PL114869B2 - Method of ensuring water run-off in particular in vertical mine excavations - Google Patents

Method of ensuring water run-off in particular in vertical mine excavations

Info

Publication number
PL114869B2
PL114869B2 PL20897578A PL20897578A PL114869B2 PL 114869 B2 PL114869 B2 PL 114869B2 PL 20897578 A PL20897578 A PL 20897578A PL 20897578 A PL20897578 A PL 20897578A PL 114869 B2 PL114869 B2 PL 114869B2
Authority
PL
Poland
Prior art keywords
water run
ensuring water
vertical mine
mine excavations
excavations
Prior art date
Application number
PL20897578A
Other languages
English (en)
Other versions
PL208975A1 (pl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL20897578A priority Critical patent/PL114869B2/xx
Publication of PL208975A1 publication Critical patent/PL208975A1/pl
Publication of PL114869B2 publication Critical patent/PL114869B2/xx

Links

PL20897578A 1978-08-09 1978-08-09 Method of ensuring water run-off in particular in vertical mine excavations PL114869B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL20897578A PL114869B2 (en) 1978-08-09 1978-08-09 Method of ensuring water run-off in particular in vertical mine excavations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL20897578A PL114869B2 (en) 1978-08-09 1978-08-09 Method of ensuring water run-off in particular in vertical mine excavations

Publications (2)

Publication Number Publication Date
PL208975A1 PL208975A1 (pl) 1979-07-02
PL114869B2 true PL114869B2 (en) 1981-02-28

Family

ID=19991016

Family Applications (1)

Application Number Title Priority Date Filing Date
PL20897578A PL114869B2 (en) 1978-08-09 1978-08-09 Method of ensuring water run-off in particular in vertical mine excavations

Country Status (1)

Country Link
PL (1) PL114869B2 (pl)

Also Published As

Publication number Publication date
PL208975A1 (pl) 1979-07-02

Similar Documents

Publication Publication Date Title
JPS52134208A (en) Method of improving water bottom subsoil
JPS54124508A (en) Method of construction of underground wall
JPS54136713A (en) Method of muddy water horizontal auger construction
JPS557317A (en) Method of burrying underground water drawing pipe
JPS54131305A (en) Control method of underground water level
JPS54146409A (en) Method of drainage construction of grout* etc*
JPS5751395A (en) Introduction of massive water into tunnel
JPS5320632A (en) Method of building underground tank
JPS54120921A (en) Method of antifreezing construction in waterrconveyance ditch of tunnel* etc*
JPS57158498A (en) Method of waterproof construction of tunnel
JPS5549433A (en) Method of eliminating shortage of water
JPS57116873A (en) Erection of underground tank
JPS54142808A (en) Method of drainage construction in slope face
JPS5523264A (en) Method of preventing water leakage in structure such as tunnel
JPS5581997A (en) Method of building culvert in stable fluid under ground
JPS57100237A (en) Permeation of rain water into underground
JPS55101629A (en) Method of collecting underground water of river
JPS54105828A (en) Method of tunnel excavation construction
JPS5295811A (en) Method of building underground wall in poor subsoil
JPS5541101A (en) Method of laying cable in vertical gallery
JPS53137515A (en) Method of preventing underground water in well sinking from freezing
JPS56119096A (en) Method of excavating tunnel
JPS54133713A (en) Method of removing slime of ditch bottom in method of construction of continuous underground wall
JPS56115451A (en) Method of improved waterproof construction of concrete roof
JPS54102007A (en) Method of building underground structure