PL341168A1 - Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
- Google Patents
Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wladyslaw GancarzfiledCriticalWladyslaw Gancarz
Priority to PL34116800ApriorityCriticalpatent/PL341168A1/en
Publication of PL341168A1publicationCriticalpatent/PL341168A1/en
PL34116800A2000-10-082000-10-08Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
PL341168A1
(en)
Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
Polypropylene fiber for cement reinforcement, molded cement made with the fiber, method of constructing concrete structure, and method of spray concreting
Precast reinforced concrete foundation slab monolithically integrated with four reinforced concrete pillars, enabling to build up a sepulchre immediately after a burial while ensuring unchanged levelling of the whole slab
Procedure for making supporting structures for earthworks built of prefabricated reinforced concrete cladding elements and/or post-stabilization of those