PL419830A1 - Lining and method for making three-way and four-way crossings of the dog headings - Google Patents

Lining and method for making three-way and four-way crossings of the dog headings

Info

Publication number
PL419830A1
PL419830A1 PL419830A PL41983016A PL419830A1 PL 419830 A1 PL419830 A1 PL 419830A1 PL 419830 A PL419830 A PL 419830A PL 41983016 A PL41983016 A PL 41983016A PL 419830 A1 PL419830 A1 PL 419830A1
Authority
PL
Poland
Prior art keywords
excavation
main
sided
headings
intersection
Prior art date
Application number
PL419830A
Other languages
Polish (pl)
Other versions
PL234143B1 (en
Inventor
Stanisław Brózda
Piotr Głuch
Original Assignee
Przedsiębiorstwo Wielobranżowe Dremex Spółka Z Ograniczoną Odpowiedzialnością
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Przedsiębiorstwo Wielobranżowe Dremex Spółka Z Ograniczoną Odpowiedzialnością filed Critical Przedsiębiorstwo Wielobranżowe Dremex Spółka Z Ograniczoną Odpowiedzialnością
Priority to PL419830A priority Critical patent/PL234143B1/en
Publication of PL419830A1 publication Critical patent/PL419830A1/en
Publication of PL234143B1 publication Critical patent/PL234143B1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Obudowa skrzyżowań trójstronnych lub czterostronnych wyrobisk korytarzowych w odrzwiach łukowych spłaszczonych skręconych podciągami w wyrobisku głównym i bocznym, charakteryzuje się tym, że na długości skrzyżowania ma odrzwia (3) z otworami (4) w łukach stropnicowych (5) z osadzonymi kotwiami strunowymi z korzystnie trzema podciągami (7, 8, 9) w wyrobisku głównym (1) i trzema podciągami (10, 11, 12) w wyrobisku bocznym (2), z których podciąg środkowy (8) ma otwory i osadzone w nim kotwie, a skrajne podciągi (8, 9) w wyrobisku głównym (1) mają śrubowe połączenie (13) nad złączem ociosowym i ma prostopadłe prostki (15) w kierunku odrzwi wyrobisk bocznych (2), położone na podciągu skrajnym (7) w każdym polu odrzwi (3) obudowy wyrobiska głównego (1), połączone z nim złączem śrubowym (16). Sposób wykonania obudowy skrzyżowań trójstronnych lub czterostronnych wyrobisk korytarzowych w odrzwiach łukowych spłaszczonych skręconych podciągami polega na tym, że w fazie I wykonuje się wyrobisko główne (1) przez drążenie go w pełnym postępie przodku w obudowie ostatecznej z odrzwi (3) z otworami (4) w stropnicach (5) w miejscu skrzyżowania z zabudową podciągów (7, 8, 9) i kotwi na odcinku o długości minimum 2 m za skrzyżowanie, a następnie w fazie II w miejscu wyrobiska bocznego (2) na jego szerokości wypina się łuki ociosowe i stawia dwa odrzwia wlotowe (20, 21) wyrobisk bocznych (2) na ich szerokości i łączy się je przez skręcenie śrubami z prostkami (15) opartymi o podciąg skrajny (7), a w fazie III drąży się wyrobisko boczne (2), budując sukcesywnie odrzwia (3), które przy wyrobisku bocznym odchylonym o kąt (?L) od wyrobiska głównego (1) są budowane wachlarzowo ze zmiennym rozstawem na ociosach i szerokości. Odrzwia są kotwione kotwiami i sukcesywnie są budowane podciągi, z których podciąg środkowy jest przykatwiany.The casing of three-sided or four-sided corridor headings in flattened arched doors with twisted girders in the main and side headings is characterized by the fact that along the length of the intersection it has doorways (3) with holes (4) in girder arches (5) with embedded string anchors with preferably three bearers (7, 8, 9) in the main excavation (1) and three bearers (10, 11, 12) in the side excavation (2), of which the central bearer (8) has holes and anchors embedded in it, and the extreme beams ( 8, 9) in the main excavation (1) they have a bolted connection (13) above the sidewall joint and has perpendicular rectangles (15) towards the side of the side excavations (2), located on the extreme beam (7) in each field of the door (3) of the housing the main excavation (1), connected to it by a screw connection (16). The method of constructing the housing of three-sided or four-sided corridor headings in flattened arched doors with twisted beams consists in the fact that in phase I the main excavation is made (1) by drilling it in full progress of the face in the final casing from the frames (3) with holes (4) in the girder (5) at the intersection with the girders (7, 8, 9) and the anchor on the section with a minimum length of 2 m for the intersection, and then in phase II at the site of the lateral excavation (2) diagonal and puts two inlet door (20, 21) of lateral excavations (2) on their width and connects them by screwing with bolts (15) based on the extreme chord (7), and in phase III the lateral excavation (2) is bored, successively building door frames (3), which are laterally fan-shaped with variable spacing on the sides and width when the side excavation is inclined by an angle (? L) from the main excavation (1). The door frames are anchored and successively the beams are built, of which the central beam is fixed.

PL419830A 2016-12-15 2016-12-15 Lining and method for making three-way and four-way crossings of the dog headings PL234143B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL419830A PL234143B1 (en) 2016-12-15 2016-12-15 Lining and method for making three-way and four-way crossings of the dog headings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL419830A PL234143B1 (en) 2016-12-15 2016-12-15 Lining and method for making three-way and four-way crossings of the dog headings

Publications (2)

Publication Number Publication Date
PL419830A1 true PL419830A1 (en) 2018-06-18
PL234143B1 PL234143B1 (en) 2020-01-31

Family

ID=62554033

Family Applications (1)

Application Number Title Priority Date Filing Date
PL419830A PL234143B1 (en) 2016-12-15 2016-12-15 Lining and method for making three-way and four-way crossings of the dog headings

Country Status (1)

Country Link
PL (1) PL234143B1 (en)

Also Published As

Publication number Publication date
PL234143B1 (en) 2020-01-31

Similar Documents

Publication Publication Date Title
RU2510444C2 (en) Three-arched underground station of column type and its erection methods (yurkevich device and methods)
DE69614134T2 (en) Prefabricated structure for building above-ground or below-ground constructions
Jain et al. Application of confined masonry in a major project in India
PL419830A1 (en) Lining and method for making three-way and four-way crossings of the dog headings
Peters How creative engineers think
Solodyankin et al. Energy efficient technologies to support mine workings under complicated geomechanical conditions
BR112013023312A2 (en) 30 minute residential floor fire protection
RU2625064C1 (en) Method of two-lane tunnel construction
RU2565314C2 (en) Subway station erection method (yurkevich(s method)
RU2602840C1 (en) Device for bearing structures reinforcement
Raptis et al. The consolidation and restoration project of Acheiropoietos basilica in Thessaloniki
RU2484219C2 (en) Method for reconstruction and superstructure erection on buildings
RU2634760C1 (en) Method for waterproofing of mine workings of potassium mines
CN112459782A (en) Coal mine rock burst treatment method based on F-shaped fully mechanized mining face and with small coal pillars
RU2235165C2 (en) Method of old bridge reconstruction
RU2293830C1 (en) Method for structure erection between ends of existent buildings
RU2597901C1 (en) Reconstructed building and method for low-rise building reconstruction
Chernieva et al. Methods of reinforcing for engineering restoration of architectural monuments
RU2256046C1 (en) Building reconstruction method
Roy et al. Saving the Wall
RU2121579C1 (en) Rectangular metal or combined support of development workings
WO2017216393A1 (en) Structural system using rigidised metal profiles and reinforced polystyrene components
ES2161597B1 (en) BUILDING CONSTRUCTION SYSTEM.
PL234210B1 (en) Lining, reinforcing the crossing supports of the mining headings
RU67106U1 (en) BRIDGE TRANSITION