Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Manuel BaternafiledCriticalManuel Baterna
Priority to PH22013000606UpriorityCriticalpatent/PH22013000606Y1/en
Publication of PH22013000606Y1publicationCriticalpatent/PH22013000606Y1/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
This utility model relates to a support truss assembly for concrete beam and floor formation that is meticulously made to ensure stable and reliable by considering weight distribution. Furthermore, the support truss assembly could be easily assembled and disassembled to thereby facilitate construction and cause earlier project completion. The support truss assembly generally comprises a pair of spacedly positioned foldable supporting cages, a pair of I-beams parallely resting on the top of the foldable cages, a plurality of traversing I-beams spacedly provided on pair of I-beams, channels resting on the traversing I-beams, and a mesh formation of I-beams provided between the channels.
PH22013000606U2013-11-272013-11-27A support truss assembly for concrete beam and flooring formation
PH22013000606Y1
(en)
Structure with primary reflector fastening beams for solar collector comprising at least two elements located in parallel that comprise a framework of three bars in the shape of an equilateral triangle, located so that one of its vertices is located as the lowest point of the structure and it has three inner bars.
METHOD FOR TRANSFORMING A LOAD COMPRISING A LIGNOCELLULOSIC BIOMASS USING A HOMOGENEOUS CATALYST IN COMBINATION WITH A HETEROGENEOUS CATALYST COMPRISING A SPECIFIC SUPPORT