Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taylor Mark AnthonyfiledCriticalTaylor Mark Anthony
Priority to PH22016000155UpriorityCriticalpatent/PH22016000155U1/en
Publication of PH22016000155U1publicationCriticalpatent/PH22016000155U1/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
On-Site Construction Work That Accompanies The Preparation And Application Of Concrete
(AREA)
Abstract
This utility model disclosed a formwork system for cast-in-place concrete structure. Formwork system comprises a pair of spaced-forming panel for receiving concrete mixture therebetween, a plurality of securing means, each being positioned on the outer section of each of forming panel, a plurality of fastening means, each being removably connecting securing means for spaced-holding together the forming panel, and a plurality of support means for supporting each of forming panel on the ground.
PH22016000155U2016-03-172016-03-17Formwork system for concrete structure
PH22016000155U1
(en)