Prior art keywords
pole
reinforced concrete
ground
bars
reinforcement
Prior art date
Application number
PL15036271A
Other languages
Polish (pl)
Other versions
PL73873B2 (en
Inventor
Mucha Leon
Trojanowski Aleksander
Original Assignee
Przedsiebiorstwo Poszukiwan Geofizycz¬Nych
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Przedsiebiorstwo Poszukiwan Geofizycz¬Nych filed Critical Przedsiebiorstwo Poszukiwan Geofizycz¬Nych
Priority to PL15036271A priority Critical patent/PL73773B2/pl
Publication of PL73873B2 publication Critical patent/PL73873B2/pl
Publication of PL73773B2 publication Critical patent/PL73773B2/pl

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 30.05.1973 Opis patentowy opublikowano: 20.01.1975 73773 KI. 21c,ll/01 MKP H02g 13/00 CZYTELNIA Urzedu Paiantowegc Twórcy wynalazku: Wojciech Bogajewski, Henryk Nowaczyk Uprawniony z patentu tymczasowego: Politechnika Poznanska, Poznan (Polska) Uziemienie zelbetowych slupów energetycznych i Przedmiotem wynalazku jest uziemienie zelbeto¬ wych slupów energetycznych, w szczególnosci dla linii energetycznych wysokiego napiecia.Obecnie dodatkowo nie uziemia sie wszystkich slupów zelbetowych energetycznych a jedynie wy¬ korzystuje sie jako uziemienie prety zbrojenia slupa do odprowadzania pradów zwarcia do zie¬ mi. Dodatkowo uziemia sie tylko zelbetowe slupy energetyczne, na których znajduja sie urzadzenia rozdzielcze za pomoca dodatkowego sztucznego uziemienia umieszczonego na zewnatrz slupa w ziemi i polaczonego ze zbrojeniem slupa za po¬ moca zacisku uziemiajacego.Dotychczasowe doswiadczenia eksploatacyjne u- wydatnily niebezpieczenstwo powstania niebez¬ piecznych napiec w najblizszej okolicy uziemio¬ nych dodatkowo zelbetowych slupów energetycz¬ nych przy przeplywie przez nie szczególnie dlugo¬ trwalych pradów zwarciowych. Zanotowano wy¬ padki smiertelne porazenia ludzi i zwierzat w naj¬ blizszej okolicy zelbetowych slupów energetycz¬ nych linii srednich napiec. Zaobserwowano znisz¬ czenia zelbetowych slupów energetycznych pod zie¬ mia szczególnie przy przeplywie dlugotrwalych pradów zwarciowych objawiajacych sie upaleniem zbrojenia slupa i stopieniem betonu i otaczajacego gruntu.Celem wynalazku jest usuniecie wad i powyz¬ szych niedociagniec a zadaniem technicznym opra¬ cowanie konstrukcji zelbetowego slupa energe- 10 20 25 tycznego zapewniajacego bezpieczny poziom razenia w najblizszej okolicy slupa przy przeplywie przez niego dlugotrwalych pradów zwarcia doziemnego i zarazem zapewniajacej trwalosc konstrukcji wsporczej.Uziemienie zelbetowego slupa energetycznego polega na tym, ze prety zbrojenia glównego wy¬ chodza poza stope slupa przy czym powierzchnie zelbetowego slupa energetycznego pokrywa sie warstwa izolacyjna na pewnej dlugosci slupa.Dzieki opisanemu rozwiazaniu uzyskuje sie znaczne zmniejszenie mozliwosci powstania nie¬ bezpiecznych napiec razenia na powierzchni zie¬ mi przy zelbetowym slupie energetycznym w cza¬ sie przeplywu przez niego pradów zwarciowych, a w przypadku przeplywu dlugotrwalych pradów zwarciowych uniemozliwia sie przepalenie pretów zbrojenia glównego oraz uszkodzenie zelbetowego slupa energetycznego pod ziemia.Wynalazek jest przedstawiony w przykladowym rozwiazaniu na rysunku, na którym fig. 1 przed¬ stawia slup zelbetowy w widoku z boku, fig. 2 slup w widoku od stopy.Uziemienie zelbetowego slupa energetycznego wykorzystujace prety zbrojenia slupa polega na tym, ze prety 1 zbrojenia glównego wychodza poza stope 2 slupa 3 najkorzystniej na dlugosc 0,2—1,0 m, przy czym powierzchnie slupa pokrywa sie warstwa izolacyjna 4 na dlugosc 0,5—2,5 m pod 7377373773 powierzchnia ziemi i na dlugosc okolo 0.1- nad powierzchnia ziemi. -0,5 m PLPriority: Application announced: May 30, 1973 Patent description was published: January 20, 1975 73773 KI. 21c, ll / 01 MKP H02g 13/00 READING ROOM of the Paiantowegc Office Inventors of the invention: Wojciech Bogajewski, Henryk Nowaczyk Authorized by the temporary patent: Politechnika Poznanska, Poznan (Poland) Earthing of reinforced concrete energy poles i The subject of the invention is the earthing of reinforced concrete energy poles, in particular for high voltage power lines. At present, additionally not all reinforced concrete poles are grounded, but only used as grounding of the pole's reinforcement rod to discharge short-circuit currents to the earth. Additionally, only reinforced concrete power poles, on which switchgear are located, are earthed by means of additional artificial grounding placed outside the pole in the ground and connected to the pole's reinforcement by means of an earthing clamp. Previous operating experience has emphasized the risk of dangerous voltages. in the vicinity of additionally earthed reinforced concrete power poles when particularly long-lasting short-circuit currents flow through them. There have been reports of fatal electrocution of people and animals in the vicinity of reinforced concrete power poles of medium voltage lines. Destruction of reinforced concrete power poles under the ground was observed, especially with the flow of long-lasting short-circuit currents, manifested in the burnout of the column reinforcement and the melting of the concrete and the surrounding soil. 10 20 25, ensuring a safe level of radiation in the immediate vicinity of the pole with the passage of long-term earth fault currents through it and at the same time ensuring the durability of the supporting structure. The earthing of a reinforced concrete power pole consists in the fact that the main reinforcement rods extend beyond the foot of the pole, with the surface of the reinforced concrete pole a certain length of the pole is covered with an insulating layer. Thanks to the described solution, the possibility of hazardous voltages on the earth's surface is significantly reduced at the reinforced concrete power pole during the flow of short-circuit currents, and in the case of the flow of long-lasting short-circuit currents, it is impossible to burn the bars of the main reinforcement and damage the reinforced concrete power column underground. The invention is presented in an exemplary solution in the drawing, in which Fig. 1 shows a reinforced concrete column in a side view, 2 pole in view from the foot. The earthing of a reinforced concrete power pole using the bars of the pole's reinforcement consists in the fact that the bars of the 1st main reinforcement extend beyond the foot of the 2nd pole 3, most preferably 0.2-1.0 m in length, with the surface of the pole covered with the Insulating 4 at a length of 0.5-2.5 m under 7377373773 the ground and a length of about 0.1- above the ground. -0.5 m PL

Claims (1)

1. Zastrzezenie patentowe Uziemienie zelbetowego slupa energetycznego wykorzystujace prety zbrojenia slupa, znamienne tym, ze prety (1) zbrojenia glównego wychodza poza stope (2) slupa (3) najkorzystniej na dlugosc 0,2—1,0 m, przy czym powierzchnie slupa pokrywa sie warstwa izolacyjna (4) na dlugosci 0,5—2,5 m pod powierzchnia ziemi i na dlugosci okolo 0,1 do 0,5 m nad powierzchnia ziemi. FlS. 1 Fis. Z PZG w Pab., zam. 1499-74, nakl. 115+20 egz. Cena 10 zl PL1. Patent claim Earthing of a reinforced concrete power pole using the bars of the post's reinforcement, characterized in that the bars (1) of the main reinforcement extend beyond the foot (2) of the post (3), most preferably to a length of 0.2-1.0 m, with the pole surfaces covering The insulating layer (4) is 0.5-2.5 m below the ground and 0.1 to 0.5 m above the ground. FlS. 1 F sharp. With PZG in Pab., Residing in 1499-74, pic. 115 + 20 copies Price PLN 10 PL
PL15036271A 1971-08-05 1971-09-06 PL73773B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15036271A PL73773B2 (en) 1971-08-05 1971-09-06

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PL14987171 1971-08-05
PL15036271A PL73773B2 (en) 1971-08-05 1971-09-06

Publications (2)

Publication Number Publication Date
PL73873B2 PL73873B2 (en) 1974-10-31
PL73773B2 true PL73773B2 (en) 1975-01-20

Family

ID=26652843

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15036271A PL73773B2 (en) 1971-08-05 1971-09-06

Country Status (1)

Country Link
PL (1) PL73773B2 (en)

Similar Documents

Publication Publication Date Title
ES2657089T3 (en) A grounding system for a wind turbine connected to a distribution network and for a wind farm
KR101255118B1 (en) Sheet type ground plate
PL73773B2 (en)
US3125009A (en) Figure
KR102503564B1 (en) Eelectric pole's earthwork for distribution
Prabhakar et al. Evaluation of soil resistivity and design of grounding system for hydroelectric generating station in a hilly terrain—A case study
KR20060089806A (en) Improved lightning protection system for buildings with LPS triangle construction
US1446239A (en) Electric pole
RU2169420C1 (en) External grounding device
DE7240230U (en) Device for cooling an encapsulated high-voltage electrical power transmission line laid underground
Martineac et al. Influence of soil resistivity on 110 kV substation grounding system
SU588287A1 (en) Method of strengthening bed of buildings, structures
DE2739165C2 (en) Defense device against the penetration of ground-based pests into systems in need of protection
Stepantsov GROUNDING DEVICES AND REQUIREMENTS FOR THEM
CN109066115A (en) Combined type tower bar Special grounding device
DE29613681U1 (en) Electrical locking of buildings against small mammals capable of climbing (such as martens, dormice)
SU1115143A1 (en) Earth connection
SU1069047A1 (en) High-voltage network
SU783438A1 (en) Reinforcement framework for ferroconcrete structures
Putra et al. Analysis of the Impact of Soil Quality on System Effectiveness Grounding Lightning Rod On Project JoMA Boutique Villas and Resort
Arora Grounding (earthing) of over head transmission line towers in hilly areas or areas with high soil resistivity
RU2571625C1 (en) Overhead power transmission line
CN204258038U (en) power industry GIS device platform
RU2277743C2 (en) Double-circuit power transmission line
Chaney et al. Mine grounding, factors that prohibit a universal grounding solution