PL76235B2 - - Google Patents

Download PDF

Info

Publication number
PL76235B2
PL76235B2 PL15862872A PL15862872A PL76235B2 PL 76235 B2 PL76235 B2 PL 76235B2 PL 15862872 A PL15862872 A PL 15862872A PL 15862872 A PL15862872 A PL 15862872A PL 76235 B2 PL76235 B2 PL 76235B2
Authority
PL
Poland
Prior art keywords
objects
under
mining
exploitation
deposit
Prior art date
Application number
PL15862872A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15862872A priority Critical patent/PL76235B2/pl
Publication of PL76235B2 publication Critical patent/PL76235B2/pl

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

Pierwszenstwo: 04.11.1972 (P. 158628) Zgloszenie ogloszono: 01.06.1973 Opis patentowy opublikowano: 17.02.1975 76235 KI. 5b, 41/00 MKP E21c 41/00 Twórcywynalazku: Miroslaw Chudek, Bernard Drzezla, Henryk Gil, TadeuszKochmanski, Magdziorz Jan, Wlodzimierz Olaszowski, Aleksander Tyrala Uprawniony z patentu tymczasowego: Politechnika Slaska im. W. Pstrowskiego, Gliwice (Polska) Sposób podziemnej eksploatacji fclóz pod obiektami Przedmiotem wynalazku jest sposób wybierania zlóz podziemnych, zwlaszcza pokladowych, pod obiek¬ tami na powierzchni ziemi lub w górotworze. Sposób ten najbardziej nadaje sie do wybierania pod obiektami dlugimi o malej szerokosci, tj. takimi jak linie kolejowe, drogi, podziemne wyrobiska korytarzowe, rurociagi, waly ziemne, rzeki itp.Korzystne oddzialywanie eksploatacji sposobem wedlug wynalazku na chronione obiekty w stosunku do eksploatacji o dlugim froncie prostoliniowym lub tez eksploatacji o przypadkowym ksztalcie, osiaga sie przez odpowiednie uksztaltowanie frontu wybierania badz tez przez odpowiednie rozmieszczenie w czasie eksploatacji pod i w sasiedztwie obiektu.Dotychczasowe sposoby eksploatacji pod dlugimi obiektami sprowadzaja sie do tego, ze najpierw prowadzi sie nieskrepowana eksploatacje poza wyznaczonym dla kazdego obiektu filarem ochronnym, a dopiero pózniej usiluje sie wybierac wewnatrz filaru ochronnego.Usilowania takie natrafiaja jednak na szereg przeszkód. Sa nimi: po pierwsze - utrudnione ksztaltowanie frontu eksploatacji pod katem zmniejszenia odksztalcen podluznych i poprzecznych w obiektach, po drugie- - niekorzystny stan odksztalcenia w obiektach poddanych poprzecznym odksztalceniom rozciagajacym, co nioze wykluczyc dalsze naruszanie ich równowagi poprzez prowadzenie eksploatacji wewnatrz filaru ochronnego, po trzecie - niekorzystny stan naprezenia w caliznie filaru, ochronnego poddanej wszechstronnym naprezeniom sciskajacym, co powoduje rozgniatanie filaru lub tapania w przypadku pokladu tapiacego, a to równiez moze wykluczyc dalsza eksploatacje. Wspomniane trudnosci poteguja sie, gdy w kilku pokladach pozostawione sa filary ochronne oraz gdy filary te sa zbyt waskie, co czesto ma miejsce.Wady dotychczasowych sposobów eksploatacji pod dlugimi obiektami usuwa sposób wedlug wynalazku, który umozliwia eksploatacje bezpieczna dla chronionego obiektu i nie przyczynia sie do wzrostu zagrozen górniczych lub nawet je zmniejsza.Sposób podziemnej eksploatacji zlóz pod obiektami wedlug wynalazku polega na tym, ze najpierw wybiera sie pod osia obiektu pas zloza o szerokosci stalej lub zmiennej zaleznie od warunków górniczo-geologicznych, a nastepnie z pewnym opóznieniem, pozostala czesc zloza w sasiedztwie obiektu.z 76236 Szerokosc wybieranego wyprzedzajaco pasa pod osia obiektu mozna tak dobrac, zeby przez caly czas trwania eksploatacj. w granicach zasiegu wplywów na chroniony obiekt odksztalcenia pódluL w"bL Se przekroczyly 50% odksztalcen wystepujacych przy eksploatacji dlugim frontem prostolimowym Ponadto IZT^TT TfI153" P°f K^ °biektU WyW°lUJe W °biekcie P°Przeczne odksztalcenia 2Z#£E& J^LSSSTja?°S tez wrecz korzystne dla obiektu czy **bezpieczeristwa robot~ Szerokosc pasa wybieranego pod osia obiektu oraz konieczne wyprzedzenie miedzy eksploatacja pasa a eksp oatacja zewnetrzna obhcza sie przy uzyciu odpowiednich wzorów matematycznych. Ponadto dla optym* hzacji tych dwu wielkosci opracowany jest odpowiedni program dla maszyny cyfrowej Poniewaz sposób eksploatacji pod obiektami wedlug wynalazku zapewnia zmniejszenie odksztalcen po¬ dluznych w obiekcre rzedu 50% i powoduje poprzeczne odksztalcenia sciskajace oraz zabezpiecza przed koncen¬ tracja naprezen w pokladach pod obiektem, wiec w wielu przypadkach mozna bedzie stosowac eksploatacje z zawalem stropu zamiast znacznie drozszej eksploatacji z podsadzka plynna, lub tez mozna bedzie eksploato- wac tam, gdzie ze wzgledu na bezpieczenstwo obiektów na powierzchni czy robót górniczych eksploatacja byla zatrzymana. r J ' Przyklady zastosowan sposobu eksploatacji wedlug wynalazku pokazano na rysunkach fig. 1 fig 2 fig 3 punkty A i B stanowia np. konce chronionegoobiektu. ' ' ' PLPriority: November 4, 1972 (P. 158628) Application announced: June 1, 1973 Patent description was published: February 17, 1975 76235 KI. 5b, 41/00 MKP E21c 41/00 Creators of the invention: Miroslaw Chudek, Bernard Drzezla, Henryk Gil, Tadeusz Kochmanski, Magdziorz Jan, Wlodzimierz Olaszowski, Aleksander Tyrala Authorized by a temporary patent: Silesian University of Technology W. Pstrowskiego, Gliwice (Poland) Method of underground mining of underground deposits under objects The subject of the invention is a method of extracting underground deposits, especially on-board ones, under objects on the ground or in a rock mass. This method is most suitable for excavating under long objects with a small width, i.e. such as railway lines, roads, underground corridors, pipelines, earth banks, rivers, etc. The favorable impact of the exploitation of the method according to the invention on the protected objects in relation to long-term exploitation. the front of a rectilinear or randomly shaped operation is achieved by appropriate shaping of the excavation front or by appropriate arrangement during operation under and in the vicinity of the object. of the object as a protective pillar, and then attempts to choose inside the protective pillar, however, such efforts encounter a number of obstacles. They are: firstly - difficult shaping of the front of exploitation in terms of reducing longitudinal and transverse deformations in objects, second - unfavorable state of deformation in objects subjected to transverse tensile deformations, which cannot exclude further disturbance of their balance by conducting exploitation inside the protective pillar, thirdly - an unfavorable state of stress in the body of the protective pillar subjected to comprehensive compressive stresses, which causes the pillar to crush or tap in the case of a sloping deck, and this may also exclude further operation. The aforementioned difficulties intensify when protective pillars are left in several decks and when these pillars are too narrow, which is often the case. The disadvantages of the current methods of exploitation under long objects are eliminated by the method according to the invention, which enables safe operation for the protected object and does not contribute to The method of underground mining of deposits under the objects according to the invention is based on the fact that first a strip of deposit with a constant or variable width, depending on mining and geological conditions, is selected under the axis of the object, and then, with a certain delay, the remaining part of the deposit in the vicinity of the facility.z 76236 The width of the pre-selected lane under the facility axis can be selected in such a way that the entire duration of operation. within the range of impacts on the protected object, the deformations of the shell L in "bL Se exceeded 50% of the deformations occurring when operated with a long rectilinear front. Moreover J ^ LSSSTja? ° They are also beneficial for the facility or ** the safety of the robot ~ The width of the belt selected for the axis of the facility and the necessary advance between belt operation and external operation are checked using appropriate mathematical formulas. In addition, for the optimization of these two sizes, an appropriate program for the digital machine is developed, because the method of operation under the objects according to the invention ensures the reduction of longitudinal strains in the object by 50% and causes transverse compression deformations and prevents the concentration of stresses in the decks under the object, So in many cases it will be possible to use mining with collapse of the roof instead of much more expensive exploitation with liquid filling, or it will be possible to operate where, due to the safety of objects on the surface or mining works, the operation has been stopped. Fig. 1, Fig. 2, Fig. 3, points A and B are e.g. the ends of the protected object. '' 'PL

Claims (2)

Zastrzezenie patentowe Sposób podziemnej eksploatacji zlóz pod obiektami znamienny tym, ze najpierw wybiera sie pod obiektem pas zloza o szerokosci stalej lub zmiennej, zaleznie od warunków górniczo-geologicznych, a nastepnie pozostala czesc zloza w sasiedztwie obiektu. Fig. 1.KL. 5b,41/00 76235 MKP E21c 41/00 777^ s//,:av///a fig.Patent claim A method of underground mining of deposits under the objects, characterized in that first a strip of a deposit with a constant or variable width, depending on mining and geological conditions, is selected under the object, and then the remaining part of the deposit in the vicinity of the object. Fig. 1.KL. 5b, 41/00 76235 MKP E21c 41/00 777 ^ s // ,: av /// a Fig. 2. mmmmmm Fig. 3 PL2.mmmmmm Fig. 3 PL
PL15862872A 1972-11-04 1972-11-04 PL76235B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15862872A PL76235B2 (en) 1972-11-04 1972-11-04

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15862872A PL76235B2 (en) 1972-11-04 1972-11-04

Publications (1)

Publication Number Publication Date
PL76235B2 true PL76235B2 (en) 1975-02-28

Family

ID=19960437

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15862872A PL76235B2 (en) 1972-11-04 1972-11-04

Country Status (1)

Country Link
PL (1) PL76235B2 (en)

Similar Documents

Publication Publication Date Title
CN107478114B (en) A kind of parallel slope surface buffer hole deep hole slope pre-split blasting construction method
Strozik et al. Mine Subsidence as a Post-Mining Effect in the Upper Silesia Coal Basin.
CN106968675A (en) Construction method of gas tunnel goaf
PL76235B2 (en)
Lesov et al. Design of rockfall protection structures
Straskraba et al. The differences in underground mines dewatering with the application of caving or backfilling mining methods
RU2013546C1 (en) Method for protection of reused workings
CN106052494B (en) The blasthole method to set up of flood mine working driving and blasting method
Franskevich et al. Evaluation of the efficiency of engineered ammunition when breaching the Bureya river stream channel and proposals for improvement
Casale et al. Improvements of safety conditions of unstable rock slopes through the use of explosives
Narwal et al. Stability Assessment of Stopping Operations in Friable Ore Bodies under an Open Pit Mine using Strength-based Mining Sequence Factor
Gschwandtner et al. The Granitztal tunnel chain/Tunnelkette Granitztal
Saito et al. Pre-grouting and tunnel excavation of watertight structure section
Price Mining Methods and Costs, Mouat Mine, American Chrome Co., Stillwater County, Montana
Schubert Recent experience with squeezing rock in Alpine tunnels
DE4037921C2 (en) Process for removing rock obstacles in shallow bores, earth slots, construction pits and similar structures
Harris How tunnels work
Porathur et al. Numerical Modelling and Design for Extracting a Flatly Dipping Orebody Using Cemented Rock Fill to Control Subsidence
Mandal et al. Design of Mechanized Underground Extraction of Deep-Seated Coal Seam by Continuous Miner Technology Under Massive Strata and High In-Situ Stress
Duraj et al. Stability of the bedrock of castle building for geotourism purposes
Clay et al. Anticipating the Unexpected--Flood, Fire, Overbreak, Collapse
Malhotra Glimpses into Gruelling Tunnelling Situations and Fatal Accidents on Beas-Sutlej Link Project
Morison Atiamuri River diversion
Čorko et al. Repair of the Pliva river waterfall at Jajce
Gravea et al. Partial Extraction of Local Support Pillars in the 106 S4 Region of Cooke 3 Shaft, Harmony’s Randfontein Operation: A Case Study