PL249115B1 - Rectification foundation of newly constructed buildings - Google Patents

Rectification foundation of newly constructed buildings

Info

Publication number
PL249115B1
PL249115B1 PL440712A PL44071222A PL249115B1 PL 249115 B1 PL249115 B1 PL 249115B1 PL 440712 A PL440712 A PL 440712A PL 44071222 A PL44071222 A PL 44071222A PL 249115 B1 PL249115 B1 PL 249115B1
Authority
PL
Poland
Prior art keywords
foundation
rectification
building
support
layer
Prior art date
Application number
PL440712A
Other languages
Polish (pl)
Other versions
PL440712A1 (en
Inventor
Leszek Szojda
Katarzyna Nowak
Original Assignee
Politechnika Slaska Im Wincent
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Politechnika Slaska Im Wincent filed Critical Politechnika Slaska Im Wincent
Priority to PL440712A priority Critical patent/PL249115B1/en
Publication of PL440712A1 publication Critical patent/PL440712A1/en
Publication of PL249115B1 publication Critical patent/PL249115B1/en

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Building Environments (AREA)

Abstract

Przedmiotem zgłoszenia jest fundament rektyfikacyjny budynków nowowznoszonych, zbrojony, którego  powierzchnia styku z fundamentem podstawowym budynku ma kształt części sfery z wypukłością skierowaną ku dołowi, mający dolną część i górną część, który charakteryzuje się tym, że górna część (2) fundamentu (I) rozdzielona jest od dolnej części (1) fundamentu (I) warstwą poślizgową (3), przy czym w dolnej części (1) znajdują się co najmniej trzy opory (4) ze wspornikiem (4a), a między wspornikiem opory (4a) a górną częścią (2) fundamentu (I) umieszczone są elementy stabilizujące w postaci klinów i co najmniej jednego elementu dystansowego (6).The subject of the application is a rectified foundation of newly erected buildings, reinforced, the contact surface of which with the basic foundation of the building has the shape of a part of a sphere with a convexity directed downwards, having a lower part and an upper part, which is characterized in that the upper part (2) of the foundation (I) is separated from the lower part (1) of the foundation (I) by a sliding layer (3), wherein in the lower part (1) there are at least three supports (4) with a support (4a), and between the support support (4a) and the upper part (2) of the foundation (I) there are stabilizing elements in the form of wedges and at least one spacer element (6).

Description

Opis wynalazkuDescription of the invention

Przedmiotem wynalazku jest fundament rektyfikacyjny budynków nowowznoszonych dla łatwego wielokrotnego doprowadzania budynku do pionu, którego wychylenie jest spowodowane deformacjami terenu, np. wywołane podziemną eksploatacją kopalin.The subject of the invention is a rectification foundation for newly constructed buildings for easy, repeated vertical adjustment of the building, the deflection of which is caused by terrain deformations, e.g. caused by underground mineral extraction.

Stan technikiState of the art

Podziemna eksploatacja złoża na skalę przemysłową wywołuje deformacje powierzchni w postaci niecki osiadań (deformacje ciągłe) oraz/lub deformacji nieciągłych liniowych lub powierzchniowych. Właściwe typowe zaprojektowanie obiektu na wpływy deformacji uchroni konstrukcję przed uszkodzeniami, często zagrażającymi konstrukcji, ale nie zabezpieczy jej przed pochyleniem, co powoduje znaczny dyskomfort użytkowania budynku. W celu przywrócenia poprzedniej funkcjonalności budynku konieczne jest jego doprowadzenie do pionu. Gdy konstrukcja nie jest do tego przystosowana taki proces jest bardzo kosztowny i często przekracza wartość prostowanego obiektu.Underground mining on an industrial scale causes surface deformation in the form of subsidence basins (continuous deformation) and/or discontinuous linear or surface deformation. Properly designing a facility for deformation will protect the structure from damage, which often threatens the structure, but it will not protect it from tilt, which causes significant discomfort during use. To restore the building's previous functionality, it is necessary to restore it to a vertical position. If the structure is not designed for this, such a process is very expensive and often exceeds the value of the straightened facility.

Rozwiązania prostowania obiektów budowlanych były „rozwijane szczególnie w obszarach intensywnej eksploatacji przemysłowej kopalin, szczególnie węgla kamiennego i są to w większości rozwiązania polskie. Dotychczasowe rozwiązania rektyfikacji obiektów zakładają równomierne unoszenie obiektu z wykorzystaniem np. specjalnie przygotowanych bloków fundamentowych w studniach pod właściwym fundamentem budowli, w których umieszczane są siłowniki hydrauliczne realizujące unoszenie, czego przykładem jest wzór użytkowy PL 59268. Innym rozwiązaniem jest P.380428 polegającym na przygotowaniu fundamentu budynku przez wprowadzenie poziomej dylatacji fundamentów oraz zamocowanie stałych występów oporowych, które będą stanowiły miejsce przyłożenia pionowych siłowników hydraulicznych. W ramach rozwiązania przewidziano również odpowiednie wzmocnienie fundamentów obiektu.Building straightening solutions have been developed particularly in areas of intensive industrial exploitation of minerals, especially hard coal, and are mostly Polish. Current solutions for building straightening assume uniform lifting of the building using, for example, specially prepared foundation blocks in wells beneath the building's actual foundation, in which hydraulic cylinders are placed to perform the lifting, as exemplified by utility model PL 59268. Another solution, P.380428, involves preparing the building's foundation by introducing horizontal expansion joints and installing permanent abutments, which will act as the point of application for vertical hydraulic cylinders. The solution also includes appropriate reinforcement of the building's foundations.

Innym zbliżonym rozwiązaniem jest P.379643, przewidujące zaprojektowanie i wykonanie sztywnej żelbetowej skrzyni fundamentowej budynku, która oparta jest na pionowych żelbetowych palach fundamentowych. Pale zakończone są poziomym żelbetowym walcem, który można unosić względem części pionowej. Umieszczenie tych zestawów pod określonymi punktami żelbetowej skrzyni fundamentowej umożliwia doprowadzenie obiektu do poziomu.Another similar solution is P.379643, which involves the design and construction of a rigid reinforced concrete foundation box for a building, supported by vertical reinforced concrete foundation piles. The piles terminate in a horizontal reinforced concrete cylinder that can be lifted relative to the vertical section. Placing these sets under specific points of the reinforced concrete foundation box allows the building to be brought to a level surface.

Kolejnym, rozwiązaniem jest P.295814 obiektów z możliwością, rektyfikacji jest fundament jednomiejscowy, który składa się z dwu niezależnych sztywnych rusztów przechodzących w płyty. Elementy te stykają się ze sobą w miejscu wewnętrznego przegubu kulistego, który umożliwia obrót w każdym z kierunków. Ustalenie geometrycznej niezmienności układu stanowią zastrzały umieszczone w zewnętrznych obszarach obu fundamentów. Regulacja długości zastrzałów umożliwia doprowadzenie górnej części obiektu do poziomu.Another solution, P.295814, for structures with the possibility of rectification is a single-station foundation, which consists of two independent rigid grids that transform into slabs. These elements interconnect at an internal spherical joint, which allows rotation in either direction. Braces placed in the outer areas of both foundations ensure the geometric stability of the system. Adjusting the brace lengths allows the upper part of the structure to be leveled.

W rozwiązaniu według US20040098930 oraz CA2415987 przewiduje się zastosowanie zdublowanego fundamentu, którego styk będzie miał kształt części sfery wypukłością skierowany ku dołowi. Niewielkie tarcie w styku ma za zadanie umożliwić wzajemne przemieszczenie się górnej części fundamentu wraz z budynkiem w przypadku wystąpienia wymuszenia poziomego np. związanego z trzęsieniem ziemi. W tym przypadku nie przewiduje się statycznego wymuszenia i stabilizacji obu części fundamentu. Bardzo zbliżone do powyższego rozwiązanie dotyczące zabezpieczenia budynku na wpływy trzęsień ziemi chronione jest pod numerem IN1199/CHE/2009.The solution according to US20040098930 and CA2415987 envisages the use of a double foundation, the contact between which will be shaped like a partial sphere with the convexity pointing downward. The slight friction at the contact is intended to allow the upper part of the foundation and the building to move relative to each other in the event of a horizontal excitation, for example, associated with an earthquake. In this case, static excitation and stabilization of both foundation parts are not envisaged. A very similar solution for protecting the building against earthquakes is protected under the number IN1199/CHE/2009.

Statyczna rektyfikacja budynku wykonywana przez zabudowanie konstrukcji wsporczej w poziomie fundamentów budynku pochylonego, a następnie wyprostowanie go poprzez przemieszczenie całości po wytworzonej powierzchni sfery jest objęta rozwiązaniem CN111962577. Metoda ta wymaga kosztownego wbudowania dodatkowej konstrukcji pod istniejącym budynkiem oraz znacznych robót ziemnych wokół obiektu.Static building rectification, performed by building a supporting structure at the level of the leaning building's foundations and then straightening it by moving the entire structure along the created spherical surface, is covered by solution CN111962577. This method requires the costly construction of an additional structure beneath the existing building and significant earthworks around the structure.

Pochylenie obiektu, które pojawia się w trakcie istnienia budowli stanowi znaczne obniżenie komfortu użytkowania. W przypadku przekroczenia, pochylenia wynoszącego %0 zgodnie z instrukcją GIG. pt. Zasady oceny możliwości prowadzenia podziemnej eksploatacji górniczej z uwagi, na ochronę obiektów budowlanych, konieczne jest usunięcie tej uciążliwości przez rektyfikację obiektu. W budynkach nieprzygotowanych do procesu rektyfikacji proces ten można wykonać dwoma grupami metod: geotechniczną lub z wykorzystaniem siłowników hydraulicznych. W pierwszym przypadku wyprostowanie (rektyfikację) obiektu uzyskuje się w wyniku odpowiedniego, strefowego podcinania lub rozluźniania gruntu pod fundamentem przez częściowe jego usunięcie. Bu dynek, swoim własnym ciężarem dogęszcza grunt, co powoduje jego prostowani e. W drugiej metodzie, wprowadza się siłowniki hydrauliczne w nisze wykonane w ścianach nośnych powyżej fundamentu budynku. W obydwu metodach konieczne jest wykonanie znacznych robót budowlanych i dużą ingerencję w elementy konstrukcyjne obiektu. Metody geotechniczne ze względu na swoją mniejszą precyzję rezultatów robót nie są obecnie stosowane. Metoda z wykorzystaniem siłowników hydraulicznych jest kosztowna, ale proces prostowania może być dokładnie kontrolowany. Koszty prostowania wraz z doprowadzeniem elementów wykończeniowych obiektu do stanu sprzed prostowania często sięga wartości samego obiektu.A structure's inclination, which occurs during its lifespan, significantly reduces user comfort. If the inclination exceeds 0 %, as specified in the Central Mining Institute's (GIG) instructions, "Principles for Assessing the Feasibility of Underground Mining Operations for the Protection of Buildings," it is necessary to eliminate this nuisance through rectification. In buildings not prepared for rectification, this process can be accomplished using two groups of methods: geotechnical or hydraulic cylinders. In the first case, straightening (rectification) of the structure is achieved by appropriate, zoned undercutting or loosening of the soil under the foundation by partial removal. The building, with its own weight, compacts the soil, which causes it to straighten. In the second method, hydraulic cylinders are inserted into recesses made in the load-bearing walls above the building's foundation. Both methods require significant construction work and significant interference with the structure's structural elements. Geotechnical methods are not currently used due to their lower precision of results. The method using hydraulic cylinders is expensive, but the straightening process can be precisely controlled. The costs of straightening, including restoring the building's finishing elements to their pre-straightening condition, often approach the value of the building itself.

Zastosowanie specjalnych fundamentów umieszczonych na centralnym przegubie (patent P.295814) lub na specjalnych rektyfikowalnych podporach (patent P.379643) wymaga odpowiedniego formowania kształtu wszystkich części fundamentu. To zaś powoduje wzrost kosztów wykonania oraz skomplikowania procesu realizacyjnego inwestycji. Tych niedogodności pozbawione jest poniżej przedstawione rozwiązanie fundamentu rektyfikowanego.The use of special foundations placed on a central hinge (patent P.295814) or on special rectifiable supports (patent P.379643) requires appropriate shaping of all foundation components. This, in turn, increases construction costs and complicates the project implementation process. The rectified foundation solution presented below overcomes these disadvantages.

Istotą wynalazku jest fundament rektyfikacyjny budynków nowowznoszonych, zbrojony, którego powierzchnia styku z fundamentem podstawowym budynku ma kształt części sfery z wypukłością skierowaną ku dołowi, mający dolną część i górną część charakteryzuje się tym, że górna część fundamentu rozdzielona jest od dolnej części fundamentu warstwą poślizgową, przy czym w dolnej części znajdują się co najmniej trzy, opory ze wspornikiem, a między wspornikiem opory a górna częścią fundamentu umieszczone są elementy stabilizujące w postaci klinów i co najmniej jednego elementu dystansowego.The essence of the invention is a rectified foundation for newly erected buildings, reinforced, the contact surface of which with the basic foundation of the building has the shape of a part of a sphere with a convexity directed downwards, having a lower part and an upper part characterized in that the upper part of the foundation is separated from the lower part of the foundation by a sliding layer, wherein in the lower part there are at least three supports with a support, and between the support support and the upper part of the foundation there are stabilizing elements in the form of wedges and at least one spacer element.

Na warstwę poślizgową, składają się dwie warstwy folii i warstwa smaru. Warstwy folii rozdzielone są warstwą smaru.The sliding layer consists of two layers of foil and a layer of lubricant. The foil layers are separated by a layer of lubricant.

Dolna warstwa folii znajduje się bezpośrednio na górnej powierzchni dolnej części fundamentu.The lower layer of foil is placed directly on the upper surface of the lower part of the foundation.

W rozwiązaniu według wynalazku, siłowniki hydrauliczne po usunięciu elementów, stabilizujących w postaci klinów działają w kierunku poziomym a nie pionowym, jak w znanych rozwiązaniach.In the solution according to the invention, after removing the stabilizing elements in the form of wedges, the hydraulic cylinders operate in a horizontal direction and not in a vertical direction, as in known solutions.

Wynalazek przedstawiono na rysunku na którym fig. 1 przedstawia rzut fundamentu z elementami przystosowującymi obiekt do rektyfikacji, fig. 2 przekrój, budynku z fundamentem przystosowanym do rektyfikacji, fig. 3 szczegół A, fig. 4 szczegół B.The invention is presented in the drawing, in which Fig. 1 shows a plan of the foundation with elements adapting the object to rectification, Fig. 2 a cross-section of the building with a foundation adapted to rectification, Fig. 3 detail A, Fig. 4 detail B.

Rozwiązanie zostało przedstawione w przykładzie realizacji.The solution is presented in an implementation example.

Dolna część fundamentu I w postaci grubej płyty żelbetowej umieszczona jest w podłożu. Górna powierzchnia 2 dolnego fundamentu I ukształtowana jest w postaci części sfery z jej osią pionową przechodzącą przez środek rzutu fundamentu. Górna część fundamentu 2 w postaci grubej płyty spoczywa na dolnej, a obie części rozdzielone są warstwą poślizgową 3. Na warstwę poślizgową 3 składają się dwie warstwy folii PE o grubości 0,4 mm, pomiędzy którymi umieszczony jest smar. Dolna warstwa folii jest układana bezpośrednio na betonowym fundamencie uformowanym na kształt sfery, a kolejne warstwy (smar i druga warstwa folii) układane są kolejno po sobie. Beton górnej części fundamentu 2 układany jest bezpośrednio na warstwie poślizgowej 3, której zadaniem jest obniżenie współczynnika tarcia w momencie wykonywania procesu rektyfikacji. Górna część fundamentu 2 stanowi podstawę do umieszczenia na niej konstrukcji budynku. Kształt rzutu obu części fundamentu 1 i 2 jest zależny od założeń architektonicznych obiektu, ale w przykładzie są zbliżone do prostokąta bez rozczłonkowania. W dolnej części fundamentu, znajdują się cztery opory 4, które umieszczone są wzdłuż dwu prostopadłych osi centralnych fundamentu po przeciwnych jego stronach. Pomiędzy wspornikiem opory 4a a górną częścią fundamentu 2 umieszczone są elementy stabilizujące konstrukcję - kliny 5 i elementy dystansowe 6. W momencie dokonywania rektyfikacji obiektu elementy 5 zostają zastąpione przez siłowniki hydrauliczne 7.The lower part of foundation I, a thick reinforced concrete slab, is placed in the ground. The upper surface 2 of lower foundation I is shaped like a portion of a sphere with its vertical axis passing through the center of the foundation plan. The upper part of foundation 2, a thick slab, rests on the lower part, and both parts are separated by a slip layer 3. Slip layer 3 consists of two layers of 0.4 mm thick PE foil, with grease between them. The lower layer of foil is laid directly on the concrete foundation formed in the shape of a sphere, and subsequent layers (grease and the second layer of foil) are laid sequentially. The concrete of the upper part of foundation 2 is laid directly on slip layer 3, which reduces the coefficient of friction during the rectification process. The upper part of foundation 2 provides the base for the building structure. The shape of the plan of both foundation parts 1 and 2 depends on the architectural design of the building, but in this example, they are close to a rectangle without any segmentation. In the lower part of the foundation, there are four supports 4, placed along two perpendicular central axes of the foundation on opposite sides. Between the support support 4a and the upper part of the foundation 2, stabilizing elements are placed – wedges 5 and spacers 6. During the rectification of the structure, the elements 5 are replaced by hydraulic actuators 7.

Promień sfery powierzchni styku R=20 m. Wartość siły niezbędna do przemieszczenia górnej części fundamentu (2) względem dolnej (1) zależna jest wielkości obciążeń konstrukcji ρ [kPa], powierzchni styku fundamentów S [m2] i współczynnika tarcia warstwy poślizgowej f, co przedstawia zależność: H = ρ S - f. Poziome przemieszczenie górnej części 2 fundamentu I względem dolnej 1 wynosi 0,2 m dla każdych 10 promil nachylenia powierzchni terenu.The radius of the sphere of the contact surface R = 20 m. The value of the force necessary to move the upper part of the foundation (2) relative to the lower part (1) depends on the magnitude of the structure loads ρ [kPa], the contact area of the foundations S [m 2 ] and the friction coefficient of the sliding layer f, which is presented by the relationship: H = ρ S - f. The horizontal displacement of the upper part 2 of the foundation I relative to the lower part 1 is 0.2 m for each 10 per mille of the terrain surface inclination.

Sposób użytkowania konstrukcji jest następujący: obiekt powinien być wznoszony w momencie, gdy nie ujawniają się deformacje podłoża, co zapewni właściwą jakość wykonania w stosunku do powierzchni pionowych ścian i poziomowości stropów. Górna część fundamentu 2 wraz z nadbudową obiektu powinna być unieruchomiona względem dolnej przez wprowadzenie elementów stabilizujących 5 i 6 pomiędzy wsporniki opór 4a i górny fundament 2. Po wystąpieniu nachylenia terenu i po podjęciu decyzji o rektyfikacji:The structure should be used as follows: the structure should be erected when no subgrade deformations are apparent, ensuring proper construction quality relative to the vertical wall surfaces and the levelness of the ceilings. The upper part of foundation 2, along with the structure's superstructure, should be immobilized relative to the lower part by inserting stabilizing elements 5 and 6 between the support brackets 4a and the upper foundation 2. After the ground slope occurs and the decision to rectify:

• Wprowadza się siłowniki hydrauliczne 7 pomiędzy wsporniki 4a i górną część fundamentu 2 z elementami dystansowymi 6. We wszystkich siłownikach 7 należy wprowadzić siłę rozpierającą o wartości 10% siły wywołującej, przemieszczenie.• Hydraulic cylinders 7 are inserted between the supports 4a and the upper part of the foundation 2 with spacers 6. In all cylinders 7, a spreading force of 10% of the force causing the displacement should be introduced.

• Usuwa się elementy stabilizujące 5.• Stabilizing elements are removed 5.

• Wprowadza się żądane poziome przemieszczenie w siłownikach 7 do uzyskania pionowości konstrukcji (przemieszczenia wprowadzać stopniowo parami w naprzeciwległych siłownikach 7).• The desired horizontal displacement is introduced in actuators 7 until the structure is vertical (displacements are introduced gradually in pairs in opposite actuators 7).

• Po doprowadzeniu do pionowości konstrukcji wprowadzić elementy stabilizujące 5, a następnie usunąć siłowniki 7.• After the structure is vertical, insert the stabilizing elements 5 and then remove the actuators 7.

Kształt rzutu poziomego fundamentu jest zależny od projektu architektonicznego. Zalecana bryła powinna być symetryczna względem środka fundamentu 1. Zbrojenie wszystkich, części żelbetowych fundamentu jest ustalane każdorazowo indywidualnie w ramach projektu konstrukcji obiektu.The shape of the foundation's horizontal projection depends on the architectural design. The recommended shape should be symmetrical about the center of foundation 1. The reinforcement of all reinforced concrete elements of the foundation is determined individually as part of the building's structural design.

Claims (4)

1. Fundament rektyfikacyjny budynków nowowznoszonych, zbrojony, którego powierzchnia styku z fundamentem podstawowym budynku ma kształt części sfery, z, wypukłością skierowaną ku dołowi, mający dolną część i górną część znamienny tym, że górna część (2) fundamenty (I) rozdzielona jest od dolnej części (1) fundamentu (I) warstwą poślizgową (3), przy czym w dolnej części (1) znajdują się co najmniej trzy opory (4) ze wspornikiem (4a), a między wspornikiem opory (4a) a górna częścią (2) fundamentu (I) umieszczone są elementy stabilizujące w postaci klinów (5) i co najmniej jednego elementu dystansowego (6).1. Rectified foundation for newly erected buildings, reinforced, the contact surface of which with the basic foundation of the building has the shape of a part of a sphere, with a convexity directed downwards, having a lower part and an upper part, characterized in that the upper part (2) of the foundation (I) is separated from the lower part (1) of the foundation (I) by a sliding layer (3), wherein in the lower part (1) there are at least three supports (4) with a support (4a), and between the support support (4a) and the upper part (2) of the foundation (I) there are stabilizing elements in the form of wedges (5) and at least one spacer element (6). 2. Fundament rektyfikacyjny według: zastrz, 1 znamienny tym, że na warstwę poślizgową (3) składają się dwie warstwy folii i warstwa smaru.2. Rectification foundation according to: claim 1, characterized in that the sliding layer (3) consists of two layers of foil and a layer of grease. 3. Fundament rektyfikacyjny według zastrz. 2 znamienny tym, że warstwy folii rozdzielone są warstwą smaru.3. Rectification foundation according to claim 2, characterized in that the foil layers are separated by a layer of grease. 4. Fundament rektyfikacyjny według zastrz. 1 znamienny tym, że dolna warstwa folii znajduje się bezpośrednio na górnej powierzchni dolnej części (1) fundamentu (I).4. Rectification foundation according to claim 1, characterized in that the lower foil layer is located directly on the upper surface of the lower part (1) of the foundation (I).
PL440712A 2022-03-28 2022-03-28 Rectification foundation of newly constructed buildings PL249115B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL440712A PL249115B1 (en) 2022-03-28 2022-03-28 Rectification foundation of newly constructed buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL440712A PL249115B1 (en) 2022-03-28 2022-03-28 Rectification foundation of newly constructed buildings

Publications (2)

Publication Number Publication Date
PL440712A1 PL440712A1 (en) 2023-10-02
PL249115B1 true PL249115B1 (en) 2026-03-02

Family

ID=88203743

Family Applications (1)

Application Number Title Priority Date Filing Date
PL440712A PL249115B1 (en) 2022-03-28 2022-03-28 Rectification foundation of newly constructed buildings

Country Status (1)

Country Link
PL (1) PL249115B1 (en)

Also Published As

Publication number Publication date
PL440712A1 (en) 2023-10-02

Similar Documents

Publication Publication Date Title
Tan et al. Characteristics of a large-scale deep foundation pit excavated by the central-island technique in Shanghai soft clay. II: Top-down construction of the peripheral rectangular pit
Korff et al. Pile-soil interaction and settlement effects induced by deep excavations
O’Rourke Ground movements caused by braced excavations
Finno et al. Performance of a stiff support system in soft clay
Nguyen et al. Finite element analysis of deformation behavior of deep excavation retained by diagram wall in Ho Chi Minh City
CN114991204A (en) Rapid combination construction method for arch shell of pillarless hall station
CN115217114B (en) Construction method of foundation pit rescue back pressure platform
EP2356287B1 (en) Monolithic foundation system
CN117344756A (en) Slope support device and construction method thereof
Santoyo et al. Geotechnical considerations for hardening the subsoil in Mexico City's Metropolitan Cathedral
Ho Ground loss behind floating diaphragm walls in soft ground excavation
Lim et al. Performance of cross and buttress walls to control wall deflection induced by deep excavation in dense urban area
Neguritsa et al. Modelling of Stress–Strain State of Artificially Improved Foundation During Construction of a Residential Complex in a Megacity
CN114319387B (en) Construction method of composite supporting structure positioning device
Fadeev et al. Settlements of Buildings Founded on Weak Soils of Saint Petersburg
Huang et al. The effectiveness of jet-grout slabs and cross-walls in restricting wall movements in deep excavations
Onishi et al. Behavior of an earth retaining wall during deep excavation in Shanghai soft ground
Jovanović et al. Excavation support system with piles—Case study
JPH0886117A (en) Building installation method
HASSAN Studying the behaviour of deep excavation adjacent to old buildings using Plaxis 3D
Skorikov et al. Behavior of plate foundation in deep excavation beneath 32-storey building in Moscow
Miranda et al. Numerical assessment of the ongoing settlements of the western tower of Terreiro do Paço, in Lisbon, Portugal
Jendzelovsky Analysis of the Stress of Reinforced Concrete Pillars as Affected by the Stiffness of the Subsoil
Michalak Selected problems of designing and constructing underground garages in intensively urbanized areas
Gandelsman Constructive solutions to ensure the safety of the object of historical heritage in conditions of weak foundation soils