przekrój pionowy szybu, fig. 2 — wezel odbiorczy urobku nadszybia w przekroju wzdluz linii A—A zaznaczonej na fig. 1, a fig. 3- przekrój podszybia wzdluz linii B-B zaznaczonej na fig. 1.Jak uwidoczniono na rysunku nadszybie do ciagnienia urobku i opuszczania materialów sklada sie z od¬ biorczego wezla 1 urobku polaczonego przenosnikiem 2 z budynkiem 3 sortowni, a umieszczonego poza osia szybu ponizej jego zrebu 4 w odleglosci 1 oraz z zaladowczego punktu 5, Poza tym odbiorczy wezel 1 znajduje sie ponizej otworu wysypowego skipowego naczynia 6 tak, aby w czasie rozladunku urobku klatka 7 tego naczynia znajdowala sie na zrebie 4 szybu. Natomiast podszybie sklada sie z dwóch poziomów 8 i 9 z których wyzej polozony poziom 8 jest przeznaczony dla obiegu wozów 10 z urobkiem i jest polaczony poprzez zbiornik 11 i dozujace urzadzenie 12 z zsuwnia 13 podajaca urobek bezposrednio do skipowego naczynia 6. Drugi nizej polozony poziom 9 jest przeznaczony do obiegu wozów 14 z materialem i do zjazdu ludzi. Ponadto oba te niezalezne poziomy sa polaczone ze soba za pomoca dwóch zbieznych w stosunku do siebie wyrobisk 15.Ciagnienie urobku i opuszczanie materialów do kopalni zgodnie z wynalazkiem odbywa sie w nastepujacy sposób. Zaladowane urobkiem skipowe naczynie 6 rozladowuje sie w znany sposób w odbiorczym wezie 1, a jednoczesnie do klatki 7 wyciagu, znajdujacej sie na zrebie 4 szybu w zaladowczym punkcie 5, laduje sie wozy 14 z materialem. Po opróznieniu skipowego naczynia 6 i zaladowaniu klatki 7 wyciag opuszcza sie na podszybie, gdzie za pomoca dozujacego urzadzenia 12 i zsuwni 13 laduje sie urobek do skipowego naczynia 6, a jednoczes¬ nie na poziomie 9 wyladowuje sie z klatki 7 wozy 14 z materialem i na ich miejsce do tej klatki laduje sie wozy puste. Natomiast na wyzszym poziomie 8 wyladowuje sie wozy 10 z urobkiem, który gromadzi sie w zbiorniku 11. PL PLPriority: Application announced: May 30, 1973 Patent description was published: April 21, 1975 76864 KI. 5c, 13/08 MKP E21d 13/08 C1YTELNIA Urzedu Patentowego Polskie] ImktKW- 'I ^ im' \ Creators of the invention: Leonard Pluta, Franciszek Morawski Authorized by a temporary patent: Central Mining Institute, Katowice (Poland) Method of pulling the spoil and dropping materials and the upper and lower shaft system for using this method The subject of the invention is a method of pulling the excavated material and lowering the materials down the mine with the use of a skirting hoist and a system above and lowering the shaft for using this method. The previously known method of pulling the excavated material and lowering the material to the mine by means of a skipout the cage was carried out in that the hoist pulled the output up or was used to lower the carts with the material to the bottom of the mine. The simultaneousness of these two activities has so far been impossible, due to the fact that neither the pit head nor the pit was adapted to this purpose. However, there are known cases of using a skirting frame to pull the output in a skip vessel and carts in a cage located above this vessel. In such cases, the lift had to be stopped twice, both in the pit and in the pit. The disadvantage of such a method of pulling the spoil and lowering the material is a very significant reduction in the efficiency of the hoist, due to the extension of the downtime of the hoist and the reduction of the average speed of travel. The essence of this method consists in the fact that at the head of the pit, on one parking level, preferably on the shaft of the shaft, carts with material are loaded into the hoist cage and at the same time the output from the skip vessel is unloaded, while on the pit, the output is loaded into the skip vessel and at the same time reloaded the carts out of the cage of the lift. The advantage of the method according to the invention is a significant increase in the efficiency of the extraction device, which is achieved by minimizing the time required for the simultaneous loading and unloading of this device. The invention also relates to an overhead and pit system for the use of the above-described method of pulling the debris and lowering the material by means of a narrow-frame extractor. The essence of this system consists in the fact that the top of the shaft has an output receiving knot located outside the shaft axis below its furrow at a distance of "1" to this furrow. Moreover, the receiving junction is located below the discharge opening of the skip vessel, and the hoist cage is at the level of the shaft rebate On the other hand, the pit has two levels, one of which is located above, is intended for the circulation of carts with the material and is connected through the material tank and dosing devices with the chute feeding the material directly to the skip vessel. The second level below is intended for circulation of carts with material and a descent. Both these independent levels are connected with each other by means of two converging workings. The advantage of such an arrangement above and below the pit is a very large capacity of the hoisting device, because it allows simultaneous unloading and loading of both the skirting vessel and the hoist cage. The subject of the invention is explained in more detail in the drawing in which Fig Fig. 1 shows the axial vertical section of the shaft, Fig. 2 - the header of the excavation of the head of the shaft, in the section along the line A-A in Fig. 1, and Fig. 3 - the section of the shaft along the line BB in Fig. 1, as shown in the figure above for pulling the excavated material and lowering the materials, it consists of a receiving node 1 of the excavated material connected by a conveyor 2 to the building 3 of the sorting plant, and located outside the shaft axis below its log 4 at a distance of 1 and from a loading point 5, In addition, receiving node 1 is located below the opening the discharge skip vessel 6 so that during unloading the excavated material, the cage 7 of this vessel is on the crest 4 of the shaft. On the other hand, the pit consists of two levels 8 and 9, of which the higher level 8 is intended for the circulation of carts 10 with the excavated material and is connected by the tank 11 and the dosing device 12 from the chute 13 feeding the material directly to the skip vessel 6. The second lower level 9 it is intended for the circulation of wagon 14 with material and for the exit of people. Moreover, both these independent levels are connected with each other by means of two converging pits 15. The drawing of the spoil and the lowering of the materials into the mine according to the invention is carried out as follows. The skip vessel 6 loaded with the spoil is unloaded in a known manner in the receiving hose 1, and simultaneously into the hoist cage 7, located on the rebate 4 of the shaft at the loading point 5, the wagons 14 are loaded with the material. After emptying the skip vessel 6 and loading the cage 7, the hoist is lowered on the pit, where, by means of a dosing device 12 and chute 13, the spoil is loaded into the skip vessel 6, and at the same time, on the level 9, the carts 14 with the material are unloaded from the cage 7 and on empty carts are loaded into this cage. However, at the higher level 8, carts 10 are unloaded with the spoil, which is accumulated in the tank 11. PL PL