OA19338A - Method for controlling an installation allowing Dc current to be transmitted in a network while protecting said network from a short circuit fault. - Google Patents

Method for controlling an installation allowing Dc current to be transmitted in a network while protecting said network from a short circuit fault. Download PDF

Info

Publication number
OA19338A
OA19338A OA1201900086 OA19338A OA 19338 A OA19338 A OA 19338A OA 1201900086 OA1201900086 OA 1201900086 OA 19338 A OA19338 A OA 19338A
Authority
OA
OAPI
Prior art keywords
line
circuit breakers
current
short
fault
Prior art date
Application number
OA1201900086
Inventor
Dieynaba LOUME
Alberto BERTINATO
bertrand Raison
Original Assignee
Supergrid Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Supergrid Institute filed Critical Supergrid Institute
Publication of OA19338A publication Critical patent/OA19338A/en

Links

Abstract

The control method allows the control of an installation (1) for transmitting electricity comprising a DC transmission network (3) including a group (2) of electricity transmission lines (4) that are linked to one another. The method allows the opening (E1) of at least one N1 safety system (7) such that, for each safety system (7) being opened, the contribution to the flow of current through the group (2) of transmission lines (4), originating from the converter station (6) associated with said safety system (7) that is opened, is removed. Furthermore, the method also allows a search (E2) for the short-circuit fault in order to identify the faulty transmission line (4), and an operation (E3), implemented after identification of the faulty transmission line (4) by the search step (E2), of isolating the faulty transmission line (4) by opening the line circuit breakers (5a, 5b) of said faulty transmission line (4).

Description

The aim of the invention is a particular installation associated with appropriate control of the components thereof in order to improve the safety of the network.
This aim is pursued by virtue of a method for controlling an installation for transmitting electricity comprising a direct current transmission network comprising a group of electricity transmission lines linked to one another, each transmission line comprising a pair of two line circuit breakers arranged at the opposite ends of said transmission line. Said installation comprises a number N of stations for converting alternating current to direct current each associated with a safety system, each converter station being linked to the group of transmission lines and being associated with a maximum contribution of short-circuit current. More specifically, each safety system is capable of interrupting a direct current corresponding to the maximum contribution of short-circuit current of the associated converter station, the line circuit breakers each having a breaking capacity capable of interrupting a direct current corresponding to the highest of the maximum contributions of short-circuit current of the converter stations. Furthermore, the method comprises, following an occurrence of a short-circuit fault on one ofthe transmission lines, the following steps:
- a step of opening at least N-1 safety Systems such that, for each safety System that is opened, the contribution to the flow of current through the group of transmission lines originating from the converter station associated with said safety System that is opened is removed;
- a step of finding the short-circuit fault to identify the faulty transmission line;
- a step, implemented after identification of the faulty transmission line by the finding step, of isolating the faulty transmission line by opening the line circuit breakers of said faulty transmission line.
In particular, the method comprises a step of detecting the short-circuit fault on each safety System triggering, for each safety System and after the short-circuit fault has been detected on said safety System, a step of transmitting an opening command signal to said safety System.
Preferably, the method comprises a step of detecting the short-circuit fault on each line circuit breaker, and the finding step comprises, for each pair of line circuit breakers of the same transmission line and after the short-circuit fault has been detected on the line circuit breakers of said pair, a step of checking for the presence of the short-circuit fault between said line circuit breakers of said pair. The step of isolating the faulty transmission line being implemented only afterthe presence ofthe short-circuit fault has been detected on said faulty transmission line by the checking step.
Advantageously, the step of isolating the faulty transmission line comprises a step of monitoring at least one physical feature on each of the two line circuit breakers of said faulty transmission line, each of said two line circuit breakers opening, in particular independently of one another, as soon as the feature monitored in the vicinity thereof is located below a reference threshold.
According to one embodiment, only N-1 safety Systems open following the occurrence of the short-circuit fault, with the safety System that remains closed being considered to be in a faulty State.
The method can comprise a step of detecting the failure of the safety System in a faulty State, then a step of disconnecting the electrical connection between the converter station, associated with said safety System in the faulty State, and the group of transmission lines.
In particular, the isolation step is such that opening at least one of the two line circuit breakers is implemented while current is still flowing therethrough.
Preferably, each safety system is selected from: a safety system integrated in the converter station and an independent circuit breaker arranged on an electrical link linking the converter station, associated with said safety system, with said group of transmission lines.
In particular, the method can comprise a step of restoring the network that is implemented after the step of isolating the faulty transmission line, said restoration step comprising closing each safety system that is opened during the opening step, in particular during and following the restoration step the line circuit breakers of said faulty transmission line remain open so that the short-circuit fault of said faulty transmission line is electrically isolated from the other transmission lines ofthe group.
The invention also relates to an installation for transmitting electricity comprising:
• a direct current transmission network comprising a group of electricity transmission lines linked to one another, each transmission line comprising a pair of two line circuit breakers arranged at the opposite ends of said transmission line;
• a number N of stations for converting alternating current to direct current each associated with a safety system, each converter station being linked to the group of transmission lines and being associated with a maximum contribution of shortcircuit current, and:
• each safety system is capable of interrupting a direct current corresponding to the maximum contribution of short-circuit current of the associated converter station;
• the line circuit breakers each hâve a breaking capacity capable of interrupting a direct current corresponding to the highest of the maximum contributions of short-circuit current of the converter stations;
• the installation is configured to send an opening signal to each safety system when a short-circuit fault originating from the group of transmission lines is detected on said safety system;
• the installation is configured, for each pair of line circuit breakers, to send an opening signal to the line circuit breakers of said pair when the short-circuit fault is detected on the line circuit breakers of said pair and when said short-circuit fault is located between the line circuit breakers of said pair.
The installation can comprise the software and hardware éléments for implementing the control method as described.
Brief description of the figures
The invention will be better understood upon reading the following description, which is provided solely by way of a non-limiting example and with reference to the drawings, in which:
- figure 1 shows an installation allowing the transmission of direct current electricity according to one particular embodiment;
- figure 2 shows the components of the installation allowing the contribution of a converter station to a short-circuit current to be computed in the event of a shortcircuit fault in the network;
- figure 3 schematically shows various steps of a particular embodiment of the method for controlling the installation;
- figure 4 shows a protection module associated with a safety system;
- figure 5 shows a protection element associated with a line circuit breaker;
- figure 6 shows a variation of the installation of figure 1 ;
- figure 7 shows a time sequence showing what happens on the installation in the event of a short-circuit fault on a transmission line;
- figure 8 shows a particular example of an installation in which the transmission lines are arranged in a Delta configuration;
- figure 9 shows, for a first case, the current on the direct side of the converter stations of figure 8 during the time following the occurrence of a short-circuit fault in a transmission line;
- figure 10 shows, for the first case, the current flowing through the line circuit breakers of the faulty line of the installation of figure 8 during the time following the occurrence ofthe short-circuit fault;
- figure 11 shows, for a second case, the current on the direct side ofthe converter stations of figure 8 during the time following the occurrence of a short-circuit fault in a transmission line;
- figure 12 shows, for the second case, the current flowing through the line circuit breakers of the faulty line of the installation of figure 8 during the time following the occurrence of the short-circuit fault.
Throughout these figures, unless otherwise stipulated, the same reference signs are used to dénoté the same éléments.
Description of particular embodiments
In particular, the following description differs from the prior art in that it proposes the implémentation of a method associated with a particular installation, which particularly allows a failure to be supported in a safety system intended to block the injection of current into the network from a station for converting alternating current to direct current, while allowing a faulty transmission line to be found and then isolated.
Figure 1 shows an installation 1 for transmitting electricity comprising a direct current transmission network 3 (in particular an HVDC network) comprising a group 2 of electricity transmission lines 4 linked to one another (it is understood that these transmission lines 4 allow direct current to flow and are therefore electrically linked to one another), particularly so as to allow direct current to flow through the group 2 of lines. Each transmission line 4 comprises a pair of two line circuit breakers 5a, 5b arranged at the opposite ends of said transmission line 4. In other words, each end of a transmission line comprises a line circuit breaker. The installation further comprises a number N of stations 6 for converting alternating current to direct current, each associated with a safety system 7: therefore, there are also N safety Systems 7, each associated with a converter station 6. Each converter station 6 is linked to the group 2 of transmission lines 4, and each converter station 6 is associated with a maximum contribution of short-circuit current. The maximum contribution is a design element, in other words each converter station 6 is designed to hâve a maximum contribution of short-circuit current. This maximum contribution of short-circuit current corresponds to a contribution of direct current that said station is capable of injecting into the network 3. In this case, it is understood that the group 2 is linked to the N converter stations 6, in particular on the direct side of each converter station 6. In particular, each safety system 7 is such that it comprises a closed state, in which it authorizes the converter station 6 associated with said safety system 7 to contribute to the flow of current through the group 2 of transmission lines 4, and an open state, in which it prevents the converter station 6 associated with said safety system 7 from contributing to the flow of current through the group 2 of transmission lines 4. Thus, each safety system 7 is particularly placed on the direct current side of the converter station 6. The particular example of figure 1 shows a network 3 provided with seven transmission lines 4 linked to one another and five converter stations 6 that can contribute to the flow of current through the transmission lines 4 ofthe group 2 ofthe network; of course, the illustration in figure 1 is only an example, with the topography of the connections between transmission lines being able to be adapted as a function of the desired features of the network.
Based on the aforementioned it is understood that, when referring to N converter stations 6 or N safety Systems 7, N is a whole number, the value of which is greater than or equal to 2 or 3. The total number of converter stations 6 will be adapted as a function of the desired current transmission features and in particular the territorial dispersion of the alternating current sources linked to these stations.
In the présent description, a transmission line 4 can be formed by any transmission element capable of allowing an electrical power to be transmitted between the two ends of said transmission line 4. Such a transmission element can be, for example, an underwater cable, an underground cable or even an overhead line.
Within the group 2, at least two transmission lines 4 can be directly linked to one another, in particular by means of a busbar 8, and transmission lines 4 can be indirectly linked to one another by means of at least one other transmission line and, if applicable, associated busbars 8. This is essentially what is shown in figure 1. In particular, within the group 2 of transmission lines 4, “electricity transmission lines linked to one another” is understood to mean that each transmission line 4 ofthe group 2 is directly linked to at least one other transmission line of the group, in particular via the ends thereof, by means of a busbar 8, with the same busbar 8 being able to be used to directly link more than two transmission lines 4 to one another. Furthermore, each converter station 6 can be electrically linked, in particular on the direct current side of the converter station 6, to one, and in particular to only one, corresponding busbar 8 by an electrical connection link 9, if applicable this connection link 9 can comprise the safety system 7 associated with said converter station 6.
In the présent description, a circuit breaker (for example, a line circuit breaker 5a, 5b, or, if applicable, a safety system 7 as will be seen hereafter) is a system selectively allowing the through flow of direct current or blocking the through flow of direct current, reference is then made to a direct current circuit breaker. More specifically, the circuit breaker is said to be closed when it allows the through flow of direct current, reference is then made to the closed state of the circuit breaker, and is open when it blocks the through flow of direct current, reference is then made to the open state of the circuit breaker. A circuit breaker can be controlled from a setpoint that allows it to switch from its closed state to its open state, or vice versa. As defined in the présent description, a circuit breaker has a breaking capacity, with the breaking capacity being defined as a maximum value of current flowing therethrough, for which it can switch from the closed state to the open state. The breaking capacity of a circuit breaker therefore corresponds to a capacity to interrupt the current of said circuit breaker. In other words, in general when a current flows through the circuit breaker that is greater than that associated with its breaking capacity, it does not open since an associated protection (the relay that will be described hereafter) does not send it the opening setpoint as long as the current measured on the circuit breaker, i.e. the current flowing through the circuit breaker, is greater than the breaking capacity, since otherwise there is a risk of damaging the circuit breaker or of initiating internai protection to prevent the circuit breaker from being destroyed. In the field, the circuit breaker is also known as a “Direct Current Circuit Breaker” (DCCB).
Within the context of the line circuit breakers 5a, 5b, when the line circuit breakers 5a, 5b of the same transmission line are in a closed state, this allows direct current to flow through said transmission line between the two ends of said transmission line, and when the line circuit breakers 5a, 5b of the same transmission line are in the open state, the transmission of current between the two ends of the transmission line is interrupted: the transmission line is then said to be isolated from the other transmission lines of the group 2, since it no longer provides its function for transmitting direct current between the two ends thereof. Furthermore, when, for one transmission line, only one of the line circuit breakers is open, the transmission of power is interrupted without the transmission line having to be isolated: in order to isolate a transmission line these two line circuit breakers must be open.
In the présent description, a station 6 for converting alternating current to direct current allows, for example, an alternating current originating from an alternating current source 10, such as, for example, an alternating current electricity network or a wind farm, to be converted to direct current with a view to injecting the direct current into the direct current electricity transmission network. A converter station 6 may or may not hâve a direct current cut-off function, this point will be developed in further detail hereafter. The contribution of a converter station to the flow of current through the group of transmission lines 4 can be such that current is extracted from the group 2 of lines or is injected into the group 2 of lines via the converter station 6 in order to provide a production/consumption balance and the stability of the network, which can be implemented by a control function inside the converter station 6.
In the présent description, when reference is made to a contribution of a converter station 6, it involves the contribution of the converter station 6 to the flow of direct current through the group 2 of transmission lines 4 to which it is linked. Furthermore, the association of a safety system 7 with a converter station 6 is such that the direct current originating from the converter station and contributing to the flow of current through the group 2 flows through said safety system 7, particularly before flowing through the group 2 of transmission lines 4.
Preferably, each safety system 7 is able to/configured to interrupt a direct current corresponding to the maximum contribution of short-circuit current of the converter station 6 associated with said safety system 7. In this respect, a safety system 7 selectively allows the through flow of direct current or the blocking of the through flow of direct current between the converter station 6 and the group 2 of transmission lines 4 of the network. It is understood from the aforementioned that the structure of the installation is such that each safety system 7 allows, when it is open, the contribution to the flow of current through the group 2 of transmission lines 4 from a single converter station 6 with which it is associated to be removed. A safety system 7 can be a circuit breaker, in particular of the type as previously described, or can be integrated in a function of the converter station 6. When a safety system 7 is a circuit breaker, it is interposed between the converter station 6 and the group 2 of transmission lines 4, so that the contribution of the converter station 6 flows through said safety system 7 in the closed state of said circuit breaker. In the open state of the circuit breaker forming the safety system 7, the contribution of the converter station 6 associated with the flow of current through the network 2 is removed. Figure 1 particularly shows this case, in which the safety Systems 7 are ail formed by circuit breakers.
The maximum contribution of short-circuit current of a converter station 6 corresponds to the current injected when a short-circuit current fault appears at the terminais thereof, it is therefore independent of the group 2 of transmission lines with which it is linked, but dépends on the features of the converter station 6 and of the alternating current network with which it is linked. As this contribution of short-circuit current is maximal, any short-circuit fault occurring within the group 2 of transmission (MMC), can be determined lines 4 cannot be supplied with current by said converter station 6 above this maximum contribution of short-circuit current. The design of each of the safety Systems 7 so as to be able to (i.e. configured to) interrupt a current flowing therethrough that corresponds to the maximum contribution of the associated station allows the contribution of the converter station 6 to the faulty current in the group 2 of lines to be removed, irrespective of the short-circuit fault in the direct current network. In this respect, in the event of a short-circuit fault in the group 2 of transmission lines 4 of the network (i.e. in/on a transmission line 4 of the group 2), this short-circuit fault can be detected on each safety system 7 that is designed to open irrespective of the short-circuit fault within the group 2, unless this safety system 7 is in a failure state. In the présent description, a short-circuit fault corresponds to an anomaly on a transmission line that causes a shortcircuit on said line: reference is then made to a faulty transmission line. An anomaly therefore can correspond to an electrical isolation fault, such as a break in electrical isolation, or even a human error, for example, incorrect closure of a grounding isolator.
In the présent description, when a short-circuit fault is detected on a safety system 7 or a line circuit breaker 5a, 5b, it is understood that the faulty current flows through the safety system 7, or the line circuit breaker 5a, 5b, and that a measurement of one or more close physical quantity(ies) is used to détermine whether this faulty current effectively flows through the safety system 7 or the line circuit breaker 5a, 5b.
During a steady-state phase of the occurrence of the fault for which none of the line circuit breakers 5a, 5b and safety Systems 7 is open, and after a transitional phase of several ms after the fault has occurred, the contribution of a converter station 6 to the résistance Rf short-circuit fault, also called short-circuit contribution current , when Modular Multilevel Converter by:
is a 0 π VA2 + R2 'G.C + ~ · ω Larrrl — - R g where represents a simple multiplication, and with reference to the diagram of figure 2 separating, on one side, which occurs electrically on the alternating current side (zone Z1) and which occurs electrically on the direct current side (zone Z2). Zones Z1 and Z2 are separated by a converter station 6 that links them together. With Vac being the voltage of the alternating current source, with m representing, in the above équations, the transformation ratio of the transformer on the alternating current side, Larm being the inductance on each arm of the MMC converter, Rf being the résistance of the shortcircuit fault, Rdc corresponding to the équivalent résistance of the portion of the network located between the relevant converter station and the short-circuit fault, Ldc corresponding to the inductance of the portion of the network located between the relevant converter station and the short-circuit fault (in this case not taken into account since the steady-state is being studied), Lac corresponding to the équivalent inductance of the alternating network, Ls corresponding to the inductance for filtering the harmonies (which can be neglected), Lt corresponding to the inductance of the transformer brought to the secondary, Rac corresponding to the équivalent résistance of the alternating network, ω being equal to 2 * π * /, with f being the nominal frequency of the network, and π corresponding to the number Pi. Thus, it follows from the aforementioned that in general the opening setpoint of a safety System 7 is sent during the stated transitional phase since, in general, the steady-state phase is never reached since the protection must be fast. Consequently, knowing that the maximum current arrives during the transitional period, and knowing ^3, it is possible to estimate the maximum fault current that will occur during the transitional period, this estimated value can be used as a reference and is approximately 20 kA.
As mentioned above, there is a probability, even if it is low, that one of the safety Systems 7 can be faulty, and it is this fault that needs to be compensated in order to restore the flow of current through the group 2 of transmission lines 4 of the network as quickly as possible in the event of a short-circuit fault in (i.e. on) a transmission line 4. Indeed, in the event of a failure of a safety System 7, said System will continue to allow through the contribution of the converter station associated with the flow of current through the network 3 and, more specifically, through the group of transmission lines 4.
It is in this respect that the line circuit breakers 5a, 5b each hâve a breaking capacity able to, i.e. configured to, interrupt a direct current corresponding to the highest of the maximum contributions of short-circuit current of the converter stations 6: in this case it is understood that if only one safety System 7 is faulty, such that it does not open following the détection of the short-circuit fault thereon, the line circuit breakers 5a, 5b for their part will be capable of opening in order to isolate the transmission line 4 comprising the short-circuit fault, since they are designed to compensate for the current remaining in the group 2 of transmission lines 4 when a single converter station 6 still supplies the short-circuit fault: it follows that there is no need to wait for a possible safety element 11 (figure 1 ) on the alternating current side to open in order to safeguard the safety system 7.
In order to improve the management of the installation, and particularly to allow faster restoration of the flow of current through the direct current transmission network, the particular architecture of the installation 1 described above will be associated with the steps of a method for controlling the installation that are implemented upon détection of a short-circuit fault within the network 3, in particular on a transmission line 4 of the group 2 between the two line circuit breakers 5a, 5b of said transmission line 4, then denoted faulty transmission line. The term “controlling an installation is understood to be the controlling and monitoring of this installation, as well as the decisions taken with respect to the operation ofthe constituent éléments of this installation, such as the safety Systems or the line circuit breakers as described. Thus, the method comprises (figure 3), following an occurrence of a short-circuit fault, in particular of résistance Rf, on one of the transmission lines 4, in particular between the two line circuit breakers 5a, 5b of said transmission line 4, the following steps:
- a step E1 of opening at least N-1 safety Systems 7 such that, for each safety system 7 that is opened, the contribution to the flow of current through the group 2 of transmission lines 4 originating from the converter station 6 associated with said safety system 7 that is opened is removed within the group (there is then a transition to a transitional degraded mode involving future restoration of ail or some of the converter stations to the flow of current within the group);
- a step E2 of finding the short-circuit fault to identify the faulty transmission line 4;
- a step E3, particularly implemented after identification of the faulty transmission line 4 by the step E2 of finding the short-circuit fault, of isolating the faulty transmission line 4 by opening the line circuit breakers 5a, 5b of said faulty transmission line 4.
It is understood from the aforementioned that the method comprises, before the occurrence ofthe short-circuit fault, a nominal operation phase, in which the N converter stations 6 contribute to the flow of current through the group 2 of transmission lines 4. In this nominal operation phase, the safety Systems 7 are ail in the closed state and the line circuit breakers of the lines of the group 2 of lines 4 that are linked to one another are in, in particular are ail in, the closed state. Following the occurrence of the short circuit fault, the method switches to a degraded operation phase, during which steps E1, E2, E3 are implemented.
Of course, the method can also comprise a step E4 of restoring the network that is implemented after the step E3 of isolating the faulty transmission line 4. This restoration step E4 comprising closing each safety system 7, in particular of at least N-1 safety Systems 7, that is opened during the opening step E1. In particular, during and following the step E4 of restoration, the line circuit breakers 5a, 5b of said faulty transmission line 4 remain open so that the short-circuit fault of said faulty transmission line 4 is electrically isolated from the other transmission lines 4 of the group 2, in particular until the subséquent repair of the faulty transmission line 4. In this respect, following repair, i.e. removal of the short-circuit fault from the faulty transmission line, the line circuit breakers ofthe isolated transmission line can be re-closed so that said transmission line can again participate in the transmission ofthe direct current. Thus, it is understood that on completion of the restoration step E4, the method returns to a new nominal operation phase, in which each safety system 7 that is opened during the degraded operation phase is in a closed state and only the line circuit breakers 5a, 5b that remained in the closed state at the end of the degraded operation phase remain in the closed state, i.e. the line circuit breakers 5a, 5b that opened remain in the open state.
In particular, it is said that the resuit of the occurrence of the short-circuit fault is a step E100 of detecting this short-circuit fault causing the implémentation of the step E1 of opening at least N-1 safety Systems 7, the step E2 of finding the faulty transmission line 4 and the isolation step E3. In fact, the short-circuit fault propagates in the group 2 of transmission lines 4, such that it is détectable on each of the line circuit breakers 5a, 5b and on each of the safety Systems 7 linked to the group 2 of transmission lines 4. As mentioned above, the détection of a short-circuit fault on a safety system 7 can be implemented by measuring one or more physical quantity(ies) in the vicinity of the safety system representing the current flowing through the safety system: it is then easy to know whether the short-circuit current flows through the safety system.
More specifically, the method can comprise a step E5 of detecting the short-circuit fault, in particular of résistance Rf, on each safety system 7 triggering, for each safety system 7 and after said short-circuit fault has been detected on said safety system 7, a step E6 of transmitting an opening command signal to said safety system 7 with a view to implementing the step E1. In particular, the method is such that, as soon as the shortcircuit fault is detected on a safety system 7, the order to open said system is provided.
It is understood from the aforementioned that a distinction can be made between two cases. In a first idéal case, the N safety Systems 7 open (the opening step E1 allows N safety Systems 7 to be opened), thus allowing the line circuit breakers 5a, 5b to provide their function for isolating the faulty transmission line 4 of the group 2, after the fault has been detected thereon, independently of the disconnection safety of the group 2 of transmission lines 4 provided by the safety Systems 7: the functions are parallelized with distinct Systems, thus improving the general safety of the installation and the isolation time of the faulty transmission line 4. Furthermore, in this case ultrafast line circuit breakers 5a, 5b do not need to be used since the aim of opening the safety Systems 7 is to lower the value of the current flowing through the group of transmission lines 4 to a level that allows the line circuit breakers 5a, 5b to be opened. Indeed, in this first case, the presence of the short-circuit fault can cause the current flowing through the line circuit breakers 5a, 5b of the faulty transmission line to increase to a level that is greater than the respective breaking capacities thereof, opening the safety Systems 7 will allow this current to drop to a value that allows said line circuit breakers 5a, 5b to be opened. In a second case, only N-1 safety Systems 7 open following the occurrence ofthe shortcircuit fault, in particular of the résistance Rf, with the safety System 7 that remains closed being considered to be in a faulty state. In this second case, the architecture of the installation and the control as described allow completely safe isolation of the transmission line 4 comprising the short-circuit fault, since the line circuit breakers 5a, 5b will be capable of opening even if the group 2 of transmission lines 4 is still supplied with current by a single converter station 6, since its contribution to the flow of current will be lowerthan the breaking capacityofthe line circuit breakers.
In general, a safety System 7 in a faulty state must not continue to be used, as it represents a risk for the installation. A safety System 7 is considered to be in a faulty state when a short-circuit fault has been detected thereon and it has not opened, in particular despite the transmission of an opening setpoint thereto. In this respect, the associated converter station 6 needs to be isolated. Consequently, the method can comprise a step E7 of detecting the failure of the safety System 7 in a faulty state, then a step E8 of disconnecting the electrical connection between the converter station 6, associated with said safety System 7 in a faulty state, and the group 2 of transmission lines 4. After the disconnection step E8, a message can be sent to a monitoring unit to request, for example, an inspection of the safety System 7 in a faulty state with a view to commencing the repair thereof. For example, in order to detect the failure of the safety system 7, the current flowing through the safety system 7 can be monitored (said safety system 7 being interposed between the converter station 6 and the group 2), if this monitored current corresponds to a faulty short-circuit current after the opening setpoint has been sent to the safety system 7 and after an estimated opening time, at the end of which said system should be open, then said system can be considered to be faulty.
In particular, as shown in figure 4, each safety system 7 can be associated with a protection module 100 allowing, for example, the current to be monitored via a current measurement element 101 and the voltage to be monitored via a voltage measurement element 102 on said safety system 7. It is this protection module 100 that will allow the short-circuit fault to be detected by virtue of a relay 103 on the module 100 that takes as input the data originating from the current 101 and voltage 102 measurement éléments. The relay 103 is then configured, when it detects a short-circuit current, to send the opening control signal to the safety system 7 with which it is associated. Figure 4 shows the protection module 100 that can be used in association with a circuit-breaker-type safety system 7 placed between the converter station 6 and the group 2 of transmission lines 4, the protection module 100 comprises the relay 103 linked to the current measurement element 101 and/or to the voltage measurement element 102. In particular, the voltage and current information are complementary, a fault can be measured from the current only, from the voltage only or from the voltage and the current, which can dépend on the type of fault, for example, if the fault résistance is zéro then the short-circuit current alone can suffice, if the fault résistance is very high (Rf») then the voltage can suffice. Furthermore, the protection module 100 can comprise an isolator 104 located between the safety system 7 and the group 2 of transmission lines, this isolator 104 can allow disconnection of the electrical connection between the converter station 6, associated with said safety system 7 in a faulty state, and the group 2 of transmission lines. The order to open the isolator 104 can originate from the relay 103, which particularly monitors the current via the current measurement element 101 following the transmission ofthe opening setpoint, and which is configured to implement the aforementioned steps E7 and E8. The data originating from the measurement éléments 101 and 102, as well as the opening orders of the safety system and of the isolator 104, are local data. The relay 103 can also communicate with the outside by virtue of the use of “communication data”, this communication data can be, for example, a transmission of a faulty state detected for a safety system. The relay 103 can also communicate with other relays 103 associated with other safety Systems through communication means, for example, an optical fiber. Thus, depending on the applications, it is possible to exchange information between relays 103, for example, to reassemble the transmission of the faulty State, from the data measured or computed on the module, etc. Communication means other than optical fiber can be implemented, for example, via a dedicated conductor or via radio communication.
It is understood from the aforementioned that in the event of a short-circuit fault, in particular of résistance Rf, on a transmission line 4, this short-circuit fault will propagate in ail the transmission lines of the network and will also be seen by the safety Systems 7 linked to the group 2 of transmission lines 4. In general, the resuit of the short-circuit fault is that it will drain a certain amount of current on the transmission line comprising the fault, such that the current flowing through the line circuit breakers 5a, 5b of the transmission line 4 comprising the fault will exceed the breaking capacity of said line circuit breakers 5a, 5b, which will not be able to open. In this respect, the function of the safety Systems 7 is to remove the contribution of the converter stations 6 to allow the current flowing through the line circuit breakers 5a, 5b of the transmission line 4 comprising the fault to drop below a threshold that allows said line circuit breakers 5a, 5b to open in order to isolate the transmission line 4 comprising the fault. With respect to the line circuit breakers 5a, 5b, their function preferably is to not open only if the fault is located between two line circuit breakers 5a, 5b of the same transmission line 4.
It is understood from ail of the aforementioned that the line circuit breakers 5a, 5b of the same transmission line 4 operate so that the opening thereof is not immédiate or instantaneous in the event of the détection of the short-circuit fault thereon, since, preferably, an attempt will be made to check for the presence of the fault between them before triggering the opening thereof; furthermore, before they are opened, a check will also be made to détermine whether the current flowing therethrough is below a predetermined threshold: thus, only the line circuit breakers 5a, 5b open of the same line between which the short-circuit fault has been located, with the others remaining in the closed State, with this strategy allowing the speed of the restoration of the network to be increased since the other line circuit breakers that hâve not broken will already be ready for the restoration.
More specifically, the method comprises (figure 3) a step E9 of detecting the short-circuit fault, in particular of résistance Rf, on each line circuit breaker 5a, 5b, and the finding step E2 comprises, for each pair of line circuit breakers 5a, 5b of the same transmission line 4, and after the short-circuit fault has been detected on the line circuit breakers 5a, 5b of said pair, a step E2-1 of checking for the presence of the short-circuit fault Rf between said line circuit breakers 5a, 5b of said pair. Subsequently, the step E3 of isolating the faulty transmission line 4 is implemented only after the presence of the short-circuit fault has been detected on said faulty transmission line 4 by the checking step E2-1 : therefore, in this case, the line circuit breakers between which the fault has been located are opened. As mentioned above, the détection of a short-circuit fault on a line circuit breaker can be implemented by measuring one or more physical quantity(ies) in the vicinity of the line circuit breaker representing the current flowing through the line circuit breaker: it is then easy to know whether the short-circuit current flows through the line circuit breaker. In other words, this can be implemented by associating, for example, each line circuit breaker 5a, 5b (figure 5) with a protection element 1000 allowing, for example, the current to be monitored via a current measurement element 1001 and the voltage to be monitored via a voltage measurement element 1002 on said line circuit breaker 5a, 5b. It is this protection element 1000 that will allow the shortcircuit fault to be detected by a relay 1003 of the protection element 1000 taking as input the data originating from the current 1001 and voltage 1002 measurement éléments (use of “local data”). Furthermore, the relays 1003 of two protection éléments 1000 associated with the line circuit breakers 5a, 5b ofthe same transmission line can communicate with each other (use of “communication data”) in order to compare their local data with a view to checking together for the presence of the short-circuit fault. For example, the presence of current flowing in the same direction toward the fault on the two line circuit breakers of the same transmission line 4 can be assimilated with the presence of the short-circuit fault. In other words, the presence of current on two line circuit breakers of the same transmission line flowing toward the inside of said transmission line can be assimilated with the presence of the short-circuit fault. To enable comparison of the data originating from two protection éléments associated with the line circuit breakers 5a, 5b, the transmission line 4 can comprise a communication element such as, for example, an optical fiber linking the relays 1003 of the two protection éléments 1000 associated with the line circuit breakers 5a, 5b of said transmission line 4. The aforementioned data to be compared are not necessarily measurement data; binary signais can be involved, for example. The relays 1003 can then exchange information through a communication means, such as an optical fiber. According to one embodiment, inductors can be added to each end of a transmission line and, in this case, the fault can be identified on the basis of the voltage measurements: however, this solution only works in the event that the transmission lines are cables and the fault has low résistance. Comparing data on two circuit breakers of the same line in order to deduce therefrom whether or not a short-circuit fault is présent between said two circuit breakers is a notion that is known to a person skilled in the art and will not be described in detail herein. When the check for the presence of the short-circuit fault Rf between the two line circuit breakers 5a, 5b of the same transmission line 4 is positive, the associated relays 1003 can send a control signal to said line circuit breakers 5a, 5b in order to request the opening thereof, particularly when the current flowing therethrough is less than their respective breaking capacities, as will be seen in further detail hereafter; the relays 1003 are therefore configured to implement the previously described finding E2 and isolation E3 steps. The local data shown in figure 5 corresponds to the data measured by the éléments 1001 and 1002 and to the setpoints sent to the associated line circuit breaker 5a, 5b.
As mentioned above, the line circuit breakers 5a, 5b hâve a breaking capacity. Furthermore, a circuit breaker, in particular a line circuit breaker, is capable of opening while current is still flowing therethrough and when this current is below a reference threshold corresponding to the breaking capacity of said circuit breaker. In this respect, the step E3 of isolating the faulty transmission line 4 preferably comprises a step E3-1 of monitoring at least one physical feature on each ofthe two line circuit breakers 5a, 5b of said faulty transmission line, with each of said two line circuit breakers 5a, 5b opening, particularly independently of each other, as soon as the feature monitored thereon is located below a reference threshold. Of course, the steps of monitoring and of opening are only performed for the line circuit breakers 5a, 5b of the same line following identification of the presence of the short-circuit fault between them. The monitored feature can be the current flowing through the line circuit breaker 5a, 5b and the reference threshold can be a current threshold associated with the breaking capacity of said circuit breaker. Typically, in the event of the use of mechanical line circuit breakers 5a, 5b, the reference threshold is 20 kA, such that the line circuit breaker can receive an opening setpoint as soon as the current flowing therethrough drops below 20 kA. In this respect, if the short-circuit fault, in particular of résistance Rf, ever causes an increase in current above the reference threshold, the opening of N-1 safety Systems 7 will allow a drop in current to be generated on the line circuit breakers 5a, 5b forming part of the transmission line 4 comprising the short-circuit fault: it will thus be possible to isolate the faulty transmission line 4 as soon as possible, and particularly when current still flows through the line circuit breakers of the faulty transmission line 4. Restoring the flow of current through the group 2 of transmission lines 4, in which the transmission line in which the fault is located is electrically isolated from the other lines of the group 2, will be even faster when the transmission line on which the short-circuit fault is identified is quickly isolated from the other transmission lines of the group 2. It is then understood that, preferably, the isolation step E3 is such that opening at least one ofthe two, and in particular both, line circuit breakers 5a, 5b is implemented while current is still flowing therethrough.
As previously mentioned, the safety system 7 may or may not be integrated into the converter station 6. In the example shown in figure 1, the safety Systems 7 are ail distinct from the converter stations 6 and are particularly formed by mechanical circuit breakers, preferably identical to those of the line circuit breakers 5a, 5b. Altematively, figure 6 shows an installation comprising safety Systems 7a that are distinct from the converter stations and safety Systems 7b integrated in the converter stations 6. The safety Systems 7a are circuit breakers, preferably identical to those of the line circuit breakers 5a, 5b, and the safety Systems 7b are a function of the converter station that then has a breaking capacity. A converter station 6 with a known breaking capacity can be an H-bridge modular multilevel converter or a full-bridge converter, also known as full-bridge MMC. When the converter station 6 does not hâve integrated breaking capacity, it can be a half-bridge multilevel modular converter, also known as half-bridge MMC. According to yet another alternative (not shown), the N safety Systems 7 can be integrated in corresponding converter stations. In other words, each safety system 7 can be selected from: a safety system 7 integrated in the converter station 6 and an independent circuit breaker arranged on an electrical link linking the converter station 6, associated with said safety system 7, to said group 2 of transmission lines 4.
It is understood from the aforementioned that the invention also relates to an installation for transmitting electricity, through which each safety system 7 is able to, i.e. configured to, interrupt a direct current corresponding to the maximum contribution of short-circuit current of the converter station 6 associated with said safety system 7, and the line circuit breakers 5a, 5b each hâve a breaking capacity able to, i.e. configured to, interrupt a direct current corresponding to the highest of the maximum contributions of short-circuit current of the converter stations 6. The installation is configured to send an opening signal to each safety system 7 when a short-circuit fault originating from the group 2 of transmission lines 4 (particularly located on a transmission line 4 of the group 2 between two line circuit breakers 5a, 5b of said transmission line 4) is detected on said safety system 7. Finally, the installation is configured, for each pair of line circuit breakers 5a, 5b, to send an opening signal to the line circuit breakers 5a, 5b of said pair when the short-circuit fault is detected on the line circuit breakers 5a, 5b of said pair and when said short-circuit fault is located between the line circuit breakers 5a, 5b of said pair. It is understood that the installation can comprise the software and hardware éléments for implementing the method as previously described.
Figure 7 shows a timing diagram associated with the strategies for controlling the installation in the first and second cases described above. At to, the short-circuit fault occurred on a transmission line of the group 2 of lines of the network 3. Between to and L, the fault is detected on the safety Systems 7 and on the line circuit breakers 5a, 5b, in particular by the protection modules and the protection éléments associated therewith. Between and t2, the line protection éléments 1000 provide their function for finding and identifying the transmission line comprising the short-circuit fault. At the same time, between ti and t3, the safety Systems 7 open (at least N-1 of them), thus triggering a réduction in the short-circuit current flowing through the group 2 of lines of the network 3. In this case, it is considered that, before ts, the current is too high to allow isolation of said transmission line comprising the short-circuit fault. Between t3 and t4, the faulty transmission line 4 is isolated from the rest of the lines of the group 2 of lines, and at the end of this isolation, between t4 and t5, the power is restored in the network 3. It is understood from this timing diagram that implementing the steps of the method will dépend on the propagation time of the short-circuit fault and on the reaction time of the components of the installation. In this respect, the restoration step E4 can be triggered as a function of a reference time, for which the installation is considered to be stabilized by isolating the faulty transmission line. Typically, the restoration step E4 comprises, for each safety system 7, a step of monitoring the elapsed time since the opening of said safety system 7 with a temporal threshold, and when the temporal threshold is reached, a closure setpoint is sent to the safety system 7, which closes in order to again authorize the associated converter station 6 to participate in the flow of current through the group 2 of transmission lines 4. This step of monitoring the elapsed time can be implemented by the relay 103 of the protection module 100 associated with said safety system 7, which triggers a timer when it sends the opening setpoint to the corresponding safety system 7. When this timer reaches the value of the temporal threshold, the relay 103 automatically sends a closure setpoint to the associated safety System 7. Altematively, larger scale overall monitoring can be implemented in the sense that the setpoint transmissions are carried out after effective détection of the proper operation of the preceding sequences, with this involving, for example, local checks of the States of the safety Systems.
In the présent description, a group 2 of transmission lines 4 can form an electric pôle, in particular, for example, a positive pôle or a négative pôle. It is therefore understood that the installation can comprise a plurality of groups of lines, each group of lines is associated with a pôle and forms an assembly associated with N corresponding converter stations, each associated with a corresponding safety System. In the field, the various groups of transmission lines form a whole, called direct current transmission network. The method described above can be implemented for each electric pôle: in other words, everything that has been previously mentioned in the présent description relates to a group of transmission lines but can be more generally applied to different groups of transmission lines of an installation.
A particular example of a protection sequence will be described hereafter with respect to the strategy proposed within the scope of the présent method for an installation, shown in figure 8, of a group of transmission lines comprising three transmission lines, each transmission line being, in the example, formed by a Delta type cable “Line 13; Line 12; Line 23” with three terminais “N1; N2; N3”. The group of lines in this case is a group of lines associated with a positive pôle. Each terminal “N1; N2; N3” is linked to an alternating current-to-direct current converter station “MMCi; MMC2; MMC3” by means of a circuit-breaker-type safety System “C-dc^ C_dc2; C_dc3”. Transmission line “Line 12” comprises line circuit breakers “L_dc12; L_dc21”, transmission line “Line 13” comprises line circuit breakers “L_dc13; L_dc31”, transmission line “Line 23” comprises line circuit breakers “L_dc32; L_dc23”. In figure 8, reference signs AC1, AC2, AC3 represent alternating current sources and reference signs aci, ac2, ac3 represent alternating current circuit breakers. At t0 = 0 a short-circuit type low impédance fault (Rf = 1Ο/77Ω) is applied to transmission line “Line 12” between line circuit breakers L_dc12 and L_dc21. The fault current associated with the shortcircuit fault propagates in the network along transmission lines and reaches the direct side of the converter stations “MMCt MMC2; MMC3”. When the fault is detected by the protection modules (not shown) associated with the circuit breakers, reference signs “C_dci; C_dc2; C_dc3”, these circuit breakers open following receipt of a suitable setpoint.
Figure 9 shows precisely the évolution of the current in pu (per unit), which corresponds to the value of the current divided by the nominal current, as a function of time flowing through each of the safety Systems “C_dci; C_dc2; C_dc3”, it can be seen that after 15 ms the converter stations “MMCi; MMC2; MMC3” no longer contribute to the flow of current through the group of transmission lines 2: the safety Systems “C_dci; C_dc2; C_dc3” are therefore open, which corresponds to the first case mentioned above. At the same time, the protection éléments (not shown) associated with the line circuit breakers “L_dc12; L_dc21; L_dc13; L_dc31; L_dc32; L_dc23” detect the fault and initiate a process for finding the faulty transmission line. When the process is launched, the current flowing through the transmission lines can exceed the breaking capacity of the line circuit breakers due to an increase in the contributions associated with the discharging of the transmission lines adjacent to the faulty transmission line and with the contributions of the converter stations. When the faulty transmission line is found, i.e. when the éléments for protecting the line circuit breakers (in this case L_dc12 and L_dc21) of the same line are aware of the presence of a fault between the line circuit breakers, the current flowing through these line circuit breakers is monitored so that the opening setpoint of said line circuit breakers is sent as soon as the current flowing therethrough drops below the current associated with their breaking capacity, as shown in figure 10 (in this case a breaking capacity associated with 2 pu), providing the current (in pu) flowing through the two line circuit breakers L_dc12 and L_dc21 as a function of time: shortly after 15 ms the setpoint for the opening thereof is sent and the fault is isolated (“effective opening” in figure 10) shortly before 30 ms, from t0. Thus, restoring the flow of current through the group of transmission lines minus the isolated transmission line can be implemented by closing the safety Systems “C-dcK C_dc2; C_dc3” after 30 ms in this précisé case. In this example, no failure occurred in a safety system.
In a variation corresponding to the second case, the safety system C_dci will now be considered to be faulty and not opening even following the détection of the short-circuit fault thereon. Thus, the safety Systems C_dc2 and C_dc3 open conventionally, such that only the system C dcq continues to supply the group of transmission lines via the source AC1. Figure 11 shows precisely the évolution of the current in pu as a function of time on the various safety Systems C_dci, C_dc2 and C_dc3: it can be seen that isolating the transmission line comprising the short-circuit fault at around 30 ms allows the fault current originating from the alternating current source AC1 (figure 8) to be cancelled. Figure 12 shows the évolution of the current (in pu) flowing through the line circuit breakers L_dc12 and L_dc21 throughout this variation, between 10 ms and 20 ms the opening setpoint is sent to the line circuit breakers L_dc12 and L_dc21, the effective opening of which is at 30 ms (figure 12), with effective opening at 30 ms resulting in a drop in current in the station MMCi between 30 ms and 40 ms (figure 11). By comparing this variation with the case in which ail the safety Systems operate and open, the additional time is approximately 10 ms, which is acceptable in the desired application.
According to the particular example and its variation in combination with figure 7, the expected durations for implementing the steps ofthe method are generally as follows:
- from t0 to t-i the expected duration is between 0.2 ms and 2 ms for the fault to be detected on ail the safety Systems and on ail the line circuit breakers;
- from ti to t2 the expected duration is from 1 ms to 10 ms for the faulty line to be identified;
- from ti to t3 the expected duration is from 15 ms to 20 ms for the current on the line circuit breakers of the faulty transmission line to drop below the threshold allowing them to be opened;
- from t3 to t4 the expected duration is from 15 ms to 20 ms until the isolation of the faulty line is effective;
- from t4 to fs the expected duration to restore the power in the network is between 75 ms and 125 ms.
In total, between the occurrence of the fault and the restoration of the network, it takes between 105.2 ms and 167 ms, with these times being considered to be suitable for restoration of the network.
Preferably, the safety Systems 7 and the line circuit breakers 5a, 5b ail hâve an identical breaking capacity and ail can be mechanical circuit breakers, particularly having a breaking capacity that is equal to 20 kA.
When the safety Systems 7 and/or the line circuit breakers 5a, 5b hâve to switch from an open state to a closed state, this can be implemented by using insertion résistances that are also known as Pre-Insertion Résistances (PIR).
The présent invention includes many advantages as previously mentioned, and in particular:
- the capability of the line circuit breakers to open while current is still flowing therethrough allows the sequence for isolating the faulty transmission line to be accelerated without having to wait for the current flowing through the group of lines to be zéro;
- in the event of the failure of one of the safety Systems, the installation remains robust since the line circuit breakers will still be capable of isolating the faulty transmission line from the group of lines without having to wait for the opening of circuit breakers on the alternating current side, which would increase the time before restoration of power to an unacceptable level;
- the use of mechanical circuit breakers for the line circuit breakers and the safety Systems has the advantage of using inexpensive technologies whilst maintaining the robustness of the installation with respect to a short-circuit fault;
- the proposed strategy avoids linking the line circuit breakers to current limiter devices such as inductors linked in sériés with the line circuit breakers or with other types of current limiters such as, for example, superconducting limiters;
- the use of line circuit breakers allows, if desired, a function to be added to the installation, for example, this allows said line circuit breakers to be used as switches as required by the network manager, in order to isolate a transmission line in the normal operating conditions ofthe installation, i.e. even when no shortcircuit fault is présent in the group of lines, with this allowing the network to be reconfigured during the normal operation thereof;
- furthermore, the line circuit breakers can be commanded to open even in the event of a fault with a high fault résistance Rf, for which the contribution to the converter fault current is below the limit for detecting faults by the safety Systems 7 and the line short-circuit current is below the breaking capacity ofthe line circuit breakers.
accelerated without having to wait for the current flowing through the group of lines to be zéro;
- in the event of the failure of one of the safety Systems, the installation remains robust since the line circuit breakers will still be capable of isolating the faulty transmission line from the group of lines without having to wait for the opening of circuit breakers on the alternating current side, which would increase the time before restoration of power to an unacceptable level;
- the use of mechanical circuit breakers for the line circuit breakers and the safety Systems has the advantage of using inexpensive technologies whilst maintaining the robustness of the installation with respect to a short-circuit fault;
- the proposed strategy avoids linking the line circuit breakers to current limiter devices such as inductors linked in sériés with the line circuit breakers or with other types of current limiters such as, for example, superconducting limiters;
- the use of line circuit breakers allows, if desired, a function to be added to the installation, for example, this allows said line circuit breakers to be used as switches as required by the network manager, in order to isolate a transmission line in the normal operating conditions ofthe installation, i.e. even when no shortcircuit fault is present in the group of lines, with this allowing the network to be reconfigured during the normal operation thereof;
- furthermore, the line circuit breakers can be commanded to open even in the event of a fault with a high fault résistance Rf, for which the contribution to the converter fault current is below the limit for detecting faults by the safety Systems 7 and the line short-circuit current is below the breaking capacity of the line circuit breakers.

Claims (10)

  1. The invention is not limited to the embodiment/s illustrated in the drawings.
  2. Accordingly it should be understood that where features mentioned in the appended claims are followed by reference signs, such signs are included solely for the purpose of enhancing the intelligibility of the claims and are in no way limiting on the scope of the claims.
    : . 26
  3. 3. The method as claimed in any of the preceding claims, characterized in that it comprises a step (E9) of detecting the short-circuit fault on each line circuit breaker (5a, 5b), and in that the finding step (E2) comprises, for each pair of line circuit breakers (5a, 5b) of the same transmission line (4) and after the short-circuit fault has been detected on the line circuit breakers (5a, 5b) of said pair:
    * a step (E2-1 ) of checking for the presence of the short-circuit fault between said line circuit breakers (5a, 5b) of said pair, the step (E3) of isolating the faulty transmission line (4) being implemented only after the presence of the short-circuit fault has been detected on said faulty transmission line (4) by the checking step (E2-1).
  4. 4. The method as claimed in any of the preceding claims, characterized in that the step (E3) of isolating the faulty transmission line (4) comprises a step (E3-1) of monitoring at least one physical feature on each of the two line circuit breakers (5a, 5b) of said faulty transmission line (4), each of said two line circuit breakers (5a, 5b) opening as soon as the feature monitored in the vicinity thereof is located below a reference threshold.
  5. 5. The method as claimed in any of the preceding claims, characterized in that only N1 safety Systems (7) open following the occurrence of the short-circuit fault, with the safety system (7) that remains closed being considered to be in a faulty state.
  6. 6. The method as claimed in the preceding claim, characterized in that it comprises a step (E7) of detecting the failure of the safety system (7) in a faulty state, then a step (E8) of disconnecting the electrical connection between the converter station (6), associated with said safety system (7) in the faulty state, and the group (2) of transmission lines (4).
  7. 7. The method as claimed in any of the preceding claims, characterized in that the isolation step (E3) is such that opening at least one of the two line circuit breakers (5a, 5b) is implemented while current is still flowing therethrough.
  8. 8. The method as claimed in any of the preceding claims, characterized in that each safety system (7) is selected from: a safety system (7) integrated in the converter station (6) and an independent circuit breaker arranged on an electrical link linking the converter station (6), associated with said safety system (7), with said group (2) of transmission lines (4).
  9. 9. The method as claimed in any of the preceding claims, characterized in that it comprises a step (E4) of restoring the network that is implemented after the step (E3) of isolating the faulty transmission line (4), said restoration step (E4) comprising closing each safety system (7) that is opened during the opening step (E1 ).
  10. 10. An installation for transmitting electricity comprising:
    * a direct current transmission network (3) comprising a group (2) of electricity transmission lines (4) linked to one another, each transmission line (4) comprising a pair of two line circuit breakers (5a, 5b) arranged at the opposite ends of said transmission line (4);
    « a number N of stations (6) for converting alternating current to direct current each associated with a safety system (7), each converter station (6) being linked to the group (2) of transmission lines (4) and being associated with a maximum contribution of short-circuit current, characterized in that:
    • each safety system (7) is capable of interrupting a direct current corresponding to the maximum contribution of short-circuit current of the associated converter station (6);
    • the line circuit breakers (5a, 5b) each hâve a breaking capacity capable of interrupting a direct current corresponding to the highest of the maximum contributions of short-circuit current of the converter stations (6);
    « the installation is configured to send an opening signal to each safety system (7) when a short-circuit fault originating from the group (2) of transmission lines (4) is detected on said safety system (7);
    • the installation is configured, for each pair of line circuit breakers (5a, 5b), to send an opening signal to the line circuit breakers (5a, 5b) of said pair when the short-circuit fault is detected on the line circuit breakers (5a, 5b) of said pair and accelerated without having to wait for the current flowing through the group of lines to be zéro;
    - in the event of the failure of one of the safety Systems, the installation remains robust since the line circuit breakers will still be capable of isolating the faulty transmission line from the group of lines without having to wait for the opening of circuit breakers on the alternating current side, which would increase the time before restoration of power to an unacceptable level;
    - the use of mechanical circuit breakers for the line circuit breakers and the safety Systems has the advantage of using inexpensive technologies whilst maintaining the robustness of the installation with respect to a short-circuit fault;
    - the proposed strategy avoids linking the line circuit breakers to current limiter devices such as inductors linked in sériés with the line circuit breakers or with other types of current limiters such as, for example, superconducting limiters;
    - the use of line circuit breakers allows, if desired, a function to be added to the installation, for example, this allows said line circuit breakers to be used as switches as required by the network manager, in order to isolate a transmission line in the normal operating conditions ofthe installation, i.e. even when no shortcircuit fault is présent in the group of lines, with this allowing the network to be reconfigured during the normal operation thereof;
    - furthermore, the line circuit breakers can be commanded to open even in the event of a fault with a high fault résistance Rf, for which the contribution to the converter fault current is below the limit for detecting faults by the safety Systems 7 and the line short-circuit current is below the breaking capacity ofthe line circuit breakers.
    The invention is not limited to the embodiment/s illustrated in the drawings. Accordingly it should be understood that where features mentioned in the appended claims are followed by reference signs, such signs are included solely for the purpose of enhancing the intelligibility of the claims and are in no way limiting on the scope of the claims.
OA1201900086 2016-09-02 2017-08-30 Method for controlling an installation allowing Dc current to be transmitted in a network while protecting said network from a short circuit fault. OA19338A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1658165 2016-09-02

Publications (1)

Publication Number Publication Date
OA19338A true OA19338A (en) 2020-06-29

Family

ID=

Similar Documents

Publication Publication Date Title
US11005261B2 (en) Method for controlling an installation allowing DC current to be transmitted in a network while protecting said network from a short circuit fault
CN104953568B (en) A kind of fault protecting method of flexible direct current power transmission system
CN107210603B (en) Fault protection in converter-based DC power distribution systems
CN108701987B (en) Error current limiter and method thereof
CN110912089B (en) Flexible direct-current power distribution system protection method based on local current mutation quantity polarity
US20150116876A1 (en) Method of fault clearance
CN112130063B (en) Detection and protection method for mechanical switch theft jump of hybrid high-voltage direct-current breaker
US10951034B2 (en) Protection for an HVDC network
US20190305669A1 (en) Voltage source converter
CN101278452B (en) Method and system for through fault detection in electrical devices
CN113395017B (en) Pumped-storage system, control method and storage medium
CN105633917A (en) Unified power flow controller-based fault processing method and system
CN112202153B (en) Locking control method, device, terminal and medium for multi-terminal direct current transmission system
CN110912391B (en) Restarting method and restarting device for frequency converter
OA19338A (en) Method for controlling an installation allowing Dc current to be transmitted in a network while protecting said network from a short circuit fault.
US10535993B2 (en) Control system countermeasures
CN108092250B (en) Fault current limiting equipment and control method
CN103941155B (en) High-voltage switch gear control loop template domain identification circuit and discrimination method
CN110768219A (en) GIL-overhead mixed line protection method and system
CN106711945B (en) A kind of blocking device and diagnostic method of tape jam diagnostic function
CN104076209A (en) Motor detection device
CN110870154A (en) Power conditioner, power system, and reactive power suppression method for power system
CN109412256B (en) Standby power supply switching method and device
CN106253252A (en) A kind of feeder automation fault self-recovery method of high fault tolerance
CN204101696U (en) With the starter relay durable systems of safeguard protection and fault cues