PL148813B1 - A scraper conveyor in a wall heading - Google Patents

A scraper conveyor in a wall heading Download PDF

Info

Publication number
PL148813B1
PL148813B1 PL26084786A PL26084786A PL148813B1 PL 148813 B1 PL148813 B1 PL 148813B1 PL 26084786 A PL26084786 A PL 26084786A PL 26084786 A PL26084786 A PL 26084786A PL 148813 B1 PL148813 B1 PL 148813B1
Authority
PL
Poland
Prior art keywords
conveyor
wall
belt
gutters
card
Prior art date
Application number
PL26084786A
Other languages
Polish (pl)
Other versions
PL260847A1 (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL26084786A priority Critical patent/PL148813B1/en
Publication of PL260847A1 publication Critical patent/PL260847A1/en
Publication of PL148813B1 publication Critical patent/PL148813B1/en

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)
  • Disintegrating Or Milling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

Przedmiotem wynalazku jest przenosnik zgrzeblowy w chodniku przyscianowym górniczych wyrobisk, przebudowany wraz z postepem sciany.Odprowadzany przenosnikiem zgrzeblowym ze sciany urobek, podawany jest do chodnika przyscianowego na ciag rynien zgrzeblowego przenosnika, który podaje go dalej w zasadzie na przenosnik tasmowy i dalsze urzedzenia sluzace do wydobywania urobku spod ziemi na powierzchnie kopalni. Zgrzeblowy przenosnik w scianie jest w miare postepu sciany przesuwany wraz z wysypowym napedem wzgledem ciagu rynien zgrzeblowego przenosnika, na który podawany jest stale urobek ze sciany do chodnika przyscianowego.Po dojsciu wysypowego napedu scianowego przenosnika do konca ciagu rynien zgrzeblowego przenosnika w chodniku przyscianowym musi nastepic przebudowanie calego zgrzeblowego przenosnika w chodniku przyscianowym oraz przedluzenie lub skrócenie wspólpracujacego z nim przenosnika tasmowego. Przedluzenie lub skrócenie tasmowego przenosnika jest uzalez¬ nione od przeciwnego lub zgodnego kierunku odstawy urobku w chodniku przyscianowym z kie¬ runkiem sciany.Zgrzeblowy przenosnik w chodniku przyscianowym ma najczesciej kruszarke do rozdrabniania nadmiernie grubych bryl urobku, zabudowane kilka rynien przed napedem przenosnika. Ciag rynien od zwrotni zgrzeblowego przenosnika do kruszarki spoczywa na spegu chodnika przyscianowego, natomiast rynny od kruszarki sa stopniowo podwyzszone az do napedu przenosnika, który siega nad zwrotnie tasmowego przenosnika. Koncowy odcinek tasmowego przenosnika wraz z jego zwrotnie, jest wiec objety podstawe napedu zgrzeblowe¬ go przenosnika, którego wspornik podstawy napedu znajduje sie na spagu po obu stronach zwrotni tasmowego przenosnika. Ze wzgledu na wymagane przewietrzanie oraz ewentualne zagrozenie metanowe w podziemiach kopalni, jak równiez zwiezany z tym kierunek przewiet¬ rzania wyrobisk, w chodniku przyscianowym w poblizu sciany, a wiec w poblizu zgrzeblo¬ wego przenosnika, znajduje sie szereg wylaczników elektrycznych silników urzedzen w scianie i w jej poblizu. Praktycznie ilosc wyleczników jest od kilku do kilkunastu.Wyleczniki te wymagaja równiez ich przemieszczania, zwanego przebudowe, wzdluz chodnika przyscianowego w miare postepu sciany. Znane sa rozwiazania przebudowy wyleczników w zestawach na dodatkowym szynowym torze, ulozonym na spegu chodnika obok przenosnika lub 148 8132 148 813 zawieszonych na szynowej kolejce. Zestaw wylaczników na torze lub zawieszony na szynowej kolejce obok przenosnika, ogranicza przejscie i stwarza zagrozenie dla przodkowej zalogi, a szczególne trudnosci wystepuje gdy wymagane bylo usuwanie usterek w instalacji elektrycz¬ nej* Kazdorazowe przebudowywanie wylaczników wraz z elektrycznymi przewodami wymagalo ich wylaczenia spod napiecia, a z tym wystepowala przerwa wydobycia w scianie niezaleznie od przerw wystepujacych w czasie przebudowy zgrzeblowego przenosnika w chodniku przyscianowym.Opisana na wstepie przebudowa zgrzeblowego przenosnika wraz z calym ciagiem ry¬ nien jest przeprowadzana przy wyprzedzajaco wykonanym chodniku przyscianowym, przed sciana lub przy jego utrzymywaniu, za sciana. W przypadku drazenia chodnika przyscianowego, krótko przed lub razem ze sciana, ciag rynien zgrzeblowego przenosnika wymaga bardzo klopotliwego i praktycznie nie stosowanego stopniowego wydluzania w.miare postepu sciany* Gdy chodnik przy- scianowy ze sciana jest likwidowany, co me nieraz miejsce jezeli znajdzie sie miedzy zrobami, wówczas ciag rynien zgrzeblowego przenosnika musi byc biezaco skracany, albowiem utrzymywanie chodnika jest praktycznie nierealne* Skracanie czy wydluzanie ciagu rynien zgrzeblowego prze¬ nosnika w chodniku przyscianowym, oprócz pracochlonnych robót montazu czy demontazu, stwarza dodatkowe trudnosci przetransportowywania i magazynowania tych czesci w chodniku ze wzgledu na brak miejsca, gdzie oprócz przejscia dla zalogi znajduja sie przenosniki do transportu urobku* Celem wynalazku jest rozwiazanie zgrzeblowego przenosnika w chodniku przyscianowym, wspólpracujacego z podajacym urobek zgrzeblowym przenosnikiem w scianie oraz odbierajacym urobek tasmowym przenosnikiem w chodniku przyscianowym, umozliwiajacego równoczesne przebudo¬ wywanie go wraz z zestawem wylaczników silników elektrycznych urzadzen zainstalowanych w scia¬ nie i jej poblizu, przy równoczesnym skróceniu czasu robót zwiazanych z przebudowa, a z tym przerw wydobycia w scianie* Zostalo to rozwiazane wedlug wynalazku przez zabudowanie na rynnach, miedzy kru¬ szarka a mechanizmem napedu zgrzeblowego przenosnika w chodniku przyscianowym, portalowych wsporników, na których przymocowane sa z kolei wylaczniki elektrycznych silników urzadzen w scianie i w poblizu sciany, takich jak maszyn urabiajacych, wiertniczych, transportowych, kruszarki i innych. Wspornik podstawy napedu zgrzeblowego przenosnika ma przegubowo polaczenie z rama zwrotni, wspólpracujacego z nim tasmowego przenosnika* Rama zwrotni tasmowego przenos¬ nika jest polaczona z podporowa belka, która podpiera ciag rynien, stopniowo obnizajacych sie od mechanizmu napedu zgrzeblowego przenosnika do spagu chodnika* Kadlub zwrotni oraz wspornik podstawy mechanizmu napedu zgrzeblowego przenosnika jak równiez polaczona z nim rama zwrotni tasmowego przenosnika maja nachylone gniazda celem latwego i szybkiego rozporowania czy nachylania rozporowych gniazd w czasie przebudowy zgrze¬ blowego przenosnika wraz z zwrotnie tasmowego przenosnika, a z tyra zmniejszenia zewnetrznej szerokosci przenosnika oraz oporów przebudowy* Rynny zgrzeblowego przenosnika, lezace na spagu chodnika maja owalne slizgi, który¬ mi dociskaja do spagu i ulatwiaja pokonanie nierównosci spagu chodnika przyscianowego w cza¬ sie przebudowy zgrzeblowego przenosnika* Slizgi te utrzymuja w zasadzie na jednej wysokosci rynny, calej dlugosci ciagu, spoczywajace na spagu lacznie z kruszarka. Rama zwrotni tasmowego przenosnika, kruszarka i kadlub zwrotni zgrzeblowego przenosnika maja pod spodem slizgowe plozy, równiez ulatwiajacego ich przesuwanie po spagu chodnika przyscianowego* Rozwiazany zgrzeblowy przenosnik umozliwia w krótkim czasie usuniecie rozpór i podniesienie uchylnych gniazd rozporowych celem przebudowywania /podciagania/ zgrzeblowego przenosnika z zwrotnie tasmowego przenosnika, w kierunku zgodnym z kierunkiem prowadzenia sciany, razem z zestawem elektrycznych wylaczników czy dodatkowym wyposazeniem, przy pomocy znanych urzadzen oraz ponowne ich rozporowanie* Wystepujaca przy tym zmiana dlugosci tasmo¬ wego przenosnika i wymagana kompensacja tasmy dokonywana jest znana petlica tasmowego prze¬ nosnika* Rozwiazany przenosnik, wedlug wynalazku, umozliwia dokonywanie przebudowy zgrzeblo¬ wego przenosnika wraz z postepem sciany codziennie, a nawet na poszczególnych zmianach przy braku wykonanego wczesniej chodnika przyscianowego lub w przypadku koniecznosci jego likwida¬ cji za sciana, przy czym w ukladzie tym moze byc zastosowany krótki ciag rynien, ulatwiajacy dokonanie przebudowy* W tradycyjnym ukladzie, gdy chodnik przyscianowy do odstawy urobku jest wydrazony przed sciana, ciag rynien jest odpowiednio dlugi, dobrany do mozliwosci przebudowy przenosnika i zdolnosci kompensacji tasmy petlica tasmowego przenosnika* Dobór tych wielkosci jest jeszcze uwarunkowany dlugoscia wpinanych lub wypinanych odcinków tasmy.148 813 3 Przedmiot wynalazku jest uwidoczniony w przykladzie wykonania na rysunku, na którym fig.l przedstawia schematycznie widok z góry zgrzeblowego przenosnika wraz z wspólpra¬ cujacymi przenosnikami przy wykonanym wczesniej chodniku przyscianowym przed i za sciane, fig.2 - przenosnik w chodniku przyscianowym wykonywanym krótko przed lub razem ze sciana, fig. 3 - przenosnik w chodniku przyscianowym likwidowanym za sciane, fig* 4 -widok z boku przenos¬ nika i urzadzen przedstawionych na fig.l w kierunku W, fig.5 - widok przenosnika w przekroju A-A fig.l, a fig.6 - widok przenosnika w przekroju B-B fig.l.Zgrzeblowy przenosnik w chodniku przyscianowym ma zabudowane na rynnach 1, miedzy mechanizmem napedu 2 a kruszarke 3, portalowe wsporniki 4, na których przymocowane se wylecz- niki 5 elektrycznych silników urzedzen w scianie i jej poblizu, a wspornik 6 podstawy napedu 2 ma przegubowe poleczenie 7 z rame zwrotni 8 wspólpracujecego z nim tasmowego przenosnika 9.Zwrotnie 8 tasmowego przenosnika znajduje sie pod mechanizmem napedu 2 zgrzeblowego przenosni¬ ka i poleczonymi z nim kolejnymi oraz stopniowo obnizajecymi sie do spegu rynnami 1, które pod¬ parte se zarazem podporowe belke 10 poleczone z rame zwrotni 8 tasmowego przenosnika 9. Kadlub zwrotni 11 zgrzeblowego przenosnika oraz wspornik 6 podstawy napedu 2 i poleczona z nim rama zwrotni 8 tasmowego przenosnika 9 maje uchylne rozporowe gniazda 12 dla latwego i szybkiego rozporowania czy uchylania tych gniazd 12 w czasie przebudowy zgrzeblowego przenosnika wraz z zwrotnie 8 tasmowego przenosnika 9. Rynny 13, lezece na spegu chodnika, maje owalne slizgi 14 ulatwiajece pokonanie nierównosci spegu chodnika w czasie przebudowy zgrzeblowego przenosnika.W tym samym celu rama zwrotni 8 tasmowego przenosnika 9, gruszarka 3 i kadlub zwrotni 11 zgrze¬ blowego przenosnika maje pod spodem slizgowe plozy 15, ulatwiajece równiez ich przesuwanie po spegu chodnika* Przebudowa zgrzeblowego przenosnika, wedlug wynalazku dokonywana jest w calosci, to jest lecznie z zwrotnie 8 tasmowego przenosnika 9 i zestawem wyleczników 5, przy czym wyma¬ gane jest, zaleznie od kierunku postepu sciany, wydluzanie lub skracanie tasmowego przenosnika 9. Zmiana dlugosci tasmowego przenosnika dokonywana jest za pomoce znanej petlicy. Przebudowa zgrzeblowego przenosnika dokonywana jest przy wydrezonym chodniku w obu kierunkach postepu sciany, gdy naped 16 scianowego przenosnika zblizy sie, zaleznie od kierunku postepu sciany, ku kruszarce 3 lub ku zwrotni 11 zgrzeblowego przenosnika i wówczas caly zgrzeblowy przenosnik z ciegiem rynien 13 przesuwany jest wzgledem napedu 16 w kierunku postepu sciany. Wielkosc ciegu rynien 13 i jednorazowa droga przebudowy zgrzeblowego przenosnika jest dobierana miedzy Innymi do zdolnosci regulacyjnej petlicy oraz urzedzen potrzebnych do przebudowy czy odcinków tasmy przeznaczonych do wymiany.Rozwiezany zgrzeblowy przenosnik pozwala na znaczne skrócenie czasu jego przebu¬ dowy wraz z zestawem wyleczników, która moze byc dokonywana codziennie a nawet na poszczegól¬ nych zmianach, co pozwala na Jego wykorzystanie szczególnie gdy chodnik przyscianowy do odsta¬ wy urobku Jest drezony krótko przed lub razem ze sciane, wzglednie jest likwidowany za sciane, jak przedstawiono na fig. 2 oraz fig.3. IV takich ukladach lezecy na spegu miedzy kruszarke 3 a kadlubem zwrotni 11 cieg rynien 13 moze byc bardzo krótki, co ulatwia i jeszcze bardziej skraca czas przebudowy. Gdy odstawa urobku prowadzona jest za sciane i chodnik przyscianowy do odstawy urobku prowadzony jest krótko przed lub razem ze sciane, wówczas zamiast stalego prze¬ dluzania ciegu rynien 13 dokonywana jest stopniowa codzienna przebudowa zgrzeblowego przenosni¬ ka za postepem sciany. W przypadku odstawy urobku w chodniku przyscianowym przed sciane a chodnik ten za sciane, ze wzgledów technologicznych musi byc likwidowany, wówczas zamiast cieglego skracania ciegu rynien 13 dokonuje sie stopniowe codzienne przebudowywanie zgrzeblo¬ wego przenosnika w kierunku odstawy urobku, a tasmowy przenosnik 9 skraca sie przy cieglym napinaniu tasmy petlice.Zastrzezenia patentowe 1. Przenosnik zgrzeblowy w chodniku przyscianowym górniczych wyrobisk, przebudo¬ wywany wraz z postepem sciany, znamienny tym, ze na rynnach /l i 13/ obnizajecych sie od mechanizmu napedu /2/ do kruszarki /3/, ma portalowe wsporniki /A/, na których przymoco¬ wane se wyleczniki /5/ elektrycznych silników urzedzen w scianie i w jej poblizu, natomiast pod skosnie usytuowanym ciegiem rynien /l/ ma podporowe belke /10/ poleczone z rame zwrotni /8/ tasmowego przenosnika /9/f przy czym wspornik /6/ podstawy mechanizmu napedu /2/ ma przegubowe poleczenie /7/ z rame zwrotni /8/.4 148 813 2« Przenosnik wedlug zastrz.l, znamienny t y m, ze kadlub zwrotni /li/ i wspornik /6/ podstawy mechanizmu napedu /2/ zgrzeblowego przenosnika maja do ich rozporowania uchylne gniazda /12/# 3* Przenosnik wedlug zastrz.l, znamienny tym, ze lezace na spagu rynny /13/ przenosnika maja owalne slizgi /14/, którymi opieraja sie na spagu chodnika, a kadlub zwrotni /li/ zgrzeblowego przenosnika i kruszarka /3/ maja pod spodem slizgowe plozy /15/.Figi148 813 "X RQ-2 Fig. 3 2 6 15 12 jfe^g 31 H5 16/ JW 13 12 //W 11 Rq.l<148 813 A-A Fig. 5 B-B Rq.6 Pracownia Poligraficzna UPRP. Naklad lOOegz.Cena 4UU zl PLThe subject of the invention is a scraper conveyor in a wall-side tunnel of mining pits, rebuilt along with the progress of the wall. The material discharged from the wall by a card conveyor, is fed to the wall-side walkway on a sequence of chutes of a card conveyor, which basically feeds it on a belt conveyor and for further mining spoil from the ground to the surface of the mine. The card conveyor in the wall is moved as the wall progresses, along with the discharge drive, against the sequence of chutes of the card conveyor, to which the material is constantly fed from the wall to the wall walkway. the entire card conveyor in the wall walkway and the lengthening or shortening of the cooperating belt conveyor. The lengthening or shortening of the belt conveyor depends on the opposite or consistent direction of the spoil clearance in the wall walkway with the direction of the wall. The chute conveyor in the wall walkway usually has a crusher to crush excessively thick lumps of material, and several chutes are installed in front of the conveyor drive. The string of gutters from the reversible conveyor to the crusher rests on the back of the wall walkway, while the chutes from the crusher are gradually raised up to the conveyor drive, which reaches over the reversible conveyor belt. The end section of the belt conveyor, together with its return, is thus embraced by the base of the belt conveyor, the drive base support of which is located on the spag on both sides of the return of the conveyor belt. Due to the required ventilation and possible methane hazard in the underground of the mine, as well as the related direction of ventilation of the workings, in the wall walkway near the wall, and therefore near the card conveyor, there are a number of electric switches of the office motors in the wall and its vicinity. Practically, the number of healers is from a few to a dozen. They also require their relocation, called rebuilding, along the wall walkway as the wall progresses. There are known solutions for the reconstruction of the healing units in sets on an additional rail track, located on the spine of the sidewalk next to the conveyor, or on 148 8132 148 813 suspended on the railway track. A set of switches on the track or suspended on the rail line next to the conveyor, limits the passage and poses a threat to the face crew, and special difficulties occur when it was required to remove faults in the electrical installation * Each reconstruction of switches with electric cables required them to be de-energized until There was a break in the extraction in the wall, irrespective of the breaks occurring during the reconstruction of the card conveyor in the wall walkway. The reconstruction of the card conveyor in the wall walkway described in the introduction, along with the entire trench sequence, is carried out with the wall walkway made in advance, in front of the wall or behind the wall. In the case of damaging the wall walkway, shortly before or together with the wall, the string of the chute conveyors requires a very troublesome and practically unused gradual elongation as far as the wall progress is concerned * When the wall walkway with the wall is liquidated, which sometimes happens if it is between with goafs, then the sequence of the card conveyor gutters must be shortened on an ongoing basis, because the maintenance of the sidewalk is practically impossible due to the lack of space where, in addition to the gangway, there are conveyors for transporting the excavated material * The aim of the invention is to solve a card conveyor in a wall walkway, cooperating with a card conveyor in the wall that feeds the output, and a conveyor belt conveyor that collects the output. with a set of switches for electric motors of devices installed in the wall and in its vicinity, while reducing the time of works related to the reconstruction, and thus the interruption of the extraction in the wall * This was solved according to the invention by building on the gutters, between the crusher and the conveyor belt drive mechanism in the wall walkway, portal supports, on which the switches of electric motors of devices in the wall and near the wall, such as mining, drilling, transporting machines, crushers and others, are in turn attached. The base bracket of the conveyor belt drive is articulated to the return frame, the mating belt conveyor * The belt conveyor turning frame is connected to a support beam that supports a string of gutters, gradually lowering from the conveyor belt drive mechanism to the bottom of the walkway, and support for the base of the conveyor belt drive mechanism, as well as the frame of the conveyor belt conveyor connected to it, have inclined seats for easy and quick expansion or tilting of the expansion seats during the reconstruction of the belt conveyor along with the reverse belt conveyor, and to reduce the external width of the conveyor and the conversion resistance * The chute of the chute conveyor, lying on the bottom of the sidewalk, have oval slides which press against the slab and facilitate overcoming the unevenness of the slab of the sidewall sidewalk during the reconstruction of the chute conveyor * These slides keep basically at one height of the gutter, the entire length of the string, resting on the spag, including the crusher. The belt conveyor's turning frame, the crusher and the belt conveyor's turning hull have sliding skids underneath, also facilitating their sliding along the side of the wall walkway * The untied belt conveyor allows you to quickly remove the struts and lift the tilting expansion slots in order to rebuild / turn the belt conveyor / pull-up conveyor conveyor, in the direction of the wall, together with a set of electric switches or additional equipment, with the use of known devices and their re-spreading * The change in the length of the conveyor belt and the required compensation of the belt is made by the known loop of the belt conveyor * The developed conveyor, according to the invention, makes it possible to reconstruct the card conveyor along with the progress of the wall every day, and even on individual shifts in the absence of a wall walkway made earlier or in the case of its need quadrant behind the wall, whereby a short sequence of gutters may be used in this system, facilitating the reconstruction * In the traditional system, when the wall walkway for the haulage of the excavated material is protruded in front of the wall, the gutter sequence is long enough, selected for the possibility of rebuilding the conveyor and the capacity of the conveyor belt loop compensation of the belt conveyor * The selection of these sizes is still determined by the length of the attached or detachable sections of the belt. 148 813 3 The subject of the invention is shown in the example of the embodiment in the drawing, in which Fig. 1 shows a schematic top view of the conveyor belt with cooperating conveyors with a wall walkway made before and behind the wall, Fig. 2 - conveyor in a wall walkway made shortly before or together with the wall, Fig. 3 - conveyor in a wall walkway made behind the wall, Fig * 4 - side view of the conveyor and devices shown in Fig. 1 in the W direction, Fig. 5 is a view of the conveyor w Fig. 1, and Fig. 6 - a view of the conveyor in section BB, Fig. 1. The chute conveyor in the wall walkway has, on the gutters 1, between the drive mechanism 2 and the crusher 3, portal supports 4, on which the curing devices are attached 5 electric motors of devices in and around the wall, and the support 6 of the drive base 2 has an articulated connection 7 with the turning frame 8 of the cooperating belt conveyor 9. In return, the 8-belt conveyor is located under the drive mechanism 2 of the conveyor belt and subsequent ones connected to it and gradually lowering to the spine gutters 1, which are supported at the same time by a supporting beam 10 connected to the return frame 8 of the conveyor belt 9. The turn-over frame 11 of the card conveyor and the support 6 of the drive base 2 and the associated frame of the turn-point 8 of the belt conveyor 9 tilting sides expanding seats 12 for easy and quick expansion or tilting these seats 12 during reconstruction of the card conveyor along with the rotating 8 of the conveyor belt 9. Gutters 13, lying on the sidewalk spine, small oval slides 14 facilitating overcoming unevenness of the sidewalk spine during the reconstruction of the card conveyor. For the same purpose, the turning frame 8 of the conveyor 9, pearhead 3 and the turning hull 11 of the welded conveyor There are sliding skids 15 underneath, which also facilitate their sliding along the pavement spine * The reconstruction of the scraper conveyor, according to the invention, is performed in its entirety, i.e. with the return 8-lane conveyor 9 and a set of healers 5, which is required, depending on the direction wall advance, lengthening or shortening of the conveyor belt 9. The change of the length of the belt conveyor is made by means of a known loop. Reconstruction of the card conveyor is carried out at the hollowed out sidewalk in both directions of the wall advance, when the drive 16 of the wall conveyor approaches, depending on the direction of the wall progress, towards the crusher 3 or towards the turn 11 of the card conveyor and then the entire belt conveyor with the gutter string 13 is driven by the travel 16 in the direction of the wall. The size of the gutter string 13 and the one-time way of reconstructing the card conveyor is selected, among others, for the regulating capacity of the loop and the equipment needed for reconstruction or sections of the belt to be replaced. The extended belt conveyor allows for a significant reduction in its renovation time together with a set of cutters, which may be performed daily and even on individual shifts, which makes it possible to use it, especially when the wall walkway for debris storage is traversed shortly before or together with the wall, or is removed behind the wall, as shown in Figs. 2 and 3. In such systems, the spine between the crusher 3 and the turning hull 11 can be very short, which facilitates and further shortens the reconstruction time. When the haulage is led behind the wall and the wall walkway to the haulage is led shortly in front of or together with the wall, then, instead of permanently extending the string of gutters 13, a gradual daily reconstruction of the scraper conveyor with the progress of the wall is performed. In the case of haulage of the spoil in the wall walkway in front of the wall and the walkway behind the wall, for technological reasons, it must be liquidated, then instead of the continuous shortening of the gutter line 13, a gradual daily reconstruction of the card conveyor towards the haulage of the material takes place, and the belt conveyor 9 shortens continuous tensioning of the loop belt. Patent claims 1. The scraper conveyor in the wall sidewalk of mining pits, rebuilt with the progress of the wall, characterized by the fact that on the gutters / 1 and 13 / decreasing from the drive mechanism / 2 / to the crusher / 3 /, has portal brackets / A /, on which are attached to the clamps / 5 / electric motors of the units in the wall and in its vicinity, while under the obliquely situated string of gutters / l / has a supporting beam / 10 / connected to the frame of the turn / 8 / belt conveyor / 9 / f with the support / 6 / base of the drive mechanism / 2 / with articulated connection / 7 / with the turning frame /8 / 4 148 813 2 «Conveyor acc. row 1, characterized in that the pivot hull / li / and the bracket / 6 / the base of the drive mechanism / 2 / of the conveyor belt have tilting seats / 12 / # 3 for their spreading * Conveyor according to claim 1, characterized by that of the conveyor spag / 13 / conveyor have oval slides / 14 /, which rest on the pavement foot, and the turning hull / li / card conveyor and crusher / 3 / they have sliding skids underneath /15/.Figi148 813 "X RQ-2 Fig 3 2 6 15 12 jfe ^ g 31 H5 16 / JW 13 12 // W 11 Rq.l <148 813 AA Fig. 5 BB Rq.6 Printing workshop of the Polish Patent Office. Mintage 100z. Price 4UU PLN PL

Claims (1)

Zastrzezenia patentowePatent claims 1. Przenosnik zgrzeblowy w chodniku przyscianowym górniczych wyrobisk, przebudo¬ wywany wraz z postepem sciany, znamienny tym, ze na rynnach /l i 13/ obnizajecych sie od mechanizmu napedu /2/ do kruszarki /3/, ma portalowe wsporniki /A/, na których przymoco¬ wane se wyleczniki /5/ elektrycznych silników urzedzen w scianie i w jej poblizu, natomiast pod skosnie usytuowanym ciegiem rynien /l/ ma podporowe belke /10/ poleczone z rame zwrotni /8/ tasmowego przenosnika /9/f przy czym wspornik /6/ podstawy mechanizmu napedu /2/ ma przegubowe poleczenie /7/ z rame zwrotni /8/.4 148 813 2« Przenosnik wedlug zastrz.l, znamienny t y m, ze kadlub zwrotni /li/ i wspornik /6/ podstawy mechanizmu napedu /2/ zgrzeblowego przenosnika maja do ich rozporowania uchylne gniazda /12/# 3* Przenosnik wedlug zastrz.l, znamienny tym, ze lezace na spagu rynny /13/ przenosnika maja owalne slizgi /14/, którymi opieraja sie na spagu chodnika, a kadlub zwrotni /li/ zgrzeblowego przenosnika i kruszarka /3/ maja pod spodem slizgowe plozy /15/. Figi148 813 "X RQ-2 Fig. 3 2 6 15 12 jfe^g 31 H5 16/ JW 13 12 //W 11 Rq.l<148 813 A-A Fig. 5 B-B Rq.6 Pracownia Poligraficzna UPRP. Naklad lOOegz. Cena 4UU zl PL1. A scraper conveyor in a wall sidewalk of mining excavations, rebuilt with the progress of the wall, characterized by the fact that on the gutters / 1 and 13 / falling from the drive mechanism / 2 / to the crusher / 3 /, it has portal supports / A /, on which are fastened with cutters / 5 / of electric motors of the units in the wall and in its vicinity, while under the obliquely situated string of gutters / 1 / there is a supporting beam / 10 / connected with the turning frame / 8 / of the conveyor belt / 9 / f with the bracket / 6 / base for the drive mechanism / 2 / has articulated connection / 7 / with the turning frame /8/.4 148 813 2 «Conveyor according to claim 1, characterized by the turning body / li / and the bracket / 6 / drive mechanism base / 2 / of the card conveyor have tilting sockets for their spreading / 12 / # 3 * Conveyor according to claim 1, characterized in that the gutters / 13 / of the conveyor lying on the spag have oval slides / 14 /, which rest on the sidewalk slope, and the hull returnable / li / card conveyor and crusher / 3 / May under sliding skids underneath / 15 /. Fig. 148 813 "X RQ-2 Fig. 3 2 6 15 12 jfe ^ g 31 H5 16 / JW 13 12 // W 11 Rq.l <148 813 AA Fig. 5 BB Rq.6 Printing workshop of the Polish Patent Office. Mintage 100z. Price 4UU zl PL
PL26084786A 1986-07-28 1986-07-28 A scraper conveyor in a wall heading PL148813B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL26084786A PL148813B1 (en) 1986-07-28 1986-07-28 A scraper conveyor in a wall heading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL26084786A PL148813B1 (en) 1986-07-28 1986-07-28 A scraper conveyor in a wall heading

Publications (2)

Publication Number Publication Date
PL260847A1 PL260847A1 (en) 1988-04-28
PL148813B1 true PL148813B1 (en) 1989-12-30

Family

ID=20032170

Family Applications (1)

Application Number Title Priority Date Filing Date
PL26084786A PL148813B1 (en) 1986-07-28 1986-07-28 A scraper conveyor in a wall heading

Country Status (1)

Country Link
PL (1) PL148813B1 (en)

Also Published As

Publication number Publication date
PL260847A1 (en) 1988-04-28

Similar Documents

Publication Publication Date Title
US4065929A (en) Mine roof support and method in longwall mining of thick mineral seams
EP0626501B1 (en) An improved equipment useful for winning of ores particularly coal in longwall mining
US6729464B2 (en) Mine conveying system
US3887235A (en) Assembly for hydraulic extraction of sheet-like mineral deposits sectioned into panels by a system of passageways
CS236464B2 (en) Equipment for underground mines especially for thick seams exploitation
US5567018A (en) Continuous mining linear advance system
US4389072A (en) Longwall mineral mining installation
EP0795680A1 (en) Shortwall mining equipment for extraction of pillars in underground coal mines
PL148813B1 (en) A scraper conveyor in a wall heading
US5979642A (en) Extendable modular conveyor assembly
CN113027502B (en) Synchronous withdrawing and installing process of fully mechanized mining equipment
US3960265A (en) Mining installations
US4505517A (en) Self-advancing mine roof supports
US4241824A (en) Conveyors for use in mineral mining installations
US4391470A (en) Method of, and apparatus for, winning mineral material
GB2089411A (en) Improvements in or relating to mine roof supports
US4120390A (en) Crossover dump and conveyor advancer
US20090039695A1 (en) Guide frame for guiding conveyor segments in high wall mining
US4183700A (en) Walking mine support
US3300025A (en) Conveyors
US4415295A (en) Mineral mining installations
GB2199068A (en) Adjustment of mine conveyor angle by link with mine roof support
CN214366054U (en) Fully-mechanized coal mining face through float coal cleaning device
US4401399A (en) Two part mine roof support unit
GB2108559A (en) Mine roof supports