PL65314B1 - - Google Patents

Download PDF

Info

Publication number
PL65314B1
PL65314B1 PL127764A PL12776468A PL65314B1 PL 65314 B1 PL65314 B1 PL 65314B1 PL 127764 A PL127764 A PL 127764A PL 12776468 A PL12776468 A PL 12776468A PL 65314 B1 PL65314 B1 PL 65314B1
Authority
PL
Poland
Prior art keywords
conveyor
belt
feeder
filler
spag
Prior art date
Application number
PL127764A
Other languages
Polish (pl)
Inventor
Stanislaw Walkiewicz wynalazki
Pawlinski Marian
Porada Ta¬deusz
Original Assignee
Zaklady Konstrukcyjnomechanizacyjne Przemysluweglowego
Filing date
Publication date
Application filed by Zaklady Konstrukcyjnomechanizacyjne Przemysluweglowego filed Critical Zaklady Konstrukcyjnomechanizacyjne Przemysluweglowego
Publication of PL65314B1 publication Critical patent/PL65314B1/pl

Links

Description

Opublikowano: 15.VII.1972 65314 KI. 5d,15/06 MKP E21f, 15/06 lCZYTELNlA U Wspóltwórcy wynalazki: Stanislaw Walkiewicz, Marian Pawlinski, Ta¬ deusz Porada Wlasciciel patentu: Zaklady Konstrukcyjno-Mechanizacyjne Przemyslu Weglowego, Gliwice (Polska) Zespól do wykonywania podsadzki Przedmiotem wynalazku jest zespól do wykony¬ wania podsadzki za pomoca kruszywa skalnego zlozony z podsadzarki i przenosnika tasmowego.Znane sa zespoly zlozone z podsadzarki i prze¬ nosnika doprowadzajacego do podsadzarki kru¬ szywo. Podsadzarka wymaga czestego przestawia¬ nia w miare wykonywania podsadzki. Kazde prze¬ stawienie podsadzarki wymaga skrócenia, podlu- zenia badz calkowicie odmiennego ulozenia prze¬ nosnika.Celem wynalazku jest rozwiazanie zespolu pod- sadzarka-przenosnik, w którym przenosnik bez skracania, przedluzania badz przekladania obslu¬ guje podsadzarke w kazdym jej polozeniu wzdluz okreslonej trasy przesuwania podsadzarki. Cel zo¬ stal osiagniety wedlug wynalazku przez dostoso¬ wanie przenosnika do ulozenia go wzdluz calej trasy podsadzarki oraz dostosowanie podsadzarki do prowadzenia poprzez nia dolnego ciagu prze¬ nosnika.Wedlug wynalazku przenosnik tasmowy ma zna¬ ne zespoly bebnowe z których co najmniej jeden jest zespolem napedzajacym ustawione po obu koncach trasy podsadzarki, wobec czego dlugosc tasmy bez konca jest dostosowana do dlugosci calej trasy podsadzarki. Dolny ciag przenosnika jest prowadzony po spagu na kraznikach umiesz¬ czonych w ramach lezacych wprost na spagu.Krazniki te moga byc pominiete jezeli spag nadaje sie do bezposredniego poslizgu tasmy. Drugi ciag 25 30 2 tasmy bez konca jest prowadzony po kraznikach zawieszonych pod stropem, ewentualnie przy wy¬ korzystaniu obudowy wyrobiska. Nad dolnym cia¬ giem tasmy znajduje sie zsyp dozujacy na nia kruszywo, ewentualnie przesyp z innego przenos¬ nika.Podsadzarka ma zamocowane co najmniej trzy bebny do prowadzenia tasmy. Jeden z nich umie¬ szczony przy górnej krawedzi zbiornika zasilaja¬ cego podsadzarke zmusza tasme niosaca kruszy¬ wo do oderwania sie od spagu i nadaje jej kie¬ runek pochyly oraz powoduje opróznianie prze¬ nosnika z niesionego kruszywa do zbiornika pod¬ sadzarki. Dwa bebny po dwóch stronach podsa¬ dzarki umieszczone przy jej podstawie, prowadza pusta tasme poprzez szczeline w podstawie pod¬ sadzarki.Dzieki temu, ze tasma bez konca dolnym kon¬ cem przewija sie przez podsadzarke, a górny jej ciag powrotny przechodzi ponad podsadzarka, jest calkowicie obojetne, w którym miejscu wzdluz przenosnika stoi podsadzarka. Mozna ja dowolnie przesuwac nie przerywajac jej pracy ani pracy przenosnika byle tylko nie wyprowadzic jej w bok poza linie przenosnika. Poniewaz przenosnik ulo¬ zony jest wedlug zalozonej trasy, która ma sie sunac podsadzarka, ograniczenie to nie stanowi wady zespolu.Zespól wedlug wynalazku ma rózne rodzaje za¬ stosowania w górnictwie. Przykladem zastosowa- 653143 65314 4 nia najbardziej typowym jest podsadzanie wyro¬ biska scianowego. Dwa zespoly bebnowe stanowia¬ ce oba konce przenosnika sa ustawione w chod¬ nikach nadscianowym i podscianowym. W jednym z tych chodników znajduje sie przesyp kruszywa z innego przenosnika na dolny ciag tasmy prze¬ nosnika wchodzacego w sklad zespolu. Podsadzar- ka umieszczona na saniach jest przesuwana wzdluz wyrobiska, zwlaszcza ku wzniosowi za pomoca kolowrotu ustawionego w chodniku ewentualnie polaczonego z zespolem bebnowym.Przesuwanie podsadzarki wzdluz calej dlugosci sciany wymaga co najmniej dodawania za pod¬ sadzarka, a odbierania przed nia, ram z krazni- kami ukladanych na spagu. W zaleznosci od ro¬ dzaju spagu ramy te moga byc niepotrzebne, albo moga byc potrzebne tylko po tej stronie podsa¬ dzarki, gdzie dolny ciag tasmy jest obciazony kru¬ szywem. Po przesunieciu podsadzarki wzdluz za¬ lozonej trasy przestawia sie caly zespól o pewien odcinek prostopadly do trasy blizej czola sciany, które oddala sie w miare urabiania pokladu.W tym celu zespoly bebnowe ustawione sa na plozach prostopadlych do trasy przenosnika.Zespól wedlug wynalazku jest uwidoczniony na rysunku, który przedstawia zespól w widoku bocz¬ nym. W skladzie zespolu przykladowo umieszczo¬ no podsadzarke krazkowa. Równie dobrze moze to byc podsadzarka tasmowa badz dowolna inna maszyna, która wyrzuca kruszywo podsadzkowe w kierunku bocznym w stosunku do trasy jej przesuwu.Podsadzarka 1 ma podstawe 2 zaopatrzona w plozy oraz w szczeline pozioma do przeprowadza¬ nia tasmy. Na podsadzarce zamocowane sa bebny 3, 4, 5, do prowadzenia dolnego ciagu 6 tasmy przenosnikowej. Czesc dolnego ciagu obciazona kruszywem opiera sie na kraznikach 7 umieszczo¬ nych w ramach lezacych na spagu. Beben 3 jest umieszczony na wysokosci ponad krawedzia zbior¬ nika zasilajacego podsadzarke i sluzy do zmiany kierunku dolnego ciagu 6 tasmy ku górze i do oprózniania jej z niesionego kruszywa.Bebny 4 i 5 sa umieszczone przy podstawie 2 podsadzarki i sluza do kierowania dolnego ciagu 6 juz opróznionego poprzez szczeline w podstawie 2 z jednej strony podsadzarki na jej druga strone.Górny ciag 8 tasmy przenosnikowej jest prowa¬ dzony na kraznikach 9 zamocowanych pod stro¬ pem. Tasma przenosnikowa bez konca przewija sie przez zespoly bebnowe 10 i 11, z których co najmniej jeden zespól 11 jest zespolem napedo¬ wym, a drugi zespól 10 zwrotnia. Zespól 11 jest zarazem zaopatrzony w nieuwidoczniony na ry¬ sunku kolowrót do podciagania podsadzarki 1 li¬ nami 12. Nad dolnym ciagiem 7 znajduje sie zwrot¬ nia 13 innego przenosnika, czyli przesyp kruszywa. PL PLPublished: 15.VII.1972 65314 IC. 5d, 15/06 MKP E21f, 15/06 READERS Inventions: Stanislaw Walkiewicz, Marian Pawlinski, Ta¬ deusz Porada Patent owner: Zaklady Konstrukcyjno-Mechanizacyjne Przemyslu Weglowego, Gliwice (Poland) The team for the proppant The subject of the invention is a team to perform The backfilling is made of a rock aggregate consisting of a filler and a belt conveyor. Assemblies consisting of a filler and a conveyor feeding the aggregate to the filler are known. The filler requires frequent repositioning as a backing is performed. Each displacement of the feeder requires shortening, extension or a completely different position of the conveyor. The purpose of the invention is to provide a planter-conveyor assembly, in which the conveyor, without shortening, lengthening or rearranging, manages the feeder at each position along a specific route. moving the feeder. The object has been achieved according to the invention by adapting the conveyor to be positioned along the entire path of the filler, and by adapting the filler to be guided through the lower conveyor passages. According to the invention the conveyor belt has known drum assemblies of which at least one is a driving unit. placed on both ends of the feeder route, therefore the length of the endless belt is adapted to the length of the entire feeder route. The lower line of the conveyor is guided along the spag on the lanes placed in frames that lie directly on the spag. These lanes may be omitted if the spag is suitable for the direct slide of the conveyor belt. The second endless string of the line is led along the lanes suspended under the ceiling, possibly with the use of the excavation lining. Above the lower belt string there is a chute dosing aggregate onto it, or possibly a discharge from another conveyor. The feeder has at least three drums for guiding the belt. One of these, located at the top of the feeder feed hopper, forces the aggregate conveyor belt to detach from the spag and gives it a sloping direction and empty the conveyor of the aggregate carried into the planter tank. Two drums on either side of the feeder, located at the bottom of the feeder, guide the empty belt through a slot in the base of the planter. Since the endless belt runs through the bottom end of the feeder and its upper return line passes over the feeder. completely indifferent where the filler stands along the conveyor. You can move it freely without interrupting its work or conveyor work, as long as you do not lead it sideways beyond the conveyor lines. Since the conveyor follows a predetermined path that the feeder is to follow, this limitation does not constitute a disadvantage of the assembly. The assembly according to the invention has various types of mining applications. An example of an application that is most typical is the backfilling of the wall blank. The two drum units constituting both ends of the conveyor are positioned in the overwrap and underwall walkways. In one of these galleries there is a transfer of aggregate from another conveyor onto the lower string of the conveyor belt that is part of the assembly. The feeder placed on the sled is moved along the excavation, especially uphill by means of a turnstile placed in the pavement, possibly connected to the drum unit. Moving the feeder along the entire length of the wall requires at least the addition of the planter and the removal of the frame from the track in front of it. with stones laid on the spag. Depending on the type of spag, these frames may be unnecessary, or they may only be needed on the side of the feeder where the lower end of the belt is loaded with a crusher. After moving the feeder along the planned route, the whole assembly is shifted by a certain section perpendicular to the path closer to the face of the wall, which moves away to the extent of the deck cutting. For this purpose, the drum assemblies are placed on skids perpendicular to the conveyor route. According to the invention, the assembly is shown on a drawing that shows the assembly in a side view. The assembly includes, for example, a disc feeder. It may as well be a belt filler or any other machine that throws backfill aggregate laterally to the path it travels. The auger 1 has a base 2 provided with skids and a horizontal slot for conveying the belt. Drums 3, 4, 5 are mounted on the feeder to guide the lower string of the 6 conveyor belt. The part of the lower string loaded with aggregate rests on the beds 7 placed in frames lying on the spag. The drum 3 is positioned above the rim of the loading hopper and serves to deflect the lower belt 6 upwards and empty it of the aggregate being carried. emptied through a slot in the base 2 on one side of the filler on its other side. The upper run 8 of the conveyor belt is guided on weavers 9 fixed under the roof. The endless conveyor belt passes through the reels 10 and 11, of which at least one unit 11 is the drive unit and the other unit 10 is the turning unit. At the same time, the unit 11 is provided with a pulley for hauling up the feeder 1 by 12 lines, not shown in the figure. Above the lower string 7, there are turns 13 of another conveyor, ie aggregate overflow. PL PL

Claims (1)

1. Zastrzezenie patentowe Zespól do wykonywania podsadzki zlozony z pod¬ sadzarki i przenosnika tasmowego znamienny tym, ze przenosnik tasmowy ma tasme siegajaca wzdluz calej trasy podsadzarki przewijajaca sie przez dwa zespoly bebnowe (10, 11) ustawione po obu krancach tej trasy, a podsadzarka (1) dowol¬ nego znanego typu ma zamocowane bebny (3, 4, 5) do prowadzenia dolnego ciagu (6) tasmy prze¬ nosnikowej ponad krawedz zbiornika zasilajacego podsadzarke oraz poprzez szczeline w podstawie (2) podsadzarki, przy czym dolny ciag (6) tasmy przenosnikowej jest oparty na spagu, a w miare potrzeby na kraznikach (7) w ramach ukladanych na spagu, zas górny ciag (8) tasmy prowadzony jest po kraznikach (9) zamocowanych pod stropem. 12 11 W.D.Kart. C/403/72, A4, 200 + 15 Cena zl 10.— PL PL1. Patent claim A unit for making a proppant consisting of a planter and a belt conveyor characterized in that the conveyor belt has a belt extending along the entire path of the filler passing through two drum units (10, 11) positioned at both ends of the path, and the filler ( 1) of any known type, has drums (3, 4, 5) attached to guide the lower string (6) of the conveyor belt over the edge of the feeder hopper and through the slot in the base (2) of the feeder, the lower string (6) the conveyor belt is based on the spag, and, if necessary, on the lanes (7) in frames laid on the spag, while the upper string (8) of the belt is led along lanes (9) mounted under the ceiling. 12 11 W.D. Card. C / 403/72, A4, 200 + 15 PLN price 10.— PL PL
PL127764A 1968-06-27 PL65314B1 (en)

Publications (1)

Publication Number Publication Date
PL65314B1 true PL65314B1 (en) 1972-02-29

Family

ID=

Similar Documents

Publication Publication Date Title
US7926640B2 (en) Transport device for continuously removing mined material
PL232204B1 (en) Tensioning returning unit for plate conveyor
US3828919A (en) Feed conveyor with selective discharge
PL188962B1 (en) Loading wagon for loose bulk materials
US5720527A (en) Continuous highwall mining machine with armless conveyor
PL65314B1 (en)
US2263458A (en) Conveyer
US20040251732A1 (en) Winch for coal mining system
US3472556A (en) Scraper-chain conveyors
PL119037B1 (en) Coal-dust conveyor in particular for scraper type chain conveyors konvejjerov
US4279445A (en) Longwall mining installation having stable-hole plough
PL144416B1 (en) Transfer station for transfering output from a longwall chain conveyor to a gallery one
US2257181A (en) Combined cutting and loading machine
PL120749B1 (en) Curvilinear conveyor in particualar of scraper type one with a central chain and intended for dumping the wall and heading outputnvejjera s seredinnojj cep'ju dlja svalivanija dobychi iz lav i shtrekov
PL216533B1 (en) Conveyor trough element for the conveyor trough
US3300025A (en) Conveyors
US3750861A (en) Selective discharge feed conveyor
CN202832641U (en) Double-layer belt conveyor
US2143092A (en) Loading machine
KR101008029B1 (en) An apparatus for supporting belt of shuttle conveyor
CN206634655U (en) Suspension type stock adhesive tape conveyor
CZ232293A3 (en) Device for disintegrating and transport in particularly coal seams
PL107662B1 (en) HANDBRAKE CONVEYOR
DE676252C (en) Elevation conveyor
GB2135961A (en) Improvements in or relating to loading and unloading installations for horizontal strata bunkers