PL115761B2 - Roof of a suspended construction and method of assembling the same - Google Patents

Roof of a suspended construction and method of assembling the same Download PDF

Info

Publication number
PL115761B2
PL115761B2 PL21696379A PL21696379A PL115761B2 PL 115761 B2 PL115761 B2 PL 115761B2 PL 21696379 A PL21696379 A PL 21696379A PL 21696379 A PL21696379 A PL 21696379A PL 115761 B2 PL115761 B2 PL 115761B2
Authority
PL
Poland
Prior art keywords
lifting
mounting
roof
hatch
strings
Prior art date
Application number
PL21696379A
Other languages
Polish (pl)
Other versions
PL216963A2 (en
Inventor
Ryszard Sanocki
Andrzej Kopec
Tadeusz Obrocki
Tomasz Kowalski
Andrzej Dobrzynski
Eugeniusz Grzadziel
Original Assignee
Slaskie Przed Konstrukcji Stal
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Slaskie Przed Konstrukcji Stal filed Critical Slaskie Przed Konstrukcji Stal
Priority to PL21696379A priority Critical patent/PL115761B2/en
Publication of PL216963A2 publication Critical patent/PL216963A2/xx
Publication of PL115761B2 publication Critical patent/PL115761B2/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Przedmiotem wynalazku jest dach i sposób montazu dachu konstrukcji wiszacej szczególnie przydatnego jako przykrycie sceny amfiteatru.Dotychczas znany jest z czasopisma pt. „Inzynieria i budownictwo" nr 7 z 1977 dach konstrukcji wiszacej skladajacy sie z dwóch luków nosnych, osadzonych poprzez dwa przeguby kuliste na fundamentach. Luki nosne polaczone sa ciegnami nosnymi oraz kazdy z luków przytrzymywany jest odciagiem do podloza. Na ciegnach nosnych spoczywaja ciegna napinajace, do których przymocowane jest przykrycie dachu.Sposób montazu wyzej opisanego dachu konstrukcji wiszacej, odbywa sie nastepujaco: segmenty luków glównych scala sie spoinami czolowymi na rusztowaniach w pozycji poziomej. Nastepnie scalone luki podnosi sie do plaszczyzn skosnych za pomoca dwóch samojezdnych dzwigów i opiera sie o dwie wieze montazowe. Do luków mocuje sie ciegna nosne i odciagi, a na ciegnach nosnych uklada sie ciegna napinajace i laczy sie z luka¬ mi. Z«kolei za pomoca dzwigu samojezdnego zdejmuje sie luki z wie*z montazowych i napina sie odciagi.Tak wykonany dach i taki sposób montazu wymaga angazowania przez dlugi okres czasu ciezkiego sprzetu montazowego. Ponadto jest niemozliwe zrealizowanie dachu tej konstrukcji tym sposobem, w przypadku, gdy w bezposrednim sasiedztwie znajduja sie zabudowania czy inne obiekty. W tym przypadku montaz dachu odbywa sie po uprzednim demontazu tych obiektów.Celem wynalazku jest dach konstrukcji wiszacej i sposób jego montazu wymagajacy krótkiego czasu zaanga¬ zowania ciezkiego sprzetu montazowego, oraz mozliwy do zrealizowania takze w przypadku wystepowania w bezposredniej odleglosci innych obiektów, bez koniecznosci ich demontazu.Istota dachu konstrukcji wiszacej wedlug wynalazku polega na tym, ze kazdy z obu luków nosnych zamocowany jest poprzez dwa przeguby montazowe w dwóch lacznikach w ksztalcie litery „V". Przeguby montazowe umozliwiaja wychylanie sie kazdego luku nosnego z pozycji pionowej do pozycji poziomej. Luki nosne polaczone sa ze soba, za pomoca ciegien nosnych i trzymane sa w ostatecznym polozeniu odciagami. Na ciegnach nosnych znajduja sie ciegna napinajace, a calosc posadowiona jest na podporach.Sposób wedlug wynalazku polega na tym, ze w srodku miejsca montazu dachu stawia sie podpore montazowa z wciagarka a luk nosny uprzednio scalony osadza sie w pozycji pionowej w dwóch przegubach2 115 761 montazowych laczników w ksztalcie litery „V" osadzonych na podporach. Nastepnie do luku nosnego i podpory montazowej mocuje sie ciegna montazowe, i za pomoca wciagarki opuszcza sie luk nosny do pozycji docelowej, po czym do luku mocuje sie ciegna nosne i odciagi, Z drugim lukiem nosnym postepuje sie w identyczny sposób. Po zespawaniu montazowych przegubów, rozwieszeniu ciegien nosnych i napieciu odcia¬ gów, demontuje sie ciegna montazowe i podpore montazowa. Nastepnie montuje sie ciegna napinajace i kladzie sie przekrycie dachu.Dach wedlug wynalazku jest mozliwy do wykonania nawet w przypadkach, gdy w najblizszej odleglosci znajduja sie inne obiekty bez koniecznosci ich demontazu, a ponadto ciezki sprzet montazowy, szczególnie dzwigi, zaangazowane sa do montazu jedynie na czas dostarczenia luków nosnych i ich zamontowania w przegu¬ bach montazowych. W konsekwencji konstrukcja dachu i sposób montazu umozliwia obnizenie znacznie kosztów i czasu budowy. • Wynalazek jest blizej objasniony w przykladzie wykonania pokazanym na rysunku, na którym fig. 1 przedstawia dach konstrukcji wiszacej w rzucie czolowym, a fig. 2 przedstawia dach w widoku z bokuG Dwa luki nosne 1 zamocowane sa kazdy poprzez dwa przeguby montazowe 3 w dwóch lacznikach w ksztalcie litery „V"2, posadowionych na podporach 4. Przeguby montazowe 3 umozliwiaja wychylanie sie kazdego luku nosnego 1 z pozycji pionowej do pozycji poziomej. Luki nosne 1 polaczone sa ze soba za pomoca ciegien nosnych 6 i trzymane sa w ostatecznym polozeniu odciagami 5. Na ciegnach nosnych 6 znajduja sie ciegna napinajace 7 i przekrycie dachu. Calosc dachu poprzez lacznik w ksztalcie litery „V" posadowiona jest na podporach 4.Montaz dachu zaczyna sie od posadowienia podpory montazowej 8 z wciagarka 9 w srodku miejsca montazu dachun Nastepnie luk nosny 1 uprzednio scalony osadza sie w pozycji pionowej w dwóch przegubach montazowych 3 laczników w ksztalcie litery ,,V" 2, osadzonych na podporach 4. Nastepnie do luku nosnego 1 i podpory montazowej 8 mocuje sie ciegna montazowe 10, i za pomoca wciagarki 9 opuszcza sie luk nosny 1 do pozycji docelowej, po czym mocuje sie do luku 1 ciegna nosne 6 i odciagi 5. Z drugim lukiem nosnymi postepuje sie w identyczny sposób. Po zespawaniu montazowych przegubów 3, rozmieszczeniu ciegien nosnych 6 i napieciu odciagów 5 demontuje sie ciegna montazowe 10 i podpore montazowa 8. Nastepnie montuje sie ciegna napinajace 7 i kladzie przekrycie dachu.Zastrzezenia patentowe 1. Dach konstrukcji wiszacej skladajacy sie z dwóch luków nosnych osadzonych na podporze, oraz polaczonych ciegnami nosnymi i przytrzymywanych odciagami, a na ciegnach nosnych posiadajacy ciegna napinajace z przekryciem dachu, znamienny tym, ze kazdy z obu luków nosnych (1) zamocowany jest poprzez dwa przeguby montazowe (3) w dwóch lacznikach w ksztalcie litery ,,V" (2), posadowionych na podporach (4), przy czym przeguby montazowe (3) umozliwiaja w czasie montazu wychylanie sie kazdego luku nosnego (1) z pozycji pionowej do pozycji poziomej. 2. Sposób montazu dachu konstrukcji wiszacej, znamienny tym, ze w srodku miejsca montazu dachu stawia sie podpore montazowa z wciagarka, a luk nosny uprzednio scalony osadza sie w pozycji pionowej w dwóch przegubach montazowych laczników w ksztalcie litery „V",posadowionych na podporach, po czym do luku nosnego i podpory montazowej mocuje sie ciegna montazowe, i za pomoca wciagarki opuszcza sie luk nosny do pozycji docelowej, i z kolei do luku nosnego mocuje sie ciegna nosne i odciagi, i w identyczny sposób montuje sie drugi luk nosny, po czym spawa sie montazowe przeguby, rozwiesza ciegna nosne i napina odciagi, a po demontazu ciegien montazowych i podpory montazowej montuje sie ciegna napinajace.115 761 V i' \ Tl S^ V/VA\ \ W/A ' VV V 7 <\' z\' V A\ \'//.<\\ -' V Av~v-S-•'/¦•'¦ -' -V ^/'7 ¦w; 1 14_J_ U. ii 2 4 Figi 8 10 7 6 1 1 4j \2£ Fig 2 PLThe subject of the invention is the roof and the method of mounting the roof of the hanging structure, which is particularly useful as a cover for the amphitheater stage. "Inzynieria i Budownictwo" No. 7 from 1977 the roof of the hanging structure consisting of two lifting hatches, mounted by two ball joints on the foundations. The lifting gaps are connected with lifting bars and each of the hatches is held by a tie to the ground. The lifting links rest on the tensioning bars, to which the roof covering is attached. The method of mounting the above-described roof of the hanging structure is as follows: the segments of the main hatches are joined by butt welds on the scaffolding in a horizontal position. Then the integrated hatches are raised to the sloping planes by means of two self-propelled cranes and supported by two Mounting towers. To the hatches are attached to the ties and stays, and the tension cords are placed on the trunks and connect to the gaps. In turn, with the help of a mobile crane, the gaps are removed from the assembly towers and the braces are tightened. the roof and this method of assembly require the involvement of heavy assembly equipment over a long period of time it is impossible to implement the roof of this structure in this way, when there are buildings or other objects in the immediate vicinity. In this case, the assembly of the roof takes place after the disassembly of these objects. The object of the invention is the roof of the suspended structure and the method of its assembly requiring a short time of involvement of heavy assembly equipment, and possible to implement also in the case of other objects in the immediate distance, without the need for them. The essence of the roof of the hanging structure according to the invention consists in the fact that each of both lifting hatches is fixed by two mounting joints in two V-shaped fasteners. The mounting joints allow each lifting hatch to tilt from a vertical position to a horizontal position. The loadbearings are connected with each other by means of the lifting strings and are held in the final position with the tensioning strings. There are tensioning strings on the lifting strings, and the whole is placed on supports. The method according to the invention is that in the middle of the place where the roof is to be installed, a mounting support is placed with the winch and the carrying hatch previously integrated is seated e in vertical position in two articulated joints 115 761 "V" -shaped assembly fasteners mounted on supports. Then, the mounting strings are attached to the lifting hatch and the mounting support, and the lifting hatch is lowered to the target position with the help of a winch, and then the lifting rods and strainers are attached to the lifting hatch. The second lifting hatch is done in the same way. After the assembly joints are welded together, the lifting strings are hung and the cables are tensioned, the assembly strings and the assembly support are disassembled. Then the tensioning cables are mounted and the roof covering is laid. According to the invention, the roof can be made even in cases where there are other objects in the closest distance without the need to disassemble them, and in addition, heavy assembly equipment, especially cranes, are only involved in the installation on the time for the delivery of lifting hatches and their installation in the mounting joints. Consequently, the structure of the roof and the method of assembly make it possible to significantly reduce construction costs and time. • The invention is explained in more detail in the embodiment shown in the drawing, in which fig. 1 shows the roof of the hanging structure in front view, and fig. 2 shows the roof in a side view. G Two lifting hatches 1 are fastened each by two mounting joints 3 in two fasteners in the shape of the letter "V" 2, placed on supports 4. The mounting joints 3 allow each lifting arch 1 to tilt from the vertical to the horizontal position. The lifting gaps 1 are connected to each other by the lifting strings 6 and are held in their final position by braces 5 There are tensioning rods 7 and the roof covering on the stretchers. The entire roof is placed on the supports by means of a V-shaped connector. The roof assembly begins with the installation of the assembly support 8 with the winch 9 in the middle of the roof installation site, then the lifting hatch 1, the integrated one, is placed vertically in two assembly joints 3 of "V" -shaped connectors 2, mounted on supports 4. Then, the mounting rods 10 are attached to the lifting hatch 1 and the mounting support 8, and with the help of the winch 9, the lifting hatch 1 is lowered to the target position, and then the lifting rod 6 and the braces are attached to the bow 1. identical way. After welding the assembly joints 3, arranging the suspension arms 6 and tensioning the guy lines 5, the assembly arms 10 and the assembly support 8 are disassembled. Then the tensioning cables 7 are mounted and the roof covering is placed. Patent claims 1. Roof of the hanging structure consisting of two lifting hatches mounted on a support, and connected with the lifting strings and held by the braces, and on the lifting strings having the tensioning strings with a roof covering, characterized by the fact that each of both lifting hatches (1) is fixed by two mounting joints (3) in two connectors in the shape of a letter ,, V "(2), placed on supports (4), while the assembly joints (3) allow each lifting hatch (1) to tilt from the vertical to the horizontal position during assembly. 2. Method of assembling the roof of the hanging structure, characterized by that in the middle of the place where the roof is to be installed, a mounting support is placed with the winch, and the previously integrated bearing hatch is set in a vertical position in two the mounting joints of the connectors in the shape of the "V", placed on the supports, then the mounting strings are attached to the lifting hatch and the mounting support, and with the help of a winch, the lifting hatch is lowered to the target position, and in turn the lifting strings and strainers are attached to the lifting hatch , and in the same way, the second lifting hatch is mounted, then the mounting joints are welded, the lifting rods are hung up and the braces are tightened, and after the assembly of the mounting strings and the assembly support are removed, the tensioning strings are mounted. 115 761 V and '\ Tl S ^ V / VA \ \ W / A 'VV V 7 <\' z \ 'VA \ \' //. <\\ - 'V Av ~ vS- •' / ¦ • '¦ -' -V ^ / '7 ¦w; 1 14_J_ U. ii 2 4 Figs 8 10 7 6 1 1 4j \ 2 £ Fig 2 PL

Claims (2)

Zastrzezenia patentowe 1. Dach konstrukcji wiszacej skladajacy sie z dwóch luków nosnych osadzonych na podporze, oraz polaczonych ciegnami nosnymi i przytrzymywanych odciagami, a na ciegnach nosnych posiadajacy ciegna napinajace z przekryciem dachu, znamienny tym, ze kazdy z obu luków nosnych (1) zamocowany jest poprzez dwa przeguby montazowe (3) w dwóch lacznikach w ksztalcie litery ,,V" (2), posadowionych na podporach (4), przy czym przeguby montazowe (3) umozliwiaja w czasie montazu wychylanie sie kazdego luku nosnego (1) z pozycji pionowej do pozycji poziomej.Patent claims 1. The roof of the hanging structure, consisting of two lifting hatches mounted on a support, connected by lifting strings and held by lashings, and having tensioning links with a roof covering on the lifting strings, characterized by the fact that each of both lifting hatches (1) is fixed through two mounting joints (3) in two "V" -shaped connectors (2), placed on supports (4), while the mounting joints (3) allow each traverse (1) to tilt from the vertical position during mounting to the horizontal position. 2. Sposób montazu dachu konstrukcji wiszacej, znamienny tym, ze w srodku miejsca montazu dachu stawia sie podpore montazowa z wciagarka, a luk nosny uprzednio scalony osadza sie w pozycji pionowej w dwóch przegubach montazowych laczników w ksztalcie litery „V",posadowionych na podporach, po czym do luku nosnego i podpory montazowej mocuje sie ciegna montazowe, i za pomoca wciagarki opuszcza sie luk nosny do pozycji docelowej, i z kolei do luku nosnego mocuje sie ciegna nosne i odciagi, i w identyczny sposób montuje sie drugi luk nosny, po czym spawa sie montazowe przeguby, rozwiesza ciegna nosne i napina odciagi, a po demontazu ciegien montazowych i podpory montazowej montuje sie ciegna napinajace.115 761 V i' \ Tl S^ V/VA\ \ W/A ' VV V 7 <\' z\' V A\ \'//.<\\ -' V Av~v-S-•'/¦•'¦ -' -V ^/'7 ¦w; 1 14_J_ U. ii 2 4 Figi 8 10 7 6 1 1 4j \2£ Fig 2 PL2. Method of assembling the roof of a hanging structure, characterized by the fact that in the center of the place where the roof is to be assembled, a mounting support is placed with a winch, and the previously integrated load hatch is placed vertically in two mounting joints of the V-shaped connectors, placed on supports, then the mounting strings are attached to the lifting hatch and the mounting support, and using a winch, the lifting hatch is lowered to the target position, and in turn the lifting hatch and braces are attached to the lifting hatch, and the second lifting hatch is mounted in the same way, then welded mounting joints, hangs the ties and tightens the lashings, and after dismantling the mounting strings and the assembly support, the tensioning rods are mounted. 115 761 V and '\ Tl S ^ V / VA \ \ W / A' VV V 7 <\ 'z \' VA \ \ '//. <\\ -' V Av ~ vS- • '/ ¦ •' ¦ - '-V ^ /' 7 ¦w; 1 14_J_ U. ii 2 4 Figs 8 10 7 6 1 1 4j \ 2 £ Fig 2 PL
PL21696379A 1979-07-07 1979-07-07 Roof of a suspended construction and method of assembling the same PL115761B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL21696379A PL115761B2 (en) 1979-07-07 1979-07-07 Roof of a suspended construction and method of assembling the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL21696379A PL115761B2 (en) 1979-07-07 1979-07-07 Roof of a suspended construction and method of assembling the same

Publications (2)

Publication Number Publication Date
PL216963A2 PL216963A2 (en) 1980-02-25
PL115761B2 true PL115761B2 (en) 1981-04-30

Family

ID=19997353

Family Applications (1)

Application Number Title Priority Date Filing Date
PL21696379A PL115761B2 (en) 1979-07-07 1979-07-07 Roof of a suspended construction and method of assembling the same

Country Status (1)

Country Link
PL (1) PL115761B2 (en)

Also Published As

Publication number Publication date
PL216963A2 (en) 1980-02-25

Similar Documents

Publication Publication Date Title
US10125507B2 (en) Fall protection system
US10280049B2 (en) System and method for connecting a crane suspension assembly to a support column
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
CN103669845B (en) High-altitude long-span overhung cornice formwork bracing system and construction method thereof
GB2097044A (en) Suspension bridges
RU2716622C1 (en) Anchor support of power transmission line
RU2700849C1 (en) Intermediate power transmission line support
EA003592B1 (en) Method for constructing structures useful as catwalks and building scaffolds on slopes
PL115761B2 (en) Roof of a suspended construction and method of assembling the same
PL221178B1 (en) Folding mobile crane
US20210230891A1 (en) Building debris containment system
KR100319434B1 (en) Safety rack for binding steel reinforcing for piers
JP2004232366A (en) Suspended scaffolding
KR200256844Y1 (en) Safety rack for binding steel reinforcing for piers
CN111003633A (en) Hoisting and mounting device for small and medium-sized multi-block prefabricated parts
RU2754615C1 (en) Fast-mount lightweight support made of composite materials for emergency recovery operations on 35-220 kv overhead lines (options)
RU158018U1 (en) NET PROTECTION AGAINST ROCK-BALDING EVENTS
US5954155A (en) Bridge containment system
CN211470537U (en) Hoisting and mounting device for small and medium-sized multi-block prefabricated parts
CN113700281B (en) Electric hanging basket counterweight-free device for coating outer wall of chimney and mounting method
WO1994018420A1 (en) Device for temporarily supporting an outer wall or boundary wall of a building
SU920151A1 (en) Suspended system
SU1567752A1 (en) Power transmission line support
SU1707171A1 (en) Supporting structure of power transmission line
RU2425225C1 (en) Stowing connection strap