OA18205A - Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull - Google Patents

Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull Download PDF

Info

Publication number
OA18205A
OA18205A OA1201700154 OA18205A OA 18205 A OA18205 A OA 18205A OA 1201700154 OA1201700154 OA 1201700154 OA 18205 A OA18205 A OA 18205A
Authority
OA
OAPI
Prior art keywords
hull
vessel
longitudinal
reinforcements
turret
Prior art date
Application number
OA1201700154
Inventor
Jean-Michel Felderhoff
Original Assignee
Single Buoy Moorings Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Single Buoy Moorings Inc. filed Critical Single Buoy Moorings Inc.
Publication of OA18205A publication Critical patent/OA18205A/en

Links

Abstract

The invention relates to a method for producing a vessel hull (1) for use as a hull of an FPSO or FSO, comprising producing a vessel hull with a stern portion (2), a bow portion (3) and a central portion (4), arranging a deck (6) on the hull, for supporting processing modules, arranging hydrocarbon storage tanks inside the hull, providing the hull with an anchoring connection arrangement (7), characterized by arranging process module reinforcements (8) in the deck for supporting the hydrocarbon process modules, providing both longitudinal hull sides with mooring line connection reinforcements (9) at or near the bow portion, arranging riser connection reinforcements (10, 14) on one or more longitudinal hull sides, in between the mooring line connection reinforcements in longitudinal direction, for a riser balcony (28, 29), and providing the bow portion with turret reinforcements (11, 12).

Description

Abrégé :
The invention relates to a method for producing a vessel hull (1) for use as a hull of an FPSO or FSO, comprising producing a vessel hull with a stern portion (2), a bow portion (3) and a central portion (4), arranging a deck (6) on the hull, for supporting processing modules, arranging hydrocarbon storage tanks inside the hull, providing the hull with an anchoring connection arrangement (7), characterized by arranging process module reinforcements (8) in the deck for supporting the hydrocarbon process modules, providing both longitudinal hull sides with mooring line connection reinforcements (9) at or near the bow portion, arranging riser connection reinforcements (10, 14) on one or more longitudinal hull sides, in between the mooring line connection reinforcements in longitudinal direction, for a riser balcony (28, 29), and providing the bow portion with turret reinforcements (11, 12).
O.A.P.I. - B.P. 887, YAOUNDE (Cameroun) - Tel. (237) 222 20 57 00 - Site web: http:/www.oapi.int - Email: oapi@oapi.int
Single Buoy Moorings Inc.
Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull
Field of the invention
The invention relates to method for producing a vessel hull for use as a hull of a floating hydrocarbon processing and storage plant (FPSO) or a floating hydrocarbon storage plant (FSO), comprising the steps of:
producing a vessel hull stem portion, a bow portion and a central portion in between the bow and stem portions, with longitudinal hull sides comprising the longitudinal hull sides of the stem portion, the bow portion and the central portion, arranging a deck on the hull, suitable for supporting hydrocarbon processing modules, arranging hydrocarbon storage tanks inside the hull, for storing hydrocarbons to be obtained from a seabed-based wellhead, and providing the hull with an anchoring connection arrangement for connection with anchor Unes suitable for mooring the FPSO or the FSO to a seabed.
Background of the invention
Such a method is known from, for instance, public use. Usually, currently existing FPSO’s and FSO’s comprise a vessel with a hull that is specifically built for a single application, i.e. for having a single type of anchor line and riser arrangement. Such a hull can be a purpose-built ‘new-built’ hull or a second-hand hull that has previously been used for example with an oil tanker.
However, constructing.an FPSO or FSO based on such a new-built hull or based on a vessel with a second-hand hull requires a relatively long construction period in a shipyard to obtain an FPSO or FSO with the desired functionality and characteristics, depending on the state of the second-hand hull and the amount of work to be done. Converting a second-hand hull into an FPSO or FSO requires massive and timeconsuming structural Works within the hull to achieve refurbishment and conversion.
Refurbishment of the existing arrangements of the second-hand hull is needed to ensure that the 20 to 30 years’ service life of the hull as an FPSO or FSO is guaranteed. Conversion of the hull adds arrangements to make the hull ready for use as an FPSO or FSO. The refurbishment and conversion of the hull occurs often in parallel and the whole operation requires often several dry-docking stops, which can be separated in time.
Since demand for FPSO’s and FSO’s is ever-increasing and pressure for even shorter construction and delivery times is mounting, the time between purchase order and delivery needs to be reduced. Also the time a hull stays in a dry-dock should be reduced, as the time at the above dry dock is relatively expensive and the slot for performing the refurbishment and conversion work or for building a new hull should be booked well in advance.
Attempts hâve been made by the présent applicant to design and construct a generic, new-built hull that will reduce the time required for construction at the dry dock. Such a generic hull was disclosed at the 2003 Offshore Technology Conférence in Houston, Texas (USA), and in particular in the paper proposed for présentation at the above conférence, prepared (among others) by the présent applicant. At the time, the idea behind such a generic hull was that the generic hull could be constructed based on a standard tanker conversion, having a standard mooring system and provided with standard process modules.
However, approximately ten years hâve gone by and the generic hull disclosed during the conférence and in the aforementioned paper appears to hâve done very little, unfortunately, to reduce the time between purchase order and delivery.
Therefore, the need to provide a method for producing a vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant (FSO, FPSO), wherein the time between purchase order and delivery is reduced, still exists.
An object of the présent invention is thus to provide a method for producing a vessel hull for use as a hull of a floating hydrocarbon storage and or processing plant (FSO, FPSO), wherein the time between purchase order and delivery is reduced.
Summary of the invention
Hereto, according to the invention, a method for producing a vessel hull for use as a hull for a floating hydrocarbon storage and/or processing plant is provided, comprising the steps of:
producing a vessel hull stem portion, a bow portion and a central portion in between the bow and stem portions, the vessel hull provided with longitudinal hull sides comprising the longitudinal hull sides of the stem portion, the bow portion and the central portion, arranging a deck on the hull suitable for supporting hydrocarbon processing modules, arranging hydrocarbon storage tanks inside the hull, for storing hydrocarbons to be obtained from a seabed-based wellhead, providing the hull with an anchoring connection arrangement for connection with anchor lines suitable for mooring the vessel hull to a seabed, characterized by arranging process module reinforcements in the deck, suitable for supporting hydrocarbon process modules, and at least two of the following steps:
providing both longitudinal hull sides with mooring line connection reinforcements near or in the bow portion and stem portion for connecting mooring lines to be used in a spread-moored anchor line arrangement, and arranging in between the mooring line connection reinforcements in longitudinal direction, riser balcony connection reinforcements on one or both longitudinal hull sides suitable for supporting a riser balcony for connecting risers, providing the bow portion with turret reinforcements suitable for receiving an internai turret, providing the bow portion with turret reinforcements suitable for receiving an external turret, wherein the turret is provided with anchor line connection points and riser connection points.
Thus, a sort of ‘multi-purpose hull’ is provided, based on a ‘design one, build several’ philosophy, having reinforcements pre-installed in those hull locations where further FSO or FPSO equipment, in particular relating to anchor line connection points (i.e. the mooring system) and riser connection points, is to be installed. The reinforcements are to be integrated in the hull at the dry dock and subsequently the hull having the aforementioned reinforcements is transported to an quay side that can receive an FPSO or FSO for the actual conversion into an FPSO or FSO having the desired mooring and riser system arrangement. The conversion can be carried out using local equipment. In a particular scénario, the dry dock is for example situated in South Korea, whereas the quay side for the top sides intégration for the FPSO is located in Brazil. If, for instance, an FPSO having an external turret system is to be constructed at the FPSO quay side, the ‘non-used’ reinforcements (i.e. the ones specifically arranged for use with a spreadmoored arrangement and/or an internai turret arrangement) can remain in place, then serving only as general structural reinforcements for the vessel hull but not for a mooring arrangement.
It is found in practice that the total time needed for conversion to an FSO or FPSO can be reduced with about 6-12 months, compared to the classic method of converting and refurbishing the hull of an existing second-hand oil tanker.
The size and flexibility of the hull design enables the FSO or FPSO to be moored in various configurations, i.e. to be compatible with any type of environment, water depth, riser type or storage requirement, with no rework needed within the hull.
In the context of this patent application, ‘reinforcements’ are to be understood as structural reinforcements for providing additional structural strength/stiffness at the respective hull location, to allow the hull to deal with the relatively larger forces occurring at that hull location due to the presence of riser Systems, mooring Systems, process modules, crâne support, flare stack, etcetera.
Another aspect of the invention relates to a vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, comprising:
a stem portion, a bow portion and a central portion in between the bow and stem portions, the vessel hull provided with longitudinal hull sides comprising the longitudinal hull sides of the stem portion, the bow portion and the central portion, a deck, arranged on the hull, suitable for supporting hydrocarbon processing modules, hydrocarbon storage tanks, arranged inside the hull, for storing hydrocarbons to be obtained from seabed-based wellheads, an anchoring connection arrangement for connection with anchor lines suitable for mooring the vessel hull to a seabed, characterized in that the deck comprises process module reinforcements suitable for supporting hydrocarbon process modules, and at least two of the following éléments:
both longitudinal hull sides comprise mooring line connection reinforcements near or in the bow portion and stem portion for connecting mooring lines to be used with a spread-moored anchor line arrangement and one or both longitudinal hull sides comprise riser balcony connection reinforcements arranged in between the mooring line connection reinforcements in longitudinal direction, suitable for supporting a riser balcony for connecting risers, the bow portion comprises a turret reinforcement suitable for receiving an internai turret, the bow portion comprises a turret reinforcement suitable for receiving an external turret, wherein the turret is provided with anchor line connection points and riser connection points.
An embodiment relates to an aforementioned vessel hull, wherein the vessel hull is produced with the aforementioned method.
In an preferred embodiment, the hull is provided with ail 3 éléments, meaning that the hull is provided with reinforcements for a spread mooring arrangement, reinforcements for an internai turret arrangement and for reinforcements for an external arrangement.
However, the following embodiments of the hull are within the scope of the claimed invention; a hull which is provided with only the reinforcements for a spreadmooring arrangement and an external turret arrangement, a hull which is provided with only reinforcements for a spread mooring arrangement and an internai turret arrangement or a hull that is provided with only reinforcements for both an internai and external turret arrangement.
Another embodiment relates to an aforementioned vessel hull, wherein a transverse bulkhead is arranged between the bow portion and the central portion, the central portion comprising two longitudinal central portion bulkheads extending in longitudinal direction from the stem portion to the transverse bulkhead, being spaced-apart at a transverse distance Dl, the bow portion comprising two longitudinal bow portion bulkheads extending in longitudinal direction from the transverse bulkhead to the bow, being spacedapart at an internai turret position at a transverse distance D2, wherein, when seen in top view, D2 is larger than a maximum outer diameter of an internai turret to be arranged at the internai turret position in between the two longitudinal bow portion bulkheads. Thus, when constructing the above longitudinal bulkheads, the possible arrangement of an internai turret in between the longitudinal bulkheads in the bow portion is already taken into account during construction of the new build hull. At the same time, only minimal déviation from the usual longitudinal bulkhead production processes is needed.
Preferably, D2 is larger than Dl, basically giving the longitudinal bulkheads the appearance of a tuning fork, when seen in top view (i.e. when viewing the hull in its usual orientation from above).
More preferably, the two longitudinal central portion bulkheads and the two longitudinal bow portion bulkheads are comprised by two continuons longitudinal bulkheads extending from the stem portion to the bow, that is to say the longitudinal bulkheads are not actually intersected or interrupted by the transverse bulkhead.
Another embodiment concems an aforementioned vessel hull, wherein the bow portion comprises a vertical plane of symmetry extending in longitudinal direction, wherein, when seen in top view, the longitudinal bow portion bulkheads are each arranged on one side of the vertical plane of symmetry, wherein the longitudinal bow portion bulkheads extend from the transverse bulkhead to the bow in such a way, that a first section of each longitudinal bow portion bulkhead diverges away from the vertical plane of symmetry and a second consecutive section extends substantially parallel to the vertical plane of symmetry forming a réception space for the internai turret at the internai turret location. The (straight) diverging sections make it easier to obtain the aforementioned tuning fork shape to create the réception space for receiving an internai turret. In practice, a relatively minimal amount of time has to be spent to obtain such a longitudinal bulkhead configuration in the bow portion, compared to having just two longitudinal bulkheads running from stem to bow along the length of the vessel.
An embodiment relates to an aforementioned vessel hull, wherein a third consecutive section converges towards the vertical plane of symmetry. Therein, the first, second and third sections of the longitudinal bow portion bulkheads preferably extend at such angles with respect to the vertical plane of symmetry, and hâve such dimensions that, when seen in top view, the longitudinal bow portion bulkheads each resemble an arc having a centre of curvature coinciding with a centre point of the internai turret receivable in the réception space.
Yet another embodiment relates to an aforementioned vessel hull, comprising one or more removable propulsion units. Each propulsion unit can be connected to or associated with a (power) generator unit that is removable as well.
Thus, the vessel hull can be transported from a first location (in particular the dry dock) to a second location (most notably the FPSO or FSO quay side) by using the propulsion provided by the removable propulsion units. After the sélective work is performed at the quayside (intégration of the selected mooring system with riser connection points, meaning adding a (upper and lower) riser balcony, intégration of an internai or external turret, adding the process modules, adding flare stack, the crânes, etc) the completed FSO or FSO can be transported by its own propulsion system to the offshore production site were risers and mooring lines are connected to the respective riser and mooring lines connection points. After transportation and hook-up of risers and mooring lines, the temporary and removable propulsion units and the associated generators are disconnected from the hull and removed so that they can be used for another FPSO or FSO hull according the invention. Thus, installing permanent propulsion in the vessel hull is not required anymore, which will reduce the initial CAPEX costs of the FPSO or FSO.
In an embodiment the deck comprises reinforcement suitable for supporting a flare stack and reinforcements for supporting one or more pedestrial crânes.
Another aspect of the invention relates to a method for producing a vessel for use as a floating hydrocarbon storage and/or processing plant using an aforementioned vessel hull comprising the steps of:
- arranging the hydrocarbon process modules on the deck, at the location of the process module reinforcements,
- selecting a desired riser and anchor line arrangement, such as a spread moored arrangement, an internai turret arrangement or an external turret arrangement, and
- configuring the vessel hull for use with the desired anchor line and riser arrangement, in particular by configuring anchor line connection points and riser connection points.
The above method can be carried out conveniently at the second location, away from the dry dock, to obtain the finalized or close-to-being-finalized FPSO or FSO.
The above method may further comprise the steps of:
- transferring the vessel for use as a floating storage and processing plant to a location near the seabed-based wellhead,
- connecting the anchor Unes to the anchor line connection points and the risers to the riser connection points.
In a preferred embodiment of the above method, the aforementioned vessel hull is thus produced at a first location, and the method for producing the vessel for use as a floating hydrocarbon storage and/or processing plant (FPSO, FSO) using the vessel hull is carried out at a second location, being different from the first location, comprising transporting the hull from the first location to the second location.
Preferably, prior to transporting the hull from the first location to the second location, the removable propulsion units are integrated in and connected to the vessel hull, wherein the vessel hull is transported from the first to the second location by using the propulsion provided by the removable propulsion units, wherein after transportation the removable propulsion units are disconnected from the hull. As stated before, the first location comprises a dry dock and the second location is a quay side suitable for receiving the vessel hull, in particular an FSO or FPSO quay side, such that only a relatively small part of the total FSO or FPSO construction and process intégration time has to be spent at the dry dock.
Patent publications US 2011/263169 Al, US 2003/205188 Al, US 6 126 501 A, US 2009/126617 Al, US 6 453 838 Al and US 2009/078185 Al describe further technical background.
Brief description of the drawings
Embodiments of a vessel hull according to the invention will by way of nonlimiting example be described in detail with reference to the accompanying drawings. In the drawings:
Figure 1 shows a perspective view of an embodiment of a vessel hull having preinstalled reinforcements;
Figure 2 shows a close-up view of the bow portion of the vessel hull as shown in figure 1 ;
Figure 3 shows a cross-section of an embodiment of a vessel hull according to the invention, at a typical longitudinal vessel hull position where the anchor line arrangements to be used with a spread-moored arrangement are to be found;
Figure 4 shows a partial cross-section of the embodiment according to figure 3, at a typical longitudinal vessel hull position where the riser balconies are to be found; and
Figure 5 shows a top view of the embodiment of the vessel hull according to figures 3 and 4.
Detailed description of the invention
Figures 1-5 will be discussed in conjunction. Figure 1 shows a perspective view of a hull 1 of a floating hydrocarbon processing and storage plant (FPSO) having reinforcements pre-installed according to the invention. The hull 1 has a stem portion 2 (shown in the lower right part of figure 1), a bow portion 3 (shown in the upper left part of figure 1) and a central portion 4 in between the bow 3 and stem portions 2, with longitudinal hull sides 5 comprising the longitudinal hull sides of the stem portion 2, the bow portion 3 and the central portion 4. A deck 6 is arranged on the hull 1 for supporting n processing modules (not shown) like hydrocarbon process modules used for FPSO’s or metering skids used for FSO’s. Also, hydrocarbon storage tanks (not shown) are to arranged inside the hull 1, for storing hydrocarbons to be obtained directly from seabedbased wellheads (FPSO) or indirectly via another hydrocarbon production vessel (not shown) in case of an FS O. An anchoring connection arrangement 7 (see figures 3 and 5) is to be provided during use for connection with anchor lines suitable for mooring the FPSO or FSO to a seabed. The orientation of the vessel hull 1 as shown in figures 1-5 corresponds with the usual orientation of such a vessel hull 1 during use. The width of the vessel hull 1 (in Y-direction) may for instance amount to 60m. The vessel length in longitudinal X direction may typically amount to for instance 350 m.
According to the invention, the deck 6 comprises process module reinforcements 8 for supporting the hydrocarbon process and other modules during use. An example of such a process module reinforcement 8 is shown near the bow portion 3 of the hull 1. Apart from supporting process modules, similar reinforcements can be provided to the deck 6, in particular reinforcements for a flare, crânes (such as the crâne pedestal 25 shown in figures 2 and 5) or vent masts.
Both longitudinal hull sides 5 can comprise mooring line connection reinforcements 9 near or in the bow portion 3 for connecting mooring lines to be used with a spread-moored anchor line arrangement 13. Two of such mooring line connection reinforcements 9 are arranged at both sides of the vessel hull 1 near or in the bow portion
3. Similarly, two of such mooring line connection reinforcements 9 are arranged in a similar fashion at the stem portion 2 of the vessel hull 1. At deck 6 level, above the mooring line reinforcements 9, chain tensioning system reinforcements 26 (see figure 2) are preferably provided to provide support for chain tensioning Systems 27 to be used for tensioning the chains in case of a spread-moored anchor line arrangement 13.
Furthermore, one or more longitudinal hull sides 5 can comprise lower riser connection reinforcements 10 and upper riser connection reinforcements 14 arranged in between the mooring line connection reinforcements 9 in longitudinal direction X. The riser connection reinforcements 10, 14 are for supporting lower and upper riser balconies 28, 29 (see figures 4 and 5) for connecting risers 31 (see figure 4). The riser connection reinforcements 10, 14 preferably hâve a length in longitudinal direction X roughly corresponding to the length of the respective riser balconies 28, 29.
Preferably, the vessel hull 1 comprises ballast tanks 32 at both longitudinal sides 5 of the vessel (as shown in figures 3, 4 and 5). More preferably, the ballast tanks 32 comprise the mooring line connection reinforcements 9, the lower riser connection reinforcements 10, the upper riser connection reinforcements 14 and/or the chain tensioning system reinforcements 26, i.e. these reinforcements 9, 10, 14, 26 are then arranged in the hollow space of the ballast tanks 32. The reinforcements 9, 10, 14, 26 may comprise reinforcement plates that extend in a plane perpendicular to the longitudinal direction X, for instance over the whole of the cross-section of the hollow space of the ballast tanks 32. The skilled person will understand that the anchoring connection arrangements 7, the chain tensioning Systems 27 and the lower an upper riser balconies 28, 29 are also to be connected or arranged on the respective ballast tanks 32.
According to the invention the bow portion 3 can comprises both internai turret reinforcements 11 and external turret reinforcements 12 for receiving both an internai or an external turret (not shown). The turrets are then provided with anchor line connection points and riser connection points. As mentioned before the hull according the invention can hâve reinforcements for ail 3 types of mooring arrangements (reinforcements for spread mooring, an internai turret and an external turret mooring arrangement) or just for 2 of the 3 mooring arrangements, like reinforcements for a spread mooring arrangement combined with reinforcements for an internai turret mooring arrangement, or reinforcements for a spread mooring arrangement combined with reinforcement for an external turret mooring arrangement or reinforcements for an internai turret mooring arrangement combined with reinforcements for an external turret mooring arrangement.
As shown in the right part of figure 5, a transverse (i.e. extending in Y-direction) bulkhead 15 is arranged between the bow portion 3 and the central portion 4. The central portion 4 comprises two longitudinal central portion bulkheads 16 extending in longitudinal direction X from the stem portion 2 to the transverse bulkhead 15, being spaced-apart at a transverse distance Dl. The bow portion 3 comprises two longitudinal bow portion bulkheads 17 extending in longitudinal direction X from the transverse bulkhead 15 to the bow 19, being spaced-apart at an internai turret position ITP at a transverse distance D2, wherein, when seen in top view, D2 is larger than a maximum outer diameter of an internai turret to be arranged at the internai turret position ITP in between the two longitudinal bow portion bulkheads 17. D2 preferably is larger than Dl, such as 1,5 - 2,5 times Dl, for instance about 2 times Dl.
The two longitudinal central portion bulkheads 16 and the two longitudinal bow portion bulkheads are comprised by two continuous longitudinal bulkheads 18 extending from the stem portion to the bow 19, i.e. these longitudinal bulkheads 18 are each formed as single, intégral éléments.
The vessel hull 1 and in particular the bow portion 3 comprises a vertical plane of symmetry P extending in longitudinal direction X. When seen in top view, the longitudinal bow portion bulkheads 17 are each arranged on one side of the vertical plane of symmetry P. The longitudinal bow portion bulkheads 17 extend from the transverse bulkhead 15 to the bow 19 in such a way, that a first section 20 of each longitudinal bow portion bulkhead diverges away from the vertical plane of symmetry P. A second consecutive section 21 extends substantially parallel to the vertical plane of symmetry P. Thus, a réception space 23 for the internai turret is formed at the internai turret location ITP. Preferably, a third consecutive section 22 converges towards the vertical plane of symmetry P. The first 20, second 21 and third 22 sections of the longitudinal bow portion bulkheads 17 extend at such angles with respect to the vertical plane of symmetry P, and hâve such dimensions that, when seen in top view, the longitudinal bow portion bulkheads 17 each roughly resemble an arc having a centre of curvature coinciding with a centre point 30 of the internai turret receivable in the réception space 23. When seen in top view, the angles as mentioned above may for instance relate to enclosed angles with respect to the vertical plane of symmetry P of 30-60°, preferably about 45°.
In a particular configuration, the vessel hull 1 comprises one or more removable propulsion units 24, for instance azimuth thrusters or the like, to facilitate transport from the dry dock to the FPSO/FSO quay side and/or from the FPSO/FSO quay side to the offshore production side where the FPSO or FSO will be installed and connected to the mooring lines. Removable diesel-electric or gas-powered propulsion units are also conceivable as well as removable power generators that are associated with the removable propulsion units.
Thus, the invention has been described by reference to the embodiments discussed above. It will be recognized that the embodiments are susceptible to various modifications and alternative forms well known to those of skill in the art without departing from the spirit and scope of the invention. Accordingly, aithough spécifie embodiments hâve been described, these are examples only and are not limiting upon the scope of the invention.
ύ
Reference mimerais
1. Vessel hull
2. Vessel hull stem portion
3. Vessel hull bow portion
4. Vessel hull central portion
5. Longitudinal hull sides
6. Deck
7. Anchoring connection arrangement
8. Process module reinforcements
9. Mooring line connection reinforcements
10. Lower riser connection reinforcements
11. Internai turret reinforcements
12. Extemal turret reinforcements
13. Spread-moored anchor line arrangement
14. Upper riser connection reinforcements
15. T rans vers e bulkhead
16. Longitudinal central portion bulkheads
17. Longitudinal bow portion bulkheads
18. Continuous longitudinal bulkheads
19. Bow
20. First section
21. Second section
22. Third section
23. Réception space
24. Removable propulsion unit
25. Crâne pedestal
26. Chain tensioning system reinforcements
27. Chain tensioning system
28. Lower riser balcony
29. Upper riser balcony
30. Internai turret centre point
31. Riser
32. Ballast tank
X = longitudinal direction
Y = transverse direction
ITP = internai turret position
P vertical plane of symmetry

Claims (18)

  1. Claims
    1. Method for producing a vessel hull (1) for use as a hull for a floating hydrocarbon storage and/or processing plant, comprising the steps of:
    5 - producing a vessel hull stem portion (2), a bow portion (3) and a central portion (4) in between the bow and stem portions, the vessel hull (1) being provided with longitudinal hull sides (5) comprising the longitudinal hull sides of the stem portion, the bow portion and the central portion, arranging a deck (6) on the hull suitable for supporting hydrocarbon processing 10 modules, arranging hydrocarbon storage tanks inside the hull, for storing hydrocarbons to be obtained from a seabed-based wellhead, providing the hull with an anchoring connection arrangement (7) for connection with anchor lines suitable for mooring the vessel hull to a seabed,
    15 characterized by arranging process module reinforcements (8) in the deck, suitable for supporting hydrocarbon process modules, and at least two of the following steps:
    providing both longitudinal hull sides (5) with mooring line connection
    20 reinforcements (9) near or in the bow portion and stem portion for connecting mooring lines to be used in a spread-moored anchor line arrangement (13), and arranging in between the mooring line connection reinforcements in longitudinal direction, riser balcony connection reinforcements (10, 14) in one or both longitudinal hull sides (5) suitable for supporting a riser balcony (28, 29) for connecting risers,
    25 - providing the bow portion with turret reinforcements (11) suitable for receiving an internai turret, providing the bow portion with turret reinforcements (12) suitable for receiving an external turret, wherein the turret is provided with anchor line connection points and riser connection points.
  2. 2. Vessel hull (1) for use as a hull for a floating hydrocarbon storage and/or processing plant, comprising:
    a stem portion (2), a bow portion (3) and a central portion (4) in between the bow and stem portions, the vessel hull (1) provided with longitudinal hull sides (5) comprising the longitudinal hull sides of the stem portion, the bow portion and the central portion, a deck (6), arranged on the hull, suitable for supporting hydrocarbon processing modules, hydrocarbon storage tanks, arranged inside the hull, for storing hydrocarbons to be obtained from seabed-based wellheads, an anchoring connection arrangement (7) for connection with anchor lines suitable for mooring the vessel hull to a seabed, characterized in that the deck comprises process module reinforcements (8) suitable for supporting hydrocarbon process modules, and at least two of the following éléments:
    both longitudinal hull sides (5) comprise mooring line connection reinforcements (9) near or in the bow portion and stem portion for connecting mooring lines to be used with a spread-moored anchor line arrangement (13) and one or both longitudinal hull sides (5) comprise riser balcony connection reinforcements (10, 14) arranged in between the mooring line connection reinforcements in longitudinal direction, suitable for supporting a riser balcony for connecting risers, the bow portion comprises a turret reinforcement (11) suitable for receiving an internai turret, the bow portion comprises a turret reinforcement (12) suitable for receiving an external turret, wherein the turret is provided with anchor line connection points and riser connection points.
  3. 3. Vessel hull (1) according to claim 2, wherein the vessel hull is produced with the method according to claim 1.
  4. 4. Vessel hull (1) according to claim 2 or 3, wherein a transverse bulkhead (15) is arranged between the bow portion and the central portion, the central portion comprising two longitudinal central portion bulkheads (16) extending in longitudinal direction (X) from the stem portion to the transverse bulkhead, being spaced-apart at a transverse distance Dl, the bow portion comprising two longitudinal bow portion bulkheads (17) extending in longitudinal direction from the transverse bulkhead to the bow, being spacedapart at an internai turret position at a transverse distance D2, wherein, when seen in top view, D2 is larger than D1.
  5. 5. Vessel hull (1) according to claim 4, wherein D2 is equal to or larger than the transverse diameter of the turret reinforcements (11, 12).
  6. 6. Vessel hull (1) according to claim 4 or 5, wherein the two longitudinal central portion bulkheads and the two longitudinal bow portion bulkheads are comprised by two continuous longitudinal bulkheads (18) extending from the stem portion to the bow (19).
  7. 7. Vessel hull (1) according to any one of the claims 4-6, wherein the bow portion comprises a vertical plane of symmetry (P) extending in longitudinal direction, wherein, when seen in top view, the longitudinal bow portion bulkheads are each arranged on one side of the vertical plane of symmetry, wherein the longitudinal bow portion bulkheads extend from the transverse bulkhead to the bow in such a way, that a first section (20) of each longitudinal bow portion bulkhead diverges away from the vertical plane of symmetry and a second consecutive section (21) extends substantially parallel to the vertical plane of symmetry forming a réception space (23) for the internai turret at the internai turret location (ITP).
  8. 8. Vessel hull (1) according to claim 7, wherein a third consecutive section (22) converges towards the vertical plane of symmetry.
  9. 9. Vessel hull (1) according to claim 8, wherein the first, second and third sections of the longitudinal bow portion bulkheads extend at such angles with respect to the vertical plane of symmetry, and hâve such dimensions that, when seen in top view, the longitudinal bow portion bulkheads each resemble an arc having a centre of curvature coinciding with a centre point of the internai turret receivable in the réception space.
  10. 10. Vessel hull (1) according to any one of the claims 2-9, comprising one or more removable propulsion units (24).
  11. 11. Vessel hull (1) according claim 10, comprising one or more removable generator units associated with the one or more removable propulsion units (24).
  12. 12. Vessel hull according to any one of the claims 2-11, wherein the deck comprises reinforcement suitable for supporting a flare stack and reinforcements for supporting one or more pedestrial crânes.
  13. 13. Method for producing a vessel for use as a floating hydrocarbon storage and/or processing plant using a vessel hull (1) according to any one of the claims 2-12, comprising the steps of:
    - arranging the hydrocarbon process modules on the deck (6), at the location of the process module reinforcements (8),
    - selecting a desired riser and anchor line arrangement, such as a spread moored arrangement, an internai turret arrangement or an external turret arrangement, and
    - confîguring the vessel hull for use with the desired anchor line and riser arrangement, in particular by configuring anchor line connection points and riser connection points.
  14. 14. Method according to claim 13, further comprising the steps of:
    - transferring the vessel for use as a floating hydrocarbon storage and/or processing plant to a location near the seabed-based wellhead,
    - connecting the anchor lines to the anchor line connection points and the risers to the riser connection points.
  15. 15. Method according to claim 13 or 14, wherein the vessel hull (1) according to any one of the claims 2-12 is produced at a first location, and the method for producing the vessel for use as a floating hydrocarbon storage and/or processing plant using the vessel hull is carried out at a second location, being different from the first location, comprising transporting the hull (1) from the first location to the second location.
  16. 16. Method according to claim 15, wherein, when dépendent on claim 10, prior to transporting the hull from the first location to the second location, the removable propulsion units (24) are connected to the vessel hull (1), wherein the vessel hull is
    5 transported from the first to the second location by using the propulsion provided by the removable propulsion units, wherein after transportation the removable propulsion units are disconnected and removed from the hull (1).
  17. 17. Method according to claim 16, wherein, when dépendent on claim 10 and 11, 10 wherein after transportation the removable generator units are disconnected and removed from the hull (1).
  18. 18. Method according to any one of the claims 15-17, wherein the first location comprises a dry dock and the second location is a quay side suitable for receiving the
    15 vessel hull.
OA1201700154 2014-10-28 2015-08-11 Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull OA18205A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP14190676.8 2014-10-28

Publications (1)

Publication Number Publication Date
OA18205A true OA18205A (en) 2018-08-17

Family

ID=

Similar Documents

Publication Publication Date Title
JP6838795B2 (en) A hull used as the outer shell of a floating hydrocarbon storage plant and / or a floating hydrocarbon processing plant, a method for manufacturing the hull, a ship equipped with the hull, and a method for manufacturing the ship having the hull.
US7669541B2 (en) Configurable multi-function vessel
JP7266447B2 (en) Offshore installation method of wind turbine using semi-submersible floating body and semi-submersible floating body
CN102356021B (en) For loading and transport the slippery boots assembly of macrostructure
US20090217861A1 (en) Construction of fpdso vessel
CN104229074B (en) For the separable separable production depressed place that FPSO is swung with weather of no capstan head
US20080196655A1 (en) Vessels
EP2841334B1 (en) Method for dry-docking a floating unit
OA18205A (en) Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull
US8585326B2 (en) Method for assembling tendons
KR100907680B1 (en) Dry and Dry Constructions
US20110192336A1 (en) Floating unit
CN105539725B (en) Tension leg installation method
CN111439347B (en) Self-installation single-upright-column platform and installation method thereof
KR101873982B1 (en) Top side module
Jatar et al. The planning and installation of the red hawk spar and polyester mooring system
KR101488940B1 (en) Floating ocean structure and method for constructing a floating ocean structure
BR112017008780B1 (en) VESSEL HULL FOR USE AS A HULL FOR A FLOATING HYDROCARBON PROCESSING AND/OR STORAGE FACILITY AND METHOD FOR PRODUCING A VESSEL FOR USE AS A FLOATING HYDROCARBON PROCESSING AND/OR STORAGE FACILITY USING THE VESSEL HULL
KR20140006635A (en) Complex type marine structure and operating method thereof